Logical System Change for Production System

Hi experts
We have new CRM and BI project.  Logical System name of our ERP production system is not in naming standart. So we want to change logical system name and run BDLS in production system.
Is there any risk about this prosedure?
Best Regards...

Hi,
It is not advisable to change the logical system in production client once its assigned.
Regards,
Nisit

Similar Messages

  • Support message and change requests only for production system

    Hi guys,
    I would like to connect the solman helpesk with CHARM ( CHARM is still running ).
    In CHARM I have to create a CR only for production system. ( don't know why - but works as designed).
    In SAP helpdesk I can create support messages for every kind of system type but if I want to connect both (HD and CR) , the source system (ibase component) of the issue will copied to the CR and runs in error because of the rule (only p-system) of CHARM.
    Of course I can change the ibase to production system manually in SDCR but it seems a very error-prone method.
    Now my question: is it possible to change the ibase component due to the creation of CR by copy rule or something like this?
    Kind regards
    Rayko

    Hi Rayko,
    We do not have this option.
    Once in ChaRM, we assume that the changes will always correct an issue in the PROD system.
    I would recommend to open the tickets directly with the PROD system IBase, once the issue is also happening there.
    Best Regards,
    Fernando

  • BI  Error Logical system name has been changed for this system

    Hello All,
    I have installed the BI system and did a client copy from 000 to 200 client with profile SAP_ALL.
    Now I have loged into the system with client 200 and wen I run RSA1, I am getting the following error
    message: "Logical system name has been changed for this system"
    Thanks
    Sekhar..

    Hi,
    Goto tcode SCC4.
    Switch to change mode. (System will prompt that this table is cross client. Continue)
    Select your client (in this case 200). Click on details button (next to change mode button)
    Enter the proper logical system name in Logical system field.
    Click on Save button.
    Then try RSA1.
    Hope it helps
    regards,
    Pruthvi R

  • RSA1 error  Logical system name has been changed for this system

    Hello All,
    Earlier the RSA1 was activated for client 300 on our crm 5.2. after that we changed the client to 500 using SE16 -> Type table RSADMINA / Check Colum BWMANDT -> 500.
    But now when we login to client 500 and execute RSA1 it is showing
    Logical system name has been changed for this system"
    In scc4 we have not made any changes. Can you tell what should be done ? in the pop up it is showing following steps
    Change the name of the logical system (table T000) for client back to SIDCLNT300. This enables you to continue working with the system.
    If you really want to change the logical name, than you can, if and when you:
    change the system name back to SIDCLNT300,
    delete all existing connections between this system and other systems,
    delete all transfer structures that still exist, and
    do not use ALE or Workflow.
    Guys do you know how to fix this ? .
    Also do you know Assignment of Source System to Source System ID (table RSSOURSYSTEM) using RSA1 ?
    Edited by: Sahad K on Mar 17, 2008 10:55 AM

    Hello Hari,
    Both the options you said  cannot be used
    since the logical system SIDCLNT300 is used by client 300 and it cannot be given to client 500.  Also there already exist a logical system SIDCLNT500 which is assigned to client 500.
    I found out the issue. In the table RSBASIDOC  the logical system name that can use rsa1( bw  client )is set as  SIDCLNT300).  Only if we delete that entry and set it to SIDCLNT500 ( 500) we can use it on client 500.
    The solution is specified in /message/3284842#3284842 [original link is broken]
    Let me try the solution 2 and inform you.
    Solution 2:
    You cannot delete the source system. Two cases have to be distinguished:
    The source system still exists.
    Switch to Transaction SM59. Find the destination which has the same name as the logical system of the source system from field SLOGSYS in table RSBASIDOC (see above).
    Such a destination does not exist in Transaction SM59. In this case, you have to create the destination to the source system. Name the destination equal the entry in SLOGSYS from above. Then return to the Administrator Workbench and repeat the deletion.
    The entry exists but a remote login is not possible. Correct the communication parameters.
    Everything works. Change to Transaction SE37, function module RSAR_LOGICAL_SYSTEM_DELETE, Sngl. test. Parameter I_LOGSYS = <log. name of the source system>, I_FORCE_DELETE = 'X'.
    The source system no longer exists or was replaced with another source system with the same IP address.
    Proceed as described in the first case but make sure, that the field 'Target host' contains a not existing server in the maintenance screen of the destination (Transaction SM59). If necessary, change an existing entry. Later when you delete, the system asks you whether you want to delete, although the source system is not available. Select 'Ignore'.
    Incase you have any idea other than this please let me know how to edit the RSBASIDOC table  and change the entry to client 500.
    Edited by: Sahad K on Mar 18, 2008 5:07 AM

  • TWO Changes In Production System

    Hi , there are two changes in Production system,
    one is there is a report i have to do some modification in PROD,for this have to do in DEV,QA,PROD Respectively , here whether i have to use old request to new one , is this is the right practice or not,
    second in  transfer rules there is a conversion routine , i have to do some modification , How can i do like once again DEV,QA,PROD
    Hope u understand the problem
    With Regards
    MAHI

    Hi,
    Normally we dont have any authorization for changing the objects directly in production.
    You need to make the required changes in Dev and then move to Quality and then to Production. Hence you need to create a new requrest for all the changes you made in Dev and move to Quality and then to Production.
    Hope this helps.
    Regards,
    K.Manikandan.

  • Restrict print out of Purchase order only for Production system

    Hi,
    I want to restrict print out of Purchase order only for Production system, don't want to take it in devep or quality.
    is there any identifier to find the system is production or development.
    can anyone tell me how to restrict it,
    is there any function module, not based on client system.
    Thanx in advance
    Kesav

    Hi Kesavarathinam Vaidyalingam ,
    yes, I also use thomas' suggestion using
    t000-cccategory = 'P'.
    to determine productive client.
    Just one small hint: I found this condition as true in a test system: The admin had done a system copy to create a fresh test client - but forgot (or did not see a good reason) to change t000-cccategory = 'P. to  t000-cccategory = 'T'.
    Regards,
    Clemens

  • Code changes in Production system.

    Hi all,
    Due to the unavailability of the development and quality i want make code changes in production system.
    Please tell me is this possible and also i want know that does it effect or not?
    Regards,
    Ramprasd

    Hi,
    For editing in PRD system, u need to get authorization for editing. To get auth object, contact basis.
    But proper way to edit a code is modifying in DEV, then transport it to QAS & PRD.
    Regards,
    Prem

  • Log frequence for productive system

    Hello!
    We use SAP DB (version 7.7)  and use auto log function.
    We configured the redo log frequence so, that every 10 minutes a new redolog will be written to hardware drive.
    Question:
    How does this setting (log frequence of 10 minutes) affect the performance of the SAP system?
    And which setting (every 10, 20, 30 minutes) should be set for productive system?
    kind regards

    > My question is about the log settings. Untill today the redo logs were written to the drive, when the max. size of redo log (appr. 1 GB) has been reached.
    > Now I changed this settng, so I have every 10 minutes a new redolog file on the hardware drive.
    So again my question: Why did you change that? What was the reason to do so?
    > The questions:
    > Does this frequence (10 minutes) affect the performance of the server (network, SAP system, DB)?
    The default max time between database savepoints is 600 seconds - so 10 minutes.
    > What is the recommended setting to redolog setting for productive systems?
    There is no recommended setting for that, it all depends on what you are trying do. If you want e. g. a shadow database running "after" the production database for 10 minutes, then you use that 10 minutes setup. If you want an hour you configure an hour etc.
    It's all based on your setup and what you want to do.
    Markus

  • Content Server config for production system - oac0

    Hi all
    We are setting up content server for our ERP 2005 system, and I am wondering what best practice is for our scenario.
    We have one content server (CST) for development and test systems on host A, and one content server (CSP) for production system on host B. The Archive link configuration in dev and test points to CST. When this is transported to production, it will point to the wrong content server and I will have to reconfigure the archivelink in production to point to the correct content server (CSP).
    What is the best way to set up the production system to point to the content server CSP on host B? Should I define a new content repository in t-code oac0 in dev, and transport this to production? Should I define the new repository directly in production system??
    Please advise.
    Best Regards,
    Thomas

    Hello,
    I had the same problem a few years ago with R/3 4.7.
    I don't think there is a perfect solution but here is what I did :
    In the DEV system, in OAC0, I created 2 content repositories, one for the test sytem and one for the production. I transported these 2 content repositories in the production system.
    In the DEV system, in OAC3, I created temporary links from my business objects to my production content repository. I released the request order.
    Then I deleted these links which are wrong in the DEV system. I transported the order in the R/3 production system where these links are right.
    In the DEV system, in OAC3, I then created  the links from my business objects to  my TEST content repository. I released the second request order.
    So my config is now OK in my test and my production system.
    When we refresh the DEV system by a database copy from the production system. We just have to reimport the test request order to switch the links to be OK on the DEV system. We don't have to recreate the test content repository as it was defined als oi nthe production system.
    I am not sure that this is clear but this works for us with no problems since 2002.
    I hope this helps.
    Olivier

  • Project Management Question - timelines for Production system deployment

    Hi
    I need an expert advice on setting up timelines for establishing an Oracle Apps Production environment. We are implementing Oracle HR & Payroll at an organization.
    Our system architecture is a 2-node application tier and 2-node DB tier (RAC). RAC is configured by another party and we only have to prepare the application tier (2 nodes)
    We would be installing Oracle Apps R11i (11.5.10) with jserv load balancing on the 2-nodes
    Can anyone suggest how much time this should take to install/configure & patching of the application tier (on 2 nodes)?
    Regards
    Saira

    Duplicate post (check your other thread):
    Project Management Question - timelines for Production system deployment
    Re: Project Management Question - timelines for Production system deployment

  • How to find system status for production orders?

    How to find system status for production orders?
    looked into table AUFK, AFKO and AFVC but none of these tables, carry
    system status as part of the fields(STTXT)
    I tried to filter in COOIS, but not much help
    Able to find system status information in COHV,Is there any other way where
    I can find system status information for production orders
    Kindly guide

    Hi,
    Look into table, JEST, JSTO, AFPO & AFKO. CAUFV filed OBJNR, TJ02T filed ISTAT.
    But, it is very difficult to combine the details like Order and System status.
    Take the help of your ABAPer to generate Report for you.
    Regards,
    Siva

  • Steps to configure BPM report from Solman 7.00 for productive system ECC6.0

    Hi all,
    Please given me the steps to configure Buisness process Monitoring reports from Solman 7.0 for productive system( ECC6.0, windows & database oracle 10.2),
    I wanted to create the Reports of  monitoring the buisness.
    Regards,
    Akash Basis consultant.

    Thanks for replying Volker von Gloeden,
    This thread is my first one in SDN & I am very glad that someone has given the answer ,
    I will take a look for solution you have provided & will inform you.
    Thanks again.

  • Minimum Trusted RFC's for productive system

    Hi!
    We have very strict requirements dealing with set up of Trusted RFC for productive system for ChaRM approach in SOLMAN.
    Can some one tell me which Trusted RFC's and users for the productive system do I need?
    a) Trusted RFC is not mandatory for the productive system
    b) Trusted RFC only in productive system, client: 000, users: 1 communication user and 1Dialog user
    c) Trusted RFC in productive system for  each client with users...
    Thank you very much!
    H. Thomasson

    Create the function modules in SE37 and set the remote-enabled flag in the attributes section. Then import them into XI.
    Create a custom Z table through SE11 on each system to store any data, and the code in each function module would reference it. (Either that or just hard-code everything)
    In short yes it can be done through SE37, no you don't need SE38.
    I think you're talking about function groups which is a container for the function module. You can do everything through SE37 if you use the Goto->Function Groups-> Create Group option and give it the same name as your Function Module.

  • MaxDB support for production systems

    Hi,
    I have a DMS with MaxDB version 7.6.00.18.
    I opened OSS message regarding an issue. I got a solution, however I was told that '7.6.00.18 is very outdated and no longer supported for productive systems'.
    I can install the latest patch but how do I know when MaxDB version is no longer supported for productive system.
    Can someone refer me to a note/article?
    Thanks,
    Omri

    here is the details i found
    Especially make sure to check in the Product Availability Matrix (PAM) http://service.sap.com/pam that the MaxDB / SAP DB version you plan to use is released for your specific SAP product!
    Note 1178367 - SAP MaxDB: End of Support Dates
    Cheers,
    -Sunil

  • TS4088 why is there a limit on 3 years? it should be all the MacBook Pro mid 2010 with symptoms, there should get their logic board changed for free, mine mac is 3 month late and i had this problem for over a year, but i first saw this article today :(

    it should be all the MacBook Pro mid 2010 with symptoms, there should get their logic board changed for free, mine mac is 3 month late and i had this problem for over a year, but i first saw this article today

    Hey Clintonfrombirmingham
    I called Apple technical support in Denmark, but with no positive reply.
    She couldn't do anything, and said that They had sent a recall Email about the problem and with their offer to repair the Macbook Pro, but I'd never recieved an Email about the problem. She wasn't in power to make an exception. It can't be true that i paid a lot of money, for a product that can't barely stand on its own feets, Apple didn't tell me that the product I was about to buy, would restart every 5 minute. and now when  they know the problem, they wont repair it? it just don't make sense for me. If a car seller discovers that all the brakes in a car he had sold, will crash after some years he will call all the cars back to repair no mater what. i just don't understand how Apple will make good service for their custumers, by extending the warranty from 2 to 3 years, but wont take the computers there is a little bit to old, 4 months will make the difference. i can't believe it.
    What can i do now? 
    best regards Oskar

Maybe you are looking for

  • Document Window display is goofy

    Dreamweaver 8, Mac OS X 10.4.8 Yesterday my web pages looked great in Dreamweaver and in several browsers. This morning I opened up Dreamweaver and viewed my pages and the graphics were jumbled all around and the table outline guide is no where to be

  • Reading text from a URL location

    I am having problems trying to read a text file from a URL. This is the code i have been using: package Java; import java.net.*; import java.io.*; public class Main_1 { public static void main(String[] args) throws Exception { URL myAddress = new URL

  • Flex 4 web application not loading (blank white swf)

    We've recently updated our code-base from the Flex 4 Beta 2 SDK to the Flex 4 final SDK.  The release builds using the final SDK do not load on all user's machines (the Beta 2 builds were all ok).  The flash player version varies on our systems, but

  • HELP:  Best way to take photos from Web

    I went to a city website and want to use some photos (that are not copyrighted)in a report. My save as jpg did not produce a good image that could be scaled up. How to do?

  • MaxDB instance error sap netweaver trial version 7.0

    I installed sap netweaver trial version 7.0 in e drive which has got 60 GB.netweaver and sap logon front end installed and max db also installed suscessfully when configuring maxdb database i.e adding new instance  the following error appears. <b>-4