Logical component in Solar02 transaction

Hi,
When i run solar02 transaction in solution manager.I get the project screen, but the logical components for the various processes is showing a wrong component. I need to manually change the logical component everytime.
Is there any way that the logical component column shows the right component automatically??
Thanks,
Visshwas

Hi,
Does the Log comp assigned to the project is correct?

Similar Messages

  • Missing Logical Component in Solar01-Transaction Tab

    We have setup several logical components and assigned it to our project template.  We then executed transaction SOLAR01; navigate to the "Business Blueprint Structure", "Master Data" and then the "Transactions" tab; we could only select One Logical Component.  The rest of them are NOT being display at all. Any idea why?
    Interestingly, when we naviate to the Business Blueprint Structure" \ "Business Scenario" - All the logical components are available again. But go down another level from there' and we are back to one logical component again.
    Thanks in ahead to anybody that could shed some light in this.

    Hi,
    logical components are assigned directly to master data objects, organizational units and process steps. Thus, these objects are part to the corresponding system. Therefore, it is only possible to assign content on tabs belonging to these objects that have the same product assigned. This is the reason why only one logical component is available on this level in your project. On scenario or process level, all logical components are available.
    Best regards,
    Michael

  • Replace logical component in solar01

    Hi,
    We have an issue with Logical component maintained in "transaction"  tab for business process under Project in solar01.
    Logical components for ERP systems have been changed from SAP ECC to SAP ERP. All ERP systems are now maintained in SAP ERP and corresponding Logical component. But the business processes mainatained refer logical component SAP ECC.
    We tried to replace and delete the logical components in solar_project_admin -> System Landscape but it does not allow to delete neither replace with new SAP ERP logical components.
    Get message "Logical component SAP ECC is still being used"
    Please help on solution.
    Thanks & Regards,
    Anthony.

    Thanks for reply.
    actually we tried to add new SAP ERP logical component and updated in the project.
    When we try to use Logical Component replace function we get below message :
    "The logical components SAP ECC and Z_ERP have different products"
    So the logical component in "transaction" tab still cannot be replaced.
    Moreover in few business process it does not list Z_ERP logical component to manually replace same in Logical component dropdown.
    we found one SAP note :
    SAP Note 1429697 - SMSY: Converting product versions
    this SAP note refers to a report SMSY_SWITCH_PRODUCT which can be used to switch logical componment SAP ECC to SAP ERP.
    But SAP ECC is used in atleast 15 more projects so need to know impact of running this report.,
    Thanks & Regards,
    Anthony

  • SOLAR02-replace logical component

    Dear Friends,
      I am working with Solution Manager 4.0, patch level SP12. In SOLAR01 i have finalised my business structure. Now in SOLAR02, i have assigned some logical component to link to satellite systems. i am having about 500 transactions in SOLAR02. Later point of time i realized that i have wrongly assigned the logical components to my 500 transactions. Now i want to replace my existing logical component with new one.
    In Sol Man, i am having the option to mass replacement of logical component.
    (Ths path is,  Edit---Replace logical component)
    Here, i am entering, Log. Component to be Replaced &  Replace with logical component. If i do the consistency check, i am getting message that , " Log component SAPR3 can be replaced with ZSAPR3".
    But if i save, i am getting following error.
    <b>The requested object is locked by another transaction</b>
    <b>The details of the error is below:</b>
    The requested object is locked by another transaction
    Message no. MC602
    Diagnosis
    A lock requested by calling an ENQUEUE function module cannot be provided because the object in question has already been locked by its own transaction.
    Technical Information: The C_ENQUEUE routine returns the following values:
    COLLISION_OBJECT =  ESOLARTAB
    COLLISION_UNAME = ZS933SENTHIL
    System Response
    The ENQUEUE function module triggers an appropriate exception. If this exception was not intercepted by the application program, it leads automatically to the active SAP transaction being cancelled.
    Procedure
    Once the ENQUEUE function module is called, the application program should intercept this exception and react to it appropriately.
    Message Text
    The requested object is locked by another transaction
    Technical Data
    Message type__________ E (Error)
    Message class_________ MC (Aggregate: views, matchcodes, lock objects)
    Message number________ 602
    Message variable 1____ ZS933SENTHIL
    Message variable 2____ ESOLARTAB
    Message variable 3____ ZS933SENTHIL
    Message variable 4____ 
    Message Attributes
    Level of detail_______ 
    Problem class_________ 
    Sort criterion________ 
    Number________________ 1
    Please guide me to solve this problem.
    Regards
    senthil

    Hi Senthil,
    you have selected a tab that can contain logical components and then started the replace functionality. Select a tab that does not contain logical components (e. g. the gen. Documentation tab).
    Best regards,
    Michael

  • Setting Logical component for Test Case.

    Hello,
                I've created test case in SOLAR02 and I want to link my test case to Quality Assurance in my logical component (SAP ECC).How can i set this link? Now the test cases  are link to Developement system in SAP ECC. Please tell me how can i fix it.

    Hi,
       If you want to perform the testing in QA client, set your system role as "Quality system" in STWB_2 transaction.
    By default, the system role has to come as "Quality system".
    If it is not check your transport route of the logical component in t.code SMSY.
    Regards
    Senthil

  • XI 3.0 and BW 3.5 system type/logical component in Solution Manager

    We are in the process of performing an upgrade for ERP 2004, XI 3.0 and BW 3.5. Initially this is being done in the sandpits. All systems are configured and connected our Solution Manager to download the packages.
    We are unable to determine what type of system the XI 3.0 and BW 3.5 should be configured under. For example, previously we had an issue where ERP was configured as ECC 5.0 rather than ERP 2004. This was causing an issue in MOPZ where the upgrade option wasn't visible in a maintenance transaction. The same issue is now happening for XI and BW.
    Please advise on the system type (logical component to use) for XI 3.0 and BW 3.5 in Solution Manager as SAP have made it very confusing. Currently both are under type Netweaver 04.
    Regards,
    -Rohan

    Hi
    I believe that SAP hasn't upgrade option for BW 3.5, Check link:
    https://service.sap.com/solman-mopz
    Upgrade
    a "straight" upgrade for SAP Business Suite (upgrade from SAP ERP 2004 to SAP ERP 6.0, for example) is not supported by Maintenance Optimizer
    Upgrade with an Installation of an Enhancement Package is supported for SAP ERP, SAP SCM, SAP SRM and SAP CRM
    Regards
    William Neira

  • Managing more than one logical component in SMSY Current System Assignments

    Hi,
    I have a problem with managing logical components in TA SMSY in my Solution Manager System, in the section "System Groups and logical Components". I want to maintain more than one logical System e. g. from Type Application Server ABAP --> SAP NETWEAVER APPLICATION SERV.
    That means e. g. i want to maintain 2 or more Demo Systems from different Servers or Instances of the same Product Version in the same logical Component .
    What I want to know is, is there a way to display these logical components in tne  "Current System Assignments" - View in that form
    Logical Component is e.g. : SAP NETWEAVER APPLICATION SERV
    product/main instance is   : SAP NETWEAVER [Application Server ABAP]
    Product Version | Development System | Demo System | Training System | Production System | ...
    |--|||--
    |
    SAP NW 7.0        |                                         | ZB1: 100           |                               |                                     |
    |--|||--
    |
    SAP NW 7.0        |                                         | ZB2: 800           |                               |                                     | ...
    Thanks beforehand for your help.
    Greets C. Peifer
    Edited by: Carsten Peifer on Dec 15, 2008 4:03 PM

    Thanks for your quick answer,
    but i have to say, that this is not exactly what i've been lookin for.
    What I need in my System Landscape is to have each demosystem as a logical Component from the same type (e.g. SAP NETWEAVER APPLICATION SERVER ABAP).
    So that in Change Management in a Maintenance Optimizer Transaction i can choose between each demo system in my System Landscape (from the type SAP Netweaver Application Server ABAP) that i will maintain in Maintenance Optimizer, e.g. download a new SP Stack.
    My Intention is to create new logical components from type  SAP NETWEAVER APPLICATION SERVER ABAP in my Namespace e.g. ZSAPNW01, ZSAPNW02, ... and to maintain the types of systems (Demo, Development, Training etc ...) for each logical component.
    Is this the only Possibility?
    Or do i can also display my logical components the way i descriped beyond?
    >
    Product Version | Development System | Demo System | Training System | Production System | ...
    |--|||--
    |
    SAP NW 7.0 | | ZB1: 100 | | |
    |--|||--
    |
    SAP NW 7.0 | | ZB2: 800 | | | ...  

  • Monitoring "check aborted jobs" not possible - Logical component issue?

    Hy Experts,
    we are facing a problem setting up system monitoring in our Solution Manger system.
    We want to check if a specified job is finished sucessfully - if it is aborted we want to receive a mail.
    In another system the monitoring as described is fully functional.
    In this scenario we are facing a problem:
    Error Text:
    The logical components SAP NW REDWOOD CRONACLE and Z_SYS_MONI have different products
    Message no. SOLAR170
    Diagnosis
    This component change can prevent the processes and scenarios which you have copied from the BPR into the "Structure" tab, in transaction SOLAR01, from running in the assigned system, or assigned transactions, IMG activities, etc. may not exist in these systems. For example, transactions or IMG assignments copied into the previous product context do not yet exist in the project.
    If the same systems are assigned to the new and old logical components, the change is not critical.
    System Response
    The system sends a warning and accepts the change, but no data is automatically converted or adjusted.
    Procedure
    If you are unsure whether your assignments will still be in the component systems after the component change, perform the function "Environment - Refresh Buffer" in the transaction SOLAR01. Errors in this program are objects which do not exist in the system.
    Actual product of the logical component "Z_SYS_MONI" is ECC5.0.
    The other (working) is using the logical component "SAP NETWEAVER APPLICATION SERV" instead of the above used "SAP NW REDWOOD CRONACLE "
    How can this error be fixed OR
    How to monitor jobs with logical component ecc5.0?
    Any help will be rewarded!!!
    Thanks in advance
    Tom

    Detailed Info:
    The working solution is assigned to ECC 6.0 AND to SAP Netweaver 7.0 (2004s).
    The selection in business process repository - it-platform - monitoring is assigned to SAP Netweaver 7.0. -  but we have ECC5.0 - even if I create the system/logical component new under Netweaver 2004 (6.40) it won't work
    It seems not to be possible.
    But how to monitor a job in ECC5.0 - think it is possible.
    Any ideas?
    Please help!
    OK
    Seems not to be possible!
    Set to solved - but this is not the way to solve problems dear SAP
    Edited by: Tom on Dec 5, 2008 9:59 AM

  • Solution Manager - Logical Component for SAP Netweaver EHP2

    Hello,
    I installed the newest SAP Netweaver Ehp2 (with usage type AS ABAP only) for a future integrating with BI_CONT (SAP BI requirement). So... what I want to know is... I want to do an update of support packages to the latest Stack (SPS) and in this product version (NW EHP2) the latest stack is stack 06 !! But I ´m facing with a problem which is, because I have to maintain this system in Solution Manager (for Maintenance Optimizer activity)...so what I want is configure this new system on Solution Manager Ehp1 (with SPS 23) but in tcode SMSY I didn´t found this Product in Logical Components for I can apply this system to my Solution... I only see SAP Netweaver with EHP1 and not with EHP2 which is the version that I want to apply this new system. (This is mandatory task, because without it, I will not be able to download the support packages for NW 7.0 EHP2)
    Tell me two things... first if this level version of Solution Manager that I have here (SPS 23) have this product in logical components, and two... if not it, is necessary to raise the level of Solution Manager support packages (to latest stack SPS 25) for I can see that logical component SAP Netweaver EHP2?!
    Thank you very much
    João Dimas - Portugal

    Hi João,
    You can verify if the EHP2 is available (if) in your system, this can be done once you are in SMSY -> Product Definitions -> SAP Netweaver where you should able to see the EHP2. If so, then it's a matter of marking the leading Product & Product Version under the Header Data ->Change Product Assignment where you can use the drop down arrow to select the Product and Product Version. If it's not available, then by checking the 'Free Product / Select Product Version' then use the drop down arrow to select the product & Product Version, once you selected that then click on copy and mark that as active and save.
    Then you need to create a new logical component in System Group & logical Component under SAP Netweaver, then assign the system to the logical component. Once this is done you can use the logical component in a solution and create a maintenance transaction.
    I hope this help you to proceed further, thanks.
    Jay Soma.

  • SAP Delivered Logical Component Inactive, SAP CRM 5.0

    I would like to use the SAP CRM 5.0 Logical Component as Delivered by SAP. The systems are already upgraded but I cannot seem to Acitvate this in transaction SMSY. CRM SERVER 4.0 is active and can be used.
    Anyone have any ideas?

    Hi Romina,
    Yes you can install it later not just for CRM but for any SAP Solution from the Business Suite or SAP NW04s.
    You have to start JSPM and select Install Additional Usage Type and select JCRM.
    Make sure after you install the new type to check your software components
    http://HOST:5XX00/sap/monitoring/SystemInfo. to see if all your components are in the correct stack.
    Best regards,
    Juan Jose Alvarado

  • Error: The logical component X is still being used

    Hi,
    In Transaction SMSY, i want to delete a Logical Component. So, pre-condition is to check whether it is mapped to any Projects/Solutions. By right-clicking - Where used list , i have seen that it is mapped to a Project. So, in transaction SOLAR_PROJECT_ADMIN under tab System Landscape, i tried to delete the Logical Component but receiving the error message - The logical component X is still being used.
    Please help.
    Many Thanks,
    Mohan.

    Hello Mohan,
    You can also solve this by using the "Replace Logical Component" button in the system landscape within SOLAR_PROJECT_ADMIN.
    Thus you can replace all the occurances of the Z_ logical component by e.g. an existing standard SAP logical component.
    Afterwards you will be able to delete your Z_ logical component in SMSY (or in LMDB from 7.1 SP9 on).
    Best regards,
    Peter

  • Logical Component SAP ERP lost

    Hello,
    after patching the Solution Manager EHP1 to SPS23, logical component SAP ERP is lost.
    in Transaktion smsy Landscape Component - Systems -> the Product SAP ERP is also lost.
    strange i can´t see any system that was registred under this component, but i can release patches for all my ERP System by using Transaktion Solution Manager.
    regards
    Steven

    Hi,
    Could you please check in transaction SMSYUtilitiesSystem Settings, the product SAP ERP is active? If not please check the active check box.
    Rajeev

  • Replace Logical Component

    I need to complete a mass change of logical componets on my implementation project.  We initially were on ECC 5.0 with a logical componen on ECC.  We have recently upgraded to ECC 6.0 and have a new logical componeont of ECC_EHP.  In the Edit menu, there is an option to replace a logical component.  I can execute the step where I indicate what logical component I want to find and what logical component I want to replace it with, however, when I run it I receive a message:  "Logical Component Replc. Error".  Has anyone successfully got this to work?  Any help?

    I opened a message with SAP, the steps in their response worked:
    Start transaction SOLAR_PROJECT_ADMIN and open the project where
    you would like to replace the log. component.
    Here change to the tab: 'System Landscape' and select the tab 'Systems'
    Here now select the log. component you would like to replace and
    press the button: 'Replace. log component' at the bottom. (the second
    one from left)
    In the following popup select the desired log component.
    (if the one you are looking for is not visible, please press the
    button 'All logical components' and search for the one you would like)
    After you have selected the componet press the OK button.
    At the end you will receive a message that states that the logical
    component has been replaced.

  • Documentation Assistant - No Logical Component exists for this analysis

    Hi
    Whe trying to create a analysis with in solution manager documentation assistant i get the error messaage
    No logical component exists for this analysis , verify the analysis project.
    Can anyone tell me how i can solve this,
    Thanks
    Barry

    Hi Barry,
    To solve this issue, you may try steps described below:
    1. Call  Transaction 'SOLMAN_DIRECTORY'
    2. Select your source Solution via single click.
    3. In detail panel, check if there is any valid Logical component in the
    'System Group' Tab.
    4. Add related Logical Component to the Solution, make sure there is val
    id System for at least one role ( Development System e.g. )
    5. Save your Solution.
    6. Try to create Analysis Project from that Solution again and afterward
    screate an Analysis.
    Hope such information can help you solve such issue.
    Kind regards,
    Fabricius

  • Logical component cannot be used in project

    HI
    after i add logical component in solar_project_admin
    i try to check system landscape
    and i get error "Logical component SAP_ERP_EHP_ABAP_EHP4 is not used in project (the name of the project)"
    i used in 2 different logical component in this project
    you now whay?
    best regards
    Naor

    I am receiving this message right now, while conducting prototype testing.
    Message no. SOLAR_SPROJECT055 - Logical component Z_CHARM_PT is not used in project CHARM_PT01
    I used this logical component in a previous solman project and it worked. Now I have closed that project and am trying to create a new one using the same logical component.
    Any help or suggestions are appreciated. Thanks.

Maybe you are looking for