Long-term planning: how can I reorganize "bulk" independent requirements ?

Hello,
Due to some circumstances I have dependent simulative requirements with no relation to any independent requirements.
I thought that with ms01 (Processing key NEUPL -Regenerative planning and Planning mode 3 - Delete and recreate planning) those independent requirements will
be deleted because the former independet requirements are no more existing.
But they remain existing. (in mfs0)
How can I reorganize "orphaned" independent requirements in long term planning.
Thanks for any help
Thomas

Thanks a lot for answer.
The subject of my original-question was
wrong. It should say "dependent" requirements
instead of "independent" requirements.
I solved the problem by deleting the
respective entries in MDSM-Table
But anyway, the usage of md74/75 was a
good recommandation, thanks very much.

Similar Messages

  • Long Term Planning: Simulative Order not covering the Simul.Requirements

    Hello everybody,
    Maybe someone has an idea what can be the reason of the following problem:
    For some raw materials, the total of simulative requirements per day is not equal to the generated simulative order quantity.
    For example:
    For material RAW, I have:
    13/01:
    Simulative Planned Order, Qty = 100
    Simulative Requirement, Qty = 40
    Simulative Requirement, Qty = 40
    Simulative Requirement, Qty = 10
    Simulative Requirement, Qty = 10
    Simulative Requirement, Qty = 10
    Simulative Requirement, Qty = 10  ---> Total of Sim.Reqts = 120
    I don't understand why the LTP RUN gives me this result...
    Does somebody have an idea?
    Thanks in advance for your help,
    Regards,
    Rudy

    Thank you, but I finally got it...
    The problem was that the MRP type of some raw materials had been changed from X0 to ND.
    So we had old simulative planned orders that were not corresponding exactly to the simulative requirements...
    Regards,
    Rudy

  • T399D - Long-term planning allowed for a plant

    Hi gurus,
    I was checking the table T399D and it has the "Long-term planning allowed for a plant" field (T399D-SIMPL), but, I do not know where I can customise this!
    I was checking OMI8 and OPPQ (Parameters for DS section) transactions, but, I cannot find this field.
    Could you help me in order to know where I can customise this?
    Kind regards,
    Sandra

    Hi Sandra,
                     As it is correctly said that there is not much configuration required to Run LTP, but what you  basically need to maintain/configure is as follows-
    To carry out an annual planning or a rolling quarterly planning run you require information on the
    future stock and requirements situation. This means you need to know how sales and operations
    planning influence resources(conceptually)-
    In long-term planning you can also plan materials that usually require very little planning in
    operative planning, such as, materials planned using reorder point planning, bulk material, and
    materials planned using KANBAN. In long-term planning, you can plan these materials as you
    would MRP materials. This provides you with an overview of how these materials influence the
    demand program.
    The materials you want to plan in long-term planning must have already been planned in
    operative MRP.Apart from above conceptual knowledge what else you require to configure /maintain is-
    Planning Scenario(If you are running wity reference to it)-MS31
    And run it through MS02(with reference to planning scenario) where you have to put mandatory  MRP Control Parameters according to your business process eg.Processing key,create MRP list,planning mode,scheduling,firming planned orders.
    Hope it fulfils your purpose at some extent.
    Regards
    Chandra

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • How to consider the Purchase Orders in Long Term Planning

    Hi All,
    I wanted to include the Purchase Orders of Finished Material in Long Term Planning.
    I have selected the check box "Long-term planning: include firmed issues and receipts" in the Planning Scenario  but after LTP run system is not considering the Purchase Orders of Finished Materials for Planning.
    Regards,
    Shailendra
    Edited by: Shailendra Hadkar on Apr 5, 2010 12:41 PM

    Dear,
    Could you please explain usage of purchase orders for Finished product?
    Regards,
    SAP CONS

  • Extracting LTP (Long Term Planning) Data from SAP ECC to SAP BW

    Hello all
    Here is the task in hand. There is a standard report that Production Planners execute post their MRP/LTP runs. This report can be accessed through T-code "MCB)". The program in action is RMCB1200. I tried looking for any standard extractors but to no avail. I would be fine to know either or both of the following:
    An extractor
    All the primary tables involved ( I have found a few tables through the program but a list by some expert will help me understand that I have not missed anything significant)
    Also, if anyone has done this before, how was your experience with the extraction in terms of extraction volume and performance.
    Regards
    Gajendra

    After further digging, here is some information that I found out.
    T-code
    Program
    BADI
    MSEX
    RMDMRPEXTRACT02
    MD_SR_LIST_EXTRACT
    This could possibly provide the data required. The program can be scheduled and the output can be managed by SPRO settings for Extraction Mode. I am running tests to confirm if it provides me the correct information and matches with MCB) output.
    Here are some tables, just for reference:
    LTP Tables: PLSC, PBHI, PLPT, MDTP, PLPR, PLPB
    MRP Records:
    MDKP
    MRP Document Header Data
    MDTB
    MRP Table Structure (no data)
    PLSC
    Planning Scenario (Long-term Planning)
    MDFD
    MRP Firming Dates
    MDVM
    Planning File Entries
    S094
    LIS -- Stock/Requirements Analysis

  • Re: Long term Planning

    Dear All,
    I am trying to do Long term Planning. In my case I am not using SOP. Demand is entered into SAP through PIR (i.e. PIR).
    I want to see how much load is there on all the resources available.
    Please advice me how to proceed in this direction.
    Regards,
    Vivek Sharma

    Dear Vivek,
    Check with these steps,
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Vendor's long term plans regarding actualizations

    Hi,
    Possibly we will decide in 2014 to purchase MBP.
    It will be than the first Apple's product in our environment.
    If it should run that way we expect to use the mbp for approximately
    next 10 years.
    How does the Apple's current long term plans conform with the above target
    regarding actualizations (bug fixes, security patches) for
    OS and all other on-board software of mbp version currently in sell?

    molom wrote:
    dav7 wrote:
    Oh, and the medium I want to use needs to scale high. Very high. Into the order of more than a decent amount of TBs... like, say, 40 or 50. Of course that nice, round figure wouldn't pop up out of nowhere the day I have my plans in order, it'd grow - slowly - over time. So not only do I need something scalable, I need something that can scale slowly.
    So kinda like a NAS or external HDD type of solution, except one that doesn't use failure-prone media like HDDs. Unless there's a kind of hard disk out there that doesn't fail very "easily" and lasts in an order of years?
    -dav7
    I believe there is nothing that exists in the world, unless you pay huge money for Solid State Hard Drives. The only solution I see is using a bunch of rewritable double layer Blu-ray discs. I don't think there is any proper solution for what your looking for. Your looking for the perfect that doesn't exist.
    I'm not sure how long SSDs will last and I don't think there is any reliable information out there, wether an SSD I plugin now will still work in ten years. Plus you would need one hell of a lot SSDs to store Terabytes of data. BlueRay is probably worse than DVD regarding reliability, until the manufacturers get more experience with them.
    Am I the only one to see a pattern with dav7 opening threads looking for things which don't exist?
    Last edited by Garns (2008-10-08 13:39:29)

  • Query on Long Term Planning (MS31)

    During the creation of long term planning the following steps i followed before i am stuck at one point.
    1)T code MS31
    2)Planning Scenarion and detail
    3)Long term Planning Radio Button selection
    4)Planning period +Use Gross Lot Size (EX)
    5)BOM Selection ID 01
    6)Tab Planned Independent requirement details filled
    Now in Plant TAB when i give my plant id  the message is REQUIREMENT PLANNING IS NOT ACTIVE FOR MY PLANT CODE.
    Message no. 61139
    Please tell me how to make it active.
    Thanks in advance
    Rupesh Jha

    Dear Rupesh,
    Plz Refer to Mr. Mangalraj inputs on LTP
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    kumar

  • Long Term Planning Issue - Transaction MS04

    Hi Experts,
    I have two problems looking for solution from you.
    1. Transaction Code MS04 -> After entered Planning Version, Material and Plant... I can see list of orders in the report.  If I click Production Order, Planned Order, Inspection Lot document Element Details (on left hand additional function) and I am able to double click and display these documents.  However If I double click Material Reservsation document It is not allowing me as I can't see "Display element (F7) Icon.   How do I get the display element icon for Material reservation document also.
    2. We have a lot of Quality Inpsection lots documents when we display in MS04 report but the problem here it is peggeging as requirements in Long term planning report.  We want to just display the document here not as requirements. 
    Please let me know the solution for above two.
    Regards
    Rc Gopi

    Dear NNeeti,
    1.In CM38-->in the top menu --->under Planning ->Profiles->Overall Profile.
    2For this over all profile check the Details in OPA6 T Code and find out the option Profile assigned to this over all profile.
    3.Edit the details of this Option profile in OPA3 (change the number of days as 730 instead of 365 in the finish date).
    Check with this setting in CM38 and proceed.
    Check and revert
    Regards
    S Mangalraj

  • Long term Planning in SAP

    Hi Gurus,
    I am new to SAP,this my 1st query in SDN.
    I have been given sales figures of last 5 years of particular organization and i have been told to create a long term planning report in SAP please tell me the detailed methodology of create a long plan for the next 6 months in SAP.
    Regards
    Krish

    Dear Krish,
    LTP is a planning tool,where simulated planned orders's are obtained for an inactive plan.
    It will be more helpful from production perspective.
    To carry out an annual planning or a rolling quarterly planning run you require information on the future stock and requirements
    situation. This means you need to know how sales and operations planning influence resources. That is, whether the results
    of sales planning can actually be produced with capacity on hand. If such information is available it is possible to decide at an
    early date whether extra work centers will be required to cope with bottlenecks, or whether additional machinery will have to
    be purchased to reach the sales target.
    Steps for LTP:
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    8.Use T Code KSPP to transfer the planned activity requirements for production.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Long Term Planning : Requirements from "Consumption based planning" missing

    Hello,
    I'm trying to use long term planning ( MSBT,MS01..) for simulation. In the scenario I've set up I want to have all actual requrements and orders as well as fixed orders.
    The problem is that requirements(=forecast) for materials with consumption based planning ( MRP type =VV ) are not transferred from the operative planning. How can this be achieved ?
    Best Regards
    Bernt

    Hi,
    Hard to say... have you looked in the details of the VV MRP setting, your LTP scenario, or your copy transaction in case there is some parameter about this?
    In case you are looking for information about this process, here is a good document  with a detailed description of the Long-Term Planning Process in SAP (with detailed T-codes as well): http://expertplug.com/materials/training/long-term-planning-in-sap
    You have a preview and a detailed description to see if it suits your needs.
    Cheers
    Matthieu

  • Long term planning analysis

    Hi,
    what's long term planning analysis and how to use the blw tcodes.. in this tcode its asking for planning scenerio, how to create it?? pls explain the usages of these t codes?? is it really used in user level??
    MCEA
    MCEB
    MCEC

    Dear,
    Basically LTP is simulative MRP to simulate and see all the results like production capacity plan/ raw material plan/ profit margin. here we are using the same master data like material master, recipe, BOM etc.
    In MS31 - you create a LTP version where you can mention the PIR version where you enter the planning data in MD61.
    Release this version and maintain the planning data like qty per period in MD61 with the version mentioned in MS31, make sure that the version is not active so that LTP consider this inactive qty data.
    Run MS01/MS02/MS03 etc to run simulative MRP.
    Results can be seen in MS04/MS05.
    Inn MSF0 you can see the capacity requirement and adjust the qty to se that 100% capacity is utilized.
    We can see the raw material requirement in Pur info system in MCEC/MCEA/MCEB/MCB&/MCB)
    Also refer my reply from this link also,
    Re: LTP - S012 Tables
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Long Term Planning-Planning File Entry

    Hi Gurus/Friends
    In the long term planning after PIR with inactive version and creating Scenario, assinging versions, Plants,....then
    during Release+Save it is giving the Result of Planning File Entries
    Logically the system has suppose to give the Number of Planning File Entries in Propotionate to the Specific Planning Scenario number and materials inside
    But it is giving for all the Materials inside the Plant
    Is there any settings to restrict the Planning File Entry creation w.r.t Planning scenario during Release+Save
    other than the solutions through Transaction MS20,MS22 and MSAB
    (Because during Release+save logically it has to call the MS22 t.code  and do planning file entries for the materials in that scenario)
    Awaiting for reply
    thanks
    K.Prabakaran

    Hi,
    Please Refer Below SAP help .
    *Releasing a planning scenario*
    You first have to release a planning scenario before you can plan it in the long-term planning run. When you release the planning scenario, the system creates planning file entries for all materials in all the plants allocated to the planning scenario. There is a separate planning file entry for this purpose. This guarantees that your operative planning is kept completely separate from your simulative planning. This long-term planning file contains all the materials that are also contained in the operative planning file. After the release, every change relevant to MRP triggers an entry in the planning file as in operative planning.
    Pradeep
    Edited by: Pradeep Kumar on May 9, 2008 4:22 PM

Maybe you are looking for

  • How to use a existing Business Service in IDoc-File Scenario

    Hi Experts, I am new to XI. I am working on a IDoc to File scenario where in i am importing the CREMAS.CREMAS03 IDoc from the R/3 System. When i try to create a Business Service in Configuration Scenario Object in Integartion Directory, i get a messa

  • How do I transfer Song from an old computer to a new one?

    I was using iTunes on a other computer I just bought a new laptop the other day Im using the same Windows system just on a new computer. I already downloaded the iTunes Store to my new computer but I just dont understand how I can get the music from

  • Can i migrate w7 os to a new computer?

    hi, the issue that i am having here is that i am planning to buy a new mbp with the i7 processor. i understand that you can migrate your files and make it as if nothing happened by using the time machine option but that is for mac. i have boot camp o

  • 11 inch or 13 inch for creative programs? (Adobe CS6, Blender, etc)

    Hello! I currently own a 15 inch Macbook pro and love it, but I have to get a new computer! The reasons why are that my father ('m a teenager, so I still live with my parents) needs a laptop for what he is doing, and because of my horrible, large, an

  • Re: Satellite L500D - Touchpad "touch" not working

    Hi everyone, my touchpad's touch function (to emulate left-clik by tapping the touchpad) is not working any more. I can move the mouse with the pad. Also the left button below the pad is not working - the right one is. I've already tried : -Updating