Link Cost Question

Hello!
apologies for my bad English
Have read through different sites and services links and got stuck with few questions - I have recently taken over AD role from previous admin
our setup below please :
We have 4 physical sites
Dusseldorf, cologne, Frankfurt and nuremberg . Each of these sites have 1 Domain controller each and each site has 500 users .
( Dusseldorf near site is Cologne )
(Cologne near site is Frankfurt )
(Frankfurt near site is Nuremberg)
BASL is enabled and all 4 sites have netework connectivity.
There is only one site link with all 4 sites into the site link with site link cost 100 , when we did a DR activity , we found that
when Dusseldorf site was shutdown - No IP connectivity, clients were authenticating to Nuremberg rather cologne
and when started analyzing the behavior , I read through Ace fekay blog post
http://blogs.msmvps.com/acefekay/2013/02/24/ad-site-design-and-auto-site-link-bridging-or-bridge-all-site-links-basl/
I have two questions
^^ DO I need to remove 4 sites from site link and configure , 3 site links ? assuming one site has complete AD replica and other sites replicate from main site ?
^^ clients DNS on dusseldorf is configured with itself as primary and cologne site as secondary , when client queries the DNS LDAP for site specific records, will DNS check for site link cost ?
Eg: in the event of site failure
      - I restart the client
      - client in Dusseldorf queries primary DNS till the timeout and then it will query secondary DNS which is pointed to Cologne
      - Secondary DNS will return list of DC's from _LDAP._TCP.dc._msdcs.domainname
      - client sends the ping to dusseldorf DC and gets no result, but receives reply from all other 3 site DC's and one of the DC  will refer client to particular site based on its IP subnet
         < does DC checks site cost before assigning site to subnet or site cost is only considered during replication ?

Just seeing this now. I agree with Paul's assessment and recommendations.
Just to touch base on the issue, you stated:
"( Dusseldorf near site is Cologne )
(Cologne near site is Frankfurt )
(Frankfurt near site is Nuremberg)"
"[...] when Dusseldorf site was shutdown - No IP connectivity, clients were authenticating to Nuremberg rather cologne."
I assume that you mean the DC in Dusseldorf was shutdown for the DR test. I see that you want the client to authenticate to Cologne. However, I'm not sure what you mean by "nearest" site, since AD can't tell how far a site is, whether a different subnet
locally or in another town, but the clients will use a number of things to failover querying for another DCs. Part of it is that if an optimal DC can't be located in its own site (as you've already probably read in Paul's KB link), it will look elsewhere,
but how does it do that? There are a number of mechanisms in place, and one of which is netmask ordering - using the longest subnet bits first. So the Dusseldorf and Nuremberg site subnets bits must be closest compared to Cologne. Here's a couple of good
discussions that will explain this more:
Good summary of Subnet Priortization, Netmask Ordering, and AD Sites, which is used first, etc.
Using Round Robin and Netmask Ordering for load balancing
http://social.technet.microsoft.com/Forums/en-US/winserverNIS/thread/0181af1e-be4d-4871-99d3-e7ea5d0ecf38/
Technet Thread - DNS issue : DHCP relay + VLANs + multiple AD Sites (Heavily discusses subnet prioritization and subnet bits)
http://social.technet.microsoft.com/Forums/en-US/winserverNIS/thread/ea03c013-7484-4a24-96be-d95219b69b3f/
And needless to say, there will be a period of time that the local machines in a site that have the DC cached. Now depending on the directory enabled apps installed (such as Outlook), will determine which ones are more tolerant than others. Outlook isn't
too tolerant. Restarting Outlook will make it pickup another DC for its DSProxy.
The operating system itself has its quirks with this, too.
If one DC or DNS goes down, does a client logon to another DC or use the other DNS server in the NIC?
http://msmvps.com/blogs/acefekay/archive/2009/11/29/dns-wins-netbios-amp-the-client-side-resolver-browser-service-disabling-netbios-direct-hosted-smb-directsmb-if-one-dc-is-down-does-a-client-logon-to-another-dc-and-dns-forwarders-algorithm.aspx
DNS Clients and Timeouts (Part 1 & Part 2), karammasri [MSFT] Dec 2011 6:18 AM
http://blogs.technet.com/b/stdqry/archive/2011/12/02/dns-clients-and-timeouts-part-1.aspx
http://blogs.technet.com/b/stdqry/archive/2011/12/15/dns-clients-and-timeouts-part-2.aspx
Ace Fekay
MVP, MCT, MCSE 2012, MCITP EA & MCTS Windows 2008/R2, Exchange 2013, 2010 EA & 2007, MCSE & MCSA 2003/2000, MCSA Messaging 2003
Microsoft Certified Trainer
Microsoft MVP - Directory Services
Complete List of Technical Blogs: http://www.delawarecountycomputerconsulting.com/technicalblogs.php
This posting is provided AS-IS with no warranties or guarantees and confers no rights.

Similar Messages

  • How to link Cost center and Work center?

    Hi All,
    We have a list of Work centers and the corresponding Cost centers. We need to know which tables can be used to connect the Work center with its corresponding cost center?
    Thanks:
    Siddharth

    Hi Please use t-code OP42. Make sure all your configuration for work centre is there. You link cost centre in the costing tab of work centre basic data.
    Hope this helps.
    Thanks
    Sanjeev

  • Wikiserver strips out links with question marks

    Since installing a fresh copy of yosemite and server 4, I've noticed the wiki server no longer allows links with question marks.
    This makes it impossible to create links that are based on tags
    eg https://myserver/wiki/find?tags=mytag
    I also use the wiki to share links to a auto login page with also needs a question mark.
    Is this something that can be added to the the whitelist ?

    Cheers Linc
    I have sort of got round it by using a link shortening service, not ideal but works for now

  • 3D repousse objects and linking / rotation question

    In Photoshop CS5 Ext, I have 4 layers, each with a 3D repousse object on them. I want to somehow link them, so that I can rotate the object as a whole (or the camera), but also want to still be able to manipulate the objects separately (like rotate and position). Is there a way to do this in PS, or does this need to be done in another program like Flash? Tried unsuccessfully using merge 3D, linking, grouping...
    Thanks,
    John

    Thanks Steve for the reply and screenshot.
    I see that 3D panel will let me rotate, etc., but it doesn't look like I will be able to rotate objects separately using animation from the timeline, will it? That is another thing I forgot to mention that I want to do, is be able to animate (rotate and move) the objects separately.
    Thanks,
    John
    From: SG... <[email protected]>
    To: PSJK2011 <[email protected]>
    Sent: Sunday, September 25, 2011 9:37 PM
    Subject: 3D repousse objects and linking / rotation question
    Re: 3D repousse objects and linking / rotation question created by SG... in Photoshop Windows - View the full discussion
    Hi John,
    Merging 3D layers should be what you want. When you tried this what failed? If it was that you could only transform all of the objects instead of each separate object, then you'll need to make sure you are using the appropriate 3D tool. The UI needs some work to make this a bit easier to discover.
    There are 3D Mesh tools in the 3D panel that allow you to manipulate individual meshes, instead of the whole scene (3D Object tools).
    http://forums.adobe.com/servlet/JiveServlet/downloadImage/2-3937802-84277/176-600/3DMeshTo ll.png
    regards,
    steve
    Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page: http://forums.adobe.com/message/3937802#3937802
    To unsubscribe from this thread, please visit the message page at http://forums.adobe.com/message/3937802#3937802. In the Actions box on the right, click the Stop Email Notifications link.
    Start a new discussion in Photoshop Windows by email or at Adobe Forums
    For more information about maintaining your forum email notifications please go to http://forums.adobe.com/message/2936746#2936746.

  • How to link individual question boxes in a Muse website to respective sections of a PDF form

    Hello! I have got two questions in terms of using Acobat Form Central and Muse.
    Q1:I built a website using Adobe Muse. I want  to link individual question boxes in this website website to respective sections of a PDF form built in Adobe Form Central. Can you please let me know how to do this?
    Q2: I imported a PDF form into the Muse website  using HTML.  I want to know how to expand the size of the whole form in the website, or at least to increase the font size.
    Many thanks!

    Hi,
    The Adobe Muse forum would be a better target for your question:
    http://forums.adobe.com/community/muse
    Regards,
    Brian

  • Interface link cost

    Hello,
    How can I display / list an interface(s) link cost settings?
    This after a CLI: fspf cost xxx vsan YYY
    Rgds,
    Ivy

    found it!
    sh fspf vsan 120 int fc2/19
    Rgds,
    Ivy

  • What is a Site Link Cost?

    I'm a Student trying to get MCITP. Please tell me when i am configuring Replication between sites, What is the site link cost means? What can i do from that? please tell me
    Regards,
    Ashane Deshapriya.
    Ashane Deshapriya ( MCP )

    Hi Ashane Deshapriya,
    The cost setting on a site link object determines the likelihood that replication occurs over a particular route between two site. Relication routes with the lowest cumulative cost are preferred. You can use this procedure to configure replication cost on
    the site link object in Active Directory Domain Services (AD DS). When you create or modify site links, use the site link object properties to configure the relative cost of using the site link.
    For your information, please refer to the following articles to get more help:
    Configure the Site Link Cost to Establish a Priority for Replication Routing
    Configure site link cost
    Regards,
    Lany Zhang

  • MSTP Link cost Calculation

    On a trial basis when we migrated from Rapid PVST+ to MSTP in a network of Cisco 3560G switches, we observed that all the link (FastEthernet) cost which by default is 19 have been increased to 200000. Any idea on what basis this link costs is calculated? Do MSTP use some different formula for link cost calculation.
    Can anybody suggest any good MSTP migration guide?
    Thanks in advance.

    Hi! Francois,
    Sorry for disturbing you once again. I was simulating the MSTP environment in my Lab ... I observed that whenever I map any new vlan to any existing instance the switch stops all communication in all vlans for few seconds. On debug I observed that all the instances are getting deleted and getting re-created. And by that process all the ports are going into disabled state. Is it becoz .... by adding additional vlan to an instance I am actually creating a separate MST region for this switch alone? But even then I am not able to understand what is the need for deleting all the instances?
    I am attaching the log with this message, pls refer to the same.
    Will be waiting for your comment.
    Anybody else faced similar issue? Any related comments are appreciated.
    SW-1(config-mst)#instance 2 vlan 15
    SW-1(config-mst)#exit
    SW-1(config)#
    Jun 8 14:02:30.274 UTC: MSTP(2): Fa0/11 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(2): Fa0/13 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(2): Fa0/21 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(2): Fa0/23 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(2): Fa0/24 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MST(2): disabled
    Jun 8 14:02:30.274 UTC: MST[2] Instance deleted
    Jun 8 14:02:30.274 UTC: MSTP(1): Fa0/21 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(1): Fa0/23 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(1): Fa0/24 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MST(1): disabled
    Jun 8 14:02:30.274 UTC: MST[1] Instance deleted
    Jun 8 14:02:30.274 UTC: MSTP(0): Fa0/11 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(0): Fa0/13 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(0): Fa0/21 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(0): Fa0/23 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MSTP(0): Fa0/24 State change forwarding -> disabled
    Jun 8 14:02:30.274 UTC: MST(0): disabled
    Jun 8 14:02:30.274 UTC: MST[0] Instance deleted
    Jun 8 14:02:31.280 UTC: MST(0): Initialization
    Jun 8 14:02:31.280 UTC: MST(1): Initialization
    Jun 8 14:02:31.280 UTC: MSTP: created IST port for 2307590
    Jun 8 14:02:31.280 UTC: MSTP(0): Fa0/21 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP(1): Fa0/21 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP: created IST port for 230A860
    Jun 8 14:02:31.280 UTC: MSTP(0): Fa0/23 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP(1): Fa0/23 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP: created IST port for 230C1C8
    Jun 8 14:02:31.280 UTC: MSTP(0): Fa0/24 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP(1): Fa0/24 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MST(2): Initialization
    Jun 8 14:02:31.280 UTC: MSTP(2): Fa0/21 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP(2): Fa0/23 State change disabled -> blocking
    Jun 8 14:02:31.280 UTC: MSTP(2): Fa0/24 State change disabled -> blocking
    Jun 8 14:02:31.297 UTC: MSTP: created IST port for 22F7550
    Jun 8 14:02:31.297 UTC: MSTP(0): Fa0/11 State change disabled -> blocking
    Jun 8 14:02:31.297 UTC: MSTP(0): Fa0/11 State change blocking -> forwarding
    Jun 8 14:02:31.297 UTC: MSTP(2): Fa0/11 State change disabled -> blocking
    Jun 8 14:02:31.297 UTC: MSTP(2): Fa0/11 State change blocking -> forwarding
    Jun 8 14:02:31.297 UTC: MSTP: created IST port for 22FA820
    Thanks & Regards,
    Jyotirmay.

  • A linked list question.

    So, I believe I understand linked lists for the most part, except for two lines....
        boolean add(Transaction item)
            for (Transaction curr = first; curr != null; curr = curr.next)
                if (curr.part_num == item.part_num)
                    return false;
            Transaction newItem = new Transaction();
            newItem.transcode = item.transcode;
            newItem.description = item.description;
            newItem.part_num = item.part_num;
            newItem.quantity = item.quantity;
            newItem.next = first;
            first.next = newItem;
            return true;
        }first is null, so First.next would be the first available space for actual insertion, and this is why it then puts null as newItem.next (the end of the list), and sticks newItem in first.next?
    Im glad I read that pass by value thing earlier at the Java Ranch place...
    Heres my actual question: When newItem.next = first; is called, it just copies null as the next field, but leaves the null in first alone right? And then it takes first.next and makes newItem copy into that field, thus inserting the first real item in the list?
    Please tell me I made that connection right. :-D
    Thanks!!

    Pictures are worth a hundred words with linked lists. Did you even put a pencil and paper next to your computer while doing this program, so that you could draw what is happening when you get confused?
    If first is null, then the for loop is skipped--because first is assigned to curr and the loop only executes when curr is not equal to null.
    So, this happens:
    newItem = new Transaction()
    int Transcode = 0
    String description = null
    int partNumber = 0
    int quantity = 0
    Tranasaction next = nullThen values are assigned to each field:
    newItem
    int Transcode = 10
    String description = "screw"
    int partNumber = 46
    int quantity = 200
    //freeze execution here:
    Tranasaction next = null (what will happen here??)Your assumption was:
    Transaction first = null
    That means first does not refer to a Transaction object. Therefore, first does not have a description member, a quantity member, etc., and this is what things look like just before newItem.next = first; is executed:
    newItem ----> Transaction
                  int Transcode = 10
                  String description = "screw"
                  int partNumber = 46
                  int quantity = 200
                  Tranasaction next = null
    first ------> nullNow,
    When newItem.next = first; is calledthings change to this:
    newItem ----> Transaction
                  int Transcode = 10
                  String description = "screw"
                  int partNumber = 46
                  int quantity = 200
          /-------Tranasaction next
    first ------> null That isn't what you want. When you add() a Transaction object to the end of your linked list, it's next member should be null. It's the end of the chain, so there is no next.
    And then it takes first.next and makes newItem copy
    into that field, thus inserting the first real item in the
    list?No. first is null so it does not refer to a Transaction object, and therefore there is no next member variable and consequently no such thing as first.next. You need to understand that null and a Transaction object that has 0 for every member are not the same.
    But suppose for a minute that null and a Transaction object with zeros for every field were the same thing, so that first.next existed. If that was the case, then you could assign newItem to first.next. But, then you would be left with this:
    first
    int Transcode = 0
    String description = null
    int partNumber = 0
    int quantity = 0
    Tranasaction next = newItemWould you want the first Transaction object in your LinkedList to be almost entirely empty?
    Instead, if first is null, you want to make first refer to newItem, i.e. you want to do this:
    newItem ----> Transaction
                  int Transcode = 10
                  String description = "screw"
                  int partNumber = 46
                  int quantity = 200
                  Tranasaction next = null
    first ----/   nullThen when the add() method ends, since newItem is a local variable, it will be destroyed leaving you with this:
                  Transaction
                  int Transcode = 10
                  String description = "screw"
                  int partNumber = 46
                  int quantity = 200
                  Tranasaction next = null
    first ----/   null

  • Archive Link & Cost Center

    Hi all,
    I have attached document to cost center through Archive Link tr.code OAWD succesfully.
    but i can't see any document attach in cost center(Tr. Code KS02).where to find this attach doucment throgh Archive Link with cost center. i allready checked Service for Object attachment.
    Thanks ..

    hi,
    It should creat link in KS02, in 'services for object' at attacment list field automaticaly.
    but i think your during configuration u miised some paramenters check. Which Business object u choosen in link table.
    Benakaraj
    ??P
    Edited by: benaka rajes on Jul 26, 2009 5:45 PM

  • Linked Lists Question

    this is kinda AP, so anyone who helps is really really appreciated. Its not hard if u already know the material.
    OK, add a middle node,
    remove the front, tail, and middle node
    use methods for adding and removing nodes
    here's what I already have
    public class link {
    public int value; //value of element
    public link next; //reference to next
    //contructor
    public link(int v, link n)
    value = v;
    next = n;
    public static void main(String args[])
    //prints out values
    link head = null;
    for(int i = 1; i<=10; i++){
    head = new link(i, head);
    link h = head;
    while (h!= null) {
    System.out.println(h.value);
    h = h.next;
    so u have to add a couple methods for adding and removing the nodes.

    so u have to add a couple methodNO! You have to add the methods because it is your assignment not ours. If you have a specific question then by all means, do ask.

  • Dynamic Link complicated question

    This is the story.....
    1. I shot & edited a training session (many sessions - over 40 hours)
    2. I did minor editing in Premiere, used Dynamic Link to send to Encore, set up a first run title page with 8 links to the 8 chapters.(all end actions going back to the main menu)
    3. Burned a DVD for the client
    4. The client made notes for additional changes for me to edit.
    5. I went back into Premiere, made the editing changes (mostly increases in volume from audience questions, removing some comments, etc.)
    Now... If I try and use Dynamic link again to "re-send" to Encore, my only choice is a new project... I cannot send using Dynamic link to an existing project (or if I can, I do not know how)
    I know one work around is to encode from Premiere, then open a Encore project, import as a timeline.... & author away....
    This way, If I go back to Premiere, make editing changes, export back out WITH THE SAME FILE NAME.... when I open the existing Encore project... everything is the same... except the timeline has the updated editing changes...
    The only problem is that on all 18 DVD's, I used dynamic link to send to Encore... so does that mean, (unless I use a work-around, like stated above), I have to re-author all 18 DVDs. I would think that even when using dynamic link, if you open the timeline again in Premiere, make editing changes, that the Encore project would reflect those changes (to make sure, I set the audio volume to 0 on the first 10 seconds in Premiere, saved the project & closed it, opened Encore, did a preview, the audio was still at the regular volume (no change).....
    Any suggestions...
    Or should I just once again use dynamic link, start a new Encore project, re-author (& basically do the same thing over)?
    Or should I do it the other way, encode from Premiere, (you know the rest), I do believe that all the editing changes have been made (according to the client)
    Or, is there some way from Premiere to use Dynamic link to send to an existing Encore project?
    David Kelley

    I didn't read all your note carefully.
    In your previous Encore project for DVD 1 (or whatever), right click on the "asset" for the timeline (the asset for a dynamic link is the Premiere sequece, not the Encore timeline that was created), and pick "revert to original." It should pick up your changes from Premiere.
    Note that to update markers, you must select the video in the Encore timeline itself, right click, "update markers from source." You will lose all previous markers. If you created the markers in Encore, you must update manually.

  • Linking Cost Centre to Hierarchy via ALE

    When sending new Cost Centres from our FMS Server to HR/Payroll Server via ALE & IDOCS, the Cost Centres are created, but there is no link to the Hierarchy. (ie) when going into transaction OKEN, they do not appear under the relevant group. However in KS03, the new Cost Centre is displayed with its Cost Centre group.
    Is there a Function Module which can be run to rectify this, or can ALE be configured to do it.

    Hi Beena,
    You can structure your cost centers into groups like
    - OverHeads
      *SalesMarkeing
      *R&D
      *Admin
      *HR
      *Service
      *MGMT Office
    - Manufacturing Depts
      *dep1
      *dep2
    - Products
      *Prd1
      *Prd2
    Rgds
    Kishore

  • Link Cost center with Org unit

    Hi experts,
    I have one question. I have create org unit for the past 2 month (May 2009). However I don't create relationship with cost center. After 2 month I decided to create cost center for the org unit. The date of relationship based on creation of org unit.
    The question is, what the impact  to the payroll since I have run payroll for 2 months.

    What ever date you maintained in relation ship for create cost center the same date will get updated in IT0001. If you set Retro date ( In PA03) based on that system will go for retro calculations. In retro calculation only CC will update net amount remain same.
    As of now how did you maintain cost center?

  • In support forum, signed in,where do I link to questions I've asked? Years back, could get RSS feed for question. Still available?

    Where can I link to my questions from my account? Searching for username gives no results. Some years back, you could subscribe to an RSS feed for a question, yours or others. Is that gone, if so, why? How do you save the question, without saving the text of your question in a document, and copying and pasting it into search? FF version 19.0.2.
    Thanks.

    The My Contributions link only appears if you are looking at a page of questions people have posted. It's a filter that doesn't apply to other pages, so I guess it's bit of a secret.

Maybe you are looking for