Linkage between Bridge and AE

When I choose 'browse presets' in AE CS4, nothing happens - ie Bridge does not open no matter how long i wait.  I can seperately launch Bridge, but of course that does not enable me to "double click apply" effects/presets in my composition.
Many thanks in advance

Mmh, Adobe Camera RAW is a component shared between Bridge, Photoshop and other programs. Since the initial release of CS4 it has been updated several times, so indeed an update to one of the programs may have affected Bridge and AE in a wierd way. I'm afraid I can't offer any advise beyond that, as most likely you would have to re-install everything, anyway, to make this work again. As a minor glimpse of hope it may be worthwile to check Bridge's file associations in its prefs as well as check the status of Camera RAW by accessing its options. Maybe it just needs to be reset in some way to produce correct configuration data and not crash.
Mylenium

Similar Messages

  • Linkage between PR and Outline agreement

    Hi All
    Is there any linkage between PR and Outline agreement
    If not how this link can be created in SAP
    Suppose User raise PR after that the Contract is raised and has to be released at both levels
    That is at PR level also and at OLA level also it has to be released, Is there any setting that i want to release PR and the Corresponding OLA(Contract) i dont want to have the release strategy.
    BAsically i just want to have the approval strategy at PR level only.
    Also i want the link between the PR and against this PR the OLA created to be displayed in PR.
    How it can be handled
    regds
    shailesh

    Hi arminda
    I have created PR and w.r.t this PR i have created Contract
    Now in PR in ststus tab i can see that contract created but i cant see the Contract doc no (Aggreement)
    Where as when i create PO with ref to Contract.....in this case also i m not able to see the PO created for the particular purchase requisiton.
    What can be the possible reason
    Whereas in case 2 if i create PR and then Contract
    then i am creating PO w.r.t Contract..............also  i m mentioning PR then it creates the link with PO in PR.. and i can see the agreememnt no also
    How to create the link in the above mention case..
    Is there any solution so that when i create PR after that Contract is created the that contract no should appear in PR
    regds
    shailesh

  • I need to synchronize color space between Bridge and PSCS3

    Hi--
    The only CS3 programs I am running are Bridge and PS. I like to work in Adobe RGB and maintain all my files in that color space. Consequently, I set that color space in PSCS3 (in
    Edit/Color Settings). However, for some reason I can't nail down, PS often seems to lose my preference and reverts to sRGB; when I re-set my working space to Adobe RGB, I am informed
    "Unsynchronized: Your Creative Suite applications are not synchronized for consistent color." I can't find the place where I can tell Bridge to use Adobe RGB color space. How can I resolve this?
    Thanks,
    --Ken

    I am having the same issue. It is frustrating because I am following a Lynda.com training video that talks about PS CS3 and Bridge basics. Included in that video is how to synchronize color between these two applications. Nowhere does it say that one needs to own a >$1000 full suite to be able to do this. Deke directs the viewer to the Edit menu of Bridge where you are supposed to enter the "creative suite color settings" menu. No such menu exists on my "el cheapo" version of Bridge CS3.

  • Linkage Between PIRs and Sales Order in STandard SAP or AFS

    Hi Gurus,
    We are implementing the concept of Planned Independent Requirements(PIRs) in SAP AFS.
    Below is the process am following :
    1. Create PIRs.
    2. Create a Purchase Requisitions.
    3. Create Sales Order.
    I am using the concept of forward consumptiona and planning strategy 40 for the PIRs consumption.
    Also I understand that the Sales order will consume the PIRs.But when I go the stock Requirements
    list I dont see any changes happening.I mean I dont see any linkage between the Sales Order or the PIRs.
    Please help on the above concept,Am trying to understand how does the concept of PIRs work and how can I simulate and see the results in SAP.What will happen to the PIRs and SO and how can I see the linkage that a Particular Sales Order has consumed the PIR.
    Any help on this would be appreciable.
    Thanks,
    Jinen

    Hi,
    I am explaining the cycle of PIR.
    Strategy group(which is used in MRP3) is the combination of different strategies.
    The strategies are defined in this following Path
    SPRO->Production->Production Planning>Demand Management>Planned Independent Requirements>Planning Strategy>Define Strategy.
    Strategy is the combination of requirement types defined wrt demand managament(PIR)-PP area
    and req types defined wrt customer(SD area).
    These requirement types are assigned to requirement class.
    PP area, to assign req type to req class,
    Production Planning->Demand Management>Planned Independent Requirements->Requirements Types/Requirements Classes>Define requirements types and allocate requirements class.
    In SD area, In OVZH u will assign req type to req class.
    In PP area, this requirement class is defined in OMPO transaction where u will maintain Planning indicator,consumption indicator etc.....
    In SD area, u will maintain it in OVZG transaction.
    For Strategy 40 requirment class are 101, requirement type VSF, Customer req type is KSV
    Just check for the above settings.
    First create the PIR. Then create sale order. and check in MD04. PIR will get consumed based on the inwarded sales order.
    Revert back for any clarification.
    Thanks and Regds
    Sridhara K N

  • Linkage between PR and PO and FS10N

    Hi,
    We have a requirement of linkage between PR --> PO --> FS10N.
    Actually, we want a extra field where we insert Asset Number. Suppose we find a field a PR and insert Asset Number there, then Asset Number should be display in PO and FS10N also.
    It is possible or not...

    Hi,
    PR/PO are logistic documents.
    FS10N is a transaction to display financial balance on G/L accounts.
    What possible connection could be between the two? Please, be more specific in your request...
    Regards,
    Eli

  • Altering the linkage between Keywords and sub keywords

    I have a master folder that contains a series of folders with several thousand images, all with keywords. Things seem to work when I try a FIND, etc. However my old keyword structure needs to be fine tuned. I created a new structure and some of the old image keywords stored in the file metadata do find the corresponding keyword in the new structure. But some images bring in the old structure as a temporary/italicized entry into my new keyword structure. For example, I have an image with the keyword “Calumet”, that’s all I see when I look at the keyword list. My new keyword structure looks like:
    Location (keyword)-Houghton County(sub keyword)-Calumet(sub keyword)
    When I select the image rather than turning on the check in new structure Bridge creates an image of the old structure:
    Locations (keyword)-Hghtn Cnty(sub keyword)-Calumet(sub keyword) in italics.
    Other images with other keywords work but unfortunately there is a series of keywords that continue to bring in the old structure. I can’t visually see how Bridge knows that the image’s use of ‘Calumet’ was originally linked to Hghtn Cnty to Locations when I first added the keywords. I unfortunately assumed that all that was saved was the sub keyword ‘Calumet’ and that Bridge would search my new structure to find a match, “Calumet” to “Calumet”, wherever Calumet appears in the new list. Does anyone know how Bridge saves the links between sub keywords and keywords and how to change that link? I have several thousand images to alter or should I just stick with the old keyword structure?

    Indexing is the key here as you probably have folders that have not been re-indexed under the new scheme.  The search works only on indexed folders, but don't believe it is automatically re-indexed just becasue you made changes.
    My best guess is that you have to dump the cache and let it rebuild, and then re-index your folders.  You could test this by purging the cache for one problem folder (tools/cache/purge cache for xxx folder".  Visit the folder and let it rebuild then do a search on that folder to see it the search now works.
    Rather than dumping the cache you can also try a Find starting at the 1st folder on your drive (it searches from start down directry tree) and check the box for "search non-indexed files" as this re-indexes everything it searches.  That is why it is so slow.
    Hope this solves the problem.

  • Is there a quick way to switch between bridge and mini bridge in ID

    I know you can right click in Mini bridge to select revel in bridge (on a Mac) but is there a way to do this in reverse?
    I often, many times a day have a folder open in bridge, when it is time to work on a design I would like to tell InDesign mini bridge to navigate to the same folder I have open in Bridge. Navigating around folders in mini bridge is a complete pain! The navigation system isn't in the least bit intuitive.
    Any known shortcuts?
    Thanks Graham.

    Any known shortcuts?
    Not to my knowledge, I already told my opinion about MB in the other thread:
    http://forums.adobe.com/message/5554101#5554101
    Your best shot is prepare a collection in Bridge itself with the files you think you might need for a project and choose collections in MB to browse in as the base for your projects in MB. Selecting the name of the collection is far easier then browsing through a bunch of nested folders
    the second best is the app short cut in Mac OS with cmd + Tab to switch to Bridge. Select the file and with right mouse click choose place in InDesign.
    But I agree, both options are far from ideal.

  • Resolution difference between Bridge and Photoshop

    I have a jpg image that has a reported dimension of 2592px x 3456px and a resolution of 180ppi.  This data is from the Metadata panel in Bridge.
    When I open the image in Camera raw or photoshop the resolution is 1024x1356 at 72 ppi.  Why aren't they the same?  What is happening?  Shouldn't Camera Raw just use the same dimensions and resolution as the original file?  It does it on every image.  If I open it directly into Photoshop the original dimensions and resolution are not effected.
    Using Photoshop CS3 in WinXP Pro.
    Thanks

    nevermind...figured it out.
    Thanks

  • Integration missing between Bridge and Version Cue CS4?

    Hi there,
    I've installed Design Standard CS4, set-up Version Cue and successfully saved an image from Illustrator.
    But when I open bridge there is no sign of Version Cue on the left hand side, the help file suggests that I need to select some options for Version Cue in the Start-up Scripts, but they aren't there...
    Has anyone had the same experience?

    Adobe recommends that you do not follow the steps above to enable Version Cue CS4 in Bridge CS4.
    Please see this thread for more details:
    http://www.adobeforums.com/webx/.59b6d12f

  • Linkage between delivery and inspection.

    Hi ,
    We have a requirment to print the inspection comments from the inspection screen in the invoice output. I was unable to find the link between the delivery to inspection.
    I need to know the link between the delivery and the inspection in SAP SD.
    Thanks,
    Kannan Mohan

    The material should have been extended for Quality Management view and after saving delivery, an inspection lot will be created which can be seen and cleared via QA32.  Here you can see the DA reference.
    G. Lakshmipathi

  • Difference between bridge and local mode with wlc 5508

    Hello,
    Now i have wlc5508 with few ap 11xx 12xx in local mode. All work correct. I will have to add few ap1552 in bridge mode ( i have to wait for wlc upgrade to change ap1552 to local mode). My question is that all ( local and bridge mode) will work correct together for my clients: rfid readers, laptop, computer in a,b,g,n mode ? What about roaming  and other feature ?
    thanks for help
    Peter

    If you plan on not doing MESH, then you set these 1552's in local mode and they will perform the same tasks as any other AP's in local mode.  When you want to do MESH, then that is when bridge mode comes into play and you have to define your RAP's and MAP's.
    Roaming, clients devices, doesn't matter if your using local or bridge.  roaming depends on your device and coverage and rfid, also depends on triangulation with the coverage you have now.
    Thanks,
    Scott
    Help out other by using the rating system and marking answered questions as "Answered"

  • Which Table for linkage between Opportunity and Campaign

    Hi,
    can anyone tell me the database table which links Opportunity´s and Campaigns?
    The campaign number is shown in Opportunity in the following field:
    Structure  CRMT_5010_1O_UI       
    Field name CAMPAIGN_HE_ID    
    Thanks for any hint!

    the above is right... but you would not find the objects directly.  opportunity and campaign would be identified as Role A & B in table srelroles.  
    The object guid, logical system and business object type forms a unique identifier for an object and defined as a Role.

  • Depriciation linkage between CRM and R3.

    Dear Friends;
    In leasing,how a depriciation value is get linked with CRM and R3.If the dipriciation value is variable,how can i do setting for that in CRM and R3.
    Thanks in Advance.
    Regards
    Suruli

    Hi Suruil,
    in SAP CRM leasing solution no depreciation is stored.  In the CRM system only sales related prices should be handled. There is only a function to get the depreciation from the ERP displayed.
    In ERP the depreciation is available on the asset in fixed asset accounting. The depreciation can differ in the different valuation areas. Usually a valuation is assigned to one accounting principle.
    My understanding for the term depreciation is the accounting related decrease of the value of the leasing object.
    Kind regards,
    Steve.

  • Alter the linkage between encore and psd-file

    hello
    I wanted to change the psd file wich is connected with encore
    in my project there is a file called "first.psd"
    now - it is an old file so I want to substitute this file with "second.psd"
    so if I open my encore-project there is a new connection to "second.psd" and not to "first.psd"
    How could I alter this?
    thanks

    Have you tried the Replace Menu command?

  • Linkage between plant and storage bin..

    Dear SAP GURUS,
    I need a calirification , I have 2 plants which we assigned to single warehouse no , now i how i create bins i have to create seperate bins for each plant .  bcs one plant is phycisal plant other one logical plant   .pls help me out.
    where we will link plant with storage bin
    Rgds Madhu

    Hi,
    Basically you assign warehouse to Plant & storage location in Enterprise structure-Assignment-LE-Assign WH number to Plant & storage location
    Under warehouse you will have storage types & under storage types you will have storage bins.
    Bins will be created under storage types & not under plant.Warehouse & storage types will represent for both plants. No separate bins are created for plants.
    Hope you got the answer.
    Regards,
    Prashant

Maybe you are looking for

  • My iphone keeps going into a huge text or zoom mode, how do I get it back to normal?

    I have an iPhone 5S and just upgraded to Yosemite, apparently a big mistake after reading a lot of support items. My phone keeps going into a zoom or huge text mode and I cannot get it back to normal.  I also have an iPad that I send and receive mess

  • Adobe licensing query

    I have installed Flash CS5 and Flash 8 on single computer system to frequently work on both softwares Hence, my query is that how many Flash licenses required to purchase to me to complain with adobe licensing? If I have purchased one Flash CS5 licen

  • Location missing in 0APO_PPDS_ORDER_01

    We are using standard extractor 0APO_PPDS_ORDER_01 for extracting orders from APO/PPDS. The extractor is delivering all the orders in the planning table, but some of them are extracted with no location,   although a location is assigned in the planni

  • Quick time installation failed

    Got iTunes 4. Want to upgrade to 7. Every time I try to install Quick Time (either installing iTunes 7 or QT alone) this error message occurs: Folder "C:" has a non valid font. Can anyone help me? Many thanks, alvise Dell Dimension 8200   Windows XP

  • Display of Vendor in the 0IC_C03 cube

    Hi all, I am using the 0IC_C03 cube to display quantity and value of raw materials received, issued and consumed. Each one is being restricted by movement types. Is there any means to display the vendor with regard to received from, issued to and con