For some raw materials, the total of simulative requirements per day is not equal to the generated simulative order quantity.
For example:
For material RAW, I have:
13/01:
Simulative Planned Order, Qty = 100
Simulative Requirement, Qty = 40
Simulative Requirement, Qty = 40
Simulative Requirement, Qty = 10
Simulative Requirement, Qty = 10
Simulative Requirement, Qty = 10
Simulative Requirement, Qty = 10  ---> Total of Sim.Reqts = 120
I don't understand why the LTP RUN gives me this result...
Does somebody have an idea?
Thanks in advance for your help,
Regards,
Rudy

Thank you, but I finally got it...
The problem was that the MRP type of some raw materials had been changed from X0 to ND.
So we had old simulative planned orders that were not corresponding exactly to the simulative requirements...
Regards,
Rudy

Similar Messages

  • Long-term planning: how can I reorganize "bulk" independent requirements ?

    Hello,
    Due to some circumstances I have dependent simulative requirements with no relation to any independent requirements.
    I thought that with ms01 (Processing key NEUPL -Regenerative planning and Planning mode 3 - Delete and recreate planning) those independent requirements will
    be deleted because the former independet requirements are no more existing.
    But they remain existing. (in mfs0)
    How can I reorganize "orphaned" independent requirements in long term planning.
    Thanks for any help
    Thomas

    Thanks a lot for answer.
    The subject of my original-question was
    wrong. It should say "dependent" requirements
    instead of "independent" requirements.
    I solved the problem by deleting the
    respective entries in MDSM-Table
    But anyway, the usage of md74/75 was a
    good recommandation, thanks very much.

  • How to consider the Purchase Orders in Long Term Planning

    Hi All,
    I wanted to include the Purchase Orders of Finished Material in Long Term Planning.
    I have selected the check box "Long-term planning: include firmed issues and receipts" in the Planning Scenario  but after LTP run system is not considering the Purchase Orders of Finished Materials for Planning.
    Regards,
    Shailendra
    Edited by: Shailendra Hadkar on Apr 5, 2010 12:41 PM

    Dear,
    Could you please explain usage of purchase orders for Finished product?
    Regards,
    SAP CONS

  • Long Term Planning : Requirements from "Consumption based planning" missing

    Hello,
    I'm trying to use long term planning ( MSBT,MS01..) for simulation. In the scenario I've set up I want to have all actual requrements and orders as well as fixed orders.
    The problem is that requirements(=forecast) for materials with consumption based planning ( MRP type =VV ) are not transferred from the operative planning. How can this be achieved ?
    Best Regards
    Bernt

    Hi,
    Hard to say... have you looked in the details of the VV MRP setting, your LTP scenario, or your copy transaction in case there is some parameter about this?
    In case you are looking for information about this process, here is a good document  with a detailed description of the Long-Term Planning Process in SAP (with detailed T-codes as well): http://expertplug.com/materials/training/long-term-planning-in-sap
    You have a preview and a detailed description to see if it suits your needs.
    Cheers
    Matthieu

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Long term planning in ECC for materials planned in SAP APO

    Hi SAP PP and APO Experts,
    I would like to know whether it is possible to plan a material in SAP ECC with Long Term Planning to create Simulative Planned Orders in ECC, when the MRP Type for the material is set to X0 (Planning in SAP APO).
    Warm regards,
    Prem

    Hi Dhaivakumar,
    Appreciate your prompt response.
    My business is MTS. I have made all settings for LTP planning for the material. (M|RP Type is set to X0-Planning in APO). When I execute the transaction MS02, I get the error message "Material 5200000013 J310  is not planned automatically. Message no. 61008". The details of the error message is:
    The material 5200000013 in plant J310 or in MRP area  is not included in automatic MRP because
    either the MRP data for plant J310 or MRP area  has not been created
    or an MRP type has been entered for the material in plant J310 or MRP area  that does not allow automatic MRP.
    Warm regards,
    Prem

  • Re: Long term Planning

    Dear All,
    I am trying to do Long term Planning. In my case I am not using SOP. Demand is entered into SAP through PIR (i.e. PIR).
    I want to see how much load is there on all the resources available.
    Please advice me how to proceed in this direction.
    Regards,
    Vivek Sharma

    Dear Vivek,
    Check with these steps,
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Query on Long Term Planning (MS31)

    During the creation of long term planning the following steps i followed before i am stuck at one point.
    1)T code MS31
    2)Planning Scenarion and detail
    3)Long term Planning Radio Button selection
    4)Planning period +Use Gross Lot Size (EX)
    5)BOM Selection ID 01
    6)Tab Planned Independent requirement details filled
    Now in Plant TAB when i give my plant id  the message is REQUIREMENT PLANNING IS NOT ACTIVE FOR MY PLANT CODE.
    Message no. 61139
    Please tell me how to make it active.
    Thanks in advance
    Rupesh Jha

    Dear Rupesh,
    Plz Refer to Mr. Mangalraj inputs on LTP
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    kumar

  • Long term planning,mid point scheduling,finite scheduling

    Dear Sir,
    Please explain the Long term planning,mid point scheduling and finite scheduling in simple words
    thnx.

    Hi,
    LTP: Long term planning used to simulate your future production plan. Based on your future production plan, you can check by simulation, loading the products requirements in the inactive planning version and defining the inactive planning version in the scenario and you can execute the MRP run. Then the system will create the capacity requirements and you can see the overloads. Based on this simulation run, you can include any new work centres and increase the manpower or increase the shifts.
    Finite Scheduling: This will consider the real details, like the no of work centres and working hours per day and working days in a year and considering the existing loads. This is called finite scheduling. R/3 does infinite scheduling. If the capacity not exist also you can release the production orders.
    Regards,
    V. Suresh

  • Vendor's long term plans regarding actualizations

    Hi,
    Possibly we will decide in 2014 to purchase MBP.
    It will be than the first Apple's product in our environment.
    If it should run that way we expect to use the mbp for approximately
    next 10 years.
    How does the Apple's current long term plans conform with the above target
    regarding actualizations (bug fixes, security patches) for
    OS and all other on-board software of mbp version currently in sell?

    molom wrote:
    dav7 wrote:
    Oh, and the medium I want to use needs to scale high. Very high. Into the order of more than a decent amount of TBs... like, say, 40 or 50. Of course that nice, round figure wouldn't pop up out of nowhere the day I have my plans in order, it'd grow - slowly - over time. So not only do I need something scalable, I need something that can scale slowly.
    So kinda like a NAS or external HDD type of solution, except one that doesn't use failure-prone media like HDDs. Unless there's a kind of hard disk out there that doesn't fail very "easily" and lasts in an order of years?
    -dav7
    I believe there is nothing that exists in the world, unless you pay huge money for Solid State Hard Drives. The only solution I see is using a bunch of rewritable double layer Blu-ray discs. I don't think there is any proper solution for what your looking for. Your looking for the perfect that doesn't exist.
    I'm not sure how long SSDs will last and I don't think there is any reliable information out there, wether an SSD I plugin now will still work in ten years. Plus you would need one hell of a lot SSDs to store Terabytes of data. BlueRay is probably worse than DVD regarding reliability, until the manufacturers get more experience with them.
    Am I the only one to see a pattern with dav7 opening threads looking for things which don't exist?
    Last edited by Garns (2008-10-08 13:39:29)

  • Short, medium and long term planning in SNP

    Hi,
          can somebody explain me what Short, medium and long term planning mean in SNP?
    Lets, say I have this scenario:
    If I have a product with SNP horizon of 35 days, which means that the product is planned in SNP only after 35 days from today.  Only PPDs deals with orders in these 35 days.
    I have a 3 planning books
    short term with 30 days from today
    medium term with 7 months from today and
    long term with 2 years from today.
    When I say short, medium and long term planning in SNP what exactly happens in these ?? What do users usually do in these books?
    SNP horizon is 35 days and the short term book is 30 days long, in which SNP does nothing. What's the use of this book?
    Thanks.

    When I say short, medium and long term planning in SNP what exactly happens in these ??
    Nothing much from a technical stand point.
    What do users usually do in these books?
    Check the Time Bucket Profile for the different books. The short Term Book will be in days, the mid term in weeks and the long term in months/quarters etc. The different books allows users to see the keyfigures in different time-based aggregate level.
    But if Heuristic is executed then behaviour will be different. Remember SNP Location Heuristic run uses the bucket of the data view to compute the Net Requirement and then try creating Receipts in each bucket within the time horizon of the data view using suitable master data. So if you run Location Heuristic in the short Term (daily) view then you will have many receipts one per day most likely. If you run in mid-term Weekly view then there are less number of receipts one receipt per week till 7 months. likewise for the long term view.
    SNP horizon is 35 days and the short term book is 30 days long, in which SNP does nothing. What's the use of this book?
    Maybe just to see the data. Location Heuristic run will not generate any new receipt.
    Thanks,
    Somnath

  • T399D - Long-term planning allowed for a plant

    Hi gurus,
    I was checking the table T399D and it has the "Long-term planning allowed for a plant" field (T399D-SIMPL), but, I do not know where I can customise this!
    I was checking OMI8 and OPPQ (Parameters for DS section) transactions, but, I cannot find this field.
    Could you help me in order to know where I can customise this?
    Kind regards,
    Sandra

    Hi Sandra,
                     As it is correctly said that there is not much configuration required to Run LTP, but what you  basically need to maintain/configure is as follows-
    To carry out an annual planning or a rolling quarterly planning run you require information on the
    future stock and requirements situation. This means you need to know how sales and operations
    planning influence resources(conceptually)-
    In long-term planning you can also plan materials that usually require very little planning in
    operative planning, such as, materials planned using reorder point planning, bulk material, and
    materials planned using KANBAN. In long-term planning, you can plan these materials as you
    would MRP materials. This provides you with an overview of how these materials influence the
    demand program.
    The materials you want to plan in long-term planning must have already been planned in
    operative MRP.Apart from above conceptual knowledge what else you require to configure /maintain is-
    Planning Scenario(If you are running wity reference to it)-MS31
    And run it through MS02(with reference to planning scenario) where you have to put mandatory  MRP Control Parameters according to your business process eg.Processing key,create MRP list,planning mode,scheduling,firming planned orders.
    Hope it fulfils your purpose at some extent.
    Regards
    Chandra

  • Use Reorder Point Planning and see VSE Requirements in Long Term Planning

    Hello,
    I would like to use reorder point planning short term and something similar to MRP planning long term. I am trying to drive actual production off of consumption and plan long term for capacity, inventory and BOM components.  Our plan is to delete the near term forecast and leave the long term forecast in to show requirements for LTP.
    I'm configured for Reorder Point Planning as follows:
    MRP type V1, Reorder Point Planning with External Requirements
    Planning Strategy 52
    HB Max Stock Level
    For the longer term forecast requirements I'm configured with:
    Independent Requirement Type VSE, Planning without final assembly.  This is creating non convertible planned order independent requirements.
    The reorder point planning is executing perfectly, but how do I get the VSE planned order independent requirements to show up in long term capacity and inventory planning? What am I missing?  Is it something with MRP type, am I missing an option in the long term planning setup?
    This has been a tough issue and I would greatly appreciate any advice on this.
    Thank you,
    Wes
    Edited by: weslaney on Jul 21, 2009 11:40 PM

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM