Longer time for Material Availability check while creation of prd order.

Hi guys,
I am facing a weird problem while creating production orders thru CO01.
I enter the component and plant and I am also using the forward scheduling option.
for some reason, SAP is taking a long time for material availability check when I hit the release button.
Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
Can someone suggest me some tips ??
Thanks & Regards,
Sashivardhan

Hi,
Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
Hope this will help.
Regards,
Navin

Similar Messages

  • Credit Check while creation of Sales Order for Item Category Purchase Req

    Hi Experts,
    We are creating Sales Order using an Order Type ABCD for a material 1000. While creating Sales Order, we use Item categories (ZOVD, ZOVB,ZOST,ZOVP and ZOBO).
    Credit Check settings are there at Order Type ABCD as well as all the Item Categories (ZOVD, ZOVB,ZOST,ZOVP and ZOBO). We are trying to test a scenario where a customer does not have enough credit limit while creating a sales order.
    When we create a sales order for Item Categories (ZOVD, ZOVB,ZOST,ZOVP), credit check fails because our customer does not have enough credit limit, so that Sales Order gets created and Delivery does not get created (This is what we want), then we go into VKM1 manually and relase the sales order and then if we go to VA02 and check the status of the Sales Order, it says sales order status is complete. My Sales Team is saying here also Purchase Requisition is getting created.
    When we create a sales order for Item category ZOBO, it is going into Purchase Requisition screen. Once we give another plant in the create purchase requisition screen and save it we are getting a message that cannot create Purchase Requisiton because of Credit Block.
    The settings were same for all the Item categories.
    1) What made difference to complete Purchase Requisition for Item Categories (ZOVD, ZOVB,ZOST,ZOVP) and not for Item Category ZOBO when my customer is not having enough credit Limit.
    2) Why Purchase Requisition screen is not coming for us when we create an Sales Order for Item Categories (ZOVD, ZOVB,ZOST,ZOVP). We only get Create Purchase Requisiton Screen for Item Category ZOBO.
    Thanks
    Rajanikanth

    Hi,
    None of the Item Categories has Create PO Automatically.
    Thanks
    Rajanikanth

  • CNS0 - Material availability check

    Hi Experts,
    Now, we have some problem for material availability check.
    For example :
    Stock : 10 pce
    1. we create outbound delivery for 6 pce for Network / Activity : A / A000
    2. we create outbound delivery for 4 pce for Network / Activity : B / B000
    3. Now we create outbound delivery for 5 pce for Network / Activity : C / C000 , what we expected is there is an error message to tell us " only 0 PCE of material XX available " , but now, there is no message, outbound can be generate without any message.
    Could you pls help me to know where might be problem ? where I should check ?
    Best regards
    Shubin

    Hi Nitin,
    thanks, but seems the problem is not here, I guess it is a material availability check issue.
    BR , Shubin

  • Material Availability Check Upon Confirmation

    Hello Everyone,
    I had a question regarding Material Availability check.
    Here My raw material and Semifinished Goods are Backflushed during confirmation. My client wants to check material availability check upon confirmation of production order. System should not allow Confirmation if no stock is available. Is there any way how I can do this?
    I know we can perform material availability check upon release and prevent the same, but user does not accept this since change in production order is possible even after release.
    Any suggestion would be greatly appreciated.
    Sincerely,
    Aji Kurian Mani

    Hi,
          you can configure this in the confirmation parametres --OPK4.In General individual entry tab Error handling/logs tabmake a tick for the Goods movements --Termination for the Incorrect Goods Movts.
    Termination of Confirmation if Incorrect Goods Movements Controls if the confirmation is terminated in the event of incorrect goods movements
    If these incorrect goods movements are determined by inventory management, then the option of correcting these errors is offered in the error handling
    If the correction is not successful, the confirmation is terminated
    Thanks,
    Rajanikanth

  • Material availability check be switched off for during dispatching of order

    Hi All,
    Material availability u2013 can the material availability check be switched off during  dispatching of production order but kept when order is created? 
    Is there any implications on availibilty check.
    How can we do this?
    Regards,
    Vidyasagar

    Dear
    If you want to do Material Availablity Check only at the time of order creation , please choose Availability Check Business Function 1  with your order type  /plant combination .Keep No Check  in Capacity  and do not assing  the Overall Capacity Profile Here .
    Where as keep the Capacity Overall Profile for Production Order Type with Availablity Check  -2  and Mark No Check to material availablity  option in the same .
    In OPKP -make sure that you have Capacity Profile assinged and do not mark Confirm Partial Available Qty .
    How ever , in capacity requirement , material availablity is the intregrated part  and while dispathcing production order with in the available capacity of any operation in work centre , system tries to make sure the materials are available for processing just before actual operation starts .
    Check in CM21-Setting-Strategy -Dispatch Control -Check if you have option to un-check the Material Availability .
    Regards
    JH

  • PR Creation from Main Order based on Material Availability Check

    Hi Experts.
    I have activated material check for maintenance order, and system is checking material availability. But system is not generating purchase requisition if material not available.
    PR creation from main order is feasible in case I will select item category as Non Stock - N; but system is not creating PR for stock item IC - L.
    Can u further guid me, how system will generate PR for material assign in maintenace order, but required stock not available.
    Thanks in advance....
    Rgds,
    Dipen

    Hi,
    As Venu told, for the Item Category L, system will create the reservation. While running MRP for that item, system will check the stock qty & required qty, then it will create the PR for the unavailable qty.
    Only for item category N, from maintenance order, PR will be created.
    Maintain the MRP type in Material Master.
    Regards,
    Maheswaran.

  • Hello I'm trying to create Apple ID without success for a long time. And after checking with the bank details are correct with no success

    Hello I'm trying to create Apple ID without success for a long time.
    And after checking with the bank details are correct with no success

    If you choose US as your country while your bank details and credit card or PayPal account are from another country, then you will get an error not related to your details, such as 'the CVV number is incorrect', although it is correct.

  • How to make material availability check work during Work Order creation

    Hi Experts,
    Kindly advice about these matters:
    1. How to make material availability check work during Work Order creation?
    My requirement is Work Order can not be created when it has missing parts. I have set the config to '3' can not created when is has missing parts, but it still does not work.
    I have implemented SAP Notes 1148139 on my system (SAP ECC 6 Ehp 5) also, but still does not have any effect.
    I must not set the config Res./Purch Doc creation to 'immediately', because it does not fit to my user requirement. Is there anyone knows how to solve this requirement?
    2. How to make information message/ Availability check screen appear when sparepart is missing, without clicking Availability Check button? for example: appear when clicking Save button.
    Thank you
    -amoonra-

    Hi Maheswaran,
    I have implement the prerequisite notes. (Notes 790219 and 1034962). Do you know why it is still does not work?
    Thanks
    -amoonra-

  • HT4759 Hello .. I've been subscribed for ic;oud for 20$ per year and I found it useless for many reasons: that I can not disconnect my mobile while the uploading process and it takes long time for uploading my data .. Its not a reliable system that's why

    Hello .. I've been subscribed for ic;oud for 20$ per year and I found it useless for many reasons: that I can not disconnect my mobile while the uploading process and it takes long time for uploading my data .. Its not a reliable system that's why I need to deactivate the space service and take my money back .. Thanks

    The "issues" you've raised are nothing to do with the iCloud service.
    No service that uploads data allows you to disconnect the device you are uploading from while uploading data. Doing so would prevent the upload from completing. It is a basic requirement for any uploading service that you remain connected to it for uploading to be possible.
    The time it takes to upload data to iCloud is entirely dependent on how fast your Internet connection is, and how much data you are uploading. Both of these things are completely out of Apple's control. Whichever upload service you use will be affected by the speed of your Internet connection.

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • When I use update software from my mobile it take long time for checking update software and no thing happened to update my IOS software

    When I use update software from my mobile it take long time for checking update software and no thing happened to update my IOS software

    Servers have been swamped. Keep trying and be patient. Wait a few days.

  • Work Order Material Availability Check Customizing

    Hi,
    I am currently trying to set up material availability check in the work order before saving. I am testing it by entering a material in the work order for which there is zero stock. Then clicking on ORDER > FUNCTIONS > AVAILABILITY > CHECK STOCK MATERIAL. However SAP would return 'All checked materials in order 100000317 are available' in status bar.
    My customizing is as follows:
    Define Checking Rules (SPRO):
    PM     Checking rule for plant maintenance
    Define Scope of Check (OPJJ):
       Availability Check: 01 (Daily Requirements)
       Checking Rule: PM (Checking rule for plant maintenance)
       Availability check: 2 (Check availability during order release)
        Stocks
        Include safety stock: X
        StockIn Transfer: X
        Incl. quality insp. stock: X
        Replenishment lead time
        Check without RLT: X
        In/outward movement
        Incl. purchase orders: X
        Incl. purchase requisitions: X
        Incl. dependant reqs: X
        Include reservations: X
        Include sales reqmts: X
        Include deliveries: X
        Incl. planned orders: X (check all planned o)
        Incl. production orders: X (take all production)
    Define Scope of Check (OIOI):
       Plant: (Corresponds to Work Order)
       Order Type: (Corresponds to Work Order)
       Check material availability when saving order: X
       Check rule: 02 (Corresponds to material being used)
       Release Material: 3 (No release if parts are missing)
       PRT Availability: No check
       Capacity Availability: No check
    I would appreciate if you could indicate if I am missing something in the customizing or if there is some sort of error. I would like SAP to display a system message on the status bar stating that this material is not available once the user enters this material.
    Regards,
    Nikolai

    I'am facing the almost the same problem. Could anyone tell me:
    1. How to make material availability check work  during Work Order creation?
    My requirement is Work Order can not be created when it has missing parts. I have set the config to '3' can not created when is has missing parts, but it still does not work.
    I have implemented SAP Notes 1148139 on my system (SAP ECC 6 Ehp 5) also, but still does not have any effect.
    I must not set the config Res./Purch Doc creation to 'immediately', because it does not fit to my user requirement. Is there anyone knows how to solve this requirement?
    2. How to make  information message/ Availability check screen appear when sparepart is missing, without clicking Availability Check button? for example: appear when clicking Save button.
    Thank you
    -amoonra-

  • Capacity check is not working while creation of Production order

    HI Gurus,
    I want to restict the system that in case of insufficient capacity at the work centers, sysstem should not create the production order. For that i did the setting
    1) Unchecked the tick for the Capacity check & enter the profile SAPSFCG013 in the OPJK for the business functions 1 & 2.& also make the setting for the Release order '3".
    2) Maintain the same profile in the production profile & maintain that profile in the Mat Master
    3) In the CR02, activate the tick for the finite scheduling & uncheck for the can used for several operations.
    But i have creted the production orders & at the time of capacity check system is giving the message " Capacity avaiolable at all the work centers. But i check in the CM50, all the work centers are overloaded at the respective date.
    But i can create & release the p[orduction order.
    Requesting all to give your comments & solutions.
    Regards
    ACP

    ACP,
    ....after confirming all the operations system is allowing me to save
    When you confirm an order, you are by definition saying that the capacity existed for that order (you have just declared to the system that all operatons have been performed, and therefore all capacity was available).  I can't imagine why you would not wish to save that order, since you must somehow post the physical work that has already been done.  Capacity availability check is really only useful when the order to be checked has not yet been executed.
    CM50 displays capacity requirements.  CM50 does not perform the same function as Capacity availability check.  To ensure that all of your orders fall within you capacity constraints, you must perform capacity levelling.  Capacity availability check does not work the same as a Material availability check - don't assume that what you know about a material ATP will be applicable for a capacity ATP.  Read the help on Capacity levelling.  It is not generally possible to stop a manually created production order from being saved, due to any capacity situation, without using an enhancement.
    http://help.sap.com/saphelp_erp60/helpdata/en/60/13e308133a11d3bf550000e83235ee/frameset.htm
    Naturally, you can use enhancements to have the system meet any business requirement that is not met with the standard Cap Availability check.
    Best regards,
    DB49

  • Material Availability Check in Process Order Issue

    Guys, I need some help in understanding the folowing issue:
    I have a FG and 2 components.I created a process order and tried to release the order. Automatic availability check is done and a dailog box appeared to list out the missing parts. Missing parts list shows both the components. But one of the componet has unrestricted stock to use in the storage location. why did the availabity check show missing part for that component?
    I checked pp checking rule and it says for business rule 2 "no check" is unchecked. so that means checking is done. and this pp checking rule is assigned in OPJJ and also assigne dto the material master of the component.
    please let me know if you need more information. Thx

    Dear you are absolutely correct if you uncheck No check box in material availability in Order control OPJK  per plant and order type that no automatic material availability check is to be executed for the specified business transaction (order creation or order release).
    But further please note that the option of calling up a material availibility check manually and also of executing a collective availability check is not affected by setting this indicator. This indicator is also ignored if you work with Assembly orders and you have defined in Customizing for Sales Orders that a material availability check is to be carried out.
    Cheers
    kK

  • Bex Reports takes long time for filtering

    Hi,
    We have gone live in last December.And already our inventory cube contains some 15 million records,sales cube contains 12 million records.
    Is there any specific limit to number of records.Because while doing filtering in inventory report or sales reports it is taking very  long time.
    Is there any alternative or we should delete some the data from the cube.
    for filtering any value it is taking long time than running the query itself.
    Pls help...
    Regards,
    viren.

    Hi Viren,
    I hope a cube can perform well even at 100 million records with some performance tunning. So i absolutely doubt why it is taking long time for your cube with just 10-15 million records.
    Do a performance analysis and check whether aggregates will be helpful or not.
    Check the below link for how to do a performance analysis.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/media/uuid/d9fd84ad-0701-0010-d9a5-ba726caa585d
    Hope it helps.
    Thx,
    Soumya

Maybe you are looking for

  • Mini to a Philips W/S, HD tv with dvi to hdmi

    ok, so i finally got the display to gome up regularly, i just bought a 30 in, wide screen philips hd with a hdmi hookup in the back. i got a dvi to hdmi cord with it, and i got the diplay to show up fine in 720x480 rez, but the whole point of the new

  • Multiplatform sound IO with LabVIEW

    We develop a commercial piece of software in LabVIEW which needs to do extensive sound output and input (professional internal and external soundcards, up to 16 channels, numerous bit depths and sampling rates with low latencies).  This software is

  • Problem with unit converter widget

    I am having a weird problem with my unit converter widget on 10.4.9. I re-installed my system, and now when I go to open the unit converter widget, I can no longer see the British pound currency, there are all these othere European currencies. Is the

  • How do I erase sights that auto populate in the dropdown bar in yahoothat have been previously viewed

    How do I erase the yahoo dropdown bar that populates by letters typed in it of previously searched topics?

  • Premiere to AE to Encore

    Hi, I have created a 1 hour film, using HDV footage which I want to send to AE to perform colour correction on the entire film and then send to encore to produce as a DVD.  I am confused whether I should use Dynamic Link or export as files to transfe