Logical Component

Friends,
   In the solution manager Business Blue Printing....
   I can see Business Processes with Logical Components attached to it.
   There are various instances wherein there are some business processes with SAP R/3 4.7. There are some with ECC 6.0 and there are some which are present for both the releases.
    Can somebody help me with the following
If i select a Business process with SAP R/3 4.7, ( which does not have a ECC 6.0 procees), it will be applicable for all the higher releases ?

Solman follows a downward compatability....
there are specific changes with each version release and due to this new processes are released...

Similar Messages

  • Logical component cannot be used in project

    HI
    after i add logical component in solar_project_admin
    i try to check system landscape
    and i get error "Logical component SAP_ERP_EHP_ABAP_EHP4 is not used in project (the name of the project)"
    i used in 2 different logical component in this project
    you now whay?
    best regards
    Naor

    I am receiving this message right now, while conducting prototype testing.
    Message no. SOLAR_SPROJECT055 - Logical component Z_CHARM_PT is not used in project CHARM_PT01
    I used this logical component in a previous solman project and it worked. Now I have closed that project and am trying to create a new one using the same logical component.
    Any help or suggestions are appreciated. Thanks.

  • XI 3.0 and BW 3.5 system type/logical component in Solution Manager

    We are in the process of performing an upgrade for ERP 2004, XI 3.0 and BW 3.5. Initially this is being done in the sandpits. All systems are configured and connected our Solution Manager to download the packages.
    We are unable to determine what type of system the XI 3.0 and BW 3.5 should be configured under. For example, previously we had an issue where ERP was configured as ECC 5.0 rather than ERP 2004. This was causing an issue in MOPZ where the upgrade option wasn't visible in a maintenance transaction. The same issue is now happening for XI and BW.
    Please advise on the system type (logical component to use) for XI 3.0 and BW 3.5 in Solution Manager as SAP have made it very confusing. Currently both are under type Netweaver 04.
    Regards,
    -Rohan

    Hi
    I believe that SAP hasn't upgrade option for BW 3.5, Check link:
    https://service.sap.com/solman-mopz
    Upgrade
    a "straight" upgrade for SAP Business Suite (upgrade from SAP ERP 2004 to SAP ERP 6.0, for example) is not supported by Maintenance Optimizer
    Upgrade with an Installation of an Enhancement Package is supported for SAP ERP, SAP SCM, SAP SRM and SAP CRM
    Regards
    William Neira

  • Logical component in SolMan using SMSY

    Hi,
    What is a logical component and why is it necessary. Why do we create that in our solman system for the landscape.
    Also i was going through one tutor in rkt-solman link for creating logical component. It shows for a r/3 system. Is the same selection valid for the Netweaver component also.
    Help required and shall be appreciated as well.

    Hi,
    First of all thanks for the reply.
    One thing is while i create a new system with assistant, and select the product as netweaver and proceed it asks me to select the main instance. What is this main instance. Say for me the system i am adding is the one having J2ee engine and portal plus trex on it. It doesnot have the ABAP instance. So what should be my selection. Should it be only WebAS Java or java + portal + trex.
    Secondly what i did was i selected java and EP and Trex and proceeded. It didn't give me the option of entering the System Number and Message Server. In the next screen the only option i had was to assign logical component. If i select the box then it asks for client but the box for client is disabled.
    Don't know what to do. Also RFC anyway is required. In such a case what should be the case. How should i create those RFC's and what RFC's are required for the same.
    Lot of questions. Hope to get the detailed reply.
    Answers will be rewarded nicely.
    Thanks

  • Logical component in Solar02 transaction

    Hi,
    When i run solar02 transaction in solution manager.I get the project screen, but the logical components for the various processes is showing a wrong component. I need to manually change the logical component everytime.
    Is there any way that the logical component column shows the right component automatically??
    Thanks,
    Visshwas

    Hi,
    Does the Log comp assigned to the project is correct?

  • How To create a maintenance project - logical component missing?

    Hi experts,
    we plan to activate ChaRM in our Landscape.
    We don't have created a maintenance project in solution_manager cause there is a logical component missing.
    I followed the instructions of the tutorial on  https://websmp206.sap-ag.de/~sapidb/011000358700006932702005E.sim (Creation of a maintenance project).
    I recognized there is the logical component "ZCHANGE REQUEST MANAGEMENT" missing.
    This seems to be a modified origin SAP Component.
    Does anyone know where to find these component?
    Maybe with informations what has to be changed for the Z*copy or is this only a 1:1 copy?
    Does anyone have a detailed document for configuring ChaRM on SolMan 7.0 (Mailadress is visible on my business card)
    thanks in advance
    kind regards
    Thomas
    Helpful answers/documents will be rewarded, surely!

    You need to set up your solution and therefor define a logical component in SMSY. For instance the logical component might consist of your ERP E, Q and P systems.
    This logical component is added to an SMI Project. It basically tells the SMI project which systems are involved in the process. After that you will have to create an IMG project, CTS project, release the SMI project to the Change Request Management and generate Maintenance Cycle and Task List (this is all being done in SOLAR_PROJECT_ADMIN).
    /cheers

  • Managing more than one logical component in SMSY Current System Assignments

    Hi,
    I have a problem with managing logical components in TA SMSY in my Solution Manager System, in the section "System Groups and logical Components". I want to maintain more than one logical System e. g. from Type Application Server ABAP --> SAP NETWEAVER APPLICATION SERV.
    That means e. g. i want to maintain 2 or more Demo Systems from different Servers or Instances of the same Product Version in the same logical Component .
    What I want to know is, is there a way to display these logical components in tne  "Current System Assignments" - View in that form
    Logical Component is e.g. : SAP NETWEAVER APPLICATION SERV
    product/main instance is   : SAP NETWEAVER [Application Server ABAP]
    Product Version | Development System | Demo System | Training System | Production System | ...
    |--|||--
    |
    SAP NW 7.0        |                                         | ZB1: 100           |                               |                                     |
    |--|||--
    |
    SAP NW 7.0        |                                         | ZB2: 800           |                               |                                     | ...
    Thanks beforehand for your help.
    Greets C. Peifer
    Edited by: Carsten Peifer on Dec 15, 2008 4:03 PM

    Thanks for your quick answer,
    but i have to say, that this is not exactly what i've been lookin for.
    What I need in my System Landscape is to have each demosystem as a logical Component from the same type (e.g. SAP NETWEAVER APPLICATION SERVER ABAP).
    So that in Change Management in a Maintenance Optimizer Transaction i can choose between each demo system in my System Landscape (from the type SAP Netweaver Application Server ABAP) that i will maintain in Maintenance Optimizer, e.g. download a new SP Stack.
    My Intention is to create new logical components from type  SAP NETWEAVER APPLICATION SERVER ABAP in my Namespace e.g. ZSAPNW01, ZSAPNW02, ... and to maintain the types of systems (Demo, Development, Training etc ...) for each logical component.
    Is this the only Possibility?
    Or do i can also display my logical components the way i descriped beyond?
    >
    Product Version | Development System | Demo System | Training System | Production System | ...
    |--|||--
    |
    SAP NW 7.0 | | ZB1: 100 | | |
    |--|||--
    |
    SAP NW 7.0 | | ZB2: 800 | | | ...  

  • Setting Logical component for Test Case.

    Hello,
                I've created test case in SOLAR02 and I want to link my test case to Quality Assurance in my logical component (SAP ECC).How can i set this link? Now the test cases  are link to Developement system in SAP ECC. Please tell me how can i fix it.

    Hi,
       If you want to perform the testing in QA client, set your system role as "Quality system" in STWB_2 transaction.
    By default, the system role has to come as "Quality system".
    If it is not check your transport route of the logical component in t.code SMSY.
    Regards
    Senthil

  • Creating Logical Component in Solman 7.1

    Hi,
    I want to create a Logical component for my SAP ECC managed system, could you please let me knowhow to create it.
    OR is there any standard SAP document available on how to create Logical component in Solman 7.1 SP10.
    Regards
    P Kumar

    hI kUMAR,
    Check in SOLMAN 7.1 master guide which is available in SAP marketplace.
    You can try below for creating logical component in SOLMAN:
    1)Make sure that managed system has correct details in LMDB (like product components,version...etc)
    2)Go to SMSY-->click on logical components in left hand side-->search for your product version i.e ERP 6.0 or Netweaver 7.0 or SCM etc.
    3)Expand ERP 6.0 (in ur case)-->right click -->create logical system-->Give logical system name and version details-->Save
    4)After that select systems i.e Dev system ,QUA system,PROD system of your ECC ,Then save
    Thanks,
    Prakash

  • Monitoring "check aborted jobs" not possible - Logical component issue?

    Hy Experts,
    we are facing a problem setting up system monitoring in our Solution Manger system.
    We want to check if a specified job is finished sucessfully - if it is aborted we want to receive a mail.
    In another system the monitoring as described is fully functional.
    In this scenario we are facing a problem:
    Error Text:
    The logical components SAP NW REDWOOD CRONACLE and Z_SYS_MONI have different products
    Message no. SOLAR170
    Diagnosis
    This component change can prevent the processes and scenarios which you have copied from the BPR into the "Structure" tab, in transaction SOLAR01, from running in the assigned system, or assigned transactions, IMG activities, etc. may not exist in these systems. For example, transactions or IMG assignments copied into the previous product context do not yet exist in the project.
    If the same systems are assigned to the new and old logical components, the change is not critical.
    System Response
    The system sends a warning and accepts the change, but no data is automatically converted or adjusted.
    Procedure
    If you are unsure whether your assignments will still be in the component systems after the component change, perform the function "Environment - Refresh Buffer" in the transaction SOLAR01. Errors in this program are objects which do not exist in the system.
    Actual product of the logical component "Z_SYS_MONI" is ECC5.0.
    The other (working) is using the logical component "SAP NETWEAVER APPLICATION SERV" instead of the above used "SAP NW REDWOOD CRONACLE "
    How can this error be fixed OR
    How to monitor jobs with logical component ecc5.0?
    Any help will be rewarded!!!
    Thanks in advance
    Tom

    Detailed Info:
    The working solution is assigned to ECC 6.0 AND to SAP Netweaver 7.0 (2004s).
    The selection in business process repository - it-platform - monitoring is assigned to SAP Netweaver 7.0. -  but we have ECC5.0 - even if I create the system/logical component new under Netweaver 2004 (6.40) it won't work
    It seems not to be possible.
    But how to monitor a job in ECC5.0 - think it is possible.
    Any ideas?
    Please help!
    OK
    Seems not to be possible!
    Set to solved - but this is not the way to solve problems dear SAP
    Edited by: Tom on Dec 5, 2008 9:59 AM

  • No monitors pulled for self defined logical component

    Hi,
    I have defined a system landscape in smsy and created solution landscapes in the sm. For some systems I had to create a new logical component.
    My problem: Although RFC destinations work fine, for all systems within the new logical component no monitors are pulled out of rz20.
    If I use a SAP-defined logical component it works.
    I use Solution Manager 3.2.
    Is there any documentation for this problem or does anybody know a solution for this?
    Thank you and best regards,
    Tim

    Hi again,
    I thought about the problem and tried several things. The problem is not the self defined logical component. The problem is the product definition. I can`t monitor systems, which I created as product SAP ERP in smsy. The check "SAP System ..." doesn`t appear when I want to setup System Monitoring.
    Does anybody have an idea what I do wrong?
    Regards,
    Tim

  • Not able to add logical component

    I am creating a template project, where I have copied from existing one. Now I am trying to add a logical component in Solar_admin and getting an error "System landscape can only be changed in private templates Message no. SOLAR_SPROJECT048"
    Also log shows templates have the status Public: TEMPLATE_1 and way suggested in error as "Set all templates on the Templates tab page to Private and make the necessary changes. After you have made your changes, reset the status to Public. You can then copy the templates to projects."
    Please let me know how to do with path as I am new to Solman. Thanks in advance.

    Dear Dee,
    Here is some useful information of Templates that may help you resolve this problem.
    [Using Templates|http://help.sap.com/saphelp_sm70ehp1_sp23/helpdata/en/57/6934946046174a891ab1363c1d391a/frameset.htm]
    Regards,
    Paul

  • Pb to create a logical component related to note 1505281

    Hello,
    I would like to create a new logical component in order to implement Note 1505281.
    When I do smsy -> System group and logical component -> create logical component,
    I set:
    Logical Component: SAP ERP 6.0
    Product: SAP ECC
    Product version: SAP ECC 6
    Main instance: SAP ECC Server
    Name: SAP ERP 6.0
    When I click on the green tick I get: Do not use any special characters.
    Would you know why?
    Thanks in advance for your answer.

    Hello,
    I have succeded by changing my old ERP (2004) logical component.
    Regards,

  • Solution Manager - Logical Component for SAP Netweaver EHP2

    Hello,
    I installed the newest SAP Netweaver Ehp2 (with usage type AS ABAP only) for a future integrating with BI_CONT (SAP BI requirement). So... what I want to know is... I want to do an update of support packages to the latest Stack (SPS) and in this product version (NW EHP2) the latest stack is stack 06 !! But I ´m facing with a problem which is, because I have to maintain this system in Solution Manager (for Maintenance Optimizer activity)...so what I want is configure this new system on Solution Manager Ehp1 (with SPS 23) but in tcode SMSY I didn´t found this Product in Logical Components for I can apply this system to my Solution... I only see SAP Netweaver with EHP1 and not with EHP2 which is the version that I want to apply this new system. (This is mandatory task, because without it, I will not be able to download the support packages for NW 7.0 EHP2)
    Tell me two things... first if this level version of Solution Manager that I have here (SPS 23) have this product in logical components, and two... if not it, is necessary to raise the level of Solution Manager support packages (to latest stack SPS 25) for I can see that logical component SAP Netweaver EHP2?!
    Thank you very much
    João Dimas - Portugal

    Hi João,
    You can verify if the EHP2 is available (if) in your system, this can be done once you are in SMSY -> Product Definitions -> SAP Netweaver where you should able to see the EHP2. If so, then it's a matter of marking the leading Product & Product Version under the Header Data ->Change Product Assignment where you can use the drop down arrow to select the Product and Product Version. If it's not available, then by checking the 'Free Product / Select Product Version' then use the drop down arrow to select the product & Product Version, once you selected that then click on copy and mark that as active and save.
    Then you need to create a new logical component in System Group & logical Component under SAP Netweaver, then assign the system to the logical component. Once this is done you can use the logical component in a solution and create a maintenance transaction.
    I hope this help you to proceed further, thanks.
    Jay Soma.

  • Create new logical component

    Hello,
    I am facing an issue when creating a new logical component, which I have to do, to be able to get maintenance optimizer to give me an option to download enhancement packages. In order to do so I follow SAP Note 1022072.
    When I come to step 12 creating a new logical component, it will not save and throws me the following error.
    "Logical component SAP ERP 2005 is not in customer namespace".
    We are currently running this as ECC 6.0 which explains why I am using this note. I am thinking it has something to do with the way we have this licensed (ERP 6.0), but am not entirely sure.
    Thanks
    Andrea

    Hi,
    I always create it starting with Z.
    Please check the latest EHP4 Technical FAQ from this site for more details on creating Logical components and all other steps required to use Maintenance Optimizer: http://service.sap.com/erp-ehp
    Cheers
    Rishi

  • SAP Delivered Logical Component Inactive, SAP CRM 5.0

    I would like to use the SAP CRM 5.0 Logical Component as Delivered by SAP. The systems are already upgraded but I cannot seem to Acitvate this in transaction SMSY. CRM SERVER 4.0 is active and can be used.
    Anyone have any ideas?

    Hi Romina,
    Yes you can install it later not just for CRM but for any SAP Solution from the Business Suite or SAP NW04s.
    You have to start JSPM and select Install Additional Usage Type and select JCRM.
    Make sure after you install the new type to check your software components
    http://HOST:5XX00/sap/monitoring/SystemInfo. to see if all your components are in the correct stack.
    Best regards,
    Juan Jose Alvarado

Maybe you are looking for

  • How  to read all files  under a folder directory in FTP site

    Hi Experts, I use this SQL to read data from a file in FTP site. utl_file.fopen('ORALOAD', file_name,'r'); But this need to fixed file name in a directory. However, client generate output file with auto finename. SO do we have any way to read all fil

  • Automatic import of cd drive

    hi good day , I wonder how do I disable the automatic startup lightroom in cd drive

  • NEW UPDATE STILL MESSED UP!!!

    My phone is already acting up since the update last night. LED light doesn't flash anymore when I have notifications, "silence all" mode missing again from the main power button, now there's only Airplane made, power off and restart. Who knows what t

  • Trashing noise when mbp wakes from sleep

    oh now i've started posting i keep thinking of new things that don't seem right! for the last few months i have noticed that when i wake my mbp up from sleep, it always makes a few strange noises much the same as when you empty the trash bin as it cr

  • Material COGS as cost element - Is it advisable?

    Gurus, I have set up my COGS accounts also as cost elements of type '11' to enable direct postings to COPA during billing document save (FYI, We post to COGS during billing and not during PGI.) I would like to know what is the downside in creating CO