List of route, pick/pack, loading, Transit

Hi,
I have shipping point  eg.abc .Let me know How to get list of route, pick/pack, loading, Transit time from mention shipping point,,means which table or any other way?/
Thanks

Hi,
You can get from LIKP
Cheers

Similar Messages

  • Pick pack, transit ,load times configuration

    Hi all,
    I need the congiration steps for transportation scheduling (pick, pack, load times). Please help.
    regards,
    Vikrant

    Hi all,
    I need the congiration steps for transportation scheduling (pick, pack, load times). Please help.
    regards,
    Vikrant

  • Pick/pack time and loading time in route

    HI People,
                If  I make entry in the shipping point that loading time and pick/pack time as route dependent then where do I enter these times in route as I didn't find any feild to enter these in routes.

    You can control scheduling by sales doc type & shipping point. Logical path - Logistic Execution-shipping-basic shipping function -scheduling-delivery scheduling & Transportation sch.
    Trasportation planning will determine below mentioned fields.
    Check-in
    Loading start
    Loading end
    Shpmt completion
    Shipment start
    Shipment end.
    Picking, packing will be controlled by delivery scheduling
    give me ur email id will forward u the document for it
    Regards,
    Krishna O

  • Transportation lead,pick/pack & Transit time

    Dear Friends,
    After considering transpoartation lead time,pick/pack time,loading time & transit time system do confirm whether stock is available or not.....my doubt is whr do we maintain the above said times in the system?........

    Hi saravanakumar
    Transit time and Transportation lead time is taken  from or maintained in  Route
    Loading time and pick/pack time comes from shipping point
    You need to have clarity on backward scheduling  and  forward scheduling
    For example you are creating a sales order today 15.02.2009 and the requested delivery date is 25.02.2009 from the customer side
    Transit time is 2 Days
    Transportaion planning time is 2 days
    Loading time is 1 day
    Pick/pack time is 1 day
    Consider these settings
    Now backward calculation  System does a backward calculation first
    25.02.2009 (requested delivery date) -- 2 days (transit days) -- 1 day (loading time) -- 2 days (transportation planning time) = that is on 20.02.2009 there should be enough stocks in the unrestricted stocks and system checks stocks for this day or date ,that is 20.02.2009  ,whether the stock is available enough
    This date 20.02.2009 becomes the material available date
    Note Transportaion planning time and Pick/pack time will run parallely and the higest of these two is considered for delivery scheduling so in our case Transportaion planning time is 2 days that is the highest and hence it is taken for calculation and not pick /pack time
    If the system finds enough stocks on 20.02.2009 (that means it performs a availability check for 20.02.2009 depending on OVZ9 settings) that is material available date then it confirms schedule lines for that order this is backward
    Same example order is registered today 15.02.2009 and if the customer wants stocks on 17.02.2009
    This means 17.02.2009-2 days (transit days)-1 day(loading time)-2 days (transportation planning time) = 12.02.2009
    The order registered date is 15.02.2009and the material availablity date is past 12.02.2009 or material available date goes to past.
    This is illogical
    This means backward is failing here and now forward calculation takes place
    Forward calculation
    If you have enough stocks today 15.02.2009 + 2 days transportation planning time+ 1 day loading time+2 days transit time = 20.02.2009
    This means that is on 20.02.2009 the stocks can be confirmed for this order as against a requested delivery date of 17.02.2009
    In forward the system will give 2 schedule lines first that is requested delivery date that is 17.02.2009(in our case) with ZERO qty and the second date as 20.02.2009 with full qty
    In backward you will find only one date in the schedule lines which is the same as requeted delivery date that is 25.02.2009 in our case
    Hope i made things little bit clear to you
    Transit and transporatation planning will come from route if route is maintained otherewise it is taken as 0 days
    Loading and pick pack time will be maintained in shipping pt  if not maintained also then it is taken as 0 days (in enterprise structure logistice execution and your shipping point details it is maintained)
    Regards
    Raja

  • Pick Pack Time and Route

    Hello Everyone,
    I know that Pick and pack times are using the Shipping point working times or calendar.
    Just to confirm, can I say that Pick / pack time cannot be derived from the Route?
    regards
    John

    This is really depends on what value you set in the field Determine Pick/Pack time in the shipping point definition. If value A is selected then the pick/pack time becomes route dependant.
    By definition the pick/pack time is the time in days that is required for allocating goods to a delivery as well as the time in days that is required for picking and packing. It is calculated using the shipping point, the route, and the weight group of the order item. (from help.sap.com at http://help.sap.com/saphelp_47x200/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm). So the route can impact the pick/pack time.
    Regards,

  • Pick Pack Manager - change Priority

    Hi
    I want to use the BP Priority field to assign a delivery run for a customer. 95% of the time the customers who own shops never change their delivery route therefore I can use the Pick /Pack Manager to create Picking lists for individual truck deliveries every day.
    However, on the odd occasion, the customer changes their mind and has goods delivered to their home address/ thus a different truck and different Priority/Run.
    I've tried using a FS to bring Priority / Run through to SO and changed but the Pick /Pack Manager pulls data from the BP Master and this didn't work.
    We have Boyum to use if required.
    Has anyone done this easily before or do I have to resort to either manual change or SDK???
    Marilyn

    Hi Marylin,
    As I understand you decided to use the Priority field because it is exposed in Pick&Pack? If this is the case I would try to use a field which is also exposed in the sales order, for instance the Shipping Type. In the order the Shipping Type is pulled from the BP master but you can change it for that one transaction, and in P&P it is pulled from the order and therefore would solve your issue.
    However I understand you might use the Shipping Type already for something else.
    Regards,
    Nat

  • Transportation/pick pack dates

    Our pick pack time and transportation planning dates changed on the sales order.
    For some reason the deliveries are now goods issuing on the same day as the material availability date.
    Where is the pick pack date,loading date or Tp date set?
    What config do I need to check?
    Edited by: saad A on Apr 23, 2009 9:16 PM

    Hi,
    You can search the forum, where you can find enough responses on this topic;
    For example, check the link
    [Transportation lead,pick/pack & Transit time|Re: Transportation lead,pick/pack & Transit time]
    Regards,

  • Link Sales Order and PO and Pick & Pack

    Ability to add a manual Link between a Sales Order and Purchase order to reserve the item(s).
    Also do not allow Pick & Pack manager to create pick list for sales orders with an earlier date if other sales orders exists waiting for complete shipment.

    HI,
    WE can use the table VBKD (SALES DOCUMENT: BUSINESS DATA )
    1.  VBELN - Sales order
    2.  BSTKD - Customer Purchase order
    we can link these two fields and can pass the data in a internal table after that Vbeln is also present in
    Tables VBAP ( SALE DOCUMENT ITEM DATA )
    1. VBELN - SALE ORDER
    2. MATNR - MATERIAL NUMBER
    3. KWMENG - ORDER QUANTITY
    which could be used for further procssing
    Thanks
    Rajat

  • Stock Report to Include Released Quantities in Pick & Pack Manager

    Hi,
    I have the following Stock Report that has been written to include various other information I need to look at regularly, but I am looking to include what quantity per stock code is released in Pick & Pack Manager.
    Is anyone able to help me on this, it would be appreciated?
    Kind Regards
    David
    SELECT     T0.ItemCode, T0.ItemName, T0.SalPackMsr as 'Pack Size', T0.SWW as 'Size', T0.OnHand, T0.OnOrder,T0.IsCommited,
    (SELECT     SUM(T1.Quantity)
    FROM         QUT1 T1 INNER JOIN
                          OQUT T2 ON T1.DocEntry = T2.DocEntry
    GROUP BY T1.ItemCode, T2.DocStatus
    HAVING      (T2.DocStatus = 'O') AND T1.itemcode = T0.itemcode) as QuoteQty,
    T0.[OnHand]-T0.[IsCommited]+T0.[OnOrder]- isnull((SELECT     SUM(T1.Quantity)
    FROM         QUT1 T1 INNER JOIN
                          OQUT T2 ON T1.DocEntry = T2.DocEntry
    GROUP BY T1.ItemCode,  T2.DocStatus
    HAVING      (T2.DocStatus = 'O') AND T1.itemcode = T0.itemcode),0) as Available,
    (SELECT     SUM(T3.Quantity) AS SoldQuantity
    FROM         OINV T4 INNER JOIN
                          INV1 T3 ON T4.DocEntry = T3.DocEntry
    WHERE     (T4.DocDate >= CONVERT(DATETIME, '2011-01-01 00:00:00', 102))
    GROUP BY T3.ItemCode
    HAVING      (SUM(T3.Quantity) > 1) and (T3.ItemCode = T0.ItemCode))as QuantitySold,
    (SELECT     SUM(T5.Quantity) AS CreditedQuantity
    FROM         ORIN T6 INNER JOIN
                          RIN1 T5 ON T6.DocEntry = T5.DocEntry
    WHERE     (T6.DocDate >= CONVERT(DATETIME, '2011-01-01 00:00:00', 102))
    GROUP BY T5.ItemCode
    HAVING      (SUM(T5.Quantity) > 1) and (T5.ItemCode = T0.ItemCode))as QuantityReturned
    FROM         OITM T0
    WHERE T0.[OnHand]T0.[IsCommited]T0.[OnOrder]  + isnull((SELECT     SUM(T1.Quantity)
    FROM         QUT1 T1 INNER JOIN
                          OQUT T2 ON T1.DocEntry = T2.DocEntry
    GROUP BY T1.ItemCode, T2.DocStatus
    HAVING      (T2.DocStatus = 'O') AND T1.itemcode = T0.itemcode),0) <> 0

    Dear Ashish,
    If your Pick List status is open, it will not lock anything. You need release them.
    Thanks,
    Gordon

  • Pick Pack time in shipping point.

    Hi Gurus,
    I would like to have a clear understanding on the Pick Pack time / Loading time in Shipping point Configuration.
    1. I have configured shipping point with factory calendar assigned to it.
    2. I have given the pick pack time in the shipping point config.
    Now the question is, i'm able to give fraction values also here , say 2.5 days for pick pack time,.
    what does this mean? how do i infer.
    Please provide clarity.
    I do not want details on how the dates are determined in Sale order w.r.t to this details, instead more clarity on how days will be taken if fractional values are given in days and not in hours.
    Regards,
    Basha.

    System will consider decimal based on factory calender and work times fields
    If work times are defined, lead times can be set in hours/minutes and applied to the work times.
    The following priorities are used for scheduling:
    Factory calendar and work times maintained
    The lead times are used in hours / minutes work time. Here, both the work days defined in the calendar as well as the work times on the individual weekdays (Monday through Sunday) are taken into consideration.
    Additionally maintained lead times in calendar days are possibly not taken into consideration if the lead times are not maintained in hours/minutes. The work time would then be zero from the schedulung view.
    Factory calendar maintained
    The work times in calendar days are used and the workdays defined in the calendar are included. From the scheduling view, each day has 24 hours (in contrast to the lead time in hours/minutes where the work times are taken into consideration).
    Additionally maintained lead times in hours/minutes are possibly not taken into consideration if the lead times in calendar days are not maintained. The work time would then be zero from the scheduling view.
    No factory calendar maintained
    As above, the system calculates only using calendar days, and work-free days, such as weekends or public holidays, are not taken into consideration
    Thanks
    Chidambaram

  • Pick/Pack Times not relevant in Stock Transport Orders?

    Hi gurus. I have a question.
    I have Pick/Pack times maintained in our Shipping Routes. In my tests I notice that entering days or hours here modify my "Material Availability Date" in Sales Orders, so I need to have the material on stock some time before shipment.
    My question is, are these Picik/Pack times relevant for Stock Transport Orders? There's no "Material Availability Date" in those documents, and in my tests, the time I put as Pick/Pack time doesn't affect the STOs.
    If these values are not relevant for STOs, I'd like to know, is there something that will?

    Hi,
    It did not work. I created a new pricing procedure as a copy of the standard for STO (RM2000). Then, I added the tax condition "NAVS". I created a new document type as a copy of UB and assign the new pricing procedure to it. I also changed the field selection for STO and made the tax code optional.
    I created STO using new document type. Tax code and tax jurisdiction code are defaulting now based on condition record NAVS. However, taxes are not calculated. Base amount shows as zero and no tax calculations are done.
    Regards, Jose Oyon.

  • Different Pick/Pack Time

    Hi Fiends,
    Can anybody advise me how can we have different Pick/Pack Time for different materials but with same Shipping Point ?
    Regards,
    Harsh

    Hi,
    As far as Standard SAP goes, you will not be able to do this. Pick / Pack time can be only Route dependent, Route Independent or it can be Defaulted from shipping point. You might have to build a logic based on some criteria such as material group (as having this for each material is practically impossible) and use the user exit to run this code to determine different pick pack time for each material.
    Hope this helps.
    Thanks
    Mukund S

  • Pick/pack time

    Hello
    I am trying to use pack time in a Stock Transfer Order and corresponding deliveries. I have several materials with  different pack times so I would like to know how can I manage this time. I have been able to add a pack time in the shipping point, but in that way I have the same time for all the materials. According to the weight it is possible to have a different time according to the weight group. I have not been able to make it work properly  but anyway this is not exactly what I am looking for. I wonder if there is a parameter in the material master to make this difference possible.
    Could anyone help me with this issue?
    Thanks!
    Eduardo

    Hello Aleem,
    Pick/Pack Time, Loading time is stored in Shipping Point - Working hours:-OVLZ.
    Reward if helpful.
    Regards,
    Priyanka

  • Select list and date picker on one line  -  is this a bug?

    I'm using: Application Express 3.2.0.00.27
    Is the following a bug? If so, how do I get it reported so it will be fixed in a future release of APEX? If not, how do I do it so it ends up the way I want?
    1. create blank page
    2. create html region
    3. create "select list" item (Begin On New Line - Yes, ...Field - Yes, ColSpan - 1, Row Span - 1)
    4. create date picker item (Begin On New Line - No, ...Field - No, ColSpan - 1, Row Span - 1)
    There will be other items displayed in more columns above what I just had you create above. I want the select list and the date picker to display next to each other on same line, so I placed date picker item on same line in same field as select list item.
    HOWEVER... the date picker ends up displayed under the select list item (kind of), instead of next to it on the same line.
    Here's what I get:
    ...................... [Select List Field] Date Picker Label
    Select List Label
    ...................... [Date Picker Field]
    Here's what I want:
    Select List Label [Select List Field] Date Picker Label [Date Picker Field]
    Thanks,
    Steve
    Edited by: sskelton on Aug 3, 2009 11:01 AM
    Edited by: sskelton on Aug 3, 2009 11:02 AM

    Hi Steve,
    I'm not sure if it's the official way, but you could add a post here: Enhancement Request Thread : Post 3.1 - that's what I've been doing :D
    Andy

  • Bapi for Picking, Packing and Post goods issue (WS_DELIVERY_UPDATE)

    Hi,
    I have a requirement to update the outbound delivery. In that, I need to update the picking, Packing details and have to complete the PGI for the particular delivery. I got the suitable function module for the same is : WS_DELIVERY_UPDATE.
    Can anyone tell me what parameters should I need to pass to perform my above requirements.
    Thanks in advance.
    Regards
    Ramesh mavilla.

    I can Update picking and PGI using the above BAPI. But I am unable to create the Handling Units properly with the above mentioned BAPI befor PGI.  Can any one help me ASAP.
    Thanks
    Ramesh mavilla.

Maybe you are looking for