Long term planning terminated

Hi,
I am running MS02 for a material group. This group contains two materials. Now the result of the planning run is showing:
'Materials with terminated MRP list: 2'. I have looked into the materials list and found an error in the exception group 8:
Message ID: 61
Message type: E
Message: 511(Number range 04 for object MDSM not planned for internal allocation)
Can anybody tell me what this error means?
Thanks in advance!!
Snigdho

1. The error means that the there is no number range maintained for the object
Object         MDSM         Number range object has intervals
Short text     Sim.dependent reqmts
Long text      Number range for simulative dependent requirements
2. Try to maintain the number range inthe transaction code MD93
3. After this the error should be eliminated.
kindly check and confirm
reg
Dsk

Similar Messages

  • Long-term planning: planning details of work center capacity

    Hi,
    we need to know what is the effect on planned production orders (generated by MPS, transaction MD40) of the flag <b>&#8220;long-term planning&#8221;</b> in planning details of work center capacity (table name: RC68K; field name: KAPLPL). We made a test  analyzing planned orders scheduling details in <i>Stock requirements list</i> (MD04) and in the <i>Planning table</i> (CM21) in both cases: with "long-term planning" flag set and without this flag for the same work center.
    The schedule of planned production order on that work center is the same in the two instance.
    Could you suggest us something?
    Thank you.

    Hi Rudy,
    Purpose for carrying out Long Term Planning to simulate impact of Future Demand Program on
    u2022 Material Requirements
    u2022 Capacity Requirements
    u2022 Material Cost budgeting (activity by Accounts dept.)
    T.Codes used -
    u2022 Demand      MD61, MD62, MD63
    u2022 Scenario Creation     MS31, MS32, MS33
    u2022 LTP Variant  Creation & Execution     MSBT, SM37
    u2022 LTP statistics Evaluation     SM37, MS04
    u2022 Data Set Up     MS70, MSB&
    u2022 Evaluation based on Set up data     MCB), MCEA, MCEB, MCEC
    u2022 Capacity Evaluation     CM38
    To Summarize -
    u2022 In long-term planning, production plans for future demand programs are simulated using MRP runs with reference to the planning scenarios.
    u2022 The parameters for the simulation in the simulation planning area are defined in the scenario.
    u2022 The Evaluation of LTP Statistics enables identification of Material for which LTP processing was terminated.
    u2022 The Data set for purchasing & Inventory Control enables reports for demand analysis
    u2022 LTP run with setting for u201CLead time scheduling and capacity planningu201D enables simulation of capacity situation/overload on work centers.
    Hope it is helpful to you.
    Srini

  • Long Term Planning-Planning File Entry

    Hi Gurus/Friends
    In the long term planning after PIR with inactive version and creating Scenario, assinging versions, Plants,....then
    during Release+Save it is giving the Result of Planning File Entries
    Logically the system has suppose to give the Number of Planning File Entries in Propotionate to the Specific Planning Scenario number and materials inside
    But it is giving for all the Materials inside the Plant
    Is there any settings to restrict the Planning File Entry creation w.r.t Planning scenario during Release+Save
    other than the solutions through Transaction MS20,MS22 and MSAB
    (Because during Release+save logically it has to call the MS22 t.code  and do planning file entries for the materials in that scenario)
    Awaiting for reply
    thanks
    K.Prabakaran

    Hi,
    Please Refer Below SAP help .
    *Releasing a planning scenario*
    You first have to release a planning scenario before you can plan it in the long-term planning run. When you release the planning scenario, the system creates planning file entries for all materials in all the plants allocated to the planning scenario. There is a separate planning file entry for this purpose. This guarantees that your operative planning is kept completely separate from your simulative planning. This long-term planning file contains all the materials that are also contained in the operative planning file. After the release, every change relevant to MRP triggers an entry in the planning file as in operative planning.
    Pradeep
    Edited by: Pradeep Kumar on May 9, 2008 4:22 PM

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Extracting LTP (Long Term Planning) Data from SAP ECC to SAP BW

    Hello all
    Here is the task in hand. There is a standard report that Production Planners execute post their MRP/LTP runs. This report can be accessed through T-code "MCB)". The program in action is RMCB1200. I tried looking for any standard extractors but to no avail. I would be fine to know either or both of the following:
    An extractor
    All the primary tables involved ( I have found a few tables through the program but a list by some expert will help me understand that I have not missed anything significant)
    Also, if anyone has done this before, how was your experience with the extraction in terms of extraction volume and performance.
    Regards
    Gajendra

    After further digging, here is some information that I found out.
    T-code
    Program
    BADI
    MSEX
    RMDMRPEXTRACT02
    MD_SR_LIST_EXTRACT
    This could possibly provide the data required. The program can be scheduled and the output can be managed by SPRO settings for Extraction Mode. I am running tests to confirm if it provides me the correct information and matches with MCB) output.
    Here are some tables, just for reference:
    LTP Tables: PLSC, PBHI, PLPT, MDTP, PLPR, PLPB
    MRP Records:
    MDKP
    MRP Document Header Data
    MDTB
    MRP Table Structure (no data)
    PLSC
    Planning Scenario (Long-term Planning)
    MDFD
    MRP Firming Dates
    MDVM
    Planning File Entries
    S094
    LIS -- Stock/Requirements Analysis

  • How to consider the Purchase Orders in Long Term Planning

    Hi All,
    I wanted to include the Purchase Orders of Finished Material in Long Term Planning.
    I have selected the check box "Long-term planning: include firmed issues and receipts" in the Planning Scenario  but after LTP run system is not considering the Purchase Orders of Finished Materials for Planning.
    Regards,
    Shailendra
    Edited by: Shailendra Hadkar on Apr 5, 2010 12:41 PM

    Dear,
    Could you please explain usage of purchase orders for Finished product?
    Regards,
    SAP CONS

  • MS05 Long Term Planning

    I need  to stock available qty at long term planing (ms05) not calculate some location that qty status nettable.
    Example : Location   yy   stock onhand 100 EA   (Nettable)
                    Location   xx   stock onhand 10  EA    (Nettable)
         MRP                          display stock available 100  ea  but
         Long Term Planning     display  stock available 110  ea  (I need to display       100 ea  same MRP because MRP can set config exclude from MRP)  
    Please advise me?

    Hi,
    Can you make this Location stock XX as blocked or Restricted stock, then you will be able to exclude it from the Net requirement calculation.
    By deselecting the Blocked Stock or Restricted use stock for avaialbile stock in Avaialble stock configuration.

  • Implementing Long-Term Planning

    Dear Guys,
    Is that possible to implement Long-Term Planning (LTP) in SAP when there is no SOP module in the system. Would you please inform me the basic requirements or basic setup to implement LTP in SAP system.
    Thank you in advance!

    Hi Payam,
    This is always recommended to implement LTP if you have long lead times for some procured parts, bottle necks in capacities for work centers and most important to plan about budget required for the production of those parts.
    The above things you cannot check with STP/MTP and perform changes after the STP/MTP runs. But this you can do with LTP with diffrent scenarios and compare it till you satisfy.
    You can do the precosting of the parts and check what would be your future costing and plant budget.
    You can transfer the requireemnst of the critical parts to vendors well in advance after LTP run and before running the actual planning for the entire year, so the vendors will be well prepared to supply you the parts.
    You can also checks the capacities required for the production before the STP run.
    If this is OK then please close this thread.
    Regards
    TAJUDIN

  • Long-Term Planning (PP-MP-LTP)

    Do you know BI content for Long-Term Planning (PP-MP-LTP)?

    Not that I know.
    Often business people actually mean SOP (BC: 0SOP_PLANNING) when talking about long-term planning. I don't see any point in reporting LTP that is more like alternative MRP scenarios. It is operational and different scenarios easily get confusing in reporting.
    BR,Tuomas

  • Long term planning in ECC for materials planned in SAP APO

    Hi SAP PP and APO Experts,
    I would like to know whether it is possible to plan a material in SAP ECC with Long Term Planning to create Simulative Planned Orders in ECC, when the MRP Type for the material is set to X0 (Planning in SAP APO).
    Warm regards,
    Prem

    Hi Dhaivakumar,
    Appreciate your prompt response.
    My business is MTS. I have made all settings for LTP planning for the material. (M|RP Type is set to X0-Planning in APO). When I execute the transaction MS02, I get the error message "Material 5200000013 J310  is not planned automatically. Message no. 61008". The details of the error message is:
    The material 5200000013 in plant J310 or in MRP area  is not included in automatic MRP because
    either the MRP data for plant J310 or MRP area  has not been created
    or an MRP type has been entered for the material in plant J310 or MRP area  that does not allow automatic MRP.
    Warm regards,
    Prem

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Inconsistent - Work Centre's Long-term Planning (KAKO-KAPLPL)

    Hi Experts,
    we're upgarding from SAP4.5 to ERP6.
    I reviewed OSS note 950834, but it's not related.
    We extracted from SAP4.5 Work Centre - Capacity Header - Long-term
    Planning.
    It's ticked (X) in CR03, but blank () in table KAKO-KAPLPL.
    We loaded into ERP6 Work Centre - Capacity Header - Long-term Planning.
    It's blank () in CR03, but ticked (X) in table KAKO-KAPLPL.
    Please advise the fix for this issue.
    Thanks,
    Thomas

    Dear Thomas,
    I suggest you to check relevant OSS notes. Also creaete a OSS message for this issue.
    thanks and regards
    muru

  • Long Term Planning MCB)

    Hi,
    Please suggest how to analyze the output of MCB) transaction for long term planning.
    Thanks & Regards,
    Nataraj

    Hi there,
    Could you please give more details such as what are your objectives, the type of material (high frequency demand, low frequency, etc) and the span of long term planning (1 year, 5 years, 10?).
    Cheers,
    Rodrigo

  • Re: Long term Planning

    Dear All,
    I am trying to do Long term Planning. In my case I am not using SOP. Demand is entered into SAP through PIR (i.e. PIR).
    I want to see how much load is there on all the resources available.
    Please advice me how to proceed in this direction.
    Regards,
    Vivek Sharma

    Dear Vivek,
    Check with these steps,
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Vendor's long term plans regarding actualizations

    Hi,
    Possibly we will decide in 2014 to purchase MBP.
    It will be than the first Apple's product in our environment.
    If it should run that way we expect to use the mbp for approximately
    next 10 years.
    How does the Apple's current long term plans conform with the above target
    regarding actualizations (bug fixes, security patches) for
    OS and all other on-board software of mbp version currently in sell?

    molom wrote:
    dav7 wrote:
    Oh, and the medium I want to use needs to scale high. Very high. Into the order of more than a decent amount of TBs... like, say, 40 or 50. Of course that nice, round figure wouldn't pop up out of nowhere the day I have my plans in order, it'd grow - slowly - over time. So not only do I need something scalable, I need something that can scale slowly.
    So kinda like a NAS or external HDD type of solution, except one that doesn't use failure-prone media like HDDs. Unless there's a kind of hard disk out there that doesn't fail very "easily" and lasts in an order of years?
    -dav7
    I believe there is nothing that exists in the world, unless you pay huge money for Solid State Hard Drives. The only solution I see is using a bunch of rewritable double layer Blu-ray discs. I don't think there is any proper solution for what your looking for. Your looking for the perfect that doesn't exist.
    I'm not sure how long SSDs will last and I don't think there is any reliable information out there, wether an SSD I plugin now will still work in ten years. Plus you would need one hell of a lot SSDs to store Terabytes of data. BlueRay is probably worse than DVD regarding reliability, until the manufacturers get more experience with them.
    Am I the only one to see a pattern with dav7 opening threads looking for things which don't exist?
    Last edited by Garns (2008-10-08 13:39:29)

Maybe you are looking for

  • D700 RAW update not working?

    I just installed the new raw update which adds support for D700 RAW files. When I try to view these, it now generates a mini-thumbnail (128x128px?) but won't generate anything larger than that... any ideas what's going on? I can apply adjustments and

  • Safari quit unexpectedly now can't reopen a new browser. All i get is2 text boxes. one for a comment and one filled with this

    Process:           Safari [811] Path:              /Applications/Safari.app/Contents/MacOS/Safari Identifier:        com.apple.Safari Version:           8.0.2 (10600.2.5) Build Info:        WebBrowser-7600002005000000~1 Code Type:         X86-64 (Nat

  • Downloaded an app on my iphone and cannot remove.

    i downloaed the iphone app from this site: http://jimandkelly.net/go2snowshoe and i cannot remove it. when the iphone is is connected to itunes, the app "go2snowshoe" does not appear so there is nothing for me to uncheck or delete and i cannot seem t

  • Failed test VerifyEnterpriseReferences

    Hello, DCDiag is failing at "VerifyEnterpriseReferences". Any assistance on this would be greatly appreciated, thanks! Please see full details of error below:       Starting test: VerifyEnterpriseReferences          The following problems were found

  • Multiple lun's per RAID, double stripping?

    Hi We have a scenario where we only have 1 set of physical disks available to our RAC cluster( I think its RAID 1+0 or 5+0.. the RAID is mirrored... ). I would like to know if creating multiple luns for +DATA disk group  ( all luns are coming from th