Locked by terminated Change Run

Hello BW Experts,
Trying to load 1 million records master data. Attribute change run short dump due to lack of space. Then deleted the master data. Again running the load with less records ( 10k ). PSA --> Infobject load not starting due to the error
"Attributes for characteristic ZCUSTNUM are locked by a terminated change run
Message no. RSENQ063"
I have done the below checks:
1)     Cleared all the locks in sm12
2)     No records to be updated in sm13
3)     No other processes running in SM50
4)     No short dumps in ST22
Any faced problem like this before. What this problem means. Wondering if there is a table where the lock status is set. So that could be the reason why the locks are not visible in sm12, but still complains of having locks on characteric ZCUSTNUM>
Any suggestions appreciated.
Thanks,
BWer
Message was edited by: BWer
Message was edited by: BWer

Hi,
You have to close the cancelled change run before starting data loads for master data infoObjects that were included in the failed change run. This is done by running the change run again for your infoObjects. You can do this by using transaction RSATTR, select the infoObjects and execute the change run. Once the change run is completed successfully, you should be able to do your data load with no problems.
Also, you may want to check table RSDDAGGRMODSTATE to see if you have any change run job that are still open.

Similar Messages

  • Cubes locked in terminated change runs

    Hi guys,
    Couple of cubes are locked in terminated change run......... how do i resolve this as there are no locks set form them in sm12 or db01
    what is the way to go..........
    Thanks,
    Your help will be rightly appreciated

    Please try going to the monitor for Attribute change run from RSA1 >> tools >> apply change run or from Transaction RSATTR which will schedule/display attribute change run. Here you can have an option called change run monitor (Monitor icon). this wil show the status of change run including which all info objects are affected, and if its hitting the aggregates of any cubes.,etc.
    Also you can try Tcode CHANGERUNMONI/program RSDDS_CHANGERUN_MONITOR to view this data.
    The Problem is that there might be another change run triggered parallely to yours.In any SAP System only One attribute change run can run at one point of time. i. e If one attribute change run is running in system from any process chain or for any project and 2nd one fails, if start at same time due to locking problem. Due to this entire data load fails.
    This blog will explain how to prevent this from happening.
    http://sapbwneelam.blogspot.com/2007/08/how-to-avoid-attribute-change-run.html
    Hope this helps.
    Award points if useful.

  • Attributes of characteristics cont_acct are locked by terminated change run

    Hello Guys ,
    Today  we have a failure of master data load, when i checked in the details tab  i saw the below error can some one please help me in this.
    Attributes of characteristics cont_acct are locked by terminated change run
    Lock not set for : Loading master data attributes.
    Thanks in advance!!!

    Hi.....
    It means that the infoobject cont_acct  is locked by a terminated change run......this situation generally occurs if someone manually cancel a change run.......in this situation lock does'nt get released.......
    If you have authorization to delete a lock......then you can delete the lock.........as suggested by Ajeet........
    Otherwise run change run for this particular infoobject using the program : RSDDS_AGGREGATES_MAINTAIN....to release the lock........
    Hope this helps.........
    Regards,
    Debjani.......

  • Attributes of characteristic 0MATERIAL are locked by terminated change run

    Hi All,
               i am planning tod see the data in 0material.when i click on maintiain master data button then i am getting Attributes of characteristic 0MATERIAL are locked by terminated change run 384436434.how can i solve this issues.please help me .
    Thanks & Regards,
    chandra

    here you need to completed the terminated ACR first because Lock will never get released, until we repeat the
    terminated Change run(Change Run id should be same). Also when a Change Run get cancelled automatically ,we should check the Job Log. If it is a Terminated Change Run, then again we should repeat the Terminated Change Run, then only lock will get Released.
    For this......
    *Go to RSA1 >> In the top TOOLS tab >> Select Apply Hierarchy/Attribute Change >> Click on Monitor and Start terminated
    Change run >> there click on Start Change run with Set Filters.........it will restart the Terminated Change run.....*
    then you can repeat your process chain.
    Thanks,

  • Infocube locked by terminate change run

    Hi All,
    Message "infocube locked by terminate change run" when I try delete infocube.
    I use SM12(Display and Delete lock), but there is no lock list.
    Anyone had this problem ? and how to fix it.
    thanks in advance
    supriatna

    Hi All,
    the cube cannot delete because some InfoObject changes was not applied, I try with 
    menu tools -> Execute Hierarchy/attribute changes (Ctrl+F9), and try to execute all the changes, after that the cube can deleted.
    thanks roberto & frank for ur suggestion
    supriatna
    YM! asupna

  • Problem with Customer master Attribute change run

    Hello Experts
    Master data load process chain for 0Customer failed in system at attribute change run step.
    Because of that failed instance when ever we try to reload data get error message
    "Attributes of characteristic 0CUSTOMER are locked by terminated change run 468502640"
    "Lock NOT set for: Loading master data attributes"
    It seems that last attribute change run step had locked master data object and lock is not yet released.
    Kindly advice resoluiton to this problem.
    Thanks in advance
    Regards
    Sudeep

    Failed due to lock issue. check in SM12 you can find lock with respect to your change run 468502640.
    Looks like master data step is running.
    Wait till the masterdata for attributes of 0CUSTOMER completes and them repeat the attribute change run step.
    To repat the attribute change run
    Rsa1 --> Menu Tools -->Apply Hierarchy/change run or use transaction RSATTR
    Click on monitor and Start Terminated Changes Runs(monitoring of Change runs)
    Here you can check the failed Attribute change run object in red status.
    after completion fo the master data and check the locks and click on execute button over there.

  • Issue with Attribute change run

    Hi All
    today one of my team memeber has killed attrribute change run, after that when we tried to use option maintain master data, a message were coming attrtibute has cancelled, please re run, even we were not able to load same infobjects, getting message, master data is locked, when it tried to see data in p table then i was getting few entries having delate and insert image( example for infoobject 0customer for customer number c100 two entries one with d flga other one with in flag.)
    First i went in t code se14, i put all tables name then cliecked on activate and adjust data.
    Even though problem persist,
    Also i was not getting any infobjects in lsit( from rsa1-> tools-> attr change run)
    Then i created one dummy process chain with process type attr change run and included only inoobject with which i was facing data load issue.
    Please advice on my step.
    Thanks,
    Prem

    Hi,
    Goto RSATTR Tcode -> Click on Tab Monitor and Start Terminated Change Run -> system will open a new screen -> here you can see the failed change run, please rerun this failed change run and then try to load data, after successful change run things will be normal.
    SAP Clearly suggest  NOT TO KILL OR CANCEL Change Run Job. If this don't solve you issue, you may need to look for some SAP Note.

  • Attribute change Run Failed/Scheduled

    Hello All,
    For a process Chain Attribute Change Run has failed in BW 3.5,and I Repeated the Change Run in Chain only
    where Repeat option is ,now the problem is in RSA1 it is now that change run is scheduled
    and sm37 it is showing that Canceled.
    Now there is Other Process Chain in BI7.0  which picks data from  3.5
    Should I repeat the Master data Chain in BW 3.5 followed by in BI 7.0
    Or any other way is possible as in BI7 the chain has run successfully..
    Thanks,
    Kiran

    Hi Kiran.......
    BI 7.0 and BW 3.5............totally two seperate systems..............here BW 3.5 is just act as a source system of BI 7.0.............if change run fails in BW3.5...............it is not going to effect BI 7.0.............
    As ajeet already said............it will effect the SID s in 3.5.............because attribute change run activates the master data...........and SID get generated during the activation of master data.......
    Also it will effect the aggregates............because aggregates also get adjusted during change run.......if any of the aggregates contains the master data.........which are getting activated in the change run....
    Now u r saying........that in SM37 it is showing that the job got cancelled............So it will not locked the master data..............terminated change runs generally lock the master data............then we hav to repeat the chain run to release the lock.........and u hav already repeated the change run............so no issue........
    Hope this helps..........
    Regards,
    Debjani........

  • Attribute change Run and Infocube Problem

    Hi SAP BW Experts ,
       I am getting the following problem
    2 days back our production system was down when Attribute change run is running in a process chain . After the system is up I triggered the Attribute change run manually for that specific master data Object. But the jobs was cancled automatically. When I checked the Job log I found the following messages
        <b>“InfoCube XXX is locked by a terminated change Run”</b>
      System error: <b>RSDU_TABLE_COPY_INI/DDIF_TABL_ACTIVATE /BIC/E200073 /BIC/E100073 0</b>
    Message no. DBMAN100
    When I verified manage screen in the Infocube XXX , one request is not rolled up . when I tried to rollup that particular request manually again I am getting the same message <b>“InfoCube XXX is locked by a terminated change Run”</b>
    When I tried to create Indexes on that Infocunbe XXX , Again I am getting the same message <b>“InfoCube XXX is locked by a terminated change Run”</b>
    When I tried to load data in to that Infocube I am getting the same message <b>“InfoCube XXX is locked by a terminated change Run”</b>
    The Steps Taken By Me:
      1. In SM12 , there are no lock entries for the Infocube XXX
      2. According to A.H.P reply I verified the Support package . We are having Import Support package 18 for 3.10( BW 3.10 patch 18 or SAPKW31018 )
      so I think there is no problem from patch side.
    So please let me know by doing which task , I can eliminate the error message “InfoCube XXX is locked by a terminated change Run”

    I got this reference from one of other site. Hope this solves issues of most of our ques on this topic.
    We faced this problem and reported to OSS. They solved our problem.Here is
    the answer from OSS
    I connected to your BWQ system. I checked the table RSDDAGGRMODSTATEand
    found an entrie for a change run "not yet" finished.
    CNSID CLOSEDFL TIMESTMP_START TIMESTMP_END TSTPNM
    207,851,300 20,030,910,141,500 0 SIDTLHG
    As you can see, the field CLOSEDFL is blank (should be 'X' for an ended
    change run) and the field TIMESTMP_END is also zero.
    You can also check with the function module RSDDS_CHANGERUN_MONITOR as
    in note 388069 that both objects you reported are the ones involved
    with thi change run error (Infocube ZINV and Infoobject ZELEM_PEP):
    E_CR_STATE C
    E_T_CHANM 1 Entry (IOBJNM = ZELEM_PEP)
    E_T_HIEID 0 Entries
    E_T_AGGRSTATE 1 Entry (AGGRID = 3QR79ZYB6VGSDS3C42HPXMA8S
    ICUBE = ZINV)
    E_T_MSG 1 Entry (IOBJNM = ZELEM_PEP)
    You have two choices to solve this problem. You cn either:
    1.- Restart the change run and let it finish with ok.
    The change run usually fails due to database errors, tablespace
    problems, and when some user manually cancel it (NEVER should be
    done!!)
    2.- Change manually the entry from table RSDDAGGRMODSTATE that isdescribed
    above. Set the field CLOSEDFL with a 'X' and also fill the field
    TIMESTMP_END with a value with the following format
    yy,yym,mdd,hhm,mss. Use, for example, '20,030,910,181,500'
    IMPORTANT!!!
    After this change on table RSDDAGGRMODSTATE, you have todeactivate
    all aggregates, activate again and refill them!!
    Hope this solves your error. If the issue is solved, please close this
    message with the [confirm] button.
    Best regards,
    David =C1lvarez
    SAP Active Global Support
    The answer refers to our problem.We chosed option 2. Here is the AbAPcode:
    REPORT ZLOCKED .
    tables: RSDDAGGRMODSTATE.
    select * from RSDDAGGRMODSTATE where CLOSEDFL = ' '.
    RSDDAGGRMODSTATE-CLOSEDFL = 'X'.
    RSDDAGGRMODSTATE-TIMESTMP_END = 20020912195015.
    MODIFY RSDDAGGRMODSTATE.
    ENDSELECT.

  • Attribute Change run issue

    Hi All,
    I have a Info Object 0MEASERE,  we have maintained master data for that and ran attribute change run... but unfortunately it was not activated, so we ran change run again now we get the message saying that it is locked in the terminated job.
    But when i check st12 there are no locks against the user.
    Can someone please tell me what should i do to activate this?.
    Regards
    BN

    Hi,
    Chk this thread. It should help ur issue.
    Hierarchy  is locked by a terminated change run
    Hope it helps. Assign points if useful.
    Cheers.

  • InfoCube blocked by Change run

    Hi all,
    we need to delete data for an InfoCube, it was blocked by a Change run that was taking some time running, so we cancel the process to delete first the data. The problem is that it still says that the InfoCube is blocked by the "canceled" change run process.
    We run the process again to let it finnish and then delete the data, and the process never finnish, on the change run screen says that the process is running, on monitor says that is restructuring the aggregates for the cube that we want to empty, but there is no activity on SM50 and its been a whole day in this state.
    The InfoCube is still blocked by the change run (that says that is running, but its not). What can i do to solve it ?
    tnx a lot.
    cheers

    Hi Juan.......
    We should not cancel any Change run...............bcoz if we manually cancel any change run.....lock will never get released........until we repeat the terminated Change run(Change Run id should be same).......
    Also when a Change Run get cancelled automatically..........we should check the Log...........if it is a Terminated Change Run...........then again we should repeat the same Terminated Change Run.......
    As per my knowledge...........u will not be able to find these locks in SM12.......
    Due to this the infocube is still locked and the restructuring the aggregates job is not progressing..........
    Do one thing................again cancel the Change run...........
    First go to SM12 >> there u will find one Log for Change run..it will be like CHANGERUN      410465767 ...........where 410465767 is the Change run id...........then                   
    As krishna told...............go to RSA1 >> In the top TOOLS tab >> Select * Apply Hierarchy/Attribute Change* >> Click on Monitor and Start terminated Change run >>  there click on Start Change run with Set Filters.........it will restart the Terminated Change run.....
    After that again Check in SM12...........whether the Change run id is same or not.............it should be same.......
    I think this time u will not face any problem............and after completion of the Change run only..delete the cube content...........
    Regards,
    Debjani.......

  • ERROR while running attribute change run.

    hi sap xperts,
    I got an error while running the attribute change run in a process chain.
    At first i got an error "The action is locked by a change run"
    SO I DID THE FOLLOWING STEPS.
    1.RUN ATTRIB CHANGE RUN MANUALLY  IT RUN SUCCESSFULLY,but the process chain is still red.
    Q1.Is there any way to link the manually run attrib chnage to process chain so that the process chain becomes Green?
    2.SM12 - realease the locks and right click the pc and repeat.It didn't work
    Q1.While removing the locks what should we remove,bcoz i removed all the locks?
    3.I again removed the lock and repeat the process but still i didn't work.Now its chowing "SQL ERROR OCCURED WHILE ACCESSING"
    So the Process chain got stuck,Can any body help me to run the attrib chnage run.
    If possible can anybody send the Process chain monitoring documents to my email id:
      <email ID removed>
    please.thanks in advance,i know how to say thanks in sdn.

    At any point in time only one attribute change run can run in the system. The other ACR's will fail due to locks. In your case, to set the process chain to green, try the following steps.
    Open the messages of a failed step by right clicking on it and selecting 'display messages'.
    In the opened popup click on the tab 'Chain'.
    In a parallel session goto transaction se16 for table rspcprocesslog and display the entries with the following selections:
    1. copy the variant from the popup to the variante of table rspcprocesslog
    2. copy the instance from the popup to the instance of table rspcprocesslog
    3. copy the start date from the popup to the batchdate of table rspcprocesslog
    Press F8 to display the entries of table rspcprocesslog.
    Now open another session and goto transaction se37. Enter RSPC_PROCESS_FINISH as the name of the function module and run the fm in test mode.
    Now copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:
    1. rspcprocesslog-log_id -> i_logid
    2. rspcprocesslog-type -> i_type
    3. rspcprocesslog-variante -> i_variant
    4. rspcprocesslog-instance -> i_instance
    5. enter 'G' for parameter i_state (sets the status to green).
    Now press F8 to run the fm.
    The above steps will help you continue with the rest of the process chain (thus avoiding manual runs) but the failed step might still remain red. Hope this helps.

  • Exception 'CX_RSR_X_MESSAGE' was raised when doing the Change Run

    Hi ,
    Change Run is not happening and it is throwing runtime error "The exception 'CX_RSR_X_MESSAGE' was raised, but it was not caught anywhere  along the call hierarchy."
    When ever I am trying to "Monitor and Start Terminated Change Runs" the same error is happening.
    Below is the error I see in the Job Log
    Job started
    Step 001 started (program RSDDS_AGGREGATES_MAINTAIN, variant &0000000000054, user ID)
    SQL: 06.03.2009 09:55:59 
    TRUNCATE TABLE "/BI0/0600001776"
    SQL-END: 06.03.2009 09:55:59 00:00:00
    SQL: 06.03.2009 09:56:01
    TRUNCATE TABLE "/BI0/0600001470"
    SQL-END: 06.03.2009 09:56:01 00:00:00
    ABAP/4 processor: UNCAUGHT_EXCEPTION
    Job cancelled
    Any help on this would be great
    Thanks
    Subbu

    Hi,
    I guess there was nothing to change with tht,  the log was simply showing tht ur change run was performing on tht table....
    Chk on which object ur running this? whether any load got failed for this...?
    Now restart the same run from the EXECUTE button in the window of monitor and start terminated change runs..... i guess it may finish...
    rgds,

  • Change run error in Process Chain

    Hi,
    I got an error in running the change run step in the process chain.
    The error is "The action is locked by a change run".
    Could this mean that the change run was running when this step in the process chain was invoked.
    I have a process chain with multiple(4) parallel processes and I would like to know from you gurus the best way to model such a process chain. Should I keep just one attribute change run at the end of the complete process chain or should I let the change run after every PC (each of the 4).
    Any inputs will be appreciated
    Thanks & Regards
    Sid

    Siddhartha,
       Exactly, you need to keep the change run process at the end of the PC. no need to run the change run for every master data flow.
    check whether change run is running? check in RS12 for locked entries.
    All the best.
    Regards,
    Nagesh Ganisetti.

  • Attribute Change run canceled

    Hi
      I have loaded master data for an Infoobject and executed Attribute change run by saving that object and execute. I got the message like Attribute change run is canceled((protocol/shortdump) now i can not able to run any attribute change runs since save button is not available in the window and also unable to load data to the same infoobject getting errored and giving messsage locked by attribute change run i have checked in sm12 no locks exist on this object
    Thanks
    Vani

    Hi,
    You can try going to the monitor for Attribute change run from RSA1 >> tools >> apply change run or from Transaction RSATTR which will schedule/display attribute change run. Here you can have an option called change run monitor (Monitor icon). this wil show the status of change run including which all info objects are affected, and if its hitting the aggregates of any cubes. There are scenarios where the attribute change run failed with message that it was hitting/affecting aggregates of some infocubes. In case we had to switch off aggregates and trigger the change run again and then swtich on the aggregates after the change run is over. this may not be the exact issue you are facing.
    Most of the times we have problem with the Attribute Change Run(ACR) running because ACR and the Roll Up's for Aggregates cannot run in parallel.
    The Problem may be that there is another change run triggered parallely to yours.In any SAP System only One attribute change run can run at one point of time. i. e If one attribute change run is running in system from any process chain or for any project and 2nd one fails, if start at same time due to locking problem. Due to this entire data load fails.
    Just check it there are any other change run active in SM37. Repeat your change run once the other change run is over.
    And sometimes ACR goes on running for a long time in such case we need to check which Aggregate the ACR is currently changing and may need to deactivate that aggregate.
    But before deactivating an aggregate you need to check the data present in that and the usage of the aggregate.
    Also you can try Tcode CHANGERUNMONI/program RSDDS_CHANGERUN_MONITOR to view this data.
    thanks,
    JituK

Maybe you are looking for

  • Re:nomad jukebox zen 1

    Hi all, I have a nomad Jukebox Zen 0Gb mp3 player. Today it has decided to act all funny. When i press the play button sometimes it will play. Then when i press the pause button it decides it wont pause but rather go thru the menu. The buttons are do

  • Change frame rate with no slowdown (Premiere Pro)

    Hello, I am making a project and need to re-create a film in the style of a silent film, the most common frame rate for silent film is 16 fps. Is there anyway in the post production stage to change the frame rate of the video to 16 from 29.97 without

  • I have downloaded acrobat reader but have documents that have been sent to me via email and I cannot

    I cannot access documents sent to me via email which have been sent via Acrobat reader

  • IPhoto gives import error "file not valid" when import more than one photo

    Trying to import lots of photos. Every time I try to import more than a few, I get an error that "The following files could not be imported (they may be an unrecognized file type of the files may not contain valid data)." When I go back to importing

  • Multiple jpanels?

    Hi, I want to draw some graphs of some data that will be controlled by an array of doubles, basically representing the array of doubles as a graph. The question I have is that I will have 5 different graphs all the same type just different runs, is t