Load fail(need help Please Immd.)

Hi,
I'm getting an error during the load.
"Attributes for characteristic NCCMASLS are locked by a terminated change run
Message no. RSENQ063".
i created another infopackage and run manual.
Please help me to fix that problem.
Thanks

Rob,
When ever you load master data attributes and hierarchies, before you load the transaction data you would have to run the attribute change run. So if there are any modification in the master data will take effect as well as the cubes, hierarchies and aggregates will be synchronized with the changes happend in the master data.
I hope this helps. Award if this is useful.
Goodluck,
Alex (Arthur Samson)

Similar Messages

Maybe you are looking for

  • Can you turn the data off?

    Im planning on buying an iPhone. I dont want to get a data plan. Is there a way to make the iPhone only transfer data via wi-fi and not any of my cell phones networks?

  • How to resize the stage of .fla project

    I would like to make a .fla project in high resolution (to meet hires demand) but would also re-size the stage to lower resolution to be able to publish at lower file size. Is there a way to do it? Changing the dimensions only changes the stage size

  • BOBI 4.1 SP2 installation with oracle database

    HI,    In our landscape, we have installed installed oracle 11g and we have installed BOBI 4.1 with oracle system user ID for both CMS and Audit. We havent create any separate schema for CMS and Audit database. It was runninf fine but recently we are

  • My number is unknown in the phone settings

    My number is unknown in the phone settings i cannot edit i restored twice with no success i'm  using ios 5.0.1 on iphone 4S The only thing i did is that i have activated iphone using another SIM but i used the original sim in the next 2 restore trial

  • Problem with Activities

    Hello, I'am facing a problem within the CIC. Whenever I ceate a new activity, the actual date is automatically filled with the current date. If I do this the "normal" way (SAP menu -> Activities -> Maintain Activities) the actual date stays empty, ev