Long Term Planning get problem!

Hi Gurus!
          I use LTP for simulation but after I run MS01, I check in MS04, no SimPlannedOrder is generated.
          I'm used to do with LTP many time before but it never happend like this.
          When I explode IndReq in MS04, It has a message "Coverage not provided by master plan"
More infors: All FG ans RM in my client are maintained with Range of Coverage profile(Dynamic Safty Stock). Last projects I've never use Rang of Coverage Profile and LTP has never  gotten problem.
Is it because some SAP note or I forgot something?
Please advise me.
Best Regards,
Tony

Dear Guru!
      Somebody help me?
Regards,

Similar Messages

  • Long term planning-Scheduling problem

    Hi Experts,
    When I am doing Long term planning run MS02, i am facing the following problem:
    There are 10 stages of operations to make a finished product. Each stage having different order types and planned orders are created at each stage.
    For the last stage material i am doing the Long term planning ( ie. Raw material)
    After running MS02, The results are like this:
    the scheduling for the first 6 stages are according to the requirement dates.
    But the last 4 stages the scheduling is not correct. The system is combining 10 days requirement and giving only one planned order.
    I want seperate planned orders date wise.
    Please give me a solution.
    Thanks & Regards
    Bala

    Hi Dharma,
    There is no planning calendar or period lot size assigned for any materials.
    MRP type is PD for all materials except the long lead time material and the lot size is EX.
    For the long lead time material ( ie. the bottom stage material) MRP type is M1 and lot size EX.
    Thanks & Regards
    Bala

  • Long Term Planning Issue - Transaction MS04

    Hi Experts,
    I have two problems looking for solution from you.
    1. Transaction Code MS04 -> After entered Planning Version, Material and Plant... I can see list of orders in the report.  If I click Production Order, Planned Order, Inspection Lot document Element Details (on left hand additional function) and I am able to double click and display these documents.  However If I double click Material Reservsation document It is not allowing me as I can't see "Display element (F7) Icon.   How do I get the display element icon for Material reservation document also.
    2. We have a lot of Quality Inpsection lots documents when we display in MS04 report but the problem here it is peggeging as requirements in Long term planning report.  We want to just display the document here not as requirements. 
    Please let me know the solution for above two.
    Regards
    Rc Gopi

    Dear NNeeti,
    1.In CM38-->in the top menu --->under Planning ->Profiles->Overall Profile.
    2For this over all profile check the Details in OPA6 T Code and find out the option Profile assigned to this over all profile.
    3.Edit the details of this Option profile in OPA3 (change the number of days as 730 instead of 365 in the finish date).
    Check with this setting in CM38 and proceed.
    Check and revert
    Regards
    S Mangalraj

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Long-Term Planning (PP-MP-LTP)

    Do you know BI content for Long-Term Planning (PP-MP-LTP)?

    Not that I know.
    Often business people actually mean SOP (BC: 0SOP_PLANNING) when talking about long-term planning. I don't see any point in reporting LTP that is more like alternative MRP scenarios. It is operational and different scenarios easily get confusing in reporting.
    BR,Tuomas

  • Long term planning in ECC for materials planned in SAP APO

    Hi SAP PP and APO Experts,
    I would like to know whether it is possible to plan a material in SAP ECC with Long Term Planning to create Simulative Planned Orders in ECC, when the MRP Type for the material is set to X0 (Planning in SAP APO).
    Warm regards,
    Prem

    Hi Dhaivakumar,
    Appreciate your prompt response.
    My business is MTS. I have made all settings for LTP planning for the material. (M|RP Type is set to X0-Planning in APO). When I execute the transaction MS02, I get the error message "Material 5200000013 J310  is not planned automatically. Message no. 61008". The details of the error message is:
    The material 5200000013 in plant J310 or in MRP area  is not included in automatic MRP because
    either the MRP data for plant J310 or MRP area  has not been created
    or an MRP type has been entered for the material in plant J310 or MRP area  that does not allow automatic MRP.
    Warm regards,
    Prem

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Vendor's long term plans regarding actualizations

    Hi,
    Possibly we will decide in 2014 to purchase MBP.
    It will be than the first Apple's product in our environment.
    If it should run that way we expect to use the mbp for approximately
    next 10 years.
    How does the Apple's current long term plans conform with the above target
    regarding actualizations (bug fixes, security patches) for
    OS and all other on-board software of mbp version currently in sell?

    molom wrote:
    dav7 wrote:
    Oh, and the medium I want to use needs to scale high. Very high. Into the order of more than a decent amount of TBs... like, say, 40 or 50. Of course that nice, round figure wouldn't pop up out of nowhere the day I have my plans in order, it'd grow - slowly - over time. So not only do I need something scalable, I need something that can scale slowly.
    So kinda like a NAS or external HDD type of solution, except one that doesn't use failure-prone media like HDDs. Unless there's a kind of hard disk out there that doesn't fail very "easily" and lasts in an order of years?
    -dav7
    I believe there is nothing that exists in the world, unless you pay huge money for Solid State Hard Drives. The only solution I see is using a bunch of rewritable double layer Blu-ray discs. I don't think there is any proper solution for what your looking for. Your looking for the perfect that doesn't exist.
    I'm not sure how long SSDs will last and I don't think there is any reliable information out there, wether an SSD I plugin now will still work in ten years. Plus you would need one hell of a lot SSDs to store Terabytes of data. BlueRay is probably worse than DVD regarding reliability, until the manufacturers get more experience with them.
    Am I the only one to see a pattern with dav7 opening threads looking for things which don't exist?
    Last edited by Garns (2008-10-08 13:39:29)

  • Report on  Long term Planning

    Hi Gurus,
    Is there a std SAP report in PP which gives out the demand of  a material based on long term planning and also informs the actual consumption of the material other than MD62 , MD73, by which we can have a variance  of planned demand and actual consumption displayed.
    Edited by: Raj Muthu on Feb 1, 2008 11:14 PM

    Dear,
    You can use MD67 to see the demand in excel or on the screen...consumption i donot think you will get so easily...

  • Use Reorder Point Planning and see VSE Requirements in Long Term Planning

    Hello,
    I would like to use reorder point planning short term and something similar to MRP planning long term. I am trying to drive actual production off of consumption and plan long term for capacity, inventory and BOM components.  Our plan is to delete the near term forecast and leave the long term forecast in to show requirements for LTP.
    I'm configured for Reorder Point Planning as follows:
    MRP type V1, Reorder Point Planning with External Requirements
    Planning Strategy 52
    HB Max Stock Level
    For the longer term forecast requirements I'm configured with:
    Independent Requirement Type VSE, Planning without final assembly.  This is creating non convertible planned order independent requirements.
    The reorder point planning is executing perfectly, but how do I get the VSE planned order independent requirements to show up in long term capacity and inventory planning? What am I missing?  Is it something with MRP type, am I missing an option in the long term planning setup?
    This has been a tough issue and I would greatly appreciate any advice on this.
    Thank you,
    Wes
    Edited by: weslaney on Jul 21, 2009 11:40 PM

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Long-term planning: how can I reorganize "bulk" independent requirements ?

    Hello,
    Due to some circumstances I have dependent simulative requirements with no relation to any independent requirements.
    I thought that with ms01 (Processing key NEUPL -Regenerative planning and Planning mode 3 - Delete and recreate planning) those independent requirements will
    be deleted because the former independet requirements are no more existing.
    But they remain existing. (in mfs0)
    How can I reorganize "orphaned" independent requirements in long term planning.
    Thanks for any help
    Thomas

    Thanks a lot for answer.
    The subject of my original-question was
    wrong. It should say "dependent" requirements
    instead of "independent" requirements.
    I solved the problem by deleting the
    respective entries in MDSM-Table
    But anyway, the usage of md74/75 was a
    good recommandation, thanks very much.

  • Long Term Planning : Requirements from "Consumption based planning" missing

    Hello,
    I'm trying to use long term planning ( MSBT,MS01..) for simulation. In the scenario I've set up I want to have all actual requrements and orders as well as fixed orders.
    The problem is that requirements(=forecast) for materials with consumption based planning ( MRP type =VV ) are not transferred from the operative planning. How can this be achieved ?
    Best Regards
    Bernt

    Hi,
    Hard to say... have you looked in the details of the VV MRP setting, your LTP scenario, or your copy transaction in case there is some parameter about this?
    In case you are looking for information about this process, here is a good document  with a detailed description of the Long-Term Planning Process in SAP (with detailed T-codes as well): http://expertplug.com/materials/training/long-term-planning-in-sap
    You have a preview and a detailed description to see if it suits your needs.
    Cheers
    Matthieu

  • Long Term Planning-Planning File Entry

    Hi Gurus/Friends
    In the long term planning after PIR with inactive version and creating Scenario, assinging versions, Plants,....then
    during Release+Save it is giving the Result of Planning File Entries
    Logically the system has suppose to give the Number of Planning File Entries in Propotionate to the Specific Planning Scenario number and materials inside
    But it is giving for all the Materials inside the Plant
    Is there any settings to restrict the Planning File Entry creation w.r.t Planning scenario during Release+Save
    other than the solutions through Transaction MS20,MS22 and MSAB
    (Because during Release+save logically it has to call the MS22 t.code  and do planning file entries for the materials in that scenario)
    Awaiting for reply
    thanks
    K.Prabakaran

    Hi,
    Please Refer Below SAP help .
    *Releasing a planning scenario*
    You first have to release a planning scenario before you can plan it in the long-term planning run. When you release the planning scenario, the system creates planning file entries for all materials in all the plants allocated to the planning scenario. There is a separate planning file entry for this purpose. This guarantees that your operative planning is kept completely separate from your simulative planning. This long-term planning file contains all the materials that are also contained in the operative planning file. After the release, every change relevant to MRP triggers an entry in the planning file as in operative planning.
    Pradeep
    Edited by: Pradeep Kumar on May 9, 2008 4:22 PM

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Extracting LTP (Long Term Planning) Data from SAP ECC to SAP BW

    Hello all
    Here is the task in hand. There is a standard report that Production Planners execute post their MRP/LTP runs. This report can be accessed through T-code "MCB)". The program in action is RMCB1200. I tried looking for any standard extractors but to no avail. I would be fine to know either or both of the following:
    An extractor
    All the primary tables involved ( I have found a few tables through the program but a list by some expert will help me understand that I have not missed anything significant)
    Also, if anyone has done this before, how was your experience with the extraction in terms of extraction volume and performance.
    Regards
    Gajendra

    After further digging, here is some information that I found out.
    T-code
    Program
    BADI
    MSEX
    RMDMRPEXTRACT02
    MD_SR_LIST_EXTRACT
    This could possibly provide the data required. The program can be scheduled and the output can be managed by SPRO settings for Extraction Mode. I am running tests to confirm if it provides me the correct information and matches with MCB) output.
    Here are some tables, just for reference:
    LTP Tables: PLSC, PBHI, PLPT, MDTP, PLPR, PLPB
    MRP Records:
    MDKP
    MRP Document Header Data
    MDTB
    MRP Table Structure (no data)
    PLSC
    Planning Scenario (Long-term Planning)
    MDFD
    MRP Firming Dates
    MDVM
    Planning File Entries
    S094
    LIS -- Stock/Requirements Analysis

Maybe you are looking for

  • Please help, desperately need to get iTunes back on my computer

    Hello all, I will make this as short as possible. I just installed a new, larger and faster HD on my Dell Inspiron 5150. It is the same brand as the other and is working fine. I use backup software and retored my HD to the same condition that it was

  • Weird 865G Neo2 PLS OC Problem

    Ok, I consider myself a pretty good overclocker, but this has confused me to no end. Ok here is the situation. I got a neo 2 pls 865, with a p4 3.0 E prescott. I have 3 sets of ram I have been using to get an overclock, 1 512 kingston value ram, 4 25

  • Xs:int , the schema register generate a NUMBER(10), but can not insert xml

    hi guys: I found a problem in the Oracle Database 10g Enterprise Edition Release 10.2.0.1.0 - Production: in the schema regist, Oracle help me create a table, with 2 Number(10) segments validFrom NUMBER(10) validTo NUMBER(10) then, I upload the xml f

  • User exit for save button in transaction code CBIH82

    HI All. i have got an issue with finding of user exit for transaction code cbih82. my functional consultant want me to go for exit CBIH_LB39_UE_POST_COMMIT (se37) but i cont find any user exit in this function module as it is triggering when i click

  • Using native database sequences in ODI

    Hi, I am using ODI 11.1.1.7.0 on windows 64 bit machine. I have written the following queries: create table sequence_src (EmpName varchar(20), salary int); create table sequence_tgt( CustId int, CustName varchar(20)); create sequence emp_sequence min