Linking exixting PR to work order

hi all,
can we link up the existing PR to the work order. if so how?
can u please explain me in detail
Edited by: anilkumar86 on Dec 26, 2011 3:25 PM

Dear Anil
For capturing external service cost you have option to trigger PR from order in csae you use control key PM03, then you do PO & then service entry. However if you wants to create PR & PO independently with out any reference to PM order then you have one option as follows:
Create PR & PO independently with account assignment category- F (ask your MM consultant)
Created maint order, assign control key PM03 but change the settings for creation of reservation/PR to never in tht operation. it will not trigger any PR. Now assign external service to that operation with selection criteria as PO. In this way you will get planned cost of the external service. Later you create the service entry  (ML81n) with reference to the Maintenance order. In this way cost of the service entry will flow to the order & you get actual cost. Hope this solves your problem.
Regards
Shakti

Similar Messages

  • Oracle EBS drill link targets for EAM Work Order and Asset

    Hi All - I am running Oracle EBS 12.1.3 and OBIEE 11g and I'm trying to link from OBIEE to EBS, but struggling to find the target functions / parameters to provide a direct URL link to EBS EAM Work Order and Asset. I have successfully linked to a Purchase Order View page, I would like to find the similar for EAM Asset and Work Order.
    I can see some parameters in WorkOrderDetailsPGCO but can't seem to work out how to get to the page from a URL.
    For reference MOS Note 555254.1 has some details, but not for EAM.
    Has anyone provided users in any reporting system with a link to EAM Work Order or Asset page and if so how were the links generated?
    Thanks,
    Gareth

    I am giving this a bump as I really need some help with this. Is I run the SQL with TOAD or SQLPlus it seems to consistently runs fine, The problem seems to only be from APEX. I think it has do to with the non-persistent state.

  • Linking Contract Master to Work Orders & Materials

    Hello,
    I'm researching the possibility of linking (tying) stock to a Service Order (in a Work Order) and/or Sales Orders before it arrived on the PO. This is for provisioning stock to customers. Is there any possibility that this could be done via Projects in SAP? 
    A colleague thinks there is a way to create a project (transaction code CJ01 or CJ27) and link it to a Purchase Order in project.  If the project was a reference document, could it be done as an example?  He also believes that there are special transaction codes for moving stock between normal stock and project stock (Special stock) such as 281Q and 412Q as examples. 
    Also, Transaction code MBBS appears to be an overview of the project to show valuated sales order and project stock? Project stock was referred to as a type of special stock?
    As an end user, I am not familiar enough with SAP to know about this project area but thought this might give you a starting point. However, I've been exploring some of the functionalities to come up with a
    solution.
    Thanks in advance.

    Hi
    You can use the BAPI - BAPI_ALM_ORDER_MAINTAIN to maintain orders.
    Given below few order related tables
    AUFK     -Production order headers
    AFIH     -Maintenance order header
    AUFM     -Goods movement for prod. order
    AFKO     -Order header data PP orders
    AFPO     -Order item
    RESB     -Order componenten
    AFVC     -Order operations
    AFVV     -Quantities/dates/values in the operation
    AFVU     -User fields of the operation
    AFFL     -Work order sequence
    AFFH     -PRT assignment data for the work order(routing)
    JSTO     -Status profile
    JEST     -Object status
    AFRU     -Order completion confirmations
    This may help you.
    Thanks & Regards,
    Govind.

  • Outline Agreement not getting link to PR from Work Order

    Hi All
    When creating purchase requisitions from a work order that reference an existing outline agreement the outline agreement is not linking to the purchase requisition (not visible from PR at all). The service masters are however being successfully referenced and are visible on the PR.
    1)The successful linking of the outline agreement appears to stem from the sequence of steps undertaken. If the requisitioner leaves the vendor field blank initially and continues on to reference the required outline agreement and service master for the desired vendor then the outline agreement will be successfully linked.
    2)If however the requisitioner completes the vendor field and continues on to reference an outline agreement then the outline agreement is not visible within the purchase requisition. This is causing delays in the purchasing process as the purchase requisition cannot be processed until referencing the appropriate outline agreement.
    So if the user enters the vendor no is it possible to link the outline agreement to PR ? ( the business don't want to enter the agreement value manually in our case this field is grey out) and they still want outline agreement  to link to PR through service selection. So is it possible or not? by using any user exit or BADI
    Thanks & Regards
    Vishvesh Saodekar

    I finally use EXPLICIT ENHANCEMENT.

  • WBS linked to work order

    I have a new rewquirement from the client wherein I have to link wbs elements to work orders.
    Please explain me from scratch what is wbs with necessary examples and the settings required?

    Hi
    A project is subdivided into WBS ( Work Breakdown Structure).
    Sometimes maintenance needs to be done in a project
    or
    Maintenance can be executed as a project
    For this PS-PM integration you need to assign WBS elements in Additional tab of work order.
    If you assigned WBS the dates from the project WBS can be copied to work order basic dates.
    In project planning board also the assigned orders to a WBS can be seen
    Configurations
    Basic PS configurations
    Define parameters for subnetworks  (PM01) (PS01)

  • Create a Link between Work Order and Reapir Order

    IREAPIRORDER is the reapir order(IW54)
    AUFNR is the work order (IW31)
    w_relation = 'VONA'.
    fs_obj_rolea-objtype = 'BUS2032'.
    fs_obj_rolea-objkey = REAPIRORDER.
    fs_obj_roleb-objtype = 'BUS2007'.
    fs_obj_roleb-objkey = AUFNR.
    CALL FUNCTION 'BINARY_RELATION_CREATE_COMMIT'
    EXPORTING
    obj_rolea = fs_obj_rolea
    obj_roleb = fs_obj_roleb
    relationtype = w_relation
    IMPORTING
    binrel = fs_binrel
    TABLES
    BINREL_ATTRIB =
    EXCEPTIONS
    no_model = 1
    internal_error = 2
    unknown = 3
    OTHERS = 4.
    CALL FUNCTION 'BINARY_RELATION_CREATE_COMMIT'
    EXPORTING
    obj_rolea = fs_obj_roleb
    obj_roleb = fs_obj_rolea
    relationtype = w_relation
    IMPORTING
    binrel = fs_binrel
    TABLES
    BINREL_ATTRIB =
    EXCEPTIONS
    no_model = 1
    internal_error = 2
    unknown = 3
    OTHERS = 4.
    The link is not getting created

    Please go through this link:
    /people/rammanohar.tiwari/blog/2005/10/10/generic-object-services-gos--in-background
    Please give me reward points
    Thanks
    Murali Poli

  • Document link to Func loc / equipment / work order

    Hi
    We need to print the documents attached in functional location/ equipment via work order. Kindly guide the process to implement the same.
    or
    I need the tables to link the document attached in functional location, equipment with work order / functional location / equipmemnt.
    Kindly guide.
    regards
    sachin

    Hi,
    The table which contains the document assignment is DRAD table. Where you have to pass your equipment number or Functional location in Object Key field DRAD-OBJKY along with this object as DRAD-DOKOB. In case of equipment the entry in *DRAD-DOKOB as EQUI and in case functional location it will be IFLOT.
    This is how you can find out attached documents based on document type per equipment or Functional location.
    Hope it is help ful.
    Regards,
    N.Nagaraju

  • DMS: Object Links for Work Order

    Hello All,
    I would like to attach and checkin originals to a work order thru CV01N/CV02N transaction. But, there is no specific tab for work oder. How do I acheive this?
    what configuaration and development has to be done?
    Any kind of help is highly appreciated.
    Thanks,
    Chandra

    Hi,
    If you need only a tab to be seen in the CV01N/CV02N Tcodes, then there is a config settings,
    Document Mangement--> Control Data->Define Document Types (under that select your document type to which this attachment is required) > Define object links> select the production order (PORDER---Object & Screen # 0251)
    then you can see the production order tab in the DIR,
    OR
    As per my understanding of your requirement is:
    When you attach a Original in DIR then it should be visible in the Production order also.
    To achieve this you need to build a relation b/w Material Master & DIR (particular document type), so when a order is created then DIR with original will also get attached automatically so that you view, or through EWB also it can viewed & edited.
    Hope i have understand correctly.
    Regards
    Rehman

  • Multiple notifications linked to work order

    Hi sap gurus,
    How can we link multiple notifications in PM Work order
    Regards,
    Krishna

    Greetings Krishna,
    You can use the "Objects" tab in the Order view (IW32 t-code) to assign multiple Notifications to an Order.
    Please note a Notification can only be assigned to 1 Order at a time (therefore it is a N:1 relationship between Notifications and Orders).

  • How is functional location linked with work order tables

    Hi, Experts:
    I am working on a BW project to extract Plant Maintenance data from R/3 to BW system. We need to get work order data with related Functional Location data togather. When check the 2 tables AFIH for Work Order header and AUKF for Order master data, I don't see Functional Location field in neither of the 2 tables.
    Can anyone please tell me how (by which table/field) Functional Location data in table IFLOT is linked to a Work Order stored in tables AFIH and AUKF?
    Many Thanks,
    Jenny

    Hi, Thyagarajan:
    Thanks for the reply! I tried to get the values of ILOAN from table AFIH. And pass the value to the field ILOAN in ITOB. However, no data returned from ITOB. The ILOAN in AFIH has different set of values from the ILOAN in ITOB.
    Any suggestions?
    Thanks,
    Jenny

  • Table Link between the Functional Location and work order

    Hi Gurus,
    I am stuck in a big problem and have to find a way to list down the work order with a specific user status in the system. I am trying to link it based on the functional location as the inputs will have to be functional location and the date. Can any one guide me with the tables to link these two???
    Thanks in advance
    Anoop

    Hi,
    Depending on your exact requirement, you might be able to select from view VIAUFKST_IFLOS. This would allow selection based on order, functional location and various dates. The field IPHAS will give you some system status information - value will indicate which status the order has reached. Example value = 3 indicates order is technically completed.
    To get the exact system status (or user status) you need to read the JEST table. Read this table by OBJNR. The object number will have the format OR005000123456 (where 5000123456 is the order number). It will be available in the order tables.
    Status values in JEST are in the internal format - example I0002 = REL. Check transaction BS23 to see the link. User status values will have the format E0002. If INACT flag is set in a jest record then that status value is not active. If you want to check for a specific status value then call function STATUS_READ.
    -Paul

  • Link work order Reservation to a PR

    Hi All,
    I have a requirement,were in i have to create a PR from a work order reservation(IW32 components tab) using a custom program.As of now i am using the FM BAPI_PR_CREATE to that but i am not able to link the Reservation to the PR.
    Please let me know if there is any BAPI to achive the same.
    Thanks in advance.
    Regards,
    Ram.

    Hello Goldie,
    you have to update field AFVC-TXTSP with the language in which you have created the text with SAVE_TEXT. Key of the AFVC are AUFPL and APLZL - the same you use to create the longtext. In IW37 only a "X" will be show, if a longtext has been maintained.
    Best regards
    Stephan

  • Link multiple work orders

    Example:  An inspection is being performed based off of a work order.  When an issue is found that requires a notification, a notification type was created for such findings from the inspection.  When that "findings" notification is converted to a work order, how do I link this to the original inspection work order?

    Hi,
    You have some limited options to acheive this viz. You can acheive this by developement like when you create some Notification you can mention the old order number in Reported by field via enhancement but create notification individualy and when you create new order it will link to this notification as well as in notification you can see the original order number.
    Otherwise just try utilize some field to group this like you can use Revision field to by creating a revision for this Inspection and and put that revision in both the orders and as well as in Notifications (from EHP4 revision is available in in Notification too).
    Thanks,
    SS

  • How is the object link populate into work order - IW31

    Hello,
    I am new in PM and am in the process of trying to picking up the concept.
    Question:
    When I create a maintenance order (IW31), how are all the relevant data being pull out and populate into the work order?
    For example, 
    The maintenance plan includes functional area and equipment object, material objects, and task list object.
    Next, you have the equipment master, which also includes the task list, and functional location.
    Finally, you have the task list which includes the Maintenance BOM component.
    Hence, when I create the PM order via IW31, how are all those object information pull out and import into the order? What is the sequence? I am confused on this.
    Thanks
    Daniel

    Daniel,
    When the work order is created from the maintenance plan it copies the maintenance item data into the order e.g. Floc, Equipment, Order Type, Main Work Centre, Priority, etc.
    The operations for the order are determined from the task list assigned to the maintenance item dependent upon the rule governed by the maintenance plan type (performance, strategy,etc).
    PeteA

  • EAM Maintenance Work Order Detail Report

    Hello All,
    I have a requirement to add new fields to the Maintenance Work Order Detail Report which is run from the web page. This report's RTF template works based on the fields which are defined in the seeded data definition. This seeded data defintion has an seeded XSD file with the fields in it. By the RTF template I got the standarad concurrent program name as Maintenance Work Order Detail Report.
    I assumed the following process to happen when the Run button on the EAM work order page is clicked.
    1. Concurrent program Maintenance Work Order Detail Report is submitted
    Executable: PL/SQL Package EAM_WOREP_PUB.Work_Order_CP
    Seeded Data Definition: Work Order Details -- This DD has a seeded XSD file EAMWOREPORT.xsd
    2. So the RTF template based on the pl/sql package and the XSD file generates the report and displays.
    Please correct if my assumptions are wrong.
    I want to add new fields to this report. So I have customized the pl/sql package, modified the code with new fields and created a custom data defintion with a new XSD file with the new fields added in it. Also created a new template linked to new data defintion. After doing all this I am not able to see the new fields on the report generated they come as NULL.
    My question is Is it feasible to add new fields to this Maintenance Work Order Detail Report or we can use only the fields which the seeded one gives?
    Version: R12.1.2
    I tried and tried but couldn't find a solution to it. If anyone has faced the same issue please let me know.
    Thank You!!

    IW47 should give you the required information.
    Regards
    Narasimhan

Maybe you are looking for

  • How can I send mail mail as different address using iCloud?

    I have setup Mail in OSX Lion to use my iCloud account ([email protected]) succesfully. When I compose a new message I would like to be able to send from an email address other than [email protected] (eg. [email protected] which is an email account I

  • Connecting iPhone duplicates photos in iPhoto

    Every time I connect my iPhone 6 (running iOS 8.1.1) to my iMac (running 10.10.1 Yosemite) to sync my photos, iPhoto launches, every photo is duplicated, and pairs of identical photos are imported into my iPhoto library.  Is there any way to prevent

  • EABP table dats is missing in TDMS ERP time slice tranfer

    Hi, Is EABP table (Budget Billing Plan) is not part of TDMS ERP transfer? Recently we did some erp time slice transfer with 2 yrs of data but this table data was not selected in sender system. Our project team needs this table data for their testing.

  • ODBC Connectivity

    Tally act's as both client & Server. Itz an ODBC Compliant also. It has a System & File DSN in the name of "TallyODBC". In Java, I had tried to establish a connection with Tally using this DSN name. But there was an error "General Error". ie., try Cl

  • WLSE upgrade 2.13.1 - 2.15

    Hey everyone, We have a WLSE express device running the following version 2.13.1. How do I go about upgrading the latest version? On the download site for the WLSE express I dont see any files to upgrade from 2.13.1 to 2.15.1 but just the download op