Linking Documents in Change Request Management

Dear all,
We are using Solution Manager 4.0 and the change request management functionality.Before implementing this we were storing the test results in the test case management of project management.But now when a tester do the testing,in urgent correction transaction,there is a option to upload the document to the particular urgent correction in the transcation tab.Can we link this document we store in the urgent correction to the test case tab in solar02 of the particular maintenance cycle?
Thanks in advance,
Avinash.

Stefan,
Have you checked SAP note 987927? It can help.
Regards,
Raquel Cunha

Similar Messages

  • Document for Change request Management in Solution Manager

    Hi,
    We are setting up Solution Manager. I know service desk configuration. But I need a document on how to configure change request management in Solution Manager.
    Also I need a steps or a document for monitoring of EP 6.0 from Solution Manager.
    Thanks a ton for help in advance.

    Hi,
    Check out these links
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/media/uuid/b4406827-0a01-0010-3da2-f56b36d88510
    BI and Portals 2006 [original link is broken]
    very good collection of eclasses. for making use of solution manager.
    Feel free to revert back.
    --ragu

  • Help me configure Change request management !!!

    Dear friends,
    I am Going to Configure Change request Management, so just to ensure that the configuration is not erronous, i would need Expert advise..
    Just want to know Clear few things before i proceed..
    I am also refering SPRO and related notes
    Scenario :
    I have two SYSTEMS SAP ECC 6.0 with System id R03 and Soluiton manager with SYSTEM id SOL,
    R03 has 3 clients, 300 600 700..
    In R03 300 is the development client, 600 is quality client, 700 is the production client.
    SOL has 2 clients, 100, 200
    With 200 as the production client.
    Q.1) <b>Do i have to configure CHARM in both the client (100 and 200 of SOLMAN).</b>
    Q.2) Initially I had tried to set CHARM in client 100 of solman, but later on realized that it has to be set up in client 200.
    When i logon to client 200 and  Execute IMG activity Spro-> sap soltion manger->basic settings-> sap solution manager system->activate integration with change request management.
    Then by default it take the previous client ( client 100) as the change request management client.
    ( as we know there are three steps in the above activity ), the other activity are executed properly, only prblem being that the default client is always set to 100, which should not be the case).
    I do get the prompt saying ( "The change request clent is set to clent 100, do u want to change to client 200, on clicking yes, still it is always set the same client 100 as charm client ")
    <b>Plz let me know what do i do to set the change request client to 200??</b>
    Q.3) Regarding TMS, we have local domain controller in solman and local domain in R3.
    We are planing to establish domain links between the two systems( ie both the domain controllers) ??
    Is this the right strategy ??
    <b>Any other method that u can recommend  ??</b>
    Q.4)One of the IMG activity says, Generate Destinations to client 000 of all the domain controllers..
    Whenever i do this these, destinations are created with errors, i am not able to create trusted RFC destinations without errors.
    When i logon to satellite domain controler and excecute sm59 there are 2 destinations created Trusted and BACK.
    These destinations works well,
    but when i logon to Solman, got to sm59 , when i test the TMW and TRUSTED rfc destinations  i test these destinations using Remote Logon i get error,
    " no authorization to logon as trusted system"
    I went thru one note which recomended Kernel upgrades to solve the problem,
    I r3 my kernel relaese is 700 with patch level 56, the note recomends to apply patch 80, did u have these problems??
    <b>what is your kernel patch levels in sateliite and solman systems.</b>
    Q.5) TO be able to raise tickets from R3 to solman we create RFC destinations.
    We also create RFC destinations to client 000 of all the sateliite system,
    <b>dont u think these RFC destinations might interfere with each other??</b>
    Q.6) Is there anyone who has successfully configured CHARM. Can you plz share the  configuration documents with me..
    Please note :
    <b>All the contributors would be handesomely rewarded with points .</b>

    Hi,
    Check this
    Note 128447 - Trusted/Trusting Systems
    For your Q4.
    Q3.)
    Establishing Domain link - That's the right way. Go ahead.
    These are the steps.
    <b>1.Define Transport Routes for System Landscape</b>
    assign exactly one development system to a production system, and that these two systems are connected by exactly one unique transport track. If a development system and a production system are connected by more than one transport track, this may lead to inconsistencies within the transport distribution. This type of transport configuration cannot be supported by Change Request Management, and may cause inconsistencies within the tools involved.
    <b>2. Activate Extended Transport Control</b>
    The CTC parameter should be '1'
    <b>3.Configure Transport Strategy</b>
    Deactivate the QA Approval.
    <b>4. Activate Trusted Services.</b>
    5.Activate Domain Links.
    You have to activate domain link between systems.
    6. Generate RFC Destinations to Client 000
    Hope this helps.
    feel free to revert back.
    --Ragu

  • Change request management in solution manger release 7.1 or 7.0

    Hi All,
    Can any body please explain me how to configure change request management in solman release7.1 and if it is possible please send document to my below maild Id.
    And please let me know what are the steps needs to be done satellite systems, we have EP7.0 landscape also there .do we have to do any additional configuration for that in solman side?
    I appreciate for your prompt response
    Thanks in advance
    My Id: haritechies gamil.com
    Regards,
    Hari Prasad . L

    Hi
    Adding more to it
    Use the following link,
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    Regular correction
    https://websmp202.sap-ag.de/~sapidb/011000358700000086572008E.sim
    Later login to solman enter tcode SPRO and goto scenario specific Change Request management node and start configuring by
    going through the IMG Help and as per requirement.
    Create a maintenance project and Activate Charms
    https://websmp202.sap-ag.de/~sapidb/011000358700005479242006E.sim
    Regards
    Uday

  • Change Request Management for Implementation Project

    Hello gurus!
    I have a problem with execution change request in implementation project.
    I have created Implementation project and task list for him."Change request management" is active for this project.
    I can create document Change Request, but I can not to create Correction linked with Task plan...
    Dmitry.

    HI,
    Have you verified if your project definition is setup correctly ? Please verify with some of the steps available in the blogs
    First steps to work with Change Request Management scenario
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    Change Request Management scenario: Usual questions
    https://weblogs.sdn.sap.com/cs/junior/view/wlg/15116
    Change Request Management scenario: Working examples
    /people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples
    Hope this helps.
    Cheers
    Sh

  • Change request management

    We are working on solution manager 3.2--change request management  , oracle 9.2.0.6 , windows 2000 server , sp level 10 for ST , 56 for Abap and basis .
    We have few queries to polish the working  of change manager - urgent correction  -->
    1. I also observe that in the cycle of urgent correction the process of importing and changing the status took a large amount of time (Around 10 mins)so please suggest ,  How can i minimize the time ?
    2. How can we do the text mandatory while entring the reason for change ...etc entries in the change request .  So that the processor should not ignore those fields.
    3. Can we assign the multiple change managers for more then one approval .
    4. More then one tester should be assign to the change document for multiple testing .
    5. Can anybody refer the  web link for creating  change request.
    7. We have support desk on client 010 and change request management  on 099 which are working fine  , how can we change the client of the support desk to 099 , so that both change req mgmt and support desk should be on the same client .how can we update all existing support messages on client 099 .
    8. How can we put some default entries like requester , iBase , Sold to party in the change request - urgent correction .
    Any kind of suggestion will be helpfull .
    Best regards
    chirag

    Hello Janak,
    Good to know you have are using CRM in SM.
    Thanks for the documentation help. I will go thru it and let you if I run in to any errors.
    Before that, I really appreciate if you can answer to the following questions.
    1. Is it possible to release and move the transport related to the satellite systems from SolMan???? Or do we have to go to the satellite systems to move the transports?
    2. How are you managing your transports using SolMan at your site??
    I really appreciate if you can send your contact number...
    Thank you,
    Nikee

  • SOLMAN- Change Request Management

    we have a request from one of our customers a big insurance company, to use the "change request management" out of the SOLMAN for non-SAP solutions.
    is it possible ? what are the advantages and disadvantages?
    thanks
    Amnon

    Hello Amnon,
    SAP Solution Manager as the name suggests is for managing the whole gamut of SAP and Non-SAP solutions in the IT Landscape of an organisation. It provides you the tool, content and gateway to create, operate, manage and monitor your solutions over time.
    Please use the following links which may help you in a better way....
    Manually registering a non-SAP system in SMSY
    http://www.sappro.com/downloads/NonSAPsystems.pdf
    SAP Solution Manager Ready
    SAP Solution Manager Ready
    A General overall discussion on Solution Manager http://www.sap.com/platform/netweaver/components/solutionmanager/index.epx
    Hope it helps.
    Cheers,
    Satish

  • Change Request Management in Implementation projects or not?

    Hello guys,
    We are starting a Change Request Management project at a customer.  We discuss  in the blueprint phase whether we should be using it only for maintenance activities, and not for implementation projects.  We have some people that can be working both in maintenance and also in projects at the same time.
    We want to understand whether that scenario is possible and also whether is advisable.  We want to have control over the process, and therefore we should be restricting the creation of Transport Orders through SE01 so that we know that transport requests are created only by change document action.
    What are the drawback, difficulties, considerations you may consider in making that decision?  Is it logic to work that way or is it better just to implement it for the whole installation, including implementation projects?
    Esteban Hartzstein
    Edited by: Esteban Hartzstein on Jan 20, 2010 3:37 PM
    Edited by: Esteban Hartzstein on Jan 20, 2010 3:39 PM

    We want to have control over the process, and therefore we should be restricting the creation of Transport Orders through SE01 so that we know that transport requests are created only by change document action.
    this you can do either via SE03 / Display/Change Request Attributes  / SAP_TMWFLOW     Request created using Change Manager          X          X / Defaul for all client = Mandatory
    or
    you can achieve this by just activating the CHaRM in SolMan ( solar_project_admin / system landscape / CHARM)
    Nesimi

  • How big effort it is to setup Change Request Management?

    We are interested in implementing Change Request Management into our Solution manager 7.0.
    What size of an effort in mandays it actually is and what kind of professional roles are required to set it up? Some background information for your responses:
    implementation project is already there in Solman (SOLAR01/02) and is already live
    satellite system connections within SMSY are already active
    no central CTS/CTS+ is currently in use
    when having CHARM it is assumed that also CTS+ should be used
    So, I guess we are in a typical situation where implementation project has ended and live and support organisation and tools are being setup. There we need CHARM and CTS+.
    I have read lots of SDN threads and blogs, but did not get a clear picture how big effort setting up CHARM is. Please note, I not looking for config guides now, just your experiences. Even if am not interested in config guides, could you at least describe the main steps that are necessary in setting up CHARM?
    br Kim

    Hi
    Adding more to it
    Use the following link,
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    Regular correction
    https://websmp202.sap-ag.de/~sapidb/011000358700000086572008E.sim
    Later login to solman enter tcode SPRO and goto scenario specific Change Request management node and start configuring by
    going through the IMG Help and as per requirement.
    Create a maintenance project and Activate Charms
    https://websmp202.sap-ag.de/~sapidb/011000358700005479242006E.sim
    Regards
    Uday

  • Solution Manager 3.2 SP 8- Change Request Management Configuration Problem

    Hi friends,
    We are in process of implementing SOLMAN 3.2 SP8 in our landscape.I am facing  problem in configuring change request management.
    When the developer is working on an urgent correction document we are facing a problem.The steps we are following are here under provided.
    Step 1 :
    Selected Action "In development" - > it created the transport request in the dev system.
    Step 2:
    Action "Log into System" -> made correction attached to the transport request manually and released the task.
    Step 3:
    Action "Release transport requests" -> The transport request in the development was released.
    Step 4:
    Went for action "Pass to correction" -> I am facing exceptions which conveys
    Status was reset by system
    A condition is not satisfied because of an exceptional situation
    Not all transport requests yet released
    And we would be thankful if you provide the authorization required for the different roles in the change request management.I have followed the help file of SOLMAN 3.2 and create the users as under
    User - Role
    SOCM_RQSTR - ZSAP_SOCM_REQUESTER
    (Derrived from SAP_SOCM_REQUESTER)
    SOCM_DVLPR - ZSAP_SOCM_DEVELOPER
    (Derrived from SAP_SOCM_DEVELOPER)
    SOCM_CHNGNGR - ZSAP_SOCM_CHANGE_MANAGER
    (Derrived from SAP_SOCM_CHANGE_MANAGER)
    SOCM_CHNGNGR - ZSAP_SOCM_IT_OPERATOR
    (Derrived from SAP_SOCM_IT_OPERATOR)
    Even then I am facing problems while developer creating transport requests and while logging into development system.
    I tried adding S_RFC,S_RFCACL auth objects to their roles but did not help.
    Pl. suggest.
    Thanks & Regards
    Mrutyunjay
    Message was edited by: Mrutyunjay Rao Dora

    Hi all,
    We are trying to implement the Change Request Management piece in Solution Manager 3.2. 
    We are facing the following issues which I think relate to the same reason:
    1)We have created a Maintenance Project in SOLAR_PROJECT_ADMIN and assigned it a logical component, which consists of our two system landscape (namely DEVàQAS). We have also created the IMG project in the DEV system and have distributed that IMG project to both the Solution manager system and the DEV system. Now we have to make the maintenance cycle and task list for that maintenance project, but as we select the project and click on “create project cycle” it shows the message "The project is not released. Hence cycle can not be created". It is showing the status of project as locked .How can we open or unlock the project to remove the error?
    2) Also after selecting the SMI project when we click on the button “CTS status switches” or “project specific Transport route” it responds with the error "Project landscape not configured; set the project status to "open" first ".
    3)When we click on “synchronize single project” it prompts for the login of connected system (Development System) and after login, it gives an error "Warning, problems during synchronization of the system Landscape".
    For Error resolution, we have checked the system landscape and it does not give us any errors. We have done that, both from the solution manager by going to the transaction SOLAR_PROJECT_ADMIN -->  >system landscape tab>selecting our logical component and doing a check by clicking the "Check system Landscape" button. It returns with "no Errors". We also did a check on the TMS configuration by logging directly on to the TMS domain controller system and checking the Transport routes. We have checked the RFC connections without any errors.
    Any help would be greatly appreciated.
    Thanks
    Abhi

  • Do we have to use Change Request Management in order to use cProjects?

    As Doreen Baseler says in her post
    Is SAP Project System part of Solution Manager?
    The Project Administration functionality…is not designed in the first place to do detailed project planning, especially not in terms of costing and budgeting. It rather delivers a general framework for carrying out SAP Solution Manager implementation, template, upgrade or maintenance projects.
    This is where cProjects comes into play which is integral part of the SAP Solution Manager installation (currently cProjects 4.0). cProjects can be used for detail project planning and execution.
    This is exactly what I want to do however I don’t know how to get there.
    The Solution Manager book (nice glasses Doreen) has some brief info on it but says you need to activate Change Request Management and that it is mainly used for CHARM. Unfortunately we don’t use CHARM and I’d have my head chopped off and fed to the dogs if I messed with the transport landscape.
    Any advice? Thank you,
    David
    P.S. I either don’t have access to the learning map in Doreen Baseler’s SDN post or it is a dead link.

    As Doreen Baseler says in her post
    Is SAP Project System part of Solution Manager?
    The Project Administration functionality…is not designed in the first place to do detailed project planning, especially not in terms of costing and budgeting. It rather delivers a general framework for carrying out SAP Solution Manager implementation, template, upgrade or maintenance projects.
    This is where cProjects comes into play which is integral part of the SAP Solution Manager installation (currently cProjects 4.0). cProjects can be used for detail project planning and execution.
    This is exactly what I want to do however I don’t know how to get there.
    The Solution Manager book (nice glasses Doreen) has some brief info on it but says you need to activate Change Request Management and that it is mainly used for CHARM. Unfortunately we don’t use CHARM and I’d have my head chopped off and fed to the dogs if I messed with the transport landscape.
    Any advice? Thank you,
    David
    P.S. I either don’t have access to the learning map in Doreen Baseler’s SDN post or it is a dead link.

  • Dependency Information for Transport Requests in Change Request Management

    If two CTS projects are not assigned to SOLMAN projects, it is possible to define a dependency successor/predecessor relation between two transport requests for the import order. For example I can state that I have to import TR 1 only after the TR 2.
    When the CTS projects are assigned to SOLMAN projects, even though you have defined the dependency relation, this is not respected and from the Change Documents you can perform the import in the order you want.
    How can I activate this check also in Change Request Management?
    Thanks
    Antonello

    Some things you could take a look on:
    1) start report /TMWFLOW/CONFIG_SERVICES --> here you can define system, client and project specific locks.
    2) Transaction /TMWFLOW/CMSCONF --> also some options for locks and definition of critical objects
    3) Transaction /TMWFLOW/LOCKMON --> monitor screen for locked objects and requests.
    This is actually not the same functionality as have it in CTS projects directly especially as the locks are removed once a request is removed. The most important thing is still missing here (or at least I haven't found a way to activate): sequence control when importing requests out of parallel projects into production (to prevent downgrading). 
    Best Regards,
    Andy

  • Change Request Management--Create Transport Request from Service Desk

    Hi Experts,
    What are the right steps to create a change request via service desk message and keep following the process until import to PRD.
    Regards.

    Hello Jorge,
    You can create Change Request using two ways.
    You can create a Change Request from a Service Desk Message using the action "Create Change Request" or you can create a Change Request directly in transaction CRMD_ORDER.
    Please, check the links below where you can find more information about Charm.
    /people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    Best Regards,
    Diego Fischer,

  • Change Request Management without Transport Management

    Hello Change Request Management Experts!
    I have understood that It is possible to take change request managment in use without transport management. So I could handle Change Request with different statuses without automatic funtions behind these statuies. We like to see how to handle changes between different roles of people and implement the functions after that.
    I suppose that I should take only Change Request (approvals) and not Change Documents (execution) from Change Request Management.
    Have any of you tried to do that? 
    Best Regards, Leena Nissilä

    Hi Andy,
    Thank you for your answer. I have tried to do that also but I where is still some configuration missing because I get error message in: No maintenance cycle is open for the current system. I have also tried to to that maintenance cycle but I thought that it needs CTS activation in some project.
    I also like to know what is minimun configuration for change management that I could use SDAD with Service Desk.
    I looking forward to you reply,
    Br Leena
    Edited by: Leena Nissilä on Sep 17, 2008 1:24 PM

  • SAP IDM on Solution Manager with Change Request Management

    Hi Experts,
    I'm facing a question. Does SAP Identity Management manage association between user in Solution Manager and links in PPOMA_CRM tree for Ticket validation on Change Request Management project ?
    It seems that it could be done using Compliant User Provisioning from GRC Access Control application.
    Thanks for your help,
    Ben

    Hello Ben,
    as far as I know currently there is no "business level" integration between IdM 7.1 and SAP Solution Manager. You only can create SU01 user data as for any other SAP ABAP system.
    I have heard that it is planned for the future to integrate the Solution Manager also in the business suite integration options the IdM product already provides for applications such as CRM, SRM and others.
    Nevertheless you could create your own implementation for your requirements.
    Regards,
    René Feister
    SAP Consulting Germany