Hy,
I know it looks crazy but, is it possible to link the process order with the Measuring counter and counter reading.
We are working with pharma compny and due to some of ragulatroy reasons it is required.
if possible then pls guide?
Regards,
Dhaval

Hy Rambabu,
Thank u for the taking intrest.
Actually we are using Filters which we have maintain as a Measuring Counter in PM. Our intention is just to track the which filter is used during the production process and also how much product is passed through that speciifc filer.I know my second point is covered through the measuring counter reading but I want to link it with PP module.
Regads
Dhaval
Edited by: Dhaval Choksi on Jun 3, 2008 2:46 PM

Similar Messages

  • XI-- IDOC scenario, how to link process code with function module

    Hi Forum,
    I have a XI--->IDOC (R/3) scenario,
    where i m creating a IDOC in XI and sending it to R/3,
    i have done all settings to send the IDOC from XI to the R/3,
    i also have the function module to process that IDOC in R/3,
    the problem is:
    I want to know in details (step by step) how to make a Idoc Inbound process code, link it with the function module and use the process code in the Partner Profile in R/3,
    pls help

    HI,
    FOr this u need to go to transaction WE41 for inbound and WE40 for outbound there u assign the function module.
    Now u go to WE20 transaction for partner profile and u can assign the proces code to the inbound message.
    Go to the below help for more information:
    http://help.sap.com/saphelp_nw04/helpdata/en/72/c18ee5546a11d182cc0000e829fbfe/frameset.htm
    Inbound process code:
    http://help.sap.com/saphelp_nw04/helpdata/en/72/c18ee5546a11d182cc0000e829fbfe/frameset.htm
    Thnx
    Chirag

  • OSSNOTES for releasing process orders with missing parts in background

    Hi All,
    The bapi 'BAPI_PROCORD_RELEASE' is not releasing the process orders
    with missing parts in background.
    Is there any OSSNotes for releasing these process orders in backgound through this bapi.
    Pls help.
    Thanks .

    Hi Suri - Thanks for your response. I tried both with blank(individual and collective) and 2 (collective req. only) but I still get the same result. I found one other setting that can solve this issue and that is checking the activate full confirmation logic at the the MRP group level in OPPR. I will test more and let you know if that works but we dont use MRP groups here at our client and that is why I was little hesistant to set up collective availability check parameters at the MRP group level. But looks like this is the only option that we can use to get this resolved.
    Thanks,
    Bharath

  • Goods receipt against process order with inbound idoc

    Hi Experts,
    We need to post good receipt against process order with movement type 101 and for By-product 531.
    Can we use inbound idoc-WMMBID02,with message type WMMBXY to achieve this functionality?
    Or please advise if we can achieve this  from any other Idoc type.
    We are getting below field values for external system
    1. process order number
    2.plant
    3.material
    4.quantity in unit of entry
    5.unit of measure
    6.storage location
    7. movement type
    8.Batch
    Kindly advise how can we achieve this.
    Best Regards
    CS

    261 and 262 are two different movement types INDEPENDENT of each other. I definitely know for the fact that SAP allows you to create a 262 without a 261. if you were to restrict it... you can disable access through a tcode for that mov. type 262 and ask users to use MBST to cancel any material documents created via 261 movt type.. that would ensure a smooth process

  • Process order with reference to sales order

    Dear All,
    Is there any provision to create a manual process order with reference to a sales order .
    Regards,
    venkat

    If you would like to create a process order with assignment to sales order item, then you have to enter the sales order item on the initial screen of the Transaction COR1 via the Arrow besides the input field for  reference process order. This is the standard way to assign sales order for process order in COR1.
    For production orders, there is a separate Transaction CO08 for this purpose. But for process order, there is no such separate transaction available.

  • Problem creating process order with ref of sale order

    Dear all,
    Kindly give solution for this scenerio..............................
    I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
    My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
    if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
    my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
    for this what i have to do kindly help to this
    regards,
    s.sakthivel

    Dear KK,
    Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
    Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
    Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
    Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
    Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
    Now check whether your material master and customer master are consistent with the item category settings(Item category group).
    Now create the transaction. It shoudl work fine.
    Reward if this helps.

  • WIP status (RESA) not updated for process order with co-product

    Hi,
    We are facing the scenario below, please confirm whether item 2 behaviour is standard SAP.
    1. Process order with settlement rule MAT - after WIP calculated, status RESA is updated & FI document it posted.
    2. Process order with settlement rule OIT (co-product) - after WIP calculated, status RESA not updated & FI document posted.
    Thank you.

    Self found answer

  • Is it possible to release Process Order  with Material Shortage

    Hi All,
    We are using PP-PI & still wants to have behavior of the PP prod order
    i.e. Release Process Order with Material shortage.
    Is it Possible.
    Regards,
    Jatin

    Hi Jatin,
    Go to Transaction OPJK. Select your Plant, order type and Business function as 2-Check availability during order release.
    Under Material Availability tab, maintain '1- User decides on release if parts are missing' if user wants to decide for release of Process order or '2-Release permitted despite missing parts' if you want directly the Process order should be released despite of shortage in Release material field.
    These settings are similar to PP.
    Please check and revert.
    Regards,
    Hiren Ramani

  • Can't relase Process Order with missing parts

    Hi seniors
    I want to relase my process order with missing parts. it is available in PP but not in PI in my system.
    help plz

    Hi
    1. Kindly check the setting for thePlant / Order type combination in the OPJKDefine Checking Control
    2. In this check for the fucntion 1 and also 2 Business function.
    3. Check the indicator for the ""Release material"" in the material avaialability screen.
    Reg
    Dsk

  • Link a DLL with Step.Module

    I am trying to create a sequence file from a C# 2005 code using TestStand 4.0
    The flow of control is (without going into the coding details) :
    - create a step
    - create a sequence
    - add step to the sequence
    - add sequence to a sequenceFile
    - save the sequenceFile
    now, the porblem is that through this flow, a sequence file is created but i am unable to Link the DLL with the Step.Module . The adapter name is "AdapterKeyNames.FlexCAdapterKeyName" and step name is "StepTypes.StepType_NumericMeasurement".
    The manual reffers to the "CommonCModule.ModulePath" but i am unable to
    access CommonCModule ! The sequence file generated has no DLL and the
    expression is the default one:
    "Numeric Limit Test,  9 <= x <= 11"
    I need to:
    - link a DLL with the module.
    - Select a function from the DLL
    - Pass paramaeter to the mathod and get result ( some default values )
    - Set the expression
    - Set the low and high limit

    This link should at least answer some part of your question.
    hope this helps,
    Norbert B.
    CEO: What exactly is stopping us from doing this?
    Expert: Geometry
    Marketing Manager: Just ignore it.

  • Stop user creating process order with material for specific order type

    Hey Team,
    Is there a way where I can stop creating process order with material for specific order type says Z*. We are using ZNMA  order type to create trial batch and we do not want to create process order with material for this order type.
    Any ideas?
    Thanks
    Bhavesh Patel.

    You can restrict the order creation in CO01 based on authorization, Remove the authorization for Z order type for the particular user,  Check with your basis Guy

  • Process Order with respect to WIP concept

    Dear SAP Gurus,
    I am implementing the product Costing with cost object as Process Order for cement industry. Hence can some one help me out the concept of With backfulush and without backfulsh  and how to treat the WIP concept with and without backfulsh.
    your inputs will help me lot for my project.
    Thanks in advance for your great support.
    Regards,
    KK

    Hi,
    Please reffer the following Link:
    http://help.sap.com/saphelp_470/helpdata/en/90/ba6609446711d189420000e829fbbd/content.htm
    http://wiki.sdn.sap.com/wiki/display/ERPFI/UnderstandingResultsAnalysisforWIP
    Thanks and Regards
    Binoj M D

  • Link Sale Order with Delivery  through DTW

    Hi All
    While importing Deliveries through DTW, is it possible to Link a Sale Order with Delivery?
    If it is possible then can any one tell me the procedure.
    Thanks in Advance
    Chakrapani Bandaru

    In the template for the document lines, you will find fields for base entry, base type and base line . Fill these with the object type for sales orders, the line number and the doc entry (not doc num) of the relevant linked document

  • Link sales order with the PO

    A s per my business requirement, we create a sales order and according to this sales order if the material is not available in stock we want to create purchase order to the vendor for the materials which not available, How I link the sales order with the purchase order?
    Can you please any one help and advise me how this scenario can be handled in SAP

    Hello,
    Are you looking to map cross docking or third party sales in your system. In both of these cases, purchase order is created which is link to sales order via purchase requistion. The only difference, here in these scenario's is that goods movement doesn't take place within the plant.
    If this is so, then, you have customize, item categories and schedule lines used for them accordingly.
    Ideally , in the aabove mentioned scenario (cross docking, third party sales) material are not kept in stock.
    Br,
    Tushar

  • Link Sales Order with STO

    Dear All,
    I am having a scenerio, where I would like to link Sales Order Document Number with Stock Transport Order.
    Can anybody advise me , plsease.
    Rgds,
    Indrajit

    hi-
    in STO we started from PO(purchase order).NO Req. of sales order in that scenario.
    I f u want to envolve the sales order then do one thing creat sales doc for STO then in sales order  you can put the PO number in PO feld in sales order as  a text then you can do having no problem also.
    thanks
    sunil

Maybe you are looking for

  • Does the 8540 support VLAN Trunking

    I would like to VLAN trunk four VLANs(8540 bridge-groups) from an 8540 switch router to a Cat 5000. I have not seen in Cisco's documentation anything that indicates that the 8540 supports VLAN trunking.

  • How to connect IMS database to BW 3.5

    Dear experts, A client has asked us to extract data from IMS database to BW (version 3.5). It is the first time I've heard of IMS and I have no idea how should this connection be done. I know there are the BC in BW which can extract from sql and othe

  • Split SNP PDS using BADI /SAPAPO/CURTO_SNP Method CIF_IMPORT

    Hello APO ABAP experts, The requirement is to split SNP PDS based on the number of modes. Meaning, the PDS should have only Mode per Activity in the Operations. My plan was to change the changing internal tables in the method CIF_IMPORT to create num

  • Exit Code 15 installing CC apps

    Hi, I have CS6 apps installed under creative cloud on my macbook pro running Mountain Lion 10.8.4 I'm getting exit code 15 installing many of the CC apps (Illustrator, Photoshop, Premier Pro). I've tried repairing file permissions in safe mode (http:

  • Photo contact sheet

    I have folders with bunches of photos that I need to review. In Windows Explorer I could print out a contact sheet of the photos so I can tell at a glance what I have. Is it possible to do this in finder or any other program?