Link down from kol india

http://www.oracle.com/technology/pub/articles/hunter-rac11gr2-iscsi-2.html
this link seems to down from kolkata,India.
regards

Works fine from midwest US
Srini

Similar Messages

  • Linked report from second level drill-down level

    Hi,
    I have a report with two drill-down levels, Dept Id and Job Id.
    The requirement is when I am on Job Id drill level; I have to call another report when I click on any of the Job Id. This Job Id is passed to another report and the report is filtered based on that Job Id.
    I created a hyperlink on Job Id drill down level successfully. But the problem is I am unable to go to the first level i.e Dept Id. Actually the hyperlink is displayed and the up arrow is not visible to go to the first level.
    Is there any way where after creating a link on second level and opening the report in a new window, the drill up functionality can be maintained?
    I am using Business Objects XI 3.1 version.
    Thank you.

    hi
    there is another way to drill down the report of web intelligence.for that we have to customize in the universe level create a folder in custom hierarchy and add your two objects to that folder, i.e empid. and deptid. the order of these objects should be in the way the drilling happens that means if you want to drill down from empid. to deptid. then empid. should be the first object of the folder,save and export the universe to the CMS.Then it ready to use for webi report.Build the query for the report and enable the drill option in the report.Now the report is ready for your requirement.
    thanks & regards
    Sreekanth K

  • Best practice for linking fields from multiple entity objects

    I am currently transitioning from PHP to ADF. I'm looking for the best practice for linking data from multiple entity objects.
    Example:
    EO 'REQUESTS' has fields: req_id, name, dt, his_stat_id, her_stat_id
    EO 'STATUSES' has fields: stat_id, short_txt_descr
    'REQUESTS' is linked to EO 'STATUSES' on: STATUSES.stat_id = REQUESTS.his_status_id
    'REQUESTS' is also linked to EO 'STATUSES' on: STATUSES.stat_id = REQUESTS.her_status_id
    REQUESTS.his_status_id is independent of REQUESTS.her_status_id
    When I create a VO for REQUESTS, I want to display: REQUESTS.name, REQUESTS.dt, STATUSES.short_txt_descr (for his_stat_id), STATUS.short_txt_descr (for her_stat_id)
    What is the best practice for accomplishing this? It appears I could do it a few different ways:
    1. Create the REQUESTS VO with a LOV for his_stat_id and her_stat_id
    2. Create the REQUESTS VO with the join to STATUSES performed within the query for the VO. This would require joining on the STATUSES EO twice (his_stat_id, her_stat_id)
    3. I just started reading about View Links - would that somehow do what I'm looking for?
    I also need to be able to update his_status_id and her_status_id through the by selecting a STATUSES.short_txt_descr from a dropdown.
    Any suggestions on how to approach such a stupidly simple task?
    Using jDeveloper 11.1.2.2.0 if that makes a difference in the solution.
    Thanks ahead of time,
    CJ

    CJ,
    I vote for solution 1 as it's just your use case. As you said you what to update the his_status_id and her_status_id through the by selecting a STATUSES.short_txt_descr by a drop down. This is exactly the LOV solution.
    ViewLinks are used fro master detail navigation (which you don't do here) and Joining the data make it difficult to update (and you still need a LOV for the drop down box.
    Timo

  • Solaris 8 says: "Link down, Cable Problem?"

    I have these on my home LAN:
    1. Sun Ultra 5 Solaris 8
    2. Win 2000 PC
    3. Win NT laptop
    They are all hooked into a LinkSys Router.
    The Router is hooked into my Motorala Cable Modem.
    Here's the problem:
    The PC and the laptop can see each other on the LAN.
    The Solaris 8 is only visible on the Lan INTERMITTENTLY.
    The lights on the Router for the PC and laptop are always ON.
    When I reboot the Solaris box, the lights on the Router sometimes come ON, and sometimes they stay OFF. When they stay OFF, I see the message: "Link down, Cable Problem?" during reboot.
    I have tried different cables, and tried various combinations of the 4 avalable ports on the back of my Router.
    If I plug in the Sun box DIRECTLY into my cable modem, then I don't see the above message. (but then I don't have a LAN anymore)
    Please help, I've been struggling with this for a while now.
    Thanks,
    Irshad Ahmed (I am relatively new to Sun)

    Hi
    You have not indicated if you have the router ethernet ports working
    at 100Mbps or 10Mbps. Depending on this sometimes, Sun systems may
    not be correctly auto-negotiating their ethernet port settings.
    You may set these parameters to force Sun Ultra 5 to a 100Mbps mode or a 10Mbps mode.
    For forcing it to 100Mbps, Full Duplex mode and disabling the auto-negotiation, put these entries in /etc/system:
    set hme:hme_adv_autoneg_cap=0
    set hme:hme_adv_100T4_cap=0
    set hme:hme_adv_100fdx_cap=1
    set hme:hme_adv_100hdx_cap=0
    set hme:hme_adv_10fdx_cap=0
    set hme:hme_adv_10hdx_cap=0
    Conversely, if you want to force your Sun to work on 10Mbps, Full
    duplex mode, (if your router does not support 100Mbps) in the same
    /etc/system file, put the following entries :
    set hme:hme_adv_autoneg_cap=0
    set hme:hme_adv_100T4_cap=0
    set hme:hme_adv_100fdx_cap=0
    set hme:hme_adv_100hdx_cap=0
    set hme:hme_adv_10fdx_cap=1
    set hme:hme_adv_10hdx_cap=0
    One of these should solve your problem. You need to reboot the system
    after putting these entries.
    You can also check the port at the OK prompt using the command
    "watch-net". This test the onboard ethernet interface.
    You may also apply the hme patch released by Sun that fixes many
    known problems with hme ethernet driver. The patch id is 108981-03.
    It is available from the site :
    http://sunsolve.sun.com
    HTH
    Shridhar
    Sun-DTS

  • Dynamic link button from speed grade to premiere is grey.

    Dynamic Link button from Speedgrade to Premier is grey. No problems Linking from Premier to SG, but no way to send the project back to Premier. The project is in Apple ProRes 4444. I have a Mac Pro last generation. Thanks for an urgent help!

    Well... I have done everything you advice first SG, but it didn't work, so I have cleaned the whole CC, erasing any possible trace of it from my computer, then I have gone through the Cleaner Tool and reinstalled brand new the whole thing.
    My builds now:
    PrPro: 8.2.0(65)
    SpeedGrade: 8.2x51
    Exactly the same. Obviously, troubleshooting.
    For what I understand, according to your comment, is that I ave to match the builds, which would mean either to low down PP to 51 or up SG to 65... Is ti that or am I getting crazy?
    But how the hell to do it?
    I have a 2 hours film with a 1 month grading work on it stuck in SG... Aaaaahhhhh!
    (Oh, the good old times of FCP 7 and Color... NEVER A PROBLEM)
    Best,
    Luis

  • Fibre Link Down

    We have been using an Apple RAID with 8 disk (4 in each controller side) for almost 6 months, each controller in the raid is conected to a Qlogic 5600 and from there to 3 IBM servers using slicing and LUN mapping.
    Suddenly since two weeks ago we have been receiving this logs AT IRREGULAR intervals:
    Upper Controller 04/01/08 08:51:09 PM RAID Controller 1 Fibre Link Up
    Warning Upper Controller 04/01/08 08:51:08 PM RAID Controller 1 Fibre LIP
    Warning Upper Controller 04/01/08 08:48:48 PM RAID Controller 1 Fibre Link Down
    And the windows server report that the SCSI disk have been disconnected, when we stop all the servers and reboot the raidfabricsservers works for 2 to 5 days and again the same messages.
    Any idea of what is happenning and how to handle this ?
    Humberto

    + the ports on the fibre switch should be configured right for storage/hosts:
    RSCN suppression on / device scan off for hosts
    and vice versa for storage
    + the logs from the FC are hidden, you can access them following the next procedure. (As explained in the [qlogic event manual|http://www.servants.co.jp/qlogic/pdf/2-259060-00_A-QLogicFCSwitchEventMassageGuideFW40.pdf]
    Archiving and Downloading the Event Log
    You can use the command line interface to create a file on the switch that contains
    the most recent 200 entries plus the previous 1000 entries. This file can then be
    downloaded to the workstation using FTP. To create and download a log file, do
    the following:
    1. Log into the switch through Telnet and create an archive of the event log.
    The Set Log Archive command creates a file on the switch named logfile.
    QLogic #> admin start
    QLogic (admin) #> set log archive
    2. Open an FTP session on the switch and login with the account name images
    and password images. Transfer the file logfile in binary mode with the Get
    command.
    ftp ip_address
    user:images
    password: images
    ftp>bin
    ftp>get logfile
    xxxxx bytes sent in xx secs.
    ftp>quit

  • Hme0: Link Down - cable problem?

    i've a problem i've buyed an ultra 10 (used)
    i've reinstalled solaris 10 01/06
    when it boot the o.s. it give this error message "hme0: Link Down - cable problem?"
    and network don't work.
    i cannot ping my router but i've gave to my sun an ip of the same netmask (sun ip 192.168.1.88 router ip 192.168.1.1)
    i've checked the cable and it's good (it work with a normal pc)
    the led on the switch is on (it's green)
    maybe i need some patch
    how can i do?

    gio,
    You didn't necesarily do anything wrong.
    You do not necessarily have any broken equipment.
    There may just be somthing that is incomplete in the setup.
    Begin by checking if your network settings were set up correctly by running:
    <b># ifconfig -a</b>
    (it's usually best to troubleshoot while you are root user)
    If the output from the <i>ifconfig</i> command seem to be complete, you could always think about reconfiguring the NIC all over again.
    If you are not sure, then just paste the entire output results back here.
    Also, use the forum search function, using keyword <u>sys-unconfig</u>.
    Next, read the Solaris man pages for sys-unconfig.
    That command will force you to repeat the setup of the connection.

  • Prime Infrastructure 2.0 Link-Down Alarm severity level

    Hi,
    i have been looking for a way to lower the severity level of link-down Alarms. I use the threshhold utilization feature and want to generate an alarm when CPU or Memory goes over 90%, this works fine. Problem is that when you enable "Switches and Hubs" or "Routers" category to receive alarms under: Operate -> Alarms & Events -> Email Notifications, you define only Critical alarms should generate an email and Link-down is by default Critical.
    Well you figure that you should be able to change this, but i can't find anything to change the severity under: Administration -> System Settings -> Severity Configuration.
    Do anyone know if this is even possible? If so please tell me how..

    Hi,
    Yes it is possible.
    Changing Alarm Severities
    You can change the severity level for newly generated alarms
    Note Existing alarms remain unchanged.
    To change the severity level of newly generated alarms:
    Step 1 Choose Administration > System Settings .
    Step 2 Choose Severity Configuration from the left sidebar menu.
    Step 3 Select the check box of the alarm condition whose severity level you want to change.
    Step 4 From the Configure Severity Level drop-down list, choose the new severity level ( Critical , Major , Minor , Warning , Informational , or Reset to Default ).
    Step 5 Click Go, then click OK.
    Check the attached screen shot ..
    Thanks-
    Afroz
    ***Ratings Encourages Contributors ***

  • PPP Link down

    Anybody know what "PPP link down" means ?
    Just recently my HHub has been dropping adsl for about 5 mins 3 or 4 times a day and reporting PPP link down when it drops and PPP Link up when it comes back on.
    From this morning -
    10:47:50  11 Jan
    PPP link up (Internet) [xxx.xxx.xx.xxx]
    10:47:50  11 Jan
    PPP CHAP Chap receive success : authentication ok
    10:47:40  11 Jan
    PPP CHAP Receive challenge (rhost = bras-red7.sl)
    10:42:40  11 Jan
    PPP link down (Internet) [xx.xxx.xx.xx]
    ADSL line status
    Line state
    Connected
    Connection time
    0 days, 14:20:15
    Downstream
    5,971 Kbps
    Upstream
    910 Kbps
    ADSL settings
    VPI/VCI
    0/38
    Type
    PPPoA
    Modulation
    ITU-T G.992.5
    Latency type
    Interleaved
    Noise margin (Down/Up)
    7.1 dB / 4.7 dB
    Line attenuation (Down/Up)
    42.0 dB / 22.9 dB
    Output power (Down/Up)
    20.7 dBm / 12.4 dBm
    Loss of Framing (Local)
    45
    Loss of Signal (Local)
    4
    Loss of Power (Local)
    0
    FEC Errors (Down/Up)
    732479 / 469
    CRC Errors (Down/Up)
    39 / 2147480000
    HEC Errors (Down/Up)
    nil / 343434
    Error Seconds (Local)
    284
    1. Best Effort Test: -provides background information.
    Download Speed
    4265 Kbps
    0 Kbps
    7150 Kbps
    Max Achievable Speed
     Download speedachieved during the test was - 4265 Kbps
     For your connection, the acceptable range of speedsis 2000-7150 Kbps.
     Additional Information:
     Your DSL Connection Rate :5968 Kbps(DOWN-STREAM), 908 Kbps(UP-STREAM)
     IP Profile for your line is - 5000 Kbps
    2. Upstream Test: -provides background information.
    Upload Speed
    712 Kbps
    0 Kbps
    908 Kbps
    Max Achievable Speed
    >Upload speed achieved during the test was - 712 Kbps
     Additional Information:
     Upstream Rate IP profile on your line is - 908 Kbps
    Ta,
    Del.

    Hi djh22
    This link may help http://en.wikipedia.org/wiki/Point-to-Point_Protocol
    If you want to say thanks for a helpful answer,please click on the Ratings star on the left-hand side If the reply answers your question then please mark as ’Mark as Accepted Solution’

  • Doing MS in software engineering from SAP India, banglore

    Hi,
    I completed my graduate in 2013 and currently working as a ABAP technical consultant in one of the IT firm. I really want to have good career in SAP. I have heard about MS in software engineering program from SAP india .Can anyone please guide me in knowing is it worth doing MS from there and if so then what is the procedure to go for.

    Hi Kumar,
    The below information may be helpful for you.
    The Birla Institute of Technology and Science popularly known as
    BITS which is a multi-campus university with campuses in India at Pilani
    (Rajasthan), Goa and Hyderabad and international campus at Dubai (UAE) gets its
    position among top ranking universities for a variety of reasons. BITS has been
    accredited by National Assessment and Accreditation Council – NAAC with a CGPA
    of 3.71 out of 4 and VERY GOOD status.
    For the year 2009, surveys by leading media giants which include
    India Today, Outlook and LiveMint have ranked BITS Pilani among top 10 Best
    Engineering Colleges. BITS is well known for its transparency in selection
    criteria based on the online BITSAT examination for all its degree programs.
    The alumni of the Institute who are ambassadors for Brand BITS are spread
    across the globe from Australia through Europe to America.
    BITS Pilani has set a benchmark in industry university
    collaborations through the Practice School Program for all its campus program
    students which is analogous to Internship by Medical graduates and Work
    Integrated Learning Programs for addressing the HRD needs of a wide array of
    corporates drawn from IT Majors, Process Majors, Pharma Majors, Engineering
    Majors, Power Majors and Healthcare Majors.
    SAP Labs India is SAP's second largest Research & Development
    and Global Services & Support center in the world. Founded in November
    1998, SAP Labs India is one of the four global development hubs (Germany, US
    and Israel being others) of SAP that contribute to all areas of the SAP product
    value chain- Research & Breakthrough Innovation, Product Development,
    Global Services & Support and Customer Solutions & Operations.
    SAP's eight Labs in different countries are undoubtedly industry
    role models for globally distributed development organizations and contribute
    in a big way to the goals of SAP's business units. Bridging the gap between
    local market demands and SAP's development organization, SAP Labs is well known
    for setting standards for excellence in innovation, efficiency, and reliability.
    With extensive employee learning system, management excellence and
    world class infrastructure in place, SAP without doubt finds a place in the
    Top-5 Best Workplaces among IT Software organizations.
    BITS Pilani and SAP Labs India signed a Memorandum of Understanding
    (MoU) and launched on 08 August 2008, the four year MS Software Engineering
    work integrated learning program for candidates holding BSc or equivalent
    qualification recruited and sponsored by SAP.
    On 06 August 2009, in a brief function organized at Bengaluru, SAP
    Labs and BITS Pilani launched the two year MS Software Engineering work
    integrated learning program for candidates holding B.E / B.Tech or equivalent
    qualification recruited and sponsored by SAP.
    Mr Ramakrishna Yarlapati (Ramki) Senior Vice President BST –
    Business Suite Core India, SAP Labs welcomed the gathering for the launch
    function and gave highlights of the BITS Pilani - SAP Labs collaboration and
    HRD focus of SAP.
    Mr Joachim Hechler Corporate Officer and Executive Council Member of
    SAP AG Group and EVP for SAP Business Suite who had specially flown to India
    for this occasion emphasized on the importance of continuing education and
    urged the prospective candidates to make the best use of the opportunity.
    Apart from Swaminathan Vemur, Expert - Learning and Talent
    management, Human Resources SAP Labs, who had tirelessly worked out the details
    to make the launch function a grand one, several senior executives of SAP Labs
    and prospective candidates enrolling for the program attended the launch
    function
    Prof BR Natarajan Dean Work Integrated Learning Programmes from
    BITS Pilani presented the salient features of the BITS model of Work Integrated
    Learning programmes with focus on the customized two year MS Software
    Engineering programme specially designed to address the HRD needs of SAP Labs.
    Mr Sai Sekhar Das faculty member of BITS Pilani who is spear heading various
    off campus activities of the Institute at Bangalore which include collaboration
    with various industries for degree programs and Practice School was also
    present for the launch function.
    Also Please see the below links
    SAP India - Scholar@SAP, Vocational Training at SAP Labs India
    SAP Labs India and BITS Pilani - M.S. in Software Engineerin
    http://www.indiaprwire.com/pressrelease/computer-software/2009081031129.htm
    Regards,
    Dipin

  • Speed grade will not cache Dynamic Linked projects from premiere

    Speedgrade does not cache linked comps from premiere. This results in an extremely slow playback in Speedgrade.
    Anyone else has similar experience?

    You will get better program help in a program forum
    SpeedGrade and http://forums.adobe.com/community/premiere/content
    The Cloud forum is not about using individual programs
    The Cloud forum is about the Cloud as a delivery & install process
    If you will start at the Forums Index https://forums.adobe.com/welcome
    You will be able to select a forum for the specific Adobe product(s) you use
    Click the "down arrow" symbol on the right (where it says All communities) to open the drop down list and scroll

  • Unable to save images linked to from InDesign CS4

    A very annoying issue.  If images are linked to from InDesign, and a user on the network has opened that InDesign file, changes to the image cannot be saved.  On a mac we get a warning that the file is 'in use'.  The PCs give no warning, and apprently save the changes made in Photoshop or Illustrator.  However, the changes are not saved.  It make no difference whether the InDesign file is still open or has been closed.  The only way to get round this problem that we have found is to either save as a new image name and re-link to that, or to close down InDesign on the offending workstation and then re-open after the image has been saved.
    This might be a similar issue to that described in this discussion:
    http://forums.adobe.com/message/2015431
    I've opened a new discussion, as the one in the link above is shown as partially answered, but I cannot see an answer which helps us.
    Anyone got a solution?

    I'm not sure if it sounds the same or not, but it sure doesn't sound "normal," but I don't work much with network-stored images and other users who might have linked to them. As far as I know there is nothing in link in ID that would cause it to appear to be open, but as I see inthe other thread I once had the problem myself, so who knows.
    Are you patched to 6.0.6? I don't see anything in the release notes specifically related to the can't save problem, but there were a number of image and link related fixes.

  • ADF Rich client demo link down?

    Is the ADF faces rich client demo link down?
    http://jdevadf.oracle.com/adf-richclient-demo/faces/components/skinningKeys/index.jspx
    Thanks,
    Rajesh

    Yes looks like it. The link is often down. You can load the war from http://www.oracle.com/technetwork/developer-tools/adf/downloads/index.html and run it in your jdev.
    Timo

  • Drill down from a line graph? Make the entire graph click-able?

    Guys, i can drill down from other types of charts except a line chart.
    Is there anything that is special about the line chart?
    Also, can i make the entire graph click-able? So, instead of clicking on a bar to trigger a linked report, can the whole chart be a link basically?
    Thanks for your help

    There is not special with the line graph..... Just click on the data symbol to drill or navigate. These settings can be found under the "additional Charting Option" button.
    regards
    John
    http://www.obiee101.blogspot.com/

  • Drill Down from Chart View

    Hi,
    I have a Pivot table with Chart view only, I want to drill down from the legend and from teh graph itself, is it possible? If so please let me know the steps involved.
    Thank you very much.

    UPDATE POST
    @SSk
    can you try this never i tried,the legend that is coming is a column from your request right?...go to column properties in that you find a option called navigate there you place the navigate report and see if the legend is showing a link below it to navigate
    follow this topic navigate value interaction of a column http://gerardnico.com/wiki/dat/obiee/olapoperation_
    if it works i would be happy,but never i tried......please try this and tell me did you get or not???
    Cheers,
    KK
    Edited by: Kranthi on Jan 20, 2011 7:14 AM

Maybe you are looking for

  • Another Error (I think) In the 12.1 New Features Guide

    Under section 1.5.9.8 Storage Snapshot Optimization: The first bullet point is: "Database crash is consistent at the point of the snapshot." I think that is supposed to be: "Database is crash-consistent at the point of the snapshot." At the very leas

  • How to reinstall old apps backed up using recovery mgr backup software

    I crashed my machine after reloading some .NET framework files.  Since windows no longer loaded, I used the HP Recovery disks and did a full backup to both DVD and USB of my hard drive.  Then I went ahead and let the recovery disks reformat and reloa

  • BAPI for displaying materian/description/Bin storage/ qty based on producti

    Hii All, please gv which bapi we use to display Bin storage, Material n qty based on production order number its very urgent

  • Strange FDF Symptoms

    I am having the same symptoms as others have written where my Classis ASP created FDF data won't populate a PDF form.  What I have is an enrollment process where Form A is used to send FDF data to an ASP program on the server which interacts with the

  • Passing value from non-table textbox to based one

    Hi all! In a master detail form I have a non-table textbox in wich I want the user writte a n: of days,and automatic I want the sysdate increased the n: of days written, in another texbox from a table, that will be insert in the table, but I don4t kn