I checked the Lock indicator in KS02 for the following
Plan Primary Costs
Plan Secondary Costs
System not allowing KP06 , but still allows me to do Activity Planning ( KP26). Why?
Thanks
psconsultant

Hi,
u201CLock Indicator for Plan Secondary Costsu201D and Lock Indicator for Plan Primary Costsu201D
If you select this indicator in Cost Center Master data, you cannot plan any secondary/primary costs on the affected cost center from this time.
The indicator normally locks the cost center only against debits with secondary costs in the plan. However, you can still credit the cost center in the plan.
In T-code-KP06-Cost Center Activity Input planning, we are debiting the cost center .
Through  T-code-KP26- Cost Center/Activity Output Planning, we are CREDITING the cost center. So this indicators will not affect  the planning function of T-code-KP26. 
Regards
appalas
Edited by: appalas on Dec 22, 2009 1:04 PM

Similar Messages

  • RKP2 and RKP3 - Planning activities by cost center

    Hi people,
    I'm having a problem with planning in activity-based costing. I planned an activity in a cost center, executed transaction KP26 and then the transaction CP06. The plan is executed, but when i see Line items, for CO plan documents, i see that system created two documents, one with the object RKP3, which debit the activity and credit the cost center. This is what is supposed, but when i checked the cost center, the value was again debited, which used object RKP2, with just one debit in the cost center.
    My question is: why system restore the value that i wanted to distribute from the cost center to activity, first correctly in RKP3 and then (not supposed..), in RKP2.
    Thanks for the help.
    Cumps.

    Cost Centres are for planning costs.
    Revenue is planned on a Profitability Segment, Sales order which has been enabled for costing, or WBS or Internal order which has been enabled to receive revenue.
    BTW, Profit centres are not CO objects, which is why you need one of the above. Alternatively you can create your Revenue accounts as GL accounts only, then you don't need the cost objects.

  • Relevance of Maximum Plan Value for Cost Center wise SKF plan Data

    Hi,
    Will you please tell me the relevence of data entered as Maximum Plan Value for the Cost center wise SKF data plan i.e. data entered through T Code KP46 using planning layout 1-301 with planning profile SAPALL.
    Regards,
    Partha B.

    Hi,
    Try 0CO_OM_CCA_1.

  • Datasource for plan value in cost center accounting

    Hi
    I would like to create query for plan value that maintain in source system via tcode KP06
    (Controlling > Cost center accounting > Planning > Cost and activity inputs). Can experts please share with me which datasource to turn on in order to send the data to BI for reporting?
    Thanks
    Kang Ring

    Hi,
    Try 0CO_OM_CCA_1.

  • Transport of planning layouts and planning profiles (CO - Cost Center Acc.)

    Dear Experts,
    I am new to SAP CO and would like to transport new planning layouts and planning profiles. Therefore I clicked on transport and the following customizing task is added to my transport request:
    IMG Activity  Create Planning Layouts for Cost Element Planning
    -> ke34
    ->
    CEFORMC
    CEFORMF
    CEFORMS
    CEFORMT
    CEFORMV
    CEFORMW
    CEPRINT
    CESETS
    TKEBS 
    TKEP1 
    TKEP2 
    TKES1 
    TKES2 
    TKES4 
    TKES5 
    TKESK 
    The transport worked without error.
    Unfortunately none of the layouts arrives in test environment.
    Do you have any idea of what I could have forgotten?
    Thanks a lot!!
    Thomas

    After you have released the transport request, the objects of the request are available in the target system and the target clients. If you want to carry out a client copy within the same system, proceed as follows:
           1.      Log onto the system in the desired target client.
           2.      Start the client copy (Tools > Administration > Administration > Client Administration > Special Functions > Copy Transport Request; transaction SCC1) and enter the source client and the number of the transport request.
           3.      Then start importing the objects.

  • Cost center planning for overhead calculation

    Gurus,
    I have a doubt regarding the cost center planning for overhead calculation.
    My scenario is:
    There is a service cost center from which a certain percentage I want to allocate to the products as overhead. Now while doing so I have created a cost center and a cost element of type 43 (internal activity allocation). This cost element is the base for overhead calculation. Also I have created one cost element of type 41 (overhead rates). I have defined the credit (of cost sheet) with the cost element of type 41 and the cost center as mentioned.
       Now I am facing a problem while planning the cost center with cost element type 43 through KP06.The system is throwing the error message: 'Cost element xxxx can only be used for activity input'. My understanding is we must carry out the planning for the cost center to allocate a certain percentage to the product cost estimate. If I am not allowed to use the cost element of type 43 to plan, what should I use for the planning?
    Request your suggestion.
    Thanks in advance!
    Snigdho.

    Hi
    Since you mentioned catg 43 cost element, I thought you are using Activuty Type
    To apply overhead on the product during CK11N, you need not plan any value on the cost center... The values planned in the cost center can not be used as a BASE in your costing sheet....
    It goes like this
    1. Your cost estimate has BOM + Routing
    2. So, the cost elements that you would see during CK11N, can be broadly classified into 3 types
    a. Primary cost ele - Material Consumption accounts for BOM components
    b. Secondary cost ele (Catg 43) - If you use any actvity type in the routing
    c. Secondary cost ele (Catg 41) - These cost elements are parasites... They need some basis to calculate the overhead value... That basis can be either the (a) or (b) above.....
    I think, what you are planning to do is Plan Primary cost ele in a cost center and trying to use the same as the Basis.. That wont work!
    What you need to do is
    a. PLan the values in the cost center, say, 100,000 USD
    b. Absorb it on the basis of 2.a or 2.b
    If 2.b is not applicable in your case, since you are not using activity types, then 2.a is the Only option left for you
    Hope it is clear....
    Regards
    Ajay M

  • Cost center plan values and Profit center plan values are not matching

    Hi,
    When user drill down the costcenter plan costs by partner in production system getting difference between P center values for a perticular functional area.
    But this number should match with Cost center and P center functional are values but there under functional are showing lower amunts.
    Pls let me know where exactly i have to check because i am fresher for controlling.
    Please help me out.

    Hi Anil,
    If I understand your requirement then you want to plan both in USD and INR at the same time.
    Say you maintain rate as 1 USD = 50 INR
    Do you want to plan for 100 USD and 480 INR against one combination (Cost Center / Cost Element) and 100 USD and 520 INR against another combination of Cost Center / Cost Element?
    SAP allows you to plan for a Cost Center / Cost Element combination only once. And that you can plan in any currency. Either in CO Area Currency or Object Currency (in this example Cost Center Currency) or in Transaction Currency (any other currency that you may choose). And the other currencies gets derived from the Exchange Rate maintained in the system using OB08 tcode. The exchange rate will be derived using the Planning Version "Exchange Rate Type" and "Value Date" (See Fiscal Year settings for Planning Version).
    So, if you plan in INR it gets translated to USD and vice versa. For planning in different currencies (only one is allowed) you need to change the planning layout to include the Amount Currency field.
    So for a single version say V1 you can plan in INR which gets translated to USD using OB08 exchange tare. Again you can plan in version V2 in USD which will get translated in INR using the same OB08 settings but you need to use a different Exchange Rate Type for V1 & V2.
    I am not sure what the business requirements are. If the requirements are only to display different currencies in a report then that can be achieved by creating a Report Painter report.
    Hope this helps.
    Thanks,

  • KSUB - Cost Center Plan Assessment

    Hi All,
    I am doing a Plan Assessment for Cost Center in Trans KSUB and i need a Sender & Receiver Line items by Plant... I tried to use Filter but Plant is not present.
    I will be glad if anyone can help me out..
    Thanks & Regards
    Ajoy

    Hi,
    You can use only CO entities as senders/receivers, e.g. cost centres, internal orders, WBS, etc.
    Plant is not a CO entity and therefore cannot be used as an object in assessment cycle.
    Regards,
    Eli

  • Cost element/cost center planning for period

    Dear Guru`s,
    My client wan`t to plan the g/l with cost center/cost element period wise. How can I achieve this???

    Hi..
    If you transfer plan data from cost center accounting to Financial Accounting, refer to sap help portal site:Transferring Plan Data from Cost Center Accounting - General Ledger Accounting (FI-GL) (New) - SAP Library

  • Cost center planning by functional area

    hi gurus,
    The client needs to do manual planning in CO (KP06) by cost center/cost element/fund/functional area. This data is later gets rolled up in FM to formulate the budget data. The client wants to enter all the account assignment manually except for functional area. They want that system automatically derive the functional area based on the cost center (one to one relationship). I tried the CO substitution but this functionality is only for actual data and not plan data. Any suggestion how I can derive the functional area in CO planning based on cost center?

    Hi,
    Functional area is required for cost of sales accounting in Finance. It has got nothing to do with Cost Center planning. Functional area shall not be visible in controlling. Pl update this constraint to the client and go ahead with Cost center/cost element planning with necessary one to one relationship with Fund center, etc.
    Trust this helps much!
    Cheers!

  • Cost Center and Profit Center Planning

    Hi,
    I have one  Co issue.  Pls Suggest me the wiseful solution.
    Cost Center and Profit Center Planning.
    For F-2008 Planning  data they have updated in the month of Aug, 07 for Profit and Loss Items and they have revised the plan data of some cost elements in the month of oct, 2007 (say 5% Increas).  when comparing the cost center report to profit center report, both are not matching.  the reason when i see and reconcile the document nos and values in between cost center and profit center reports  i found out that there are some documents are missing in the profit center report. 
    wherever plan data had revised e.g for cost element Salaries they have updated 100000 Planning cost in the month of Aug, 07.  In the month of Oct, 07 increased 5% i.e.5000. In cost center line items details i found 2 documents for Rs.100000/- and Rs.5000/-  But in Profit Center Line Items i am getting only Rs.5000/- Value Document.
    Note.  As and when KP06 Plan data has been updated Profit Center line items are generating.  It is not necessary to run any programme inorder to transfer Plan Data from cost center to profit center.
    Observations From My Side:-
    I tried to run the transaction code 1ke0. i have selected the cost object is Cost Center, version and had given Cost Center Parameter in development and quality clients and executed the same.By this time already existing data either deleting/ riversing and creating new documents fully except manually changed data in profit center through 7ke1.
    My Question is
    1.Upto what extent it will work.
    2.will it be possible to transfer data from cost center to profit center only missing documents which are available in cost center, without disturbing of existing data in profit center.
    3.suppose if i done this activity, there are some data which was already transferred from other cost objects like internatl orders & wbs elements to Profit Center. will the data get disturbed (deleted/riversed).
    Pls suggest me the wiseful way to solve the

    Hi
    Try This
    BAPI_COSTCENTER_CREATEMULTIPLE
    BAPI_COSTCENTERGROUP_CREATE
    BAPI_PROFITCENTER_CREATE
    BAPI_PROFITCENTERGRP_CREATE.
    Regards,
    V.balaji
    Reward if usefull

  • Cost Center Integrated Planning with GP12N

    We are using the New GL in 6.0.  I have made all of the Integrated Planning settings in the versions for both the GL Planning and the Cost Center Planning.  If I load the Cost Center Planning through KP06, the transfer works fine.  However, it was my understanding that you could load Cost Center Planning through GP12N, and see it in Cost Center reporting.  This does not seem to work.  Am I missing some particular setting?  We are loading into FAGLFLEXT.
    Thank you for any suggestions.

    Hi,
    - this is not going to happen; cost centre planning is flowing from CO to FI and not viceversa. the same apply if you run a cost centre allocation in accouting: it is not posting to CO.
    - you can use FI planning for accounts not managed as cost element and cost centre planning for the others.
    - as an alternative you can design cost centre reporting in accouting with transaction FGI0.
    Paolo

  • Cost center plan

    Hi all,
    Is it possiable to control the plan figures for cost center/profit center.
    Please let me know, i to achieve it.
    Thanks a tone in advance.
    Chandu

    Hi,
    As like, in Internal order we have budget & availability control, i need to control plan figures of cost center.
    The actual  figures of cost centers should not  exceed the plan number. When 80% of the plan amount is reached, a warning msg should pop up, whne posting the actuals. When 100% of plan is reached then it should not allow to post any actual to the cost center.
    Please let me know how this can be achieved.
    Assured points.
    Thanks a lot,
    Chandru.

  • Copy from planning to Budget in Cost Center Accounting (Controlling)

    Hi to All,
    Currently we are using the SAP 4.6C Version.
    Is there anyway to copy the planned version into Cost Center Budget when using the TCODE:KPZ2 (Cost Center Budget).
    SAP has provided the same option when dealing with Internal Orders. We can copy the Planned Version by Edit->Copy View and in Setting->Planned Total Version we can set the version what we want.
    Is there any way to perform the above funtionality under Cost Center Accounting.
    Thanking you all in advance.
    Samad Farooq

    Hi,
    Good evening and greetings,
    Please go through the following SAP OSS note
    Note 15966 - Copy Planning: Only Manually-Planned Values
    Please reward points if found useful
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • How to block the cost center

    Dear Guru's
    Can any tell me how to block the cost center, can we detele which is having values. can we delete which is not having values
    Regards
    Chandra Sekhar Reddy.P

    Hi,
    Once you post actual values or any planning exists on this cost center you cant delete.
    To ristrict posting to cost you have two options.
    1.You can change validity period.
      change  end from 12/31/9999 to what ever date you want to stop posting(e.g. as of today 10/23/08)
    2. lock all postings to cost center on Control data tab in KS02.
    Thanks,
    Rau

Maybe you are looking for

  • Unable to read SD cards, CF cards, etc with windows 8. Windows 7 and before work

    Hi everyone, One strange thing I've found with Windows 8.1 is that if I try to access a SD card, micro SD card, CF card, or similar, I get an error that says something about you need permission to access this. I've tried giving myself permissions, bu

  • Looking for the patch of adf 11.1.2

    Hi all. As the request from the application team, I am preparing to upgrade my weblogic server from 11.1.1.4 to 11.1.2. Therefore I have to seek for the latest ADF as well. The download page of Oracle noted that "Oracle ADF 11.1.2.* Application Devel

  • UIX radioSet: a bug or a feature ?

    I have a quite simple radio set: <radioSet name="radioSet_1">   <contents>    <option text="label_1" value="first"/>    <option text="label_2" value="second"/> </contents> <primaryClientAction>    <fireAction formSubmitted="true"/> </primaryClientAct

  • How to execute an external executable in my java program?

    hi, i want to write a java program to execute some external executables. for example, i had an executable which takes a string as its input parameter, and: it writes to stdout a string : "[stdout] hello, "+parameter+"!"; it writes to stderr a string

  • Connections between decentral adapter engine and other components

    Hi, is there any documentation of what connections are needed between decentral adatper engine (DAE) and PI, SLD or other components for configuration/monitoring&alerting and at runtime? I need this information because our client has a very strict fi