'Log Book' in plant maintenance (SAP PM module)

Dear Experts
I want to know about 'Log Book' in plant maintenance (SAP PM module). How to work on LOG BOOK & what are the configuration settings available in SAP PM for Log Book?
Basically, the concept of logbook is to update shift activities & measures during Plant Maintenance without SAP. but in SAP, What i know about the Log book in SAP PM is : It is an industry specific feature, before it was only used in (IS- Aeronautical). but now it is available in ECC 6.0 also. To activate this node, we need to update the patch 2.0 in ECC 6.0
Thanx,
PMGURU

Dear,
The Logbook is an easy-to-use tool that supports the controlling and execution of daily maintenance tasks for assets in operation. This tool provides personnel, who are operating the assets, with the functions to log defects and operational data. It provides maintenance personnel, such as maintenance engineers and technicians, with functions that ensure the timely and reliable execution of their maintenance tasks.
Logbook is easy to use and provides functionality that is seamlessly integrated with follow-on processes of the mySAP for Aerospace & Defense solution for Maintenance, Repair and Overhaul (MRO). For example, operational data captured in the Logbook updates measurement points that, in turn, trigger preventive maintenance events. Maintenance work steps created in the Logbook generate material and resource requirements in materials and capacity planning. Material exchanges update the asset structure and automatically generate the required goods movements.
An important business example for using the Logbook is to control the daily line maintenance tasks for aircrafts.
The logbook helps you record defects encountered during aircraft flights and the actions taken to correct them. The log may also include the space to record additional flight data, such as the names of the crew members, flight parameters, payload data, fueling data, flight hours, and cycles operated.
Regards,
Rakesh

Similar Messages

  • Intergration of Production Planning with Plant Maintenance (SAP Modules)

    Our SAP Implentation Consultants are creating work centres in Production Planning which are different to the workcentres in Plant Maintenance as follows.
    Work Centres in PP
    Mixing
    Blowing
    Filling
    Packaging
    Work Centres in PM
    Mechanical
    Electronics
    Electrical
    My observation is that in PM the work centres should be identical to PP work centres. whereas Mechanical, Electronics and Electrical should be configured as divisions or departments. The idea is that by having PM WC identical to PP WC the costing will be simplified.
    looking forward to expert's advices, please
    Amjad

    I am locking this thread in PI forums. Ask your question under SAP Solution forums
    /community [original link is broken]
    Regards,
    Prateek

  • Workflow Scenarios (PM/CS) - Plant Maintenance (PM) - SAP Library

    To add a comment, please log in or register on the top of this page and choose Reply. Please write your comment in English.
    You can also go back to the SAP help page.

    hi sergej,
    Check the below link and forums
    [Integration of Predefined Portal Content Home page|http://www.sdn.sap.com/irj/sdn/contentportfolio]
    SAP PM (Plant Maintenance) Integration
    Plant Maintenance Iviews- BP requirements for SAP PM
    Is there any Business Package for Plant Maintenence and Project Systems ?
    Plant Maintenance Iviews- BP requirements for SAP PM
    maintenance order workflow (in plant maintenance module)
    BADI for log book in Plant Maintenance
    EAM Simplification
    hope these links are useful,
    Regards,
    maheshchandra.

  • Which book to buy for Plant maintenance on SAP press...

    Which book to buy from SAP press which book has good amount of configuration details regarding Plant maintenance i found three books if there is some other good book please do let me know
    1.maximize your plant maintenance with sap
    2.sap enterprise asset management
    3.plant maintenance with sap

    Hi Mohammad
    I already posted a query for SAP PM in certification forum , but i couldnt see any active replies.
    SAP PM certification
    I am already SAP SD certified and working on Support sider of Customer Service Module , This Teched Planning to take certification exam for SAP PM maintenance and repair, But i am not getting any source of help as to how do i start with for preparing for the certification and no idea as to what are the topics to be covered and how will be the set of questions , Is there any seperate certification only for SAP CS
    Please do reply on my query and guide me accordinlgy
    Best Regards
    Waseem Mohammad

  • How to read the configuration for SAP GUI elements in Plant Maintenance module from SPRO and leverage the same in NWBC for HTML.

    Dear Members,
    Greetings for the day!
    I am working on NWBC for HTML in Plant Maintenance module.
    We have configured some changes in SPRO for customizing the UI elements( like visibility, mandatory ) like tabs and fields in transactions like IW21( Create Notification).
    As of now separate parallel configuration needs to be carried out in NWBC for HTML in PM module to achieve the same UI features for creating notifications and this is time consuming.
    Is there any way to read the configuration done in SPRO for the SAP GUI's and leverage the same in NWBC for HTML.
    Appreciate your time in responding to this.
    Thanks & Regards,
    Ram.

    >
    <IfModule mod_weblogic.c>
    WebLogicCluster 127.0.0.1:7005,127.0.0.1:7007,127.0.0.1:7003,127.0.0.1:7103,127.0.0.1:7104
    MatchExpression /app1
    </IfModule>
    <Location /weblogic>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007,127.0.0.1:7103,127.0.0.1:7104
    DebugConfigInfo ON
    PathTrim /weblogic
    </Location>
    <IfModule mod_weblogic.c>
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007
    MatchExpression /app2
    </IfModule>
    <Location /weblogic>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007
    DebugConfigInfo ON
    PathTrim /weblogic
    </Location>
    >
    This configuration is weird little bit. There is MatchExpression /app1 and MatchExpression /app2 and at the same time two <Location /weblogic> sections. Are you sure you understand what that configuration stands for?
    Try something like this ...
    <Location /app1>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007,127.0.0.1:7103,127.0.0.1:7104
    DebugConfigInfo ON
    </Location>
    <Location /app2>
    SetHandler weblogic-handler
    WebLogicCluster 127.0.0.1:7003,127.0.0.1:7005,127.0.0.1:7007
    DebugConfigInfo ON
    </Location>
    where /app1 and /app2 are contexts of your weblogic applications.
    http://download.oracle.com/docs/cd/E11035_01/wls100/plugins/apache.html
    http://httpd.apache.org/docs/2.0/mod/core.html#location

  • SAP Enterprise  Structure for Plant Maintenance Module

    hi,
    please explain me SAP Enterprise  Structure for Plant maintenance (PM) module.

    Hi,
        As SAP PM enterprise structure comprises of Company, Maintenance Planning plant & Maintenance Plant. Company will be defined in Financial Accounting. Production plant will be the maintenance plant. Seperate plant would be created as Maintenance Planning Plant. All the plants (Maintenance Planning plant & Maintenance Plant) should be assigned to the company. All the maintenance plants should be assigned to Maintenance Planning Plant. For all the Maintenance Plants, technical objects would be created.
    Company --> Maintenance Planning Plant --> Maintenance Plant.
    Relation between Maintenance Planning Plant & Maintenance Plant will be 1:1 or 1:n or n:1.
    Regards,
    Maheswaran.

  • CATS--- How it is transferred to plant Maintenance module

    Hello HCM Guys,
    Currently we are confirming Manhours using IW41 against the reservations of the respective manhours made in the Maint work order.After confirmation , the cost of the manhours is accumulated on the work order which is settled on the sender Cost Center maintained in the Work center master data. After TECO of the work order, Settlement of the maint work order is done in Controlling module thru KO88/KO8G(mass) and the cost transferred from the sender to the receiver cost center maintained in the CO during month end closure activity before period end close. Also standard Activity re-evaluation is done for consecutive month activity price update thru the link of activity type---Cost center assignment. This is the standard process of confirmation of manhours in SAP.
    Now since the business needs indiviual employee manhours confirmation(Internal and external employees(Contractors), I understand it can be achieved by the CATS component of HR module. I understand that in this process of CATS we do the daily attendance/absence/overtime thru the standard data entry profile maintained in CATS by HR team. After the employee has entered his daily time sheet and released, it is approved by Time administrator of HR dept which finally goes to Manager-HR for his approval. The approved time sheet manhours are then  transferred to respective module like PS, PM, CS modules. As we have never used this before I wnat to know how the transfer of costs happen when transfer to Plant Maintennace module is done. How the cost gets booked. How the cost is charged and transferred to payroll in PM...Does this happen against Maint Orders or CO Internal orders?Please explain me the detail procedure after transfer of manhours to Plant maintenance module and the cost transfer to respective receivers from sender objects....
    Thanks
    Murad Shaikh

    usually there is one step approval in CATS, You can do so via cats_appr_lite in backend
    Transfer to other components is done via CAT6
    Refer help.sap.com on various target components CATS can do transfer. you need to define the correct attributes
    http://help.sap.com/erp2005_ehp_05/helpdata/EN/f1/76a97879a311d38e720000e81de309/frameset.htm

  • Creating Z report for material stock (plant maintenance module)

    hello,
    we are implemented Plant maintenance module (SAP PM)  in our organization.
    our requirement is to create a stock report which will incldue
    followings:-
    1)material number
    2)plant number
    3) storage location
    4) material type
    5)valuation type
    6)Opening Stock 
    7) OpValue 
    8)Received Stock  
    9)   ReceiptValue      
    10)   Issue Stock          
    11)  IssueValue        
    12)  Closing Stock      
    13)  Closing Value
    we want above details in ALV grid format.
    to gert all the details for perticular material, we calcute closing stock and closing value in following manner:-
    opening stock + received  stock - issue stock = closing stock
    opening value + recipt value - issue value = closing value
    we are unable to find table name for  accessing  opening stock,  received  stock , issue stock  & opening value ,recipt value , issue value from system. please suggest table name information for getting above details  for creating Z report

    Dear friend,
    Before to make a decision to bulid a custom report make sure you have checked out the following standard transactions:
    MB5T Stock in Transit
    MMBE Stock Overview
    MD04 Stock/Reqs list
    MB53 Plant Stock Availability
    MB52 Warehouse Stock
    MB5M Expiration Date list
    MB5B Stock for Posting Date
    MB5T Stock in Transit
    MBBS Valuated Special Stock
    MBLB Stock with Subcontractor
    The possible tables are:
    MARA, MARD, MARC, VBEP, VBAK(VBAP), EKKO(EKPO), EKBE, EBAN, EBEW, MSEG, MKPF,...
    Good luck!

  • Creation of Sub Job Order/ Maintenance Order in Plant Maintenance Module

    Dear SAP Expert and Gurus,
    I am new in SAP Plant Maintenance Module, and right now having problem to create sub Job Order/ Sub Maintenance Order. Kindly provide the step on it.
    Thank you
    Regards
    Leonard Tan

    hi
    check out this link
    http://help.sap.com/saphelp_40b/helpdata/EN/5b/ae2e484b8611d182ba0000e829fbfe/content.htm

  • What is the use of service entry sheet in plant maintenance module.

    Hi Expert,
    I want know about, What is the use of service entry sheet in plant maintenance?
    Regards,
    Ram Rathode

    Hi dear,
    Service entry sheet concept is used in all the modules.
    Service entry sheet is created to do the service confirmation and to pay the vendor for the services which he has performed.
    Based on the service entry sheet invoice is booked by Finance.

  • Urgent Issue in Plant Maintenance Module

    Dear Experts,
    We have requirement as described below, please give us your solutions / comments on this.
    We have GTC company which is having around 800 trucks for transporting the products. I n this company we have implemented SAP Plant Maintenance Module, as we have the maintenance activities done for vehicles.
    Under the same group of companies, we have PM1,PM2,PM3 companies which provide maintenance to GTC. These companies are not external to the group.
    When I raise a maintenance order for a vehicle then I will mention hours of work and material that need to be used in the activity. This maintenance work / labour is provided by PM1/PM2/PM3 company.
    In plant maintenance we have external service management, but that is for external vendors who provide service to GTC.
    But how to handle the same with internal vendors like PM1/PM2/PM3.
    Please tell me how to handle this kind of scenario.
    Thanks in advance.
    Nagesh

    Hi,
    this is a major topic and cannot be covered in a blog. Even if it can it will take a lot of time to clarify. So, first do your checks within your module. Check if u really need to treat the services from the other company as external services. You might as well create workcenters in the plants of the other companies. And make a single maintenance planning plant for all the plants in these companies. This will make a better solution technically. But think also from the perspective of the cost of this solution. Meaning, is it worth doing all the jobs such as maintaining activity prices, work centers in the other plants etc..
    In general, my suggestion is include the FI and CO consultants at least in the discussion. It will b good if u can have the MM consultant also during the discussion.
    Bala

  • Plant Maintenance Module

    Hi Expert,
       I am new to Plant Maintenance module, I want to know flow of this module, transaction codes involved, few objects if possible for better understanding. Thanks in advance.
    Regards ,
    nagaraju  Tankala

    hi ,
    look at  this...
    http://help.sap.com/saphelp_nw04/helpdata/en/66/158661547611d182cc0000e829fbfe/frameset.htm
    regards,
    venkat.

  • Plant Maintenance Feature / Module

    Does Apps have any module on Plant Maintenance covering or does Apps cover Plant maintenance including:
    a. breakdown reporting with reason and categorisation into recurring & nonrecurring
    b. preventive maintenance schedule
    Please revert back ASAP.
    Thanx
    Ganesh

    Dear All,
    Can anyone share some links or materials regarding the PM module.
    I have checked the help.sap reference. but since I dont have experience & practical knowledge regarding this module I am finding a bit difficult to follow. So please advice how to start with ?
    Materials with the basics structure & Process flow in PM  Or if someone can explain the PM process flow like the PR-LIV flow in MM it will be really very helpful.
    Also if you can provide details regarding the SDN forum i.e related to PM module where I can find PM materials & threads it will be highly appreciable.
    Expecting your valuable replys.
    Regards,

  • Upgrade on SAP Plant Maintenance and Product Data Management

    Hi Gurus,
    I assigned to a upgrade project for Plant Maintenance and Product Data Managemet modules.
    Please guide me what are the steps to follow and provide more information on this ...
    Thanks in advance!!!!!!!!!
    Regds,
    RK

    Hello Kurni,
    In PDM/PLM latest version is PLM 7.0.
    There are many new functionalities available in this version.
    Earlier version can be accessed from SAP GUI, but the latest one can be accessed from Portal/NWBC.
    DMS side many notes have to be applied as you will be instaling EHP4.0 as part of the upgrade.
    ECM side some standard reports are missing in PLM 7.0, which were available in ECC6.0.
    Regards
    Prasad K

  • Plant Maint (SAP Modules)

    We wrote to our SAP Implementation Team
    In the Plant Maintenance Module we need a well-defined setup procedures allowing addition of new / modification of existing Standard Operating Procedures and a mechanism which allows the system to ensure all plant maintenace operations are strictly done in accordance to the SOPs, and deviations are either restricted and/or highlighted by alerts depending upon the sensitivity
    Our SAP Implementors have said
    In the task lists (SAP) which will be created by you will contain all
    the SOP's as defined by you which are needed to carry out maintenance
    on a particular machine. However the automation to generate alerts if
    someone does not follow the SOP's cannot be done in SAP. This is
    because that SAP is not a Plant automation software it is an ERP
    software.
    Can anyone help us resolve this issue.

    Hi ,
    I think this is not relevent forum,move theread to relevent forum,you may get valuable inputs
    Regards,
    Raj

Maybe you are looking for

  • How do I remove purchased albums from artist list ios7

    In the music app on ios7 under the artist tab, I can now see any artist I've ever downloaded from the iTunes Store. This includes any of the free artists I downloaded such as the free iTunes Gifts during the holiday season. How do I hide artists from

  • ALV Grid Total Text (OOPS)

    Hi All, I have a simple ALV Grid Report(OOPS), I would like to give a Text for Total Row. In REUSE_ALV_GRID we have the option of giving this text, but i am not able to figure it out how to get the same in OOPS. Regards Anup

  • [WRT45G] Can't update firmware and other problems

    Nevermind. I'm buying a different brand since rather than getting any help, I get my post censored because I mentioned that I've had problems with other Linksys routers. Thanks for nothing Linksys.Message Edited by Samutz on 08-27-2006 09:13 AM

  • ESS/MSS configuration as a BASIS Admin

    Hi gurus Aa a Basis Consultant I installed EP 7.0 successfully on windows 2003 database Db2. What are the Configuration to be done for ESS/MSS. Thanks Rao.

  • Poor quality PDF output

    Hi, I have noticed that the PDF output when using Rome on Windows is quite poor and is far inferior to an outputted PDF from a Mac. When you use a drop shadow on a piece of text it is displayed in low quality (even if the high quality option is selec