Load Runner Tool Cost

Hi there,
                Can i get the detail cost of load runner tool.

Hi Harsha9,
This is actually a consumer forum for fellow HP users. You might have better luck if you called HP sales at:  free area code 888 then 999-4747.
Cheers,
aricari

Similar Messages

  • Webi XI 3.1 SP2 LOAD TESTING ISSUE WITH LOAD RUNNER

    Hello,
    We are launching a test campaign in order to test the Webi XI 3.1 SP2 (FP2.2) platform to validate it is capable to host 150 concurents users.
    The test is pretty simple:
    Logon to Infoview
    Navigate to the Document list page
    Make a search to find the adequate report
    Open this document
    Fill the prompts (doc is auto refresh)
    Wait for the results
    Logoff InfoView
    The problem is related to the tool with which we are scripting that is not able to run this script (Tool is Load Runner (ex Mercury)). In fact, we are able to capture the script correctly but when it is replayed, it crashes when displaying the document list page as it can't find the frame with the list of documents and the tree view...
    Do you know whether there are some specific settings to make it working correctely?
    For information, the Protocol used for our testing are:
    Web Click-&-Script
    HTTP-HTML
    AJAX

    I've used LoadRunner for this purpose before.  There is a tutorial that comes with the product.  My suggestion is to go through that and from there you should be able to get it working with enterprise.  I feel that's the best way to get up and running quickly.

  • Tool cost

    Dear Gurus,
    Here is my scenario. While doing a production of a Product, i want to load Tool cost on that product based on the yield.
    with the help of activity i am planning to load this cost. But my problem is not a single tool using to make that product. There are 3 to 5 tools are using to make that product and the cost of that tools are not similar means suppost if i use Tool-1 then Rs.1/- per unit to be load on Prodction order, if Tool- 2 i used Rs.5/- to be loaded.like that...
    Pls through some light on this issue..
    Advance Thanks,
    Janardhan.

    Hi Janardhan
    You can have different activity types for different tools and all the activity types linked to one cost center.
    thanks
    Ashok
    Assign points for useful answer

  • HP Load Runner and BI

    I am interested in hearing experiences of using tools like HP Load Runner in connection with the BI environment (possibly in conjunction with Portals).  We are also considering the benefits of Quality Test Director in regard to our periodic BI updates.
    The issue is that we are primarily a BEx (Excel based - NW04s) BI shop and are in the process of migrating to Web based reporting. 
    If you have experience with these tools in the BI environment, I would be interested in getting your feedback.
    Thanks BI Gurus!
    Mitchell

    hi Mitchell Lehr  ,
    You can put the experience as BW Testing Consultant. Why bcoz as per ur thread I understood ur are working in Testing.
    But requirment for this is very less .
    please check in the market.
    Thanks,
    Kiran Manyam.

  • Condition type to be loaded on Material cost after Taxes but shouldn't change Tax base Amount.

    Customer requirement is that they want to deduct some amount after the Taxes (after BASB) &t load this amount value after taxes on Material cost  (hence accrual KEY can't  be used). but with the addition of this new condition type (for deduction) it shouldn't change the base amount  for Tax condition type (BASB).
    Basic Problem : new condition type value to be load on material (after taxes). but this condition value shouldn't change the Net price of PO(amount in BASB condition of Tax) so that base amount (BASB) of Tax procedure remain unchanged.
    (Since it is to be loaded on material hence i cant use account key definitely. Also this cost to be loaded on material after taxes)
    Ex -             PBXX =     100 base price
                     Freight =       20
       Tax base amnt =     120
                   Tax (5%)=          6
                          Total =    126
         Other Charges=      10  (this 10 Rs amount in this condition type required to be loaded on material cost, at the same time this condition value shouldn't change the base amount for the Tax (BASB)
    Please suggest (purpose is to load the deduction on material cost after Taxes & same time it shouldn't change the  the amount after Tax base calculation)

    Hi,
       Your condition type is without acrual flag in M/06. No acrual key is maintained in the MM pricing procedure.
       To achieve your requirement, maintain subtotal 6 against the condition type in your MM pricing procedure in M/08.
       Maintain the base type calc procedure as 362 against your BASB condition type in tax procedure. Keep the field blank for the tax condition type (VAT or CST / ED etc)
       Test the scenario again with a new PO. System will show the condition value in net amount field in PO, but the same wont be copied to BASB in tax procedure. Check the taxes pop up. Check the same and revert back.
    Note: Similar requirement (not exact) for acrual conditions are mentioned in my doc: Tax Calculation on Freight - Different Scenarios You may refer it if required.
    Regards,
    AKPT

  • Error in connecting SAP R/3&Load Runner thr' recording for script creation

    Hi SAP Gurus!!
    I am New to SAP environment.
    I got the following Error
    " Scripting Interface  is disabled on SAP Server"
    No action can be recorded on this connection.
    What I try to do is:
    I  tried to connect the SAP R/3 (4.77 EE- IDES environment) through Load Runner (8.1 evaluation version) through recording for creating a script.
    What I did at load runner :
    Start Creating Script by by pressing "start recording"  by giving the following options
    Program to Record : SAP logon
    Working Directory :C:\Program Files\SAP\FrontEnd\SAPgui
    Record into action : vuser_init
    and in options : enable the Auto logon by providing the details of
    SAP Server name,client,username,password and language.
    By pressing OK button I got the above error and it was trying to connect the SAP.
    If i give manually again logon details it is loging in to SAP but it is not recording any thing.
    Can any body help in this regard?
    Thanks in advance
    Regards,
    Vam C

    Hi HP
    Was wondering if you can help me, I am trying to create a trouble shooting sheet for possible reasons why sap scripting fails to connect at some of our clients. We write a screen reader that consumes the sapfewse.oxc, I have implemented this in C sharp and have great results. However I constantly getting support issues that my screen reader fails to connect.
    Often the problem is fixed by just enabling Scriping on the client or using RZ11, I noted that you seem to indicate, however that RZ11 is short term solution and you mentioned a permanent change.
    Can you please give details on the permanent change and how one can achieve this. Could you also list any other possible reasons why connecting to scripting might fail. I will be happy to mail you my connection code for a peer review as well, I would feel more comfortable with expert stamp of approval.
    Thanks
    Shaun,
    Your help will be much appreciated,

  • Include Tool cost in Standard cost of material

    Hi
    I have a scenario  where we use  consumable tools in manufacturing the end product , which is 'nut'. We use roughly 80 tools in the manufacturing process. Each tool has its life. For eg. Tool A will be used to manufacture 10,000,000 nuts. The production lot size is usually 900,000 and the tool will be used for more than10 production orders.
    Since the tool is being reused for various production orders, i have problems in bringing its cost. I cannot give 0.1 pc as the unit of measure for tool is per piece. If i give 1 piece, since its being reused, the cost will not be accurate and there will be huge variance.
    Any ideas on how to deal with this?
    Thanks

    Hi,
    is there an operation for tool usage within the production order where time confirmation happens?
    And correlates the tool usage with the time confirmed?
    If yes, post the tool consumption to the cost center that is a assigned to the work center that is used in this operation and in the cost center (plan) activity rate cover the tool cost overall.
    Result: Each time confirmation valuated with the activity rate contains a portion of tool cost.
    best regards, Christian

  • Flex Issue in Load Runner

    Recording Application in Flex + Web (HTTP/HTML) in LR11.52
    Facing problem while parsing AMF binary code to XML. 
    Uploaded flex-messaging-* jar files and application related jar files.
    The warning is
    "It is unable to instantiate the object com.db.lrc... ..ProductClassification as the class does not have a public specifier.
    Suggestion is Add default constructor to the concerned class."
    [The above mentioned com.db.lrc.... ProductClassification is available in the application jars attached in Load Runner] 
    The error is :
    java.sql.sqlException ORA01407 Cannot update the values in table to NULL.

    Hi,
    Go to the monitor of the load, make the technical status "Red" even if it looks red by clicking on the traffic light. Go to Info package and manually start the info package, system will ask you to repeat the delta select yes. After successfully finishing the load perform all the steps in process chain manually.
    Regards,
    Kams

  • EBS R12 - Load testing tool

    Oracle E-Business Suite Releae 12 (12.1.3) on Oracle Linux 6.x
    We are looking suitable load testing tool to provide performance load testing analysis/benchmark results with system response time
    Please adivse best practice industry stand performance testing tool for EBS R12.
    Thanks in advance.

    user13681259 wrote:
    Oracle E-Business Suite Releae 12 (12.1.3) on Oracle Linux 6.x
    We are looking suitable load testing tool to provide performance load testing analysis/benchmark results with system response time
    Please adivse best practice industry stand performance testing tool for EBS R12.
    Thanks in advance.Please see these links.
    EBS 12.1.1 Test Starter Kit now Available for Oracle Application Testing Suite
    https://blogs.oracle.com/stevenChan/entry/ebs_1211_tsk
    Oracle Application Testing Suite
    http://www.oracle.com/technetwork/oem/app-test/etest-101273.html
    Oracle Application Testing Suite Downloads
    http://www.oracle.com/technetwork/oem/downloads/index-084446.html
    HP LoadRunner
    http://www8.hp.com/us/en/software-solutions/software.html?compURI=1175451#.UPiIemeS-Fg
    Thanks,
    Hussein

  • Free load test tool

    Hello all,
    are there any free load testing tool for sql queryl ?? We have this sql that i want to change and use a parallel hint....so i wanted to load test...maybe 50 concurrent user executing that at the same time....and see how the performance is on the server ...are there any freeware tool for that or anything that i can do ?? i am on 10.2.0.3 (AIX)....

    I'm a bit confused.
    Parallel query improves performance by allowing one session to use more of the database's resources than a single session could normally utilize. That makes it ideal for data warehouse environments where there are few concurrent users each running very resource intensive SQL statements. Parallel query is poorly suited, in general, for OLTP workloads because letting one session spawn multiple slave processes takes resources away from other sessions. If you really have 50 users simultaneously running a query, it should almost certainly not be parallelized. Even if each session creates only 2 slave processes, that's 100 simultaneous slave processes which probably overloads anything below, say, a 64-core box. Hopefully, your database is configured, in that case, to disable parallelism to avoid overloading the server. But if the database is configured to disable parallelism in that case, adding the PARALLEL hint will have no effect at high load.
    Justin

  • How can I down load msn tool bar for Mozilla firefox?

    My computer crashed and have lost msn tool bar. How can I down load msn tool bar for Mozilla firefox? edit

    It used to be more common to be asked how to uninstall such toolbars. I think It will now be known as a Bing bar, but as far as I know it is no longer supported for Firefox. You may find some unofficial addons with similar types of functions.
    You would be better discussing anything further relating to MSN on a specialist MSN forum.

  • Load Test Tools for CC&B 2.2?

    We are evaluating four load test tools for CC&B 2.2. JMeter (Free), BadBoy (Free), TheGrinder3 (Free), Selenium (Free) and Loadrunner 9.5.1.
    1) Does anyone out there have a load test success story to share? If so, be sure to mention which tool or tool combination.
    2) Can anyone recommend another solution we might want to evaluate?
    3) It appears none of these tools work "out of the box" with CC&B. GUI rendering mode fails ajax calls. Does anyone have a trick for working around/through this issue?
    At this point, it appears the best options are:
    1) Use a combination of JMeter and BadBoy. We record the gui navigation in BadBoy and run the script in JMeter. JMeter doesn't support https GUI capture, but it seems to be the better tool for running the scripts and analyzing the results. BOTH TOOLS ARE FREE.
    2) Loadrunner VuGen. Fails on replay due to the ajax calls. Manual scripting is the only workaround found so far.
    TheGrinder3 has no GUI replay. You can't watch the replay. Also, passwords are clear text.
    Selenium only works with Firefox. LVVWD doesn't use/support firefox.
    I should also mention that our criteria assumes minimal load testing in the near future and are trying very hard to avoid spending big $$$ for upgrade and maintenance fees.

    My company used AppLoader to run tests through NRG Global. We didn’t have a lot of people to dedicate to the testing, so we paid NRG a consulting fee to do it for us (for surprisingly less than we thought!). We had them test a Citrix & .net client/server application (with 300 users) and an Apache web application with Ajax (150 users). AppLoader is protocol independent, so it worked just fine with both. Also, it tests from the front end, so you can watch the GUI replay. They also have password encryption, although we didn’t use it for our tests.
    They were able to run the tests & get the data back to us quickly. We ended up with some failures & errors, but they gave us a detailed report with screenshots, logs & graphs which enabled us to find the problem, get it fixed and get our application up quickly. Turns out we had a memory leak. It was a relief to have the test done so fast, thorough & without the huge price tag. I spoke with the consultant there directly. She was very nice & helpful walking me through the results. Hope that helps. Good luck!

  • Tool cost amortisation

    hi friends,
    i have following query,
    we are into auto component manufacturing and get tool cost amortised as part of selling price, ( Sale price is inflated till tool cost is recovered)  and tool has specific life of some quantity.
    We want to map as follows
    Sale proceeds consists of sale price and tool cost
    tool cost paid to vendors of in house is capitalised
    Depreciation is @ standard rate, where as actually tools get scrapped in lesser period
    my question is how to capitalise the tools and write off the same through amortisation.
    Milind

    Hi,
    Using o/h accounting you can book the cost to the Tools.
    In pricing you may try condition types to amortise.
    hope this helps.
    Regards
    Ramesh

  • Tool cost ammortize in component price

    Hi All,
    We have a case where component price is Re 1 per pc. Tool Cost is Rs 5000.00 and  we have to ammortize the tool cost in 5000 Pcs of supply. After completion of 5000 Pcs Goods Receipt, system should change the price to Re 1.00.
    How can we proceed, there is no facility in info record where we can maintain GR Qty 5000 Rate 2.00 and after that Re 1.00.
    Please help.
    Regards
    Rajeev Gupta

    Hi Rajiv
    Tool amortization cost is the cost to be distributed to the material and has to be the part of material accessible value. To do that create a condition type in your regular calculation schema this you can do by copying a frieght condition type and set the controlling functionalities of this condition type as per your business needs. In this condition type try to assign subtotal 4, 6 etc..as you wish. Now go to your tax procedure in that for Base value condition type assign a routine 362. This is the standard routine. Here you bring the value of subtotal as a addition or subtraction as per your requirement. This you could do with a help of an abaper.
    Reward if useful.
    Regards
    edwin

  • Tool cost capturing and calibration of tool:

    Hi, to capture tool cost, we defined tool as fhmi material type and included in bom. Accordingly it is issued to production (thru alternate unit) and tool cost is collected in production order.  Now we need to do calibration also for that tool. To do calibration we need to define that tool as equipment as standard practice. What we feel that we are duplicating the data by doing that. Please advise is there any method to eliminate data duplication and to work with product costing as well as calibration. Please advise.

    Dear,
    Generally tooling cost will be obsorbed through overhead charges for a cost center. So best way go with overhead cost for PRT. And define it as equipemt PRT.
    Regards,
    R.Brahmankar

Maybe you are looking for