Local Process Chain becomes inactive

Hi BWers,
We are having problems with our process chain wherein one of the local process chain becomes inactive. Here's the job log of the BI_PROCESS_CHAIN job. Will give points even for those who can give hints, better if solved.
1. Job started
2. Step 001 started (program RSPROCESS, variant &0000000753000, user ID BATCH_AP1)
3. Version 'M' of chain YWAR_MPC_INTERRUPTS_MD_TD was saved without checking                
4. Chain Is OK       
5. Version 'A' of chain YWAR_MPC_INTERRUPTS_MD_TD was saved without checking
6. Object with runtime number                          0' not defined
7. Job cancelled after system exception ERROR_MESSAGE
Thank You in advance!

Hi
you have pasted the process chain log, as the process was terminated, i required the dump information from the st22 and system messages from the sm21 concerned messages.
Please provide the above infomation to resolve your problem.
Regards
Anwer Waseem
SAP BASIS

Similar Messages

  • Local Process Chains

    HI Guys,
    I am in the process of designing the process chains for data loading. I have a situation where I am planning to use local process chains in the meta chain. Situation is like this:I have created Meta Chain for Master Data loading, which is having 2 local process chains, one is for Attributes and another is for loading texts. I placed them in the sequential order. First Attributes chain and on successful completion of Attribute chain it should run the Text process chain. But in the system it executes the Attribute chain successfully but the text process chain is always in the YELLOW( in progress ) state even though in that process chain I have only start process. In the SM50 it shows two background process with the user id ALEREMOTE, but process chain never finishes. In the Messages of the Text process chain I see the message"Communication buffer delted from the previous run ".
    So I put the process chains in the parallel manner, meaning after start process of Meta chain I attached the two process chains so that they should execute simultaneously. But in this case too, Attribute local process chain gets executed but not the Text local process chain.
    We tried debugging the process in SM50, it seems that there is some infinite loop.
    If anybody has any clue then please reply back at your earliest. Your help is highly appreicated,
    Thanks.
    Santosh Taware

    first point, i think you can have single process chian for both attributes and texts one after other.
    second thing check in st22 if any dumps are occuring and check in the monitor in which step it is still running.
    reward if helps.

  • How to trigger a local process chain to run manually

    Dear Experts,
    In my company, I have a Daily process chain.
    In this Daily process chain, it contains many other local process chains which are grouped by modules.
    For example, I have created the following 3 process chains:
    - Accounts Receivables Process Chain which contains all the required process for loading FIAR data.
    - Accounts Payables Process Chain which contains all the required process for loading FIAP data.
    - Inventory Process Chain which contains all the required process for loading  Stocks data.
    These 3 process chains are scheduled one after the other in the main process chain which is called Daily Process Chain.
    FIAR needs to be successful before FIAP can run and Inventory chain will run only after FIAP is successful.
    Normally it runs without any problems.
    But recently, when the previous chain is successful, the next process chain does not get triggered to run.
    In the end, I have to manually execute the remaining process chains to start running.
    With this, all data are loaded, but the Daily Process Chain status for the day is yellow because it is not complete.
    Is there a program or method which I can execute or use to trigger the process chain to continue to run in the Daily Process Chain? If there is, please let me know so that I can avoid having to run the process chains manually one by one.
    Thanks in advance for your help.
    Regards,
    Shunhui.

    Check thid thread with the similar issue:
    Process Chain - Node untriggered.
    /people/siegfried.szameitat/blog/2006/02/26/restarting-processchains

  • ABAP Program for set local process chain failed

    I would like to execute ABAP Program in local process chain. If the condition is in the pre-defined bussiness rule, local process chain is set to fail.
    Currently I use ABAP and Raise Message Error = Message Type E for cancel program. After program is cancelled, local process chain don't know its status, wait for job SAP_CCMS_MONI_BATCH_DP  to determine status of process chain and then further execute subsequent process.
    I 'm not sure that our solution is right or not about set process chain to fail via ABAP. Please suggest us if there are other solution to set process chain as failed.

    Hi.
    Plz see my answer to similar question in [this thread|Re: Manage a message at the end of process chain on Web planning Application].
    Regards.

  • Schedule local process chain

    Hi, I have a requirement to schedule local PC to run every 8 hrs instead of daily as it does now.  Local process chain is called within a meta chain.  Is there a way I can schedule local process chain separately within a meta chain or I have to change schedule for the entire meta chain? 
    Thanks!

    No need to change schedule for the entire meta chain. U should schedule local process chain separately.
    For local chain change mode
    Right click 'Start Variant' -> Maintain variant -- Direct Scheduling -- Change Selections
    Enter Date/Time... Select periodic Job
    Periodic Values -- Other period -- enter 8 for Hour(s)
    If u r using company calender -- Select 'Restrictions' -- enter Calender ID
    Save -- Activate - Schedule
    Local PC will run for every 8 hrs from the time u specified, and also run in metachain (once in a day if metachain runs daily)

  • How to change local process chains job priority to A?

    hi experts,
    there are process chains are running in BW production system.
    for independent process chain when i forcefully change JOB PRIORITY from C to A last night it was executed successfully with PRIORITY A, but whereas i have meta chain in that there are some local process chains, though i forcefully change the JOP PRIORITY in PRODUCTION TO A, still those local chains were executed with JOB PRIORITY C only.
    Can you tell me the reason and solution to change the local process chain as well with JOB PRIORITY A.
    The metachain with JOB PRIORITY shows my userid, and the local chains shows BW_USER id.
    Regards
    venuscm
    Edited by: venu WAD on Nov 18, 2011 6:37 AM

    Check what's job priority for particular cube in TA RSRT->double click on your chain->menu Process chain->Attributes->Job Priority. Via this you can set priority as you need.

  • Process chain is inactive

    Hi Gurus,
    I transported process chain successfully to QBW, but I found some of the process chains are inactive and it does not show up in the node. Please advice how to resolve this issue.
    Thanks
    Liza

    Hi Liza,
    You may not activated properly the process chains in develoment and transportd them to production. You can also activate these chains directly in production system, but it is recommended to actiavte these list of process chains in development system and save into transport request and now transport to development.
    I hope it helps u..
    Regards,
    Ramki.

  • Local Process Chain

    Hi Friends !
    We have one "Main Process Chain' within the main process chain there is a "Local Process Chain". Main PC is scheduled at 2 PM.
    Ques : For the Local Process Chain, will the start variant be "Immediate"? Please advise.
    With Regards
    Rekha

    Rekha,
    There shouldn't be any problem even the local chain is set to "Immediate". it all matters with the Meta chain, the subsequent local chains are taken care during the Meta chain run.
    In the scheduling option of the Local chain start variant ,you can select either of the options Direct or Start using metachain.
    We have Direct shceduling for our local chains(with in the Meta chain) and there has been no problem.  this will be an advantage to maintain with the option "Direct shceduling", so that whenever you want to run the local chain seperately, there will not be any need to change any setting. else if you use "Start Using Meta chain or API", each time you have a need to run the local chain the setting has to be changed to "Direct shceduling" before executing it.
    Regards,
    Sudheer
    Edited by: Sudheer Kumar Kurra on Oct 17, 2011 9:30 AM

  • Schedule Local process chain (by fac calender) in a daily meta chain

    Hello SAP Gurus,
    We have a meta chain (e.g. M1) which runs daily. Within this meta chain (M1), a local process chain (e.g. LP1) is attached. This LP1 should run once a month on a Monday (defined in factory calendar). Please note LP1 can not be scheduled separately by factory calendar, as it depend on few activities in daily meta chain. I think LP1 can be scheduled by using the decision in meta chain. I have rough idea of the formula, but not sure. Can you please suggest what should be the suitable formula in decision to schedule it.
    Example formula:
    DATE_WEEKDAY1(Current Date, 'P1' ) = '1'
    Where
    DATE_WEEKDAY1 = Calculate weekday Number from Date
    P1 = Factory Calendar for one year. Only 12 days (Monday) are open. For example 17 Jan, 14 Feb 2011, etc

    No need to change schedule for the entire meta chain. U should schedule local process chain separately.
    For local chain change mode
    Right click 'Start Variant' -> Maintain variant -- Direct Scheduling -- Change Selections
    Enter Date/Time... Select periodic Job
    Periodic Values -- Other period -- enter 8 for Hour(s)
    If u r using company calender -- Select 'Restrictions' -- enter Calender ID
    Save -- Activate - Schedule
    Local PC will run for every 8 hrs from the time u specified, and also run in metachain (once in a day if metachain runs daily)

  • Local process chain is Removed from schduling

    Hi firends,
    when i try to schdule my global process chain whats
    happening is
    saying that:
    1.version 'm' of chain zprocess_stor was saved without
    checking
    2.version 'A' of chain zprocess_stor was saved without
    checking
    3.chain is removed from scduling(means local chain)
    i saved the local process chains,global process chains and activated also
    but agian it is giving the same error,
    can anyone plz give me solution urgent for me
    Regards,
    gunasekhar

    Hi Gunasekhar,
    Before activating try checking the process chain. the process chain may have some errors.
    Hope it helps.
    Regards,
    Parth.

  • Local process chain is removed from global chain

    Hi firends,
                     when i try to schdule my global process chain whats
    happening is
      saying that:
             1.version 'm' of chain zprocess_stor  was saved without
    checking
             2.version 'A' of chain zprocess_stor  was saved without
    checking
             3.chain is removed from scduling(means local chain)
                        i saved the local process chains and activated also
    but agian it is giving the same error,
                             can anyone plz give me solution urgent for me
            Regards,
      gunasekhar

    Hi Gunasekhar,
    Check in system log for the job to see why the background process is being removed. If the issue is unique job count, check sap Note 784969 - The RSBTCDEL2 program and sap Note - 942804
    this should help solve this issue.
    Chandra M

  • Local process chain is failing and i want to run its successor chain

    Hello All,
    I have a query regarding process chain, which is :
    I have a metachain, in which some local chains are existing.
    If suppose local process chain 2 is failing and i don't want to run that i want to run local process 3 directly
    (which is successor of chain 2 ).
    What should i do?
    Regards,
    Dolly

    Hi,
    You can trigger the process chain as below:
    Go to TC SE37 -
    > use function module RSPC_CHAIN_START -
    > execute -
    > put your process chain's technical name in variant  I_CHAIN -
    > Execute -
    > specify job priority
    Cheers
    Chanda

  • Local Process chain getting failed

    Hi All,
    My local process chain is getting failed due to the following error.
    "Job started
    Step 001 started (program RSPROCESS, variant &0000000068733, user ID ALEREMOTE)
    Start process CHAIN EC_EW_M_COMPLAIN_ZMTCOCR1 in run 1HN75DVW2PG2WFU98WGFIXOGV of chain EC_EW_M_TRAN_L1
    Communication buffer deleted from previous run F0CDWKC96L0O0D8NQBGVHYK9R (status X)
    Chain Is OK
    No job found
    Job cancelled after system exception ERROR_MESSAGE"
    How to resolve this issue?
    Thanks,
    Sathya

    Hi
    Communication buffer deleted from previous run F0CDWKC96L0O0D8NQBGVHYK9R (status X)
    This means, the previous step is completed and system should get the status as G(green), but in above system got this  as X(Deleted). That's why system unable to start the next process(your local chain).
    I don't think, this is an issue with background processes.
    try to repeat the step once again and monitor the display messages, if you get same error again check process type before this local chain.
    Regards,
    Venkatesh

  • Local process chain used in Meta chain

    Hi,
    Suppose there is a Local process chain (X), and in it has scheduling options "Start using meta chain or API" selected. How can I know which meta chain is using this local chain.
    Something similar functionlity of "Where used list" which can give a list of meta chains where this local process chain (X) is used.
    Thanks.

    Hi Lohana,
    I think there no such functionality.
    Local chains means just you are calling from some other chain. But that it self a process chain. You are just linking in the chain through Local mode.
    Regards,
    Kishore Reddy.

  • Local Process Chain question

    Dear Experts,
                   A small quick question. If you have a local process chain, does it just create a dependency or does it execute the local process chain?
                   We have a Master data process chain and another chain that loads transaction data. These 2 chains are different chains. Now what we want is to create a dependency. If I include the Master data as a local process chain, does it load the master data again?, which we don't want or just create a dependency saying that the transaction data starts only after the local chain status is complete?
    Thank you.
    Message was edited by: Visu Venkat

    Hai Bhanu,
                    Thanks for the reply. We have the Master data chain running from a long time every day and the master data I need for my chain is part of it. We made another process chain for Transaction data that needs dependency on the master data thats part of the loading in the first chain. We don't want to control or change anything in the first chain as there are many other objects and other dependencies with other chains. Now if I include that whole Master data chain in my process chain and execute mine, does it execute the Master data chain also(the Master data chain is generally already executed by the time the second I mean transaction data chain start). So, in this case, is using the Master data chain as a local chain advisable?
    Tahnk you very much.

Maybe you are looking for

  • Urgent: IDOC to EDI with SAP Conversion Agent

    Hi, I have a requiremetn like IDOC to EDI ( Gentran ) scenario. We have decided to use SAP Conversion Agent to deal the same. Can anybody share their experiences on this kind of scenario. Needed step by step information to complete would be appreciat

  • Iphone 6 connectivity issue

    I have a new iPhone 6. Had a 5s before. Still have it. Had the same issue with both. I work in an office that does not get an ATT signal in my office. When I leave the office and go to where there is a good signal, I have an issue with both iPhones w

  • Using Swing Parser locks up.

    I'm using the Swing Parser class to read all the text content of an HTML page off the web. I override the parse() method. I then setup my URL connection and setup my BufferedReader, and then I call super.parse(br); I run this code every 5 seconds in

  • Android 2.1 adobe flash player

    hi, i have upgraded my samsung glaxy portal from android 1.5 to version 2.1.i want to downlaod adobe flash player but it sems flash player 10.1 will only work with android 2.2.is this correct?can i get a work around or is there another version i can

  • Which version of firefox works on iMac 10.4.11, version 3.5.2 I had to remove because my computer freezes and cannot fix this

    Which version of firefox will work on iMac 10.4.11? I had to remove the 3.5.2 version because of constant freezes that I could not get out of, even after shutting down my computer, the freeze would continue when I turned it back on.