List Display of component in subcontracting Purchase order

Hi experts
I want to know is there any transaction by which i can see list display of component in subcontracting po.
Regards
Parkash

What do you mean by list display?
You can display it in the purchase order itself.
If the normal table display is not good enough, then when in the Component Overview (you get there by pressing the BOM icon on Material Data TAB of the purchase order item), go to the menu:
Component list --> Print
and you get a list format.

Similar Messages

  • Component Stock reservation during subcontracting purchase order

    Hi
    We have a below requirement..
    While creating subcontracting purchase order,using Me21 transaction for finished goods,we require Bill of material components stock to be allocated autamatically during ATP check..Can u tell us where exactly we need to do the config..We need similar settings like sales order(When sales order is created stock gets reserved autamatically ...)
    While creating sub contracting order using Me21 transaction,components stock to be be reserved for that order...And if requried we need to unblock the stock for that order and allocate to other order.....
    Regards
    Swetha

    Hi,
    As I have already stated, there is no standard way of achieving what you want.
    ME2o is the nearest thing you have to achieving what you want.
    Remember the main point I made that the stock sent to the subcontractor is NOT LINKED to the subcontract PO in any way. That is why you can issue a 541 as many times as you like.
    the 541 and ME2o are simply methods of maintaining the required stock level of the components at the subcontractor, they are not designed to be allocating stock to individual POs.
    As I also said, if you run ME2o regularly you will be shown all POs that have insufficient stock of components at the subcontractor. You do not need to be able to specify an individual PO number, simply enter the subcontractor number, tick the "only SC stocks with shortage" and you will see a list of every item with a shortage. Simply goods issue those items from within ME2o and ths stock will be "reserved" against that subcontractor and so it cannot be used for any internal movements etc.
    this is the closest you will get, it reserves the stock against the subcontractor and you wanted it reserved against the PO. This is surely close enough to mean that you don't have to generate a HUGE modification to the system to reserve against the PO. (It would be so big a mod that it would certainly NOT be recommended anyway).
    Please do try to see things from another view and consider trying to use ME2o as it was designed to "reserve" the stock against the subcontractor.
    Steve B

  • Batch determination for subcontract purchase order component.

    Hello
    Is it possible to do batch determination for the subcontract purchase order componet, then bring the component batch to the outbound delivery directly from purchase order?   If no standard, any user exit or BADI... can do this also good for us.
    Thanks
    Hailiang

    Hi
    Yes I can manual input batch number, but I want the system select the batch in stock base on the batch classification.  I can not find the batch determination function the the component detail screen.
    Best Regards
    Hailiang

  • Components for the Subcontract Purchase Order

    Hello All,
    I am trying to create a subcontract Purchase Order, I have created a subcontract Purchase Info Record using ME11 for the Finished Goods and also defined the BOM using CS01. 
    When using ME21N, I have defined the line item as L Category.  In the Item Detail -> Material Data tab, there is a "Components" and "Explode BOM" button.  When I click on the "Components" button, I see the list of raw materials defined in the BOM.  I know for subcontracting that we are able to enter the components manually or can be generated via BOM explosion.  I would like to ask how can I enter the components manually as when I try to delete an item it said not able to do so. 
    Can anyone please help.
    Thanks.

    Hi..
    In Subcontract PO, BOM can be deleted by selecting all BOM line items then go to Edit and select Delete tab .
    To enter the component manually click on Collective Entry Tab in PO BOM and after that you can enter components manually.
    So 1st delete the BOM and then add BOM manually by above procedure.
    But as a standard Practice CS03 BOM only to be changed and then explode the PO BOM.
    Regards
    Vishnu

  • Problem for Goods Receipt for Subcontracting Purchase Order

    Dear all,
    Presently, we are using SAP version 4.6C and we need to introduce GR for
    Subcontracting Purchase Order. We have developed a ABAP program to handle
    subcon Goods Receipt by uploading flat-files from our subcontractor. The
    scenario is as follows :
    Goods Receipt for Subcontracting Purchase Order
    1. In the ABAP program, function BAPI_GOODSMVT_CREATE will be used for goods
    movement.
    2. Data provided to the function are as follows :
    - Posting date
    - Document date
    - Material number
    - Plant
    - Storage location
    - Batch
    - Movement type (101)
    - Quantity
    - Purchase order number
    - Purchase order item
    - Movement indicator (B - Goods receipt for purchase order)
    3. The function will do data verification and automatically determine GI
    item for subcon stock:
    - Movement type (543)
    - Special stock (O - parts prov. vendor)
    - Material
    - Quantity
    - Plant
    Our problem is that :
    Only the GR item in the interface is to be transferred and the GI item is
    determined by the system. So, the quantity for subcon stock cannot be
    changed using this BAPI. Then the system will continue processing the goods
    receipt and create material document.
    Manually, by using transaction code MIGO, the user can display the subcon
    stock data and then change the quantity.
    By using transaction code MB01, after the user fills in all the GR fields,
    the system comes to line item 002 (subcon stock data) and then quantity can
    be changed.
    As per user requirement, quantity for GI item must be same with the quantity
    that has been transferred to subcon vendor in Delivery for Subcon
    (transaction code VL02N).
    We cannot achieve this requirement by using the BAPI mentioned above. Would
    appreciate any valuable help from anyone who is able to help us on this
    matter. Are there any other BAPI's that can help us to achieve the same
    result ?
    Thank you in advance and best regards.

    As far as i understood the problem I suggest u to create the
    BDC according to user actions that are performed in he manual
    operation.
    I can't say that the BAPI performs the exac solution what you want.
    I have done some BDC work using MB01 and suggest you to be careful
    and try to keep the complete in the logic as some chages in rows in BDC will
    change the complete scenario.And throw correct quantity val in correct
    material
    row.
    This methodology will help u even in mass uploads.
    Or in case of automation u can perform the call transaction BDC in
    background mode.
    so As per my understanding bdc program is the solution. pls try and let me
    know.

  • Link from delivery to subcontracting purchase order

    Hi Guys,
    anyone know how to pick up the link from a delivery (LIKP / LIPS) and the subcontracting purchase order (EKKO / EKPO) which was used to create it?
    I'm not sure such a link exists - the PO does not appear in the document flow of the delivery, and the delivery does not appear in the history of the purchase order.
    My users want to print the PO number on the delivery document (not unreasonable?) but I can't find a link anywhere...
    Mick Kelly

    Hi Mick,
    I assume that you mean the outbound delivery created in transaction ME2O to deliver components to your subcontractor.
    There is no link possible between the subcon.PO and this outbound delivery. Because the component requirements in ME2O can be the result of multiple subcon.PO's. When you create the outbound delivery, it contains components for the cumulated requirements (so that can be for multiple PO's). That's the reason that there is logically no link possible between PO and the outbound delivery.
    Kind regards, Dick Hendriks.

  • BAPI for GR against subcontracting Purchase order

    Hi Friends,
    I need to make the GR against the Subcontracting Purchase order, for that I need the BAPI. can I use BAPI_GOODSMVT_CREATE.
    The problem is how to find out the BOM Materials. Can anybody provide me the source code for the reference of GR for Subcontracting Purchase Order.
    Thanks in advance.
    Krishan

    Hi krishan,
      Refer to the link below for sample code of
    BAPI_GOODSMVT_CREATE:
    http://www.sap-img.com/abap/bapi-goodsmvt-create-to-post-goods-movement.htm
      also refer to the link below for BAPi's:
    http://www.sapbapi.com/bapi-list/
    With luck,
    Pritam.

  • Posting of Components made compulsory for Subcontracting Purchase orders

    Hi
    I am working in ECC 6.0. In case of Goods receipt for subcontracting Purchase Orders, does the child quantities automatically changes when i change the default quantity of Header material according to the BOM relation ? I found it is not happenning.Please inform is this standard?
    Also i can post the documentfor  header material without the components,by manually changing the quantities for Child items .Kindly give a me suggestion by which this can be controlled.
    Regards
    Arvind

    Hi,
    1.
    The component changes as per the header material in MIGO when you want to do GR. Please take care that the components musn't be exploded when you change the qty of the BOM header material. If they are exploded, collapse them ("close the explosion"), after that change the qty of header material and when you explode the components again you should get the proper quantities (this button is in the line of BOM header material).
    2.
    As per my best knowledge, in standard system you cannot restrict/control the change of component quantities. The cause of it might be that the quantity of components may differ from the rates defined in the BOM and the user HAVE TO CHANGE the quantities as per the real consumption.
    Solution might be training. If the user intentionally changes the component quantities, this is a HR issue..
    Regards,
    Csaba.
    Edited by: Csaba Szommer on Dec 26, 2008 5:14 PM

  • Alternative Bom in Subcontracting Purchase Order

    Hi Friends,
    Can you suggest me how to pick alternative Bom in a Subcontracting Purchase Order.
    Rgds, Krishan Raheja.

    create the production version and assign that to sub contracting inforecord and system will pick based on the production version assigned to info record
    Production Version                                                                               
    Key which determines the various production techniques according to which
         a material can be manufactured.                                                                               
    The production version determines the following:                         
         o  the BOM alternative for a BOM explosion                               
         o  the task list type, the task list group and the task list group       
            counter for allocation to task lists                                  
         o  lot-size restrictions for repetitive manufacturing

  • LTP Planning for Subcontracting Purchase Order

    Hi All,
    I am doing LTP run for the Finished Material.
    Finished Material is having few open subcontracting Purchase order's.
    When I take the LTP run  in MS02, system is considering the Open PO's and adjusting (netting) it with the Planned independent requirements of finished material. This is ok.
    But the planning is not creating depending procurement proposals for the child items.
    It is subcontracting PO of finished material, system suppose to create the dependent requirements.
    In the MRP run it is working fine in MD02. But not working in LTP planning run in MS02 Transaction.
    Rgds /  Shailendra
    Edited by: Shailendra Hadkar on Apr 7, 2010 10:44 AM

    Hi All,
    I have found one BAdi u201CMD_CHANGE_MRP_DATAu201D  for showing up Subcon requirements in MS04 for child materials.
    This BADI "MD_CHANGE_MRP_DATA" requires to implement using method "CONSIDER_RESB".
    But implementation of this BADI using method "CONSIDER_RESB" will open up Dependent requirements/reservations of phantoms in phantom assembly planning and other reservations also.
    How I can implement this BADI for specific Subcon requirements or Specific MRP element??
    Regards,
    Shailendra
    Please refer below post by Nethi Venkata R... 
    LTP Doubt

  • Open Po quantity in subcontracting Purchase Order

    Hi,
      In case subcontracting purchase order,If order quantity 10 and recept quantity is 05 then in delivery shedule tab I didn't got any open purchase order quantity means  05 quantity why?
    Thanks and Regards
    Anil Patil

    Hi Anil.
    Please check the following fields in schedule line:
    - 'Scheduled qty': 10
    - 'Delivered' (quantity): 5
    (This means the goods were partially delivered for the PO)
    If your situation is this you don't have to expect SAP to create new shedule line I think.
    I think you have to modify the schedule line manually if you want a 'Delivery date' different from that was defined in the line of the PO item.
    BR
    Csaba

  • Good receipt problem for subcontracting purchase order

    Good receipt problem for subcontracting purchase order
    with account assignment type ‘E’.
    After update to ECC 6.0. Do good receipt for subcontracting purchase order with account assigment 'E'.The system show the error message(KI235)----Two cost elements (Change in Stock (Subcontracting)&Outside processed fee) haven't CO account assignment.but the field status  for sale order is option entry , when I default cost center for the cost element  in OKB9.the system post the material document and generate the following accounting document.
    Doc.Type : WE ( Goods receipt ) Normal document
    Doc. Number    5000056065       Company code    1000         Fiscal year     2007
    Doc. date      2007.12.04       Posting date    2007.12.04   Period          12
    Calculate Tax
    Doc.currency   HKD
    tm PK Account    Account short text   Tx Cost Ctr   SaleOrder               Amount
    1 89 13500000   Stock-Work in proces                   1007823  10             274.4
    2 96 21210010   GR/IR Clearing                             1007823  10             205
    3 91 41010102   Chg in Stock(Subcon)    10901099  1007823  10            274.4
    4 86 41031000   Outside processed fe     10901099  1007823  10            205  
    5 99 13500000   Stock-Work in proces                    1007823  10            69.4
    6 81 41010101   Cost of Prod (Subco)                      1007823  10           69.40
    My problem is:
    When use MIGO to do good receipt for subcontracting Purchase order, for consumption account((Change in Stock (Subcontracting)-41010102&Outside processed fee--41031000) ,why the system don’t recognize the sale order filled as CO account assignment?

    Dear fanny chen
    Did you get a solution for your open question?
    I`m facing the same problem, so any help yould be appreciated.
    Regards

  • How to change material component for a Purchase Order?

    How to change material component for a Purchase Order?
    I need FM .
    PLEASE help

    Dear ,
    Create PO with item category L....There in Item detail you will get tab for material.
    There click in component Button, it will take you to the component screen there you can assign and deassign components.
    Hope this helps.
    Regards
    Utsav

  • Bapi for subcontracting purchase order

    Hi,
    is there a BAPI allowing to create a subcontracting purchase order?
    Best regards.

    Hello,
    BAPI_PO_CREATE and BO: BUS2012.
    BAPIEKPOC = ITEM_CAT (3 - Subcontracting)
    Regds, Murugesh AS

  • Subcontracting Purchase Order with Delivery Cost

    Hello Experts,
    I am facing issue during Goods Receipt against Subcontracting Purchase Order.
    Note:
    a) Subcontracting PO has delivery cost given 200 /pc.
    b) Condition type Z001 for Delivery has Condition Category "B" with accrual checked.
    c) Pricing Procedure has Accrual Key FR1 with condition type Z001
    d) Condition Z001 is common for Standard Item Category PO and Subcontracting PO for delivery cost.
    During Goods receipt, system generates following accounting.
    BSX     Inventory-SemiFinish     M     S     521.12
    WRX     GRIR Clrg-Mat A/c     S     H     100.00-
    BSV     Inc/Dec. in Semi-F     S     H     521.12-
    FRL     Job Work                          S     S     100
    FRN     Freight Clearing A/c     S     S     100
    FR1     Freight Clearing A/c     S     H     100.00-
    BSX     Inventory-RM(Domest)     M     H     321.12-
    GBB     RM Consumed-Domestic     S     S     321.12
    As shown above FRN is the account which is the resultant of Devliery cost during Subcontracting. Entry of this Key is not completely knocked off in this transaction and next transaction for invoice verification MIRO.
    My query:
    A) Can we stop account posting for FRN.
    B) If not How will FRN entry be knocked off, (Entry for FR1 gets set off during MIRO- Invoice verification.)
    C) In case B is not possible, Posting in account  assigned to FRN Key will always show values.
    Can any one help me to confirm that Entries above during Goods Receipt are ok, If not what sort of changes are required.
    Can we use same condition types for Delivery cost for Standard Item category PO and Subcontracting PO .
    Awaiting reply,
    Regards,
    Manish

    Hi Vaibhav,
    a) I am not able to understand why do you think the above entries are not correct.The entries are perfect.
    My Reply:  Ok I do agree for a movement that entries are ok, No Issues
    b) If you want that freight entries should not go to separate account then you can include the freight charges in the same condition as basic price condition so that charges will go to FRL and WRX.
    My Reply: How can I include Freight Charges in the same condition as basic price condition, so that charges will to go FRL & WRX, Can you please explore this,
    Regards
    Manish

Maybe you are looking for

  • Help with Script AS 2.0

    I have this slideshow I've done and I'm wondering why it's stopping at the last image. I need it to continuely play in a loop. Any help? holder_mc._alpha = 1; whichPic = 1; _root.onEnterFrame = function() { if (holder_mc._alpha>2 && fadeOut) { holder

  • Can I Control Book Module Zoom Levels in LR4

    Hi I'm frustrated that using zoom in/out in Book module doesn't seem to let me control the level of zoom. On my macbook this makes text in captions either too small to read without straining or too large to see more than a few words at a time. I can

  • Filtered Value in Reports

    Hi all, I have a requirement where in whenever a user filters on any characteristic in the report a dynamic text should appear on a screen which says, "Report filtered by - XXXX". I tried using info item and dynamic filters but that doesnt serve my p

  • MS DSC Base Config Vs Role Based Config

    Hello - I have been working on a project with the following goal: (1) automated deployment of windows servers ( Physical and Virts on Hyper-V) [This is achieved from custom code] (2) once the server has been deployed and joined to the domain, I would

  • Non-jpg files in iPhoto

    I'll admit right off that I'm a mac newbie (love it so far). But I have a problem with iPhoto. I use iPhoto to import my photos, and I like some of the iPhoto features, especially the slideshows. However, once I import a photo, I edit it in Photoshop