Look Ahead LOV Feature - From R12.1.2 onwards...

I have posted a new article on my blog regarding Look Ahead LOV.
http://oracleanil.blogspot.com/2010/09/auto-suggest-or-look-ahead-lovs-oaf.html
Thanks
--Anil
http://oracleanil.blogspot.com

Hi Anil,
Thanks a lot for all the valuable information you are sharing with OAF techies and your precious time.
Regards,
Reetesh Sharma

Similar Messages

  • Look ahead LOVs

    Hi,
    I guess look ahead LOV feature is available in the latest OAF build (R12 version). I was trying to achieve this functionality but was not able to do so. As per the guide, I created messageLovInput filed and tried adding Look ahead LOV. After typing some character, instead of getting matching records, I was getting the message "Message FND_LOV_DATA_PROGRESS not found". I couldn't find any details about this message.
    Can anybody help me with this?
    Thanks in advance,
    Shree

    Hi
    I have implemented the same and i am not facing any issues with that. Try to run simple LOV and remove all the properties for LookAheadLOV .Check whether it runs or not.If it runs then change
    Look Ahead Enable : True
    Look Ahead Search Type : startsWith
    Minimum characters : 1
    This should solve your problem.
    Ajay

  • Look Ahead Lov dosen't work for SubTab layout

    Hi,
    I have developed a custom page which can have multiple tabs.
    When there is only one tab, everything works fine. Now when i try to copy a bid , which opens a new tab, and try to enter a valid value in the LOV field. I get a message saying 'Unable to fetch results. Please invoke the LOV window for search results'.
    One more Observation here is , when an invalid item is entered and tabbed out, the Lov window should open up automatically. Which doesn’t happen for the second tab. Everything works fine when there is only one tab.
    Please assist on this issue.
    Thanks
    AG

    same problem here. Has there been any update on how to fix it?

  • Impact on OAF Personalization/Customizations - Upgrade from R12.1.3 to 12.2.4

    Hi All,
    1) I would like to know if we need to re-deploy the OAF personalizations if we migrate from EBS 12.1.3 to 12.2.4?
    As per my understanding, after upgrade, personalizations would remain intact in MDS (jdr_* tables) layer but we need to perform testing and correct any layout error etc. if it is not in line with 12.2.4. However, re-deployment is not required.
    2) I also have a second questions wrt OAF customizations (i.e; VO extension, CO extension, Custom pages/regions). I assume we need to redeploy the customizations.
    It would be great if you can guide me on this.
    Regards,
    K

    1. Would R12.1.5 need separate license? Or, R12.1.3 license would cover R12.1.5 as this looks like an incremental upgrade.Same license (assuming you already have HRMS license).
    2. Not finding good documentation on R12.1.5 on metalink. Is there a RVP that can be shared if any of you have it with you.If you are referring to HRMS Release Update Pack 5 for Release 12.1 then you should have the docs referenced above.
    3. This probably should have been my first question. Is R12.1.5 a public release? I ask this question as I do not see good information available on upgrade road map to R12.1.5.The latest 12.1.x release is 12.1.3 and Oracle has no plans to release any higher 12.1.x releases -- The next release will be 12.2
    4. Can these features in R12.1.5 be applied as one-off patches on R12.1.3?Again, if you are referring to HRMS Release Update Pack 5 for Release 12.1 then the answer is "Yes".
    Thanks,
    Hussein

  • Oracle Read-Ahead: not the same as look-ahead, yes?

    Hi,
    I've tried to understand the Oracle Read-Ahead systems, and I think I undersand how it works, though I'd like to assert that I am not mistaken.
    From what I've managed to understand in the Oracle documentation, the Oracle read-ahead mechanism is mostly used for sequential accesses of data blocks. For example, to perform operations like table scans.
    In such cases, Oracle will for example use a physical operation called scattered read.
    The scattered read, in turn, is configured in the ini.ORA by a parameter name something like db_multiblock_read_count. Having a multiblock read count of 60, will make the scattered read operation read 60 sequential data blocks from disk, starting with the data block that was requested in the operation.
    From what I've gathered, this is the basis of the Read-ahead mechanism. It is use mult block operations do read data instead of single bock operations.
    If what I've said so far is correct. There are two things that I'd like to know:
    1.
    Those 60 blocks read by the sctarred read. Do they go directly into the database buffer cache? Or are they loaded first in to a lower level cache, like a scattered read cache?
    Thus, if the table scan requested the page 1. And the scattered read operation fetched the database pages 1 to 60. I assume that only page 1 would be transfered to the buffer cache. Later on, when the table scan requested for page 2, the buffer cache would retrieve that page from the scattered read cache into the buffer cache. Or is this completly wrong? And when the scattered read gets pages 1 to 60. It automatically dumps those data pages into the buffer cache into random positions of the main buffer?
    2.
    With Oracle read-ahead, table scans and other such physical operations will always incur scattered read waits periodically. For example, every 60 pages the table scan incurs in another scattered read wait correct?
    3.
    Reading-ahead In oracle only anticipates the database page needs of a physical operator a specific point in time, yes? The following does not happen:
    While the table scan is currently on page 50, having another 10 more pages left in the database buffer, some background process decides that it is a good idea request another fetch for 50 more data pages. In such a way that the forground thread processing the table scan never has stop in read IO.
    This would be called looking-ahead, and it is not an Oracle feature, is it?
    Thank you for your insight.
    I've performed some tests where though the table size of a data transformations remain the same (1GB) but the time I take to process the source table into my output varies. The processing time for each record increased greatly from test to test. But I noticed that the wait time of the data transformation remained constant, though the cpu time increased greatly. THe increase in CPU time means that the Time Until Next Buffer fetch was reduced, which would give more time for the system to look-ahead. Eventally I could have made the CPU time so great, that if REad IO was being performed in anticipation it would be theortically possible for the READ wait time to be 0. Which I know is not going to happen. So I'd just to be certain of how the read-ahead works.
    My best regards.

    sono99 wrote:
    Hi,
    I've tried to understand the Oracle Read-Ahead systems, and I think I undersand how it works, though I'd like to assert that I am not mistaken.
    From what I've managed to understand in the Oracle documentation, the Oracle read-ahead mechanism is mostly used for sequential accesses of data blocks. For example, to perform operations like table scans.
    In such cases, Oracle will for example use a physical operation called scattered read.
    The scattered read, in turn, is configured in the ini.ORA by a parameter name something like db_multiblock_read_count. Having a multiblock read count of 60, will make the scattered read operation read 60 sequential data blocks from disk, starting with the data block that was requested in the operation.
    From what I've gathered, this is the basis of the Read-ahead mechanism. It is use mult block operations do read data instead of single bock operations.
    Am not sure if you meant reading multiple blocks at the same time or Read ahead cache features provided by some storage devices. But to me it seems you are talking about MBRC (Multiblock read count) and not about read ahead cache provided by storage vendors.
    If what I've said so far is correct. There are two things that I'd like to know:
    1.
    Those 60 blocks read by the sctarred read. Do they go directly into the database buffer cache? Or are they loaded first in to a lower level cache, like a scattered read cache?
    Thus, if the table scan requested the page 1. And the scattered read operation fetched the database pages 1 to 60. I assume that only page 1 would be transfered to the buffer cache. Later on, when the table scan requested for page 2, the buffer cache would retrieve that page from the scattered read cache into the buffer cache. Or is this completly wrong? And when the scattered read gets pages 1 to 60. It automatically dumps those data pages into the buffer cache into random positions of the main buffer?
    If my mbrc is 60, and none of the blocks are in buffer and table size is more than 60 blocks then entire 60 blocks would get transferred to buffer cache. There is nothing called scattered read cache in the architecture of Oracle.
    2.
    With Oracle read-ahead, table scans and other such physical operations will always incur scattered read waits periodically. For example, every 60 pages the table scan incurs in another scattered read wait correct?
    Yes db file scattered read wait event would mean that another physical IO has been initiated for fetching next blocks of records.
    3.
    Reading-ahead In oracle only anticipates the database page needs of a physical operator a specific point in time, yes? The following does not happen:
    While the table scan is currently on page 50, having another 10 more pages left in the database buffer, some background process decides that it is a good idea request another fetch for 50 more data pages. In such a way that the forground thread processing the table scan never has stop in read IO.
    This would be called looking-ahead, and it is not an Oracle feature, is it?
    Yes I do not think so it is an Oracle feature but some storage vendor provides it. It is also known as Read ahead.
    Thank you for your insight.
    I've performed some tests where though the table size of a data transformations remain the same (1GB) but the time I take to process the source table into my output varies. The processing time for each record increased greatly from test to test. But I noticed that the wait time of the data transformation remained constant, though the cpu time increased greatly. THe increase in CPU time means that the Time Until Next Buffer fetch was reduced, which would give more time for the system to look-ahead. Eventally I could have made the CPU time so great, that if REad IO was being performed in anticipation it would be theortically possible for the READ wait time to be 0. Which I know is not going to happen. So I'd just to be certain of how the read-ahead works.
    My best regards.I did not understood your last para.
    Regards
    Anurag

  • Oracle E-Business Suit Upgrade from R12.0.6 +10.2.0.3 to R12.1.3 +11.2.0.2

    Dear Experts,
    Let me update you that one of our client is looking to upgrade their Oracle E-Business Suit Verion from R12.0.6 to R12.1.3. and database version from 10.2.0.3 to 11.2.0.2.
    Current all the financial and SCM modules are implemented on there production instance.
    We would like to know what are the pre and post upgrade activities needs to be performed ?
    What are the list of patches which needs to performed while doing an upgade from
    R12.0.6 to R12.1.1 - R12.1.3.
    Regards
    Mohammed.

    Please advise on the below approach....
    R12.1.1 to R12.1.3 upgrade high level steps
    Install upgrade / EBS Patch
    Pre-install R12.1     
    1. Setup hardware.     
    2. Install and setup OS.     
    Install R12.1.1     
    3. Install R12.1.1 (run Rapid Wiz)     
    Post –Install R12.1.     
    4. Upgrade Opatch in 10.1. home     
    5. Upgrade /patch OAS 10.1.2.3 (inc in R12.1.1)     
    6. Redeploye forms.ear     
    Pre-install R12.1.3     
    7. Upgrade OPatch in database home     
    8. Upgrade OPatch Database in 11.1.0.7     
    9. Upgrade OPatch in 10.1.3 Home     
    10. Upgrade /Patch OAS 10.1.3.4 to .5     
    11. Upgrade Java to 1.6_0_17 or lower     
    Install R12.1.3     
    12. Apply EBS R12.1.3 maintenance pack

  • HT201299 Not enable or disable cellular data for certain iOS apps and features from setting? I keep it off but when I go to other app it on automatic

    I can't  enable or disable cellular data for certain iOS apps and features from  setting.
    When I off data for specific application and go to other option it automatic on all application
    Any one can help

    SOLUTION! (NO NEED TO RESET YOUR IPHONE SETTING!)
    I have the same issue for the last two weeks. But i have already managed to solve the issue all by myself. When i go to Settings > Cellular > below the tab "use cellular data for:", i turned off some apps which i didnt want to use with cellular data. As soon as i go back to Settings, and then i went back to Cellular, the apps which i had switched off earlier, automatically turned back on.
    Here's the solution:
    Either you're using wifi or cellular data, first of all you're gonna hafto turn on the cellular data use for App Store. Once you have turned it on, go to App Store application. Update ALL the apps which have new updates available. If it asks you to log in your App Store, just do so. If there's something wrong with your debit or credit card information, it will ask you to update to a different card. Just do what it asks. Put in a new credit or debit card info and fill in the forms provided. The card you're using must be usable and has usable balance in it. Let's say atleast $10 to $20. As soon as it confirms your card successfully, the app updates will start automatically. Continue to update all the apps. After all updates are finished, go back to Settings > Cellular. Try to switch on or off some apps for data use and recheck.
    Try it yourself! Have a nice day and don't put a blame on Apple for this.
    From Malaysia, with love.
    Please hit LIKE button if this solve your issue. Thank you very much! (:

  • Implementing an Effect that looks ahead in the source

    Hello all,
    I need to create an application which reads from one AVI file, processes each frame with a special effect, and outputs the result to another AVI of the same format. Fairly standard stuff.
    I am fairly new to JMF but I think I have the basic methodology right: creating a Processor, and then during the Configured state, adding a new Effect to the Codec chain of the Processors first TrackControl.
    The thing I am unsure about is this: the Effect I am programming needs to 'look ahead' in the source i.e. it needs to see frames 1, 2 and 3 before it can write frame 1 of the output.
    Does the process(Buffer input, Buffer output) method of Effect is called for each frame of the video, providing a Buffer for each frame at a time? In this case can I buffer the first three frames for myself, and withhold output until the third frame?
    Or is process(Buffer input, Buffer output) called once by the Processor, with the in/out buffers represent the entire stream and able to be read and written to 'asynchronously'? In this case, when I use javax.util.BufferToImage to get my actual frames to apply the effect, do successive calls step through the frames, how do I reference specific frames from this context?
    I'll stop speculating now - I hope someone can nudge me in the right direction... Thanks very much for any advice.

    Hello Darkmoon_UK,
    Your problem seems similar to my one.
    I want to implement a slow motion effect with jmf. I also read from an avi file.
    First thing I hava to ask is, whether your effect simply plays the original video into the new file, if you only add
    output.copy(input);
    into process()-method.
    I dont't know if it is important, but I add the new Effect to the codec chain AFTER ConfiguredCompleteEvent, not during Configured state. And this works (at least simply playing the video works, not my slow motion effect ;-) ).
    Next thing is you should insert some System.out.println()s into your process()-method code to discover that it is called several times (for each frame of the video).
    I think it is possible to buffer all the frames into an collection out of java.util.* and make a specific variable (int frameCounter) count the frames by calling frameCounter++; at the end of the process()-method. Same effect is using input.getSequenceNumber(), I think. With the help of a Collection of java.util (ArrayList or something else), it should be possible to access any frame out of the video.
    Well, I'm also still learning and trying to force JMF to do what I want, not the other way round, as it is at the moment. I hope this little bit of information I gave you could help you solve your problem or at least nudge you in the right direction.
    Bye,
    sscheer81

  • Search by PR #, PO # etc from R12.1.3

    Dear All,
    Currently we are using 11.5.9 and soon going for upgrade to R 12.1.3.
    At present, we are using a seperate portal to search PR#, PO#, status (Inprocess/Approved), vendor, Buyer, by division (a person from a division can search only his/her division records) etc.
    We would like know whether the same feature (advance search) is available in R12 or not as standard funcitonality. Please advice.
    Thanks in advance.
    MAK

    The Professional Buyer Work Centre, one of the cool feature of R12 has got all kind of search you need for your business.
    Thanks,
    PS.

  • I am looking for educational posters from Apple or for Garageband, if they exist. I'll be teaching a new class for middle school using Garageband next year. Thanks!

    I am looking for educational posters from Apple or for Garageband, if they exist. My school district will be teaching a new class for middle school using Garageband next year. I'd love to make the rooms look awesome! Can anyone hook me up? Thanks!

    lucky14life wrote:
    first i was wondering what everyone thinks about macbooks compared to let's say another pc like hp,dell,etc.... i have been told that i'd have to be dumb to get a machine with windows vista on it,so that is why i have turned my focus to a macbook because i have heard they are pretty good and worth it...
    I personally like my MacBook better than any other computer I have ever owned. I like being able to use windows when I need to but not being tied to it. My wife bought an HP with Vista and it doesn't seem to bad. Lots of updates at least one a week. Mostly graphic card drivers update.
    also is it true that if you upgrade let's say the memory,hard drive,etc it won't be covered in the warranty/apple care plan??
    Only two things you can upgrade on a MacBook is the Hard drive and Memory. It will not void the warranty. This is apples word on it. DIY Warranty Info
    I would just like to ask for people's opinions please on purchasing one of these i am currently a senior in college and will be using it next year for grad school,need to replace the one i currently have...
    Be sure you can live with the graphics. If you do a lot of graphics work you might want to consider the MacBook Pro. I use my MacBook for video editing using Final Cut Express HD and it works well. The MB is also not very good for gaming if you are into that. The integrated chip set doesn't work well with 3D games.
    also any other ideas on getting iwork or office, a hard plastic case or a skin,thanks alot for anyone's input it is greatly appreciated.... i am looking to get one once leopard comes out thanks!!
    Depending on your school may be a factor in what you choose. I use iWork and it is pretty good. You could also try NeoOffice or Open Office. They are good also. Office is supposed to be coming out with a new Mac version but not sure yet how it will work.
    Be sure to ask for the student discount when you purchase the computer and software. It adds up.

  • Possible to look ahead with a cursor

    I need to know if you can do sort of a cursor look ahead and view data from the next row in the cursor. I'll try to succinctly explain why, maybe there's a better solution.
    We have several items that are valid through certain date ranges. The database was designed to only hold the starting date of an item, thinking that the end date could be calculated by looking at the start date of the next revision of that item. For instance:
    Cert1 version 1's start date -> January 1, 2000
    Cert1 version 2's start date -> January 1, 2002From that we can deduce that Cert1 was valid between January 1, 2000 and December 31, 2001. Unfortunately, this isn't working out quite like I expected in my function because I don't have access to the second version information until AFTER I've already processed version one's information and the processing of version one is dependent upon the data in version two. I'm sure you can see where this is headed... =)
    So is there a way I can read something out of the next row, without moving the cursor, or will I need to redesign that particular table in the DB?

    Hi,
    You can get the value from the next row right in your result set, using the analytic LEAD function.
    For example:
    SELECT  start_date
    ,     LEAD (start_date) OVER ( ORDER BY start_date)     AS next_start_date
    ...LEAD returns NULL on the last row in the result set.
    If you have several different groups (say, different items, identified by item_id) and you want to find the next start_date in the same group, then add a PARTTITION BY clause:
    SELECT  item_id
    ,     start_date
    ,     LEAD (start_date) OVER ( PARTITION BY  item_id
                                     ORDER BY      start_date
                          )     AS next_start_date
    ...See the [SQL Language manual|http://download.oracle.com/docs/cd/B28359_01/server.111/b28286/functions079.htm#sthref1560] for more.

  • How can I turn off the share link feature from the 'open link' menu?

    Longpressing a link in firefox opens a menu.
    I want to remove the "share link" thing from this menu, as that is something I'd NEVER do.
    It's highly intrusive and gets in the way with it's "prime" position at the top of the list.
    Couldn't find any flag in about:config or anywhere. Going to take a look at google-chrome now, see if that thing is better. I'll miss adblock.

    Hi t.rei,
    Thank you for your feedback. Please also include this in input.mozilla.org where the User Advocacy team lobbies features from gathered feedback.
    Unfortunately I do not have a work around for this feature.

  • Reporting on milestones with a 2 week look ahead?

    Hi,
    I'm pretty new to my role as project planner (it was kind of thrust upon me) and I'm still getting my head around Project.
    I'm working on a programme and each PM has their own plan in the template that I created. I have taken the milestones and deliverables from their plans and built my own "integrated plan", showing just milestones and deliverables.
    My programme manager would like a report that easily allows us to project to the team their milestones with a two week look ahead, and a view of the previous two weeks, so that people can see just how much they're slipping by etc. I've messed around with
    views and filters but I can't get it to show what I want. Is what I want achievable in project or do I need to export it to Excel or something else?
    Any help would be greatly appreciated!
    Thanks.

    Hi
    Dewsey83,
    An example of what you want to achieve would be good. If, for example, you are looking for all the tasks that are supposed to have some work executed over the period then the formula for the flag field can be something like:
    IIf([Finish]>=Now()-15 And [Start]<=Now()+15,1,0)
    and if my project plan is the one below, note that any work scheduled over the specified interval will drive the Validation field to be set to Yes:
    and if I use a filter like:
    I will see only the tasks that will be executed over the period
    Paul

  • Upgrading from R12.1.1 to R12.1.2

    Hi,
    I have the following configuration:
    Oracle Enterprise Linux:5.3
    EBS Version:R12.1.1
    Database version:11.1.0.7
    OracleAS 10g Forms and Reports:10.1.2.3.0
    OracleAS 10g: 10.1.3.4.0
    Please explain is it recommended to upgrade all Tech stack Components before upgrading from R12.1.1 to R12.1.2
    I am upgrading from R12.1.1 to R12.1.2 without upgrading any tech stack components, as it requires minimum versions and R12.1.1 tech stack components are supporting those versions
    Can i go ahead on production after applying it on test
    will it create any problem, if i could upgrade tech stack components later, will it be a problem for me
    Please explain...
    Thanks,
    Alig
    Edited by: user12257829 on Aug 17, 2010 12:30 AM

    Hi
    Hussein
    While Upgrading from R12.1.1 to R12.1.2 faced many errors(Applied 8502056 patch) and then applied 7303033
    first adrelink failed.
    1. An error occurred while relinking application programs.
    Continue as if it were successful [No] : Yes
    but i entered Yes to continue as my OS is OEL 5.3 binutil version is binutils-2.17.50.0.6-9.el5
    as my system binutil is updated one but in the note at MOS 758831.1, binutils-2.17.50.0.6-6.0.1.el5.x86_64.rpm, this doesnt apply to my system as my binutil is updated one.
    2. The following Oracle Forms objects did not generate successfully:
    au resource OKLCSASD.pll
    An error occurred while generating Oracle Forms library files.
    Continue as if it were successful [No] : Yes
    as i entered yes to continue with the patch and tried to compile OKLCSASD.pll thru adadmin and manully aslo but didnt succeed.
    The patch is completed atlast, and a huge number of invalid objects where created ..
    I tried to recompile thru admin,utlrp,adcompsc.sql & utl_recomp.recomp_parallel but unable to compile a single objects
    How could i make sure that patch is applied successfully & recompileinvalid object
    find below invalid objects
    BIS_MEASURE_SECURITY_PVT
    BIS_INDICATOR_REGION_PVT
    BIS_TARGET_LEVEL_PVT
    BIS_ACTUAL_PUB
    ENG_ECO_PUB
    BIS_PMF_REG_SERVICE_PVT
    ENGECOBO
    AS_SALES_LEAD_OPP_PVT
    BISVIEWER_PMF
    BIS_PMF_DEFINER_WRAPPER_PVT
    IES_TELESALES_BP_PKG
    OKL_REVERSE_CONTRACT_PVT
    OKL_CONTRACT_PVT
    OKL_AM_PARTIES_PVT_W
    OKL_AM_CREATE_QUOTE_PVT_W
    OKL_AM_REPURCHASE_ASSET_PVT_W
    OKL_AM_RESTRUCTURE_QUOTE_PVT_W
    OKL_AM_SEND_FULFILLMENT_PVT_W
    OKL_SPLIT_ASSET_PVT_W
    OKL_TRX_QUOTES_PUB
    OKL_CONTRACT_REBOOK_PUB
    OKL_AM_TERMNT_QUOTE_PUB
    OKL_TXL_QUOTE_LINES_PUB
    OKL_TRANSACTION_PUB
    OKL_ACTIVATE_ASSET_PVT
    OKL_GENERATE_ACCRUALS_PVT
    OKL_ASSET_DETAILS_PVT
    OKL_AM_ASSET_DISPOSE_PVT
    OKL_ACTIVATE_IB_PVT
    OKL_AM_PROCESS_ASSET_TRX_PVT
    OKL_AM_QA_DATA_INTEGRITY_PVT
    OKL_AM_PARTIES_PVT
    OKL_AM_ASSET_RELOCATION_PVT
    OKL_AM_UTIL_PVT
    OKL_AM_ASSET_RETURN_PVT
    OKL_BLK_AST_UPD_PVT
    OKL_CONTRACT_BOOK_PVT
    OKL_KBK_APPROVALS_WF
    OKL_COPY_ASSET_PVT
    OKL_AM_CONSOLIDATED_QTE_PVT
    OKL_AM_CREATE_QUOTE_PVT
    OKL_AM_CALCULATE_QUOTE_PVT
    OKL_CS_CREATE_QUOTE_PVT
    OKL_CS_WF
    OKL_CURE_CALC_PVT
    OKL_EQUIPMENT_EXCHANGE_PVT
    OKL_FUNDING_WF
    OKL_INTEREST_CALC_PVT
    OKL_LA_JE_PVT
    OKL_CREATE_KLE_PVT
    OKL_LCKBX_CSH_APP_PVT
    OKL_LIKE_KIND_EXCHANGE_PVT
    OKL_AM_BTCH_EXP_LEASE_LOAN_PVT
    OKL_AM_LEASE_LOAN_TRMNT_PVT
    OKL_AM_LOAN_TRMNT_PVT
    OKL_LOSS_PROV_PVT
    OKL_AM_LEASE_TRMNT_PVT
    OKL_MASS_REBOOK_PVT
    OKL_MISC_TRANS_PVT
    OKL_QA_DATA_INTEGRITY
    OKL_AM_QUOTES_WF
    OKL_CONTRACT_REBOOK_PVT
    OKL_CURE_RECON_PVT
    OKL_RELEASE_PVT
    OKL_REV_LOSS_PROV_PVT
    OKL_AM_REPURCHASE_ASSET_PVT
    OKL_AM_RESTRUCTURE_RENTS_PVT
    OKL_AM_RESTRUCTURE_QUOTE_PVT
    OKL_AM_RECYCLE_TRMNT_PVT
    OKL_AM_PROCESS_RV_TRX_PVT
    OKL_AM_RV_WRITEDOWN_PVT
    OKL_AM_SEND_FULFILLMENT_PVT
    OKL_LA_STREAM_PVT
    OKL_SPLIT_CONTRACT_PVT
    OKL_SPLIT_ASSET_PVT
    OKL_AM_SV_WRITEDOWN_PVT
    OKL_AM_AMORTIZE_PVT
    OKL_TRANS_CONTRACTS_PVT
    OKL_AM_TERMNT_QUOTE_PVT
    OKL_CS_TRANSFER_ASSUMPTION_PVT
    OKL_TRANSACTION_PVT
    OKL_VARIABLE_INTEREST_PVT
    OKL_GENERATE_ACCRUALS_PUB_W
    OKL_VP_K_ARTICLE_PUB_W
    OKL_AM_CONSOLIDATED_QTE_PUB_W
    OKL_AM_CREATE_QUOTE_PUB_W
    OKL_TRX_QUOTES_PUB_W
    OKL_CONTRACT_REBOOK_PUB_W
    OKL_AM_REPURCHASE_ASSET_PUB_W
    OKL_AM_RESTRUCTURE_QUOTE_PUB_W
    OKL_AM_SEND_FULFILLMENT_PUB_W
    OKL_SPLIT_ASSET_PUB_W
    OKL_TRX_ASSETS_PUB_W
    OKL_TRX_CONTRACTS_PUB_W
    OKL_TRANS_CONTRACTS_PUB_W
    OKL_TXL_QUOTE_LINES_PUB_W
    OKL_TRANSACTION_PUB_W
    AST_UWQ_WRAPPER_PKG
    OKL_AM_CNTRCT_LN_TRMNT_PVT
    OKL_CS_PRINCIPAL_PAYDOWN_PVT
    OKL_SERVICE_INTEGRATION_PVT
    OKL_AM_TERMINATE_INV_AGMT_PVT
    OKL_AM_TERMNT_INTERFACE_PVT
    CSC_ACTION_ASSEMBLER_PVT_W
    OKL_AM_SYSTEM_PARAMS_PUB
    OKL_VENDOR_AGREEMENT_PUB
    OKL_AM_INTEGRATION_PVT
    OKL_PERIOD_SWEEP_PVT
    OKL_SEC_AGREEMENT_PVT
    OKL_VSS_WF
    OKL_SSC_WF
    OKL_AM_SYSTEM_PARAMS_PUB_W
    WSH_IB_TXN_MATCH_PKG
    WSH_RCV_CORR_RTV_TXN_PKG
    WSH_IB_UI_RECON_GRP
    OKL_AM_BAL_WRITEOFF_PVT
    OKL_VP_SYNC_CR_PVT
    OKL_CREDIT_LINE_WF
    OKL_PROP_TAX_ADJ_PVT
    OKL_PROCESS_PPD_PVT
    OKL_LA_SALES_TAX_PVT
    OKL_AM_TERMNT_VENDOR_PRG_PVT
    OKL_AM_VENDOR_RES_SHARE_PVT
    OKL_MULTIGAAP_ENGINE_PVT
    one thing important while generating .pll/.fmb thru adadmin it asks for FND_INSTALL_PROCESSES & AD_DEFERRED_JOBS to be dropped, if we select to drop it will drop this tables and patch process will not continue if these tables were dropped and created for .pll/.fmb generation
    How to avoid this  & to apply patch cleanly
    Thanks,
    Alig
    Edited by: user12257829 on Aug 19, 2010 3:56 AM
    Edited by: user12257829 on Aug 19, 2010 3:59 AM

  • How to include look and feel features in the Hyperion Financial Reports

    Hi,
    Can anybody suggest me how I can enhance the look and feel features of Hyperion Financial Reports, any references
    2) Will traffic lighting functionality is present in Hyperion Reports (FR), if not present how can achieve this functionality
    in FR ?
    3) We have user look and feel features like pinboard in the web analyis reports, but are there any certailn features
    in Hyperion Reports ??

    You can use Conditional Formatting to produce stoplights in Report Studio.
    If you know of specific things that you want to see, try reading the manual. I cannot give you details of every type of formatting you may want to see from such a vague post.

Maybe you are looking for

  • Unable to create webI report??

    HI all I am using BO XI3.1 SP3, when I logged into infoview and click on the new webintelligence document, I see universes available and select the universe then it is showing as "PLUGIN's NOT INSTALLED" instead of showing the query panel of the repo

  • Free Goods - (ISA 5.0)

    I am using the ECC/R3 "edition" of E-Commerce (ISA 5.0)...NOT the CRM flavor. I am trying to see if anyone has successfully configured the 'free goods' functionality. Although, all of the documentation I have seen confirms that ISA 5.0 supports it an

  • MCX From OD has no impact on users coming in from Novell Server

    Well I'm in the process of trying to build my first real image now with 10.5. I've had a Alpha image which was nothing more than an upgrade of my 10.4 image. I have it running on 2 machines in the general populas and thats been going ok. Most of the

  • Adobe Extension Manager CS5.5 won't launch

    Hi, As the title states the program will not launch, I have not used it since upgrading to OSX Yosemite, however I did have to reinstall CS5.5 suite after it ceased working after the update. I also installed extension manager separately today to see

  • Anyone else experiencing the menu bar, occasionally absent on startup with 15" MacBook Pro Retina early 2013

    Has Anyone experienced the menu bar on a MacBook Pro 15" Retina ocasionally not appearing on startup?