LONG TERM INSPECTION CHARACTERISTICS

can any body guide me   my quality plan have short term and long term characteristics  0010 operation i maintained  all characteristics is short term characteristics  and 0020  operation all characteristics link with class  i am not maintained   short and long term
my query is  i am not enter any values in 0010 operation  i enter 0020 operation characteristics but once i done  usage decision this  characteristics  not update for batch  means  if i maintain any long term characteristics  in quality plan  system should not update for batch characteristics
if any body done this business kindly revert me this is urget .

No need that all characteristic should have status '5'.
But the result only which has status '5' would be updated to batch characteristic value.
If a batch characteristic is long-term and required characteristic, the status would be '1' when first usage decision.
When you record the result for the long-term characteristic, the status would changed '5'.
Then you should save usage decision againg for batch characterstic update.
Regards
Luke

Similar Messages

  • Transfer of results From M.I.C to Batch in case of Long Term Inspection

    Hi Gurus,
    We have maintained long term inspection in the control indicators in the inspection plan and also assigned Class Characteristics to M.I.C.
    We are following these procedure for Result recording.
    1) we are doing U.D and then posting to unrestriced stock
    2) We are doing result recording.
    In our case the result from M.I.C are not transferred to Batch
    and the Status is Long Term Inspection,Short inspection completed and transfer posting completed.We are not getting Status Long Term Inspection completedand the results are not transferred to batch.What might the reason for this.
    Regards
    Amit

    You must redo the UD to have the results transfer.  (Providing of course your setup is correct and the transfer happens for regular characteristics at the first UD)
    I would recommend that you create two UD codes.  The first one might be ALTP - Accepted, Long-term Pending.
    After the LT characteristic is recorded, use QA12 to change the UD to ACC - Accept.  When you save, the resutls should be transferred.
    Craig

  • Result recording to be done after UD with long term inspection

    Dear All
    I have activated two MIC's for long term inspection. Inspection lot is created and UD is provided after Result recording. i have run QA12 and go to EDIT/RESET/INSPECTION COMPLETION.  status of UD changed to LTIN and then in Qe51 / qe51n i selected long term inspection but error message is coming '' NO CHARACTERISTICS WERE FOUND". Plz help , how to do result recording after UD.

    Dear Even if the char is long terms & if you have forcefully completed the chars then even if char has LTIN status it will not allow you.
    But check this in your sandbox and revert.
    1. In the MIC set the 'Optional Characteristic' and 'Long tem inspection ' in the control indiactors.
    2. Attach MIC in inspection Plan
    3. Do results recording and comlpete UD. all short term charactericts are closed.
    4. QA12Change UD with history for Inspection Lot ,
    Menu-> Reset inspection completion -> Status changes to LTIN
    5. Goto QA02 --> you woudl see " do you wnat to compete Long term inspections" --> yes
    6. Then Long term inspection characterictic is open for results recording.
    7. Change and complete results --> Make UD
    Check and Revert.
    Cheers
    KK

  • Long term inspection

    Dear Gurus,
                     Scenerion is as material is produced though process order it is checked for quality, but some characteristics are checked for long duration. And results are getting after 5-6 days . Uptill that material cant retain in quality lot. So some temperary result has to give for the lot clearance. I want to use Long term inspection functionality in that. So what are the steps to impement and how can i record results once i given UD.
    thanks in advance
    ACP

    Hi
    So what are the steps to impement and how can i record results once i given UD.
    In a task list there can be many char that can be long term.
    You only have to define Long term in control indicator of the char.
    Once you define that .......you can do result recording for all the char(including the LT char) & take UD
    System then change the status of the lot as LTIN after you take UD.
    so when you want to do RR for those char which requie 5-6 days to inspect ..you have to go to the RR-->system will show only those long term char here.& disply msg "char are long term.do you want to inspect"
    click on ok & do RR for those char even after UD is taken.
    I hope you understood.
    Regards
    Sujit

  • Short term and Long-term inspection and characteristic

    Hi all,
    In the SAP portal, they mentioned about Long-Term Inspection with Long-Term Characteristic, and Short-Term Inspectoin with Short-Term Characteristic.
    May I know what is the usage on the above and how to setup in the system?
    Thanks
    YY

    Long Term Characteristics Indicator is marked in the Control Indicators Tab of an MIC.
    Long Term Inspection is used when the Business Requirement is to do Results Recording after Usage Decision.
    In normal circumstances, i.e. Short Term Inspection, system won't allow us to do RR once UD is given.
    Best Regards,
    K. Raghavendra Nayak

  • Long term inspection conversion

    Dear All ,
    We have made the setting  for long term plan in the inspection plan .
    We have completed the RR and the UD . But the system does not show the LTIN status and does not alow the entry or change of results.
    What can be the reason for the same ?
    Now since the UD has been completed as short term is there any way I can convert this to long term again
    Kindly let me know  .
    Ram

    Dear Gajesh,
    Thank you for your suggestions and I have tested as per your suggestions . My observation is once it is in LTIN it contiues to remain so and if the authorisation is there all other characteristics(with long term settigns active) which have been earlier closed can be unclosed and the results can be changed.
    Thus it means to get the LTIN status one mere needs to keep atleast one characterisitcs unrecorded and go for UD.if other characteristics which have been recorded can be changed then it should have been possible to change all characterisitcs irrespective of whether an unrecorded characteristic exists or not .In any case.
    We are now looking for some solution in which we would like to put the lot into LTIN mode so that we record results. is this ever possible ?
    Ram

  • Long term x short term characteristics

    Dear colleagues,
    Easy one.
    Where exactly to check if the characteristic to be checked is a shor term one or a long term one ?
    Regards
    Fernando Luz

    QP03->enter material->plant->enter>go to char level>select mic/char->go to control indicator--->check whether "Long term inspection is ticked" if not its short term.
    There could be another ways also but this is how we see from inspection plan.

  • Table for control indicator in inspection characteristics(QP03)

    Hi
    can any one tell me in which table " Control Indicator " data is stored?
    in QP03 there is a control indicator tab for MICs in that i want Long term inspection details for ALL MICs
    can any one tell me the control indicator table?
    Regards
    Smitha

    Refer the reply given by Gaint in QM Gajesh Nagesh
    Re: Control Indicator field in Inspection plan characteristics
    This will solve your perpose .....use Bapi
    iNSPECTIONPLAN_DISPLAY
    INSPECTIONPLAN_CHAR_DISPLAY
    this will at least give you some idea...........

  • Long term inspecion

    Dear all,
    I want to do long term inspection for my material.so for mic in control indicators i have activated check box of concern .even though after UD i am unable to do inspection .where might be problem.what more i have do settings .
    regards
    prasad

    Hi Prasad,
    The functionality of long term inspection is used, when there is need to record results for some characteristics after UD. So I hope you are doing such so, i mean, the RR is yet pending though UD is completed. Pls ignore if you are on the correct way, I have merely shared a practical possibility.
    Dear, Deepak,
    I think your confusion/question about the function of longterm characteristic, is also clear herewith, that it don't generate any lot new inspection lot.
    Regards,
    Shyamal
    Edited by: Shyamal Joshi on Jun 30, 2008 11:25 AM

  • Showing Long-term characteristics are still open

    Hi QM expert,
    i am using inspection type 03..after result recoding of all operation..i do UD..and save that...
    but show Long-term characteristics are still open
    status show LTIN STIC STUP
    kindly suggest me what to do
    Regards
    akil

    Hi,
    my client require in process inspection inspection type 03 and and after GR inspection type 04.
    i have ticked  in  material master Inspect with Material Specification, in 03.inspection type ..
    .then in result recoding MIC not coming..then again i have change  .i have ticked  Inspection with Task List.then and un ticked  Inspect with Material Specification  then show all MIC at the time of result recoding .
    what ever MIC  i have maintained in  routing  operation
    ..now i do result recording with value and and accept all MIC value....
    then i do UD...i select A ( accept UD) then save...but when open UD screen..show the massage Long-term characteristics are still open near the Insp. End Date
    i save that  
    then show the status ...LTIN STIC STUP
    again i opened result recoding and add new MIC and accept that and saved...
    then i opened UD screen...and i selected again A (accept) and saved...
    but agian showing same massage
    Regards
    akil

  • Outstanding Long-Term & Short-Term Characteristics

    Hi all,
    In QA32 there are Number of outstanding long-term & short-term characteristics, and according the information within F1 help, only if no short-term characteristics are open, the usage decision for the inspection lot can be made. However, I have several inspection lots which have already been made UD with outstanding short-term characteristics, please refer to following screenshot:
    Danny

    Dear Danny,
    The normal standard process will not prevent you from giving UD if the result recording is done.
    For this you need to use a status profile which will mandate that the result recording has to be completed for the UD to be done.
    Regards
    GN

  • QM, Inspection Lot with Long-Term and Required Characteristic

    I want to know if it is possible to print a Certificate of Analysis (COA) with a required, long-term characteristic, if the inspection lot is using the special function "Short-Term Inspection Completed". And then a special Usage decision is made.
    Our dilemma is that we have materials that must be shipped for pre approval with a COA, before certain QM tests have been made, and we want to be able to print the COA, but the required flag stops us.
    So, what we really want is to require the characteristic if it is one usage decision and not require it if it is a special usage decision related to a "Short-Term Inspection Completed" inspection lot.
    We also, would prefer not to have multiple COA profiles to handle, this would cause too much extra data handling.
    Thanks,

    Hi,
    I If your Characteristic , whether it is short term or long term, is not marked as REQUIRED characteristic then there will be sure botheration for you to perform UD w\o performing the RR for them. It will prompt a message, which tends to be warning normally. But the characteristic is not REQUIRED and is OPTIONAL one then there will be no message , no botheration.
    But one thing is very clear that if you want to print the Result of some MIC or characteristic,
    then
    1. it must be recorded for the result.
    2. it must be maintained in the COA profile.
    At the other hand if you don't wish to print the result of some characteristic, whether it is short term or long term, don't keep it in the COA profile. System will not print it for you.
    Regards,
    Shyamal

  • Inspection characteristics cancelled for inspection

    Hi Experts,
    Whern does an Inspection Characteristic of an Inspectin Lot can be cancelled in inspections?
    Thanks...

    Hi,
      I think u must be geeting red light in qa33 in monitor column.
    According Sap It has following meaning
    There are 5 possible settings for the traffic light:
    1)According to start dateIf the start date has passed, the traffic light is red.
    If the start date corresponds to the current date, the traffic light is yellow.
    If the start date has not yet been reached, the traffic light is green.
    2)According to end date
    If the end date has passed, the traffic light is red.
    If the end date corresponds to the current date, the traffic light isyellow.
    If the end has not yet been reached, the traffic light is green.
    3)According to the degree of processing for the inspection lot
    If the usage decision is due to be made (that means, the end date has been reached and no usage decision has been made), the traffic light is red.
    If the usage decision is not due to be made, the traffic light is yellow.
    If the usage decision has already been made, the traffic light is green
    4)According to open characteristicsIf there are open short-term characteristics, the traffic light is red
    If there are only long-term characteristics, the traffic light is yellow
    5)If there are no open characteristics, the traffic light is green
    According to open quantities
    If quantities are open, the traffic light is red
    If there are no quantities open, the traffic light is green
    Regards
    Amol

  • Long Term Planning Issue - Transaction MS04

    Hi Experts,
    I have two problems looking for solution from you.
    1. Transaction Code MS04 -> After entered Planning Version, Material and Plant... I can see list of orders in the report.  If I click Production Order, Planned Order, Inspection Lot document Element Details (on left hand additional function) and I am able to double click and display these documents.  However If I double click Material Reservsation document It is not allowing me as I can't see "Display element (F7) Icon.   How do I get the display element icon for Material reservation document also.
    2. We have a lot of Quality Inpsection lots documents when we display in MS04 report but the problem here it is peggeging as requirements in Long term planning report.  We want to just display the document here not as requirements. 
    Please let me know the solution for above two.
    Regards
    Rc Gopi

    Dear NNeeti,
    1.In CM38-->in the top menu --->under Planning ->Profiles->Overall Profile.
    2For this over all profile check the Details in OPA6 T Code and find out the option Profile assigned to this over all profile.
    3.Edit the details of this Option profile in OPA3 (change the number of days as 730 instead of 365 in the finish date).
    Check with this setting in CM38 and proceed.
    Check and revert
    Regards
    S Mangalraj

  • I am a long-term user of Lightroom as a standalone product with a perpetual licence. As a retired person on limited income, it is very disappointing to me that Adobe have introduced the 'Creative Cloud' (CC) subscription service in order for me to be able

    I am a long-term user of Lightroom as a standalone product with a perpetual licence. As a retired person on limited income, it is very disappointing to me that Adobe have introduced the 'Creative Cloud' (CC) subscription service in order for me to be able to continue upgrading this excellent product. It will be for me too expensive at the minimum cost of £9 per month. The additional services that CC brings are personally of no relevance or usefulness. Adobe should be prepared to support existing users who are, like myself, non commercial, amateur photographers by giving them the simple opportunity to upgrade to Lightroom 6 as a standalone, perpetual licence product. As a member of a camera club I know my co-members who use Lightroom are equally disappointed by this move to a subscription-only service.

    john beardsworth wrote:
    John Waller wrote:
    However, Adobe will soon introduce Cloud only features into Lightroom CC for which LR6 (perpetual license) owners will have to wait until LR7 (paid upgrade).
    That is possible, John, but it is only speculation on your part. Might, not will.
    kwdaves wrote:
    There is a "Lightroom 6" upgrade available for US $79 if you have a valid license for any of the earlier versions. From what I can tell, the only difference between Lightroom 6 Full, Lightroom 6 Upgrade and LightroomCC is in the license. The download file is the same.
    Other differences - with CC you get LrMobile/LrWeb and they throw in a free copy of Photoshop too.
    Yes, but when I bought my standalone license and clicked on the "Download" button it took me to the LightroomCC page. The downloaded file is named Lightroom 6, but in the CC app the installed program is LightroomCC (2015).

Maybe you are looking for

  • Getting FLV to stop playing when user clicks on nav button

    I have a portfolio_mc that is inside of a content_mc (stage->content_mc->portfolio_mc). There are 3 buttons that take the user to an appropriate frame designated by a frame label and this loads up an FLV. The problem is that when I click on any of th

  • Acrobat 6.0 Pro and reader 9.1

    I have both the free Reader 9.1 and Acrobat 6.0 Pro installed on my computer. Is this going to create problems for me, such as being able to read or create files? I attempted an update earlier today and my computer locked up, so I'm figuring I may ha

  • How to use Synchronized Keyword

    Hi guys, Sorry if this is a simple question, but I'm not sure about the following: Suppose we have the class, Class Foo public synchronized void bar1() {...} public synchronized void bar2() {...} If I have two threads running concurrently, say T1 and

  • Cisco SA 520W Web Interface not loading.!!

    Hi Im going to start with saying this appliance is really winding me up!! The unit has been working fine for a while and i now need to make some changes. The unit is passing traffic fine, URL filtering is working fine however when i load the web page

  • Error in Syntax check in code

    Hi, We are developing a report, where we have written the following piece of code: LOOP AT lt_kondd2.       DO.        If lv_first = "X".                                            "1           READ TABLE lt_kotd2 WITH KEY knumh = lt_kondd2-knumh.