Linking SLoc and MRP Areas in Supply Area

Hi All,
I recently moved one production line from one plant to an other one. This new line is feeded with Water from a separated tank. I would like to be able to see the requirement of water coming from the new line and stock in this tank separatelely from the "other" Water to be able to know how much water we have to supply to this separated tank.
Based on, what we are asking for is a new storage location equivalent to the separated tank (for stock and consumption) and a new MRP are (to be able to differentiate between demand).
this is the situation am going on right now, i think the above subject is what am i thinking the best solution on this situation, can anyone help me guide to work on this. thank you!

Dear,
APO-DP  Vs  Flexible Planning in ECC.  Yes  APO advance but ECC is more user friendly.
The master data is managed in R/3 and transferred to APO using CIF. An issue storage location is maintained in the R/3 production version. This issue storage location is assigned to an MRP area in R/3. This MRP area is contained in the integration model (transaction CFM1). The MRP area is therefore transferred to APO. The APO plan (PPM or PDS) is created in APO in the MRP area. Using this plan, a planned order is created in the MRP area location in APO.
If you want the R/3 behavior, you must not assign the component to the model in the MRP area location. The system will then automatically switch to the plant location, that is, the system then uses the plant location as the issuing location of the component in MRP area.
Hope it will solve your problem. Also refer the OSS  Note 628739 - APO 3.x Release restrictions for MRP areas
Regards,
R.Brahmankar

Similar Messages

  • Difference between Production Supply Area and a Storage Location

    Hello Experts,
    Basic question but wanted to get more clarity on the concept as i never worked on the PSA
    Can someone tell me the exact difference between PSA and a SL. I understand PSA is a Kanban, WM and SL is an IM concept. Can a work center have a storage location assigned or just a PSA? Can a GI be done from PSA or just from a storage location.

    Hello
    The production supply area is a master data used by WM, while the storage location is used by MM-IM.
    Check this link for details:
    Production Supply Area - Warehouse Management System (WMS) - SAP Library
    The goods issue is done with reference to the storage location
    It is possible to assigne a storage location to a production supply area and assign the production supply area to the work center.
    BR
    Caetano

  • SUPPLY AREA  & Controlling Cycle

    Hello,
    I am working with PP REM scenario.
    I want to know more about the customizing and master data and Function of following terms.
    1. SUPPLY AREA
    And
    2.  Controlling Cycle
    Maulik

    Dear Maulik,
    Dear Maulik,
    The Master data required for Kanban production control includes
    1.Supply Area:A supply area is an interim storage location on the shop floor which is used to provide material directly to the
    production line or the work center.
    The supply area can be a shelving area, an area marked off on the ground, special boxes and so on. Defining the supply areas
    for a plant is part of the material flow design for KANBAN. The supply area is defined in Customizing and is assigned the following
    objects:
    Plant
    Storage location
    Person responsible
    Goods movements are posted to the storage location assigned to the supply area.
    One storage location can be assigned to several supply areas, however, one supply area cannot be assigned to several storage locations.
    2.Control Cycle: The control cycle defines the relationship between the demand source and the supply source.
    The control cycle contains the following control data for KANBAN production:
    ●     Kanban circulation, that is, the number of kanbans and the quantity per kanban or per call item as well as the number of load carriers
    ●     The basic data required for automatic kanban calculation, if necessary
    ●     Replenishment strategy
    ●     Printing kanbans, if necessary
    ●     The delivery address, if necessary
    3.Replenishment Stragegy: The replenishment strategies define in the control cycle how replenishment is to take place:
    Using in-house production
    Using external procurement
    Using stock transfer
    The replenishment strategies also determine whether and which replenishment elements (run schedule quantities, production orders, and so on) are created by the kanban signal.
    The replenishment strategy is assigned to the material in the control cycle.
    1.You can create the supply area by executing PK05
    2.Control cyce can be created using PK01.
    Regards
    S Mangalraj

  • Production supply area (PSA) and supply area

    Hi,
    Is there any difference between supply area and Production supply area. it woul be good if you could explain me the difference.
    Thanks,
    Maxx

    Both are same
    Production Supply Area is the link between Warehosue Management and Production function.
    Production supply areas (PSAs) are used for material replenishment and are situated directly on the shop floor in the production department. The supply area groups work centers near production storage bins based on the material staging methods. You need to enter the PSA in the work center master data.
    http://help.sap.com/saphelp_46c/helpdata/en/c6/f8412f4afa11d182b90000e829fbfe/frameset.htm
    Hope this helps.
    An area on the shop floor where material is provided that can be directly used for production.
    The supply area is used, for example, in KANBAN production control and for material staging using Warehouse Management (WM).
    Proposed Supply Area in Material Master Record                                                                               
    The supply area is used as an interim storage area on the shop floor    
         which is used to provide materials directly at the production line.                                                                               
    The proposed supply area is mainly used for KANBAN materials that are   
         only or usually provided at one supply area in a plant. Here, this supply
         area can be easily saved in the system.                                                                               
    The proposed supply area is used, for example, to determine the supply  
         area for the dependent requirements of a material.                      
         The supply area in the dependent requirements of a material is required:
         o  to enable the system to calculate the KANBAN control cycles          
            automatically                                                        
         o  to enable you to select requirements in the pull list with reference 
            to a supply area

  • Allt he links in the header of any websites are not working, I reinstalled fiorefix and it s the same. No problem in others browser. the tool bar is working but not the link sinside the web page located between the top 300px height

    all the links in the header of any websites are not working, the cursor is not changing into pointer and no way to click on any link located at the top of any website page. I reinstalled firefox and it s the same. No problem in others browser. the tool bar is working but not the links inside any web page located between the top 300px height.
    So I can t tlog into any website, i cant write an email as the compose button is located in the top of the page.. Please help, i have all my bookmarks into my firefox...

    Start Firefox in <u>[[Safe Mode]]</u> to check if one of the extensions or if hardware acceleration is causing the problem (switch to the DEFAULT theme: Firefox (Tools) > Add-ons > Appearance/Themes).
    *Don't make any changes on the Safe mode start window.
    *https://support.mozilla.com/kb/Safe+Mode
    *https://support.mozilla.com/kb/Troubleshooting+extensions+and+themes

  • Handling Unit Management and supply areas with WM/control cycles

    Dear all,
    has anyone come across the issue how to handle a replenishment process for production with supply area within WM and Handling Unit Management?
    Normally a supply area is being staged via control cycles. in the supply area, all storage units get lost (standard functionality as far as I know). When we post the GI, the components will be taken out of the supply area, backflushing is not allowed as far as I know.
    Now: what happens if HUM is switched on? Do we have to enter a HU for these GI's as well? Or does the supply area  keep the information of the SU/HU? I want to avoid that the users have to tell the system the HU no. for every screw they take/consume...
    Thanks & regards
    Christian

    Hi,
    (as already described,)
    it is possible to use handling unit management together with lean        
    warehouse management. You activate handling unit management independent  
    from storage unit management (that is only possible in case of full-WM   
    as far as I know).                                                       
    Only in case if storage location is full-WM- AND HU-managed the storage  
    unit management is always active and HU numbers are taken over as SU     
    numbers. In all other cases HUM and SUM are independent from each other  
    and number ranges must be set a way that they are not overlapping.                                                                               
    Regards,
    Ely

  • When I am trying to package my artwork in Adobe Illustrator CC, it is not capturing my images and fonts. How do I make sure my linked photos and fonts are captured?

    When I am trying to package my artwork in Adobe Illustrator CC, it is not capturing my images and fonts. How do I make sure my linked photos and fonts are captured?

    Not all fonts can be packaged depending on their licensing. Some fonts are set to not allow packaging. For those you would have to manually locate them on your computer and add them to the folder where the packaging occurred.
    For the images have you checked the "copy links" option?

  • SPP and MRP Areas

    Hi,
    today we are doing all our ECC planning (MRP) on MRP Areas. No planning is carried out at plant level.
    Is it possible to do the planning in SPP on the MRP Area locations instead of Plant locations.
    We are considering where to perform our spare parts planning in the future and we are thinking of either using:
    - ECC Flexible Planning
    - APO Demand Planning
    - SPP
    Regards,
    Kenneth

    Hi,
    we can use Total planning(MD01) for a single plant or use scope of planning to control whether total planning is to be carried out for single plant/sevaral plant/ for one MRP Area/sevaral MRP areas/ combination of plant and MRP Areas.
    Steps :
    1.Group together the plants which are to be planned in spro in --->Define scope of planning.(OM0E)
    2. Define the scope of planning as 999 for ex and give description.
    2. Now select that and Specify the sequence in which Plants and MRP Areas are to be planned,
    3.Goto new entries and enter the plant as 1000/MRP Area as 1000 with counter 1 and plant as 1100 with counter 2 and save.
    4.Execute the total planning either as online job or as background job.
    5.The planning run has to be always started with paralle processing.
    In SPRO in define parallel processing in MRP enter the destination for parallel processing for ex your server name and enter the no .of sessions as 1 and save.
    6.Tcode MD01 enter the scope of planning group and selet the parallel processing and enter. Hope the above points taken care and resolve the issue. Thanking you.

  • MRP Areas and MRP

    Hi I've created MRP areas, and expect to run MRP by MRP area, however, when I click on the drop down list beside the field MRP area in MD01 I do not get a list to select an individual MRP area.  Is this right?
    Thanks

    Hi,
    we can use Total planning(MD01) for a single plant or use scope of planning to control whether total planning is to be carried out for single plant/sevaral plant/ for one MRP Area/sevaral MRP areas/ combination of plant and MRP Areas.
    Steps :
    1.Group together the plants which are to be planned in spro in --->Define scope of planning.(OM0E)
    2. Define the scope of planning as 999 for ex and give description.
    2. Now select that and Specify the sequence in which Plants and MRP Areas are to be planned,
    3.Goto new entries and enter the plant as 1000/MRP Area as 1000 with counter 1 and plant as 1100 with counter 2 and save.
    4.Execute the total planning either as online job or as background job.
    5.The planning run has to be always started with paralle processing.
    In SPRO in define parallel processing in MRP enter the destination for parallel processing for ex your server name and enter the no .of sessions as 1 and save.
    6.Tcode MD01 enter the scope of planning group and selet the parallel processing and enter. Hope the above points taken care and resolve the issue. Thanking you.

  • I'm trying to load up webpages and am getting the error "URL not valid" but it's on sites and URLs that i know for sure are. Like when I click a link it'll do that but I'll close the notification box and click the link again and it'll load.

    I'll pretty much just get a message that says something like google.com is invalid when I know it for sure it. Even if I just click on a link on like Gizmodo or something, I'll get that message. I'll close the message and then I'll click the link again and it would actually load up now.
    == This happened ==
    A few times a week
    == A while ago. Perhaps a couple weeks

    Click here and request assistance.
    (91679)

  • Why does Illustrator CS4 save pdfs with clipping paths and make rasters of gradient areas

    I am on a IMAC and upgraded to 10.6.8 Jan 2014. I am using CS4 Illustrator to create with. When i save my work as a pdf then reopen the pdf in Ill to make changes, the whole page has:
    A.) Multiple clipping paths around it
    B.) Most text has now become outlined. Not editable anymore.
    C.) Gradient areas have multiple clipping paths of the single gradient area
    D.) The gradient areas now become rasterized.
    This is very frustrating as now all of my marketing files, some 300+, are worthless. I don't know where to look anymore to find the problem.
    Please help.
    Thank you very much

    John,
    I have the presets as you have shown. I had been editing the supplied items as you suggested. Then figured i should ask the questions of those who are better than I.
    But still a bit confused as to why the new save places clipping paths around the document.
    Thank you John and Monika for your help.
    why does Illustrator CS4 save pdfs with clipping paths and make rasters of gradient areas
    created by John Mensinger in Illustrator - View the full discussion
    I do a save as "pdf" in the format pull down tab. I save to a folder on the hard drive. Where is the "Illustrator editability" check box? I presumed it is in Acrobat some where
    but i seem to be lost.
    It is in Illustrator's Save Adobe PDF dialog, which pops up before the saved file is written.
    https://forums.adobe.com/servlet/JiveServlet/downloadImage/2-6439399-644928/450-397/Untitl ed-1.jpg
    Sorry i didn't mention this, but this seems to have occurred when using images and text from provided pdfs.
    That's a critical fact. If you didn't do the original save, the above is moot, and it's too late to exercise any control over the save process. Someone else failed to save for editability. The only thing you can do is clean up/repair the content, (release clipping masks, rebuild rasterized elements, expand objects, etc.), and save correctly as AI. Then, if necessary, re-save as PDF with the correct settings.
    Please note that the Adobe Forums do not accept email attachments. If you want to embed a screen image in your message please visit the thread in the forum to embed the image at https://forums.adobe.com/message/6439399#6439399
    Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page:
    To unsubscribe from this thread, please visit the message page at . In the Actions box on the right, click the Stop Email Notifications link.
    Start a new discussion in Illustrator by email or at Adobe Community
    For more information about maintaining your forum email notifications please go to http://forums.adobe.com/thread/416458?tstart=0.

  • Iso5 download error, network timed out, how do i stop this, all of my firewalls and security on my pc are currently swiched off but this still didnt help

    iso5 download error, network timed out, how do i stop this, all of my firewalls and security on my pc are currently swiched off but this still didnt help>
    trid multiple times over the last few weeks, after waiting 45 minutes for the download to comlete the network times out whilst processing the download

    The router is in your house.
    In a nutshell, a modem communicates with the Internet and brings a single communications link to your house,  The router takes that single link and divides it up among many links, both wired and wireless, to support many devices in your house.  The router and the modem may be separate physical boxes or, more commonly, they're in the same enclosure.
    Unfortunately, if there is a firewall in the router, you will need help.  I don't think that it's a good idea to try to walk you through it via the forum.  You should contact the router supplier and have them walk you through the investigation.

  • How to realize assign mul storage location to one supply area

    senario description: in my project there two production plants A and B.and use the one serial work center which created under the plant A.At the same time ,raw material were stored the defferent storage location in every plant.and the storage location linked with WMS.my question is:
    1how to design the supply area,create one links many storage location or create one supply area for every storage location.
    2whether the TR can be created automatically when release the production order if the produciton order is in the plant B.

    Hi,
    1)how to design the supply area,create one links many storage location or create one supply area for every storage location.
    To design supply area one storage location can be assigned to several supply area however one supply area cannot be assigned to several storage locations.
    2whether the TR can be created automatically when release the production order if the produciton order is in the plant B.
    To create TR automatically you have to configure at movement type & storage type level.
    Regards
    Ravi shankar.

  • Errror : production supply area not available fieldin  work center .

    HI
       hi friends
            i want  to maintain production supply area in work centre...
            production supply area means storage location??
          i have a confusion between storage location and production supply area
    pls suggest me where i missed the setting
    with regards
    dinesh

    Production supply area is not a storage location. It is linked to one, but you may have more than one supply area per storage location.
    Supply areas are used in KANBAN processes, and I think that also in WM-PP interface.

  • How can i connect iphone to itunes.. i want to restore because my finger mistakes that click Reset all content and setting.. so iphone are empty.. all foto and data lost, right.. how can i use my iphone again..

    how can i connect iphone to itunes.. i want to restore because my finger mistakes that click Reset all content and setting.. so iphone are empty.. all foto and data lost, right.. how can i use my iphone again.

    Yes, try to restore your iPhone from iTunes or iCloud backup.
    iOS: How to back up and restore your content
    http://support.apple.com/kb/HT1766
    Tell us the result if you will try.
    <Link Edited By Host>

Maybe you are looking for

  • Step-down voltage converter or traval adapters?

    Hi, I am studying in Ireland with my iBook that I bought in the US - as well as a few other US electrical appliances. I have been using step-down voltage converters, but having problems. I just discovered today that I was using too many watts for the

  • Problem executing e-Recruitment Pages

    Hi SAPiians, We are implementing SAP e-Recuitment using BSPs. We are done with the configuration part and also configured the ALE. Also, generated the URLs using RCF_GENERATE_URLS. When i copy and paste the URL in a browser, the logon page pops up. W

  • Dynamic view names in view objects (adf faces bc 10g)...

    I have written an application in adf faces and business components, but would like to be able to add sections to it by simply creating a database view, say with standard names and a suffix, and probably static number of columns (just a read only view

  • Help Please Repeat Region not repeating all records only repeating 7 records

    Hi all, Please can you advise what's going on here - I'm building an ASP SQL site and all was going well until my colleague pointed out that the repeat region is not repeating all records as i've coded it to using Dreamweavers Repeat region SB, it ap

  • HTML Editor Table border colors, JavaScript Integration

    Hi, i have two questions regarding the HTML Editor in KM: 1) How can I change the border color from tables? I have tried to change it with the adjustment from Tables in Theme Editor, but nothing happens. 2) Can I add JavaScript Coding in HTML-Editor?