List of materials planned in a MRP Run

Hi,
We are running MRP through background job...after completion of MRP Run how to see the list of materials planned in that particular MRP Run...
plz help
Thanks
Kumar

Hi ,
If you goto  BG job logs in SM37-Enter Job name or user name -Execute  and then Hit the Spool  and Mark the Spool chek box against the spool number generated after the job finished  and click on detail ( magnifying glass)- Here you will get the list of materials for BG run of MRP.
Regards
JH

Similar Messages

  • Report on list of Materials planned in UCP

    Hi Experts,
    Is there any report available to get the list of Materials planned in Unit Cost Planning.
    Thanks in advance.
    Vinodh

    Hi Vinvidh_18,
    I have also been trying for capturing list of Materials planned in UCP in reports for quantity comparisions.
    If you please explain the development you have done on this along with the linked tables for the same, it will be useful a lot.
    Thanking you in advance,
    Best wishes,
    Mohan, SAP PS

  • Production orders in place of planned orders in MRP run

    Hi,
    Please help me with this senario,
    we receive saleorders through CRM interface then these are chnged to redistribute to different plants by changing the plants in saleorders.
    we want to run and create production orders directly for these saleorders without creating planned orders.
    I tried using strategy 82 but it makes the production order online, but we want it to be created after mrp run.
    Is there a way to create production orders instead to planned orders in MRP run.

    Hi You used Right strategy only.Use Strategy '82',  Transfer requirement from CRM and execute MRP run in Background.It will generate Production order.But i didn't understand what you mean by 'Online' 3
    Pl.  Correct me If I am wrong.
    Edited by: Velmurugan S on Mar 4, 2008 10:02 AM

  • Multiple planned orders in MRP run

    Hi All
    I have a requirement where I need to create multiple planned order for the same material during MRP run. I understand that once I run MRP a planned order creates. If I run again for the same material, the quantity will be changed for the same planned order. Do we have any configuration so that system creates multiple planned orders for same material for each MRP run.

    Hi Adithya
    Planned orders may be changed by MRP until they are firmed. Therefore, what you need to do is to firm the planned orders after the MRP execution.
    You can use for example, transaction MD19 to mass firm planned orders after each MRP run.
    Otherwise, you can user BAdI MD_PLDORD_CHANGE to automatically firm the planned orders created by MRP.
    BR
    Caetano

  • Wrong Planned Order dates - MRP Run

    Dear Experts,
    Please guide to resolve the following problem:
    I have uploaded the PIRs for 3 months. When I take the MRP run, the system is scheduling the planned orders for first 2 months only. For the 3rd month's PIR the planned order are created for the PIR dates only. 
    For example, if the PIR (for 3rd month) is maintained on 25th of the month. The planned orders for FG & SFGs are being created for 25th only. While for 2 months the Planned orders are properly scheduled.
    What could be the reason for such behavior.
    The planning horizon is 90 days.
    Regards,
    Rohit.

    Dear Rohit,
    If you are running MRP with NETPL, then the Lead time scheduling will be carried out only for the planning harizon.
    Try executing MRP you can select NETCH key.
    or
    If you want to run MRP with NETPL key, then please give In-house production time in workscheduling view as per the routing values. For example 1 day is the processing time and give the quantity for for 24 hr production. Then the sceduling will be carried out as per this values.
    And change the planning harizon for detailed scheduling in OPU5 transaction.
    Thanks and regards
    Murugesan

  • Generate Plan Order from MRP Run (MD51) by WBS Element

    Dear All,
    1. I have created sales order with assigment WBS element (VA01)
    2. Then I created Routing & BOM for Material (CA01 & CS01)
    3. Generate MRP Run (MD51)
    The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
    Help Me...
    MamaRara

    Hello,
    Hopefully, the following link can assist you.
    - Re: After firming planned order, new planned order is generating in MRP run
    - Basic Scheduling in MRP run
    - Re: MRP run
    - During MRP run unwanted plant and storage location include and exclude
    - MRP run does not consider the common stock
    Thanks & Regards
    JP

  • Creating purchase requisitions instead of planned orders after MRP run in MDBT

    When running regenerative planning in MDBT for plant with following details ,The system has to provides planned orders for the materials .
    Processing key:NEUPL
    Create Purchase requisition :3
    Schedule lines:3
    Create MRP list:1
    Planning Mode:1
    Scheduling :1
    But sometimes it provides purchase requisitions for certain materials.The problem happens for different materials at different times.
    I checked the material master and found that procurement type is external procurement.Business need to create planned order for the materials and then want to convert it to purchase requisition.
    MRP group is assigned to the materials but no creation indicator maintained for the MRP group.
    Please tell me why this run creates purchase requisitions suddenly and in the next run it disappears?

    Hello
    Maybe someonelse is running MRP in another transaction, such as MD02, with a different parameter. Check on transaction MD05 when was the last MRP execution and the user that ran it.
    Also check if there is any active implementation of BAdI MD_MRP_PARAMETERS.
    If you don't have a cretion indicator, maybe it would be useful to set it for your MRP group, with the parameter 3, in order to make sure that planned orders will be created.
    BR
    Caetano

  • Problem when creating planned order with MRP run

    Hello,
    I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
    - planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
    - when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
    Material requires configuration
    Message no. 61259
    Diagnosis
    Orders and requirements for a configurable material must have characteristic values.
    Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
    System Response
    MRP: Requirements without characteristic values for a material cannot be planned in MRP.
    Procedure
    Check requirements or orders.
    Create a configuration evaluation for the material in the material master record if necessary.
    Thanks in advance.

    Hi
    I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
    Thanks
    Nagesh.

  • BADI For Changing Planned order Qty during MRP Run

    Hi,
      My requirement is i want to change Planned order qty based on some conditions during MRP run(MD02). Is there any BADI to fullfill my requirement.
    Thanks,
    Kishore

    Not sure I understand the situation correctly...You want to delete the planned orders before MRP runs again. WHy do you want to do that ? Are these firmed Planned orders ?

  • MRP Run For Credit Blocked Sales Orders

    Hi
    Does any one know how to prevent the generation of planned orders for Sales orders which
    have been credit blocked. At the moment the reservation is still visible on MD04 and is therefore
    planned during the MRP run. As a result manufacturing continues for these sales orders.

    As far as credit block is concern; what it means is that delivery will not be done for this customer via VL01N.
    This means if you have blocked this customer in FD32; no delivery to be done
    It may not be linked with MRP calculation b'cos it comes into picture while doing delivery & not during planning
    Rgds

  • MRP run on basis of lot size

    Dear all
                    I have two different lot size routing for a inhouse product are 0-2000 and 0-1500 nos . I planned for 5500 nos  , after MRP run system should create planned order as per selection of lot size as 0-2000 for 2 planned order and 0-1500 for 1 planned order .is it possible ?
    thans in advanced
    regards
    siva

    Dear,
    Quota arrangement can be used if the demand (100) is created in which is define the ratio 60:40 but it will create two planned order after MRP Run. Go to transaction MEQ1 maintain a quota arrangement for this material. In MRP 1 view choose lot size with quota splitting and in MRP 2 view maintain quota usage as 4.
    Refer this thread
    Re: Quota Arrangement
    Please try and come back.
    Regards,
    R.Brahmankar

  • Sales order while MRP run

    Hello friends;
    My requirement is such that when i run mrp in MD02, system should not consider those sales order that are planned in previous MRP run. System should consider new sales orders that are created after MRP run.
    Waiting for reply.
    Thanks.

    Hi,
    One solution is go for individual Sales Order/Line Item MRP run using T.code MD50.
    But I can't understand problem with use of MD02.If Receipt element(Plan order)is there which contains the Account Assignment of that Sales Order line Item then I don't think system will replan for same Sales Order Line item.
    Regards,
    Dhaval

  • Planning Mode in MRP

    Hi Gurus,
    Can any one throw light on Planning Mode in MRP run?
    I basically what to know the difference and impact of this on MRP run?
    I have basically done this keeping all other parameters same, but go same reult for planning mode 1, 2, 3.
    a) Scenario 1 - I have changed the MRP controller in material master.
    After MRP run with 1, 2 and 3 - Observation is planned order number is changed and it has new MRP controller.
    b) Scenario 2 -I have changed the BOM of header material and added a new child item.
    After MRP run with 1, 2 and 3 - Observation is planned order number remains the same and in all 3 cases picks the new BOM.
    What the difference then?
    Can anyone if have document made pl share it with me.
    Thanks in advance,
    Srini

    Planning Mode 1
    Planning mode 1 is if you have only set the planning file entries (net change planning indicator and net change planning horizon indicator) in the planning file for a material (see Planning Run Type).
    In the planning run in planning mode 1 the system reactivates the existing planning data, that is, procurement proposals that are not firmed remain on the database and are only then adapted, if the dates and quantities do not suit the new planning situation. The system only re-explodes the BOM for adjusted procurement proposals. System performance is thus improved.
    Example of changes that cause planning mode 1 to be set:
    Changes in date and quantity
    Requirement changes
    Changes in the lot-sizing procedure or MRP type
    Planning Mode 2
    Planning mode 2 is if a material has planning file entries and the Re-explode BOM indicator is also set in the planning file.
    In the planning run in planning mode 2, the system re-explodes the BOMs for all existing procurement proposals that are not firmed and also for those, for which the dates and quantities do not have to be adjusted.
    Example of changes that cause planning mode 2 to be set:
    Changes to the material BOM
    Changes to the sales order BOM
    Changes to the phantom assembly BOM
    Changes to references assigned within BOM
    Changes to material classification
    Change of production version in material master or planned order
    Change or conversion of BOM explosion number
    Planning Mode 3
    Planning mode 3 is if a material has planning file entries and the Reset order proposals indicator is also set in the planning file.
    In planning mode 3 existing procurement proposals that are not firmed are completely deleted from the database and recreated. The system then re-explodes the BOMs.
    Example of changes that cause planning mode 3 to be set:
    In-house production time
    Planned delivery time
    Scheduling margin key
    MRP controller
    Regards,
    Ajay Nikte

  • Alternate material, alternate vendor handling in MRP run

    Could you please guide for  the following :
    1) Alternate materials setting/handling for MRP run.
    2) Alternate Vendor setting/handling for MRP run.
    3) Handling of sub contacting for MRP run.
    Edited by: laroia on Sep 22, 2011 10:11 AM

    Hi,
    Hope these two notes as FAQs might help you in identifying the issue , Please check and retun back .
    206684 - MRP: automatic source determination
    457110 - FAQ: Source determination in purchasing
    Rehards

  • Materials planning for Recursive BOM during  MRP run

    SAP Guru's,
    We developed an recursive BOM as per production  requirments , but we didn't know the impact of this recursive BOM during MRP run.
    Pls help us how to recursive bom behaves during MRP.
    Thanks & Regards
    Suresh Babu.S
    Bangalore

    Hi,
    This message was sent to us by SAP when we were having the same kind of requirement. Hope it will help you too.
    Usage Probability
    Material requirements planning (MRP) plans the alternative items according to usage probability.
    If you use the usage probability to determine the withdrawal posting (strategy 1), the quantities are proposed according to the usage probability. You can change the proposed quantities.
    An alternative item is only planned if the usage probability is at least 1%.
    If the usage probability is 0%, a dependent requirement with quantity
    0 is generated for the material.
    The component with the quantity 0 is displayed in the planned order.
    If required you can increase the quantity there.
    It is possible to plan too much for alternative items, because you can enter usage probabilities that add up to more than 100%.
    Hope it will help you.
    Regards,
    Alok Tiwari

Maybe you are looking for

  • Adobe Air vs HTML5 vs Native in Mobile Development

    Just now, I read an article "HTML5 vs. Native: What`s a Mobile Developer to Do?" (http://www.eweek.com/c/a/Application-Development/HTML5-vs-Native-Whats-a-Mobile-Developer- to-Do-648997/), and this make me think of Adobe AIR. For those of you who hav

  • If U R Trying To Copy Music From Your iPod To Your iTunes Read This First!

    If you need to copy music from your ipod to your itunes in your computer becuse all your music was erased, try this first. Go to http://www.copypod.net/ try the 14 day free trial, i use this and it works wonderfully, because my pc crashed and lost ev

  • BI7 BEx Analyser problem

    Hi, I am working on BI7. I have problem that I cannot open BI7 BEx Analyser, however I can open 3.X Analyser. On clickin for BI7 Analyser It say that 'Critical programm erroe occured, The programm needs to close, Please refer to the trace for further

  • Rendering has to be done each time I reopen a project.

    I have set my project SCRATCH DISKS local to project. Each time I open my project I have to RE-RENDER IT just to export my movie or to play it smoothly. Why Adobe? Never did this before the 2014.2 update. Same RED sections. Take eight minutes each ti

  • Cloning the main drive

    I'm thinking of replacing the 250gb drive that game with my mac pro with at least a 500gb drive. What's the best way to duplicate the main drive onto the new disk. I was thinking of taking the new drive and placing it in bay 4. (which is currently op