Looking for BOM and Routing objects created with a BAPI

(I ran this one up the flagpole in the data forum and didn't get any responses.  Maybe someone here has see this phenomon?)
I'm invoking BAPI_MATERIAL_BOM_GROUP_CREATE from an external Java program. I believe my code matches the example I find here and in the SAP documentation (transaction BAPI). When it finishes, I get a successful return (type=I, number=000), and a message of "BOMGroup 00000070/TAM1/1 has been created. External reference:" But I can't find anything back on the SAPGUI - the material number still says it has no BOM (on CS02); I don't see any new BOM Groups (on CS06). By the way, the "00000070" number seems to be assigned by SAP: I t increments each time I run my test, so I must be doing something; the TAM1 in that message is the plant, and the "1" is the BOM Usage I assign in my BAPI (both in the BOMGroup structure and the MATERIALRELATIONS structure). I do a commit transaction at the end too, although the BAPI to create the material created it without me doing a commit, so I don't think that was necessary.
(Update since I posted this on the other forum:  I tried to create a routing and have the same result - 000 message number, and a message including an SAP-assigned number, making me think I've created an object, but I don't see it anywhere.  Any idea which tables I can look at to find them, and maybe see what's missing (e.g., with SE12 or some such)?)
Any thoughts on what I AM creating? Or some little thing I'm missing here?
Thanks for any insight!
Thomas.

check the post:
BOM and Routing with Dependencies
-Murugesh AS

Similar Messages

  • Changes documents for BOM and Routing

    How Can I find the change documents for a BOM and routing?

    Change Documents For BOM
    CS80 - Material BOM
    CV80 - Document Structure
    IB80 - Equipment BOM
    IB81 - Functional Location BOM
    CS81 - Standard BOM
    CS82 - Order BOM
    CS83 - WBS BOM
    Change Documents for Routings
    CA60 - Task List Changes
    CA61 - Routing
    CA62 - Reference Operation Set
    CA63 - Rate Routing
    CA64 - Reference Rate Routing
    Hope the above may help you.

  • Updating BOM and Routing

    Hi
    I have requirement  to update BOM and Routing . Please suggest me BAPI or functional module  to Update BOM and Routing .
    Thanks
    Uday

    Dear Shankar,
    For BOM use the T Codes CS20 or else CEWB for making mass changes or else check with this Functional Module,
    CS_CL_P_BOM_MASS_CHANGE 
    For routing use the T Code CEWB or else check with these Functional Modules,
    CP_CL_S_OPR_MASS_CHANGE 
    CP_CL_S_TSK_MASS_CHANGE 
    EWB_MASS_CALL_OPR       
    EWB_MASS_SAVE_OPR       
    EWB_MASS_SELECT_OPR     
    Regards
    Mangalraj.S

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • How BOM and routing is selected for Planned order and Production order?

    Hi,
    Can any1 plz tell me how BOM and routing is selected for a planned order and production order. ?

    Hello Mathisuthan,
    BOM and Routing selection for the planned order and production order through production version, If u have more than one BOM and more than one Routing then u can maintain this information as Production Version in the system.
    Production version you maintained
    MM01/MM02 -- MRP4--- Production version
    Or you can create Production Versions in Mass also with Transaction Code "C223"
    In the case no production version maintained/created  for the material, then system by default  will pick the first BOM and routing.
    I hope this information helpful to you.
    Regards
    Umesh Mali

  • Production order creating without BOM and Routing

    create the production orders without bom and routing
    they confirm the order
    they want to stop confirmation if production without bom and routing
    is it possible to set error or warning message
    my first doubt is how can we confirm the order without bom and routing
    i think it can be solved by production order type
    please reply

    Hi,
    You can make it mandatory by following ways :
    Go to OPPQ -> Select your plant-> Go to BOM / Routing Selection in that you need to maintain BOM Sel ID & Routing Sel ID which is having selection ID with usage 1 Production which will make it mandatory to create BOM & ROuting with usage 1 & need to be selected while creation & saving Production ORder.
    Also, you can maintain another config. for making routing mandatory at Order type level :
    Go to OPL8 -> Select Plant & Order type-> Routing Selection
    Maintain 5     Routing/ref. op. set mandatory (manual selection)
    or          6     Routing mandatory (automatic selection)
    This setting will ensure without routing your order will not be saved.
    Hope this helps.
    Regards,
    Tejas

  • Standard cost with material with alternate BOM and Routing

    I have a set up where the same material can be manufactured in 2 different production lines and each production line has two different BOMs and Routings. If I want to have a blended standard cost for the material what are our options?
    We do not want to do split valuation.
    thanks a lot

    Hi
    You can different PCC (Product cost collector) for both lines of the same product (Product cost by period).
    You can define a production process within a product cost collector for each line of production with a combination of BOM and Routing. TCode KKF6n. It would generate a order number for each production process.
    You can use each order within the PCC for each production line to capture the costs for seperate lines.
    Regards,
    Suraj

  • Looking for a wireless router / accespoint with radio time restriction

    I am looking for a wireless router / accespoint with a radio time restriction but didn't find any information about this option. Are there any routers with the option to turn off the wireless signal between a specific time?
    The router will be used at a small office .
    I hope you can tell me more.
    Cheers
    Michel

    Well there is No router which linksys/cisco manufacture that can stop the wireless signals to be broadcast for a specific time..
    However what you can do is you can get into the setup interface of the router and disable the SSID broadcast and that will stop the router to broadcast the wireless signals...and whenever you need to enable it you can just go back into the setup page of the router and enable the broadcast again.

  • Production order for alternate BOM and Routing

    Hi All,
             In my business(Discrete) scenario I have alternate bom and routing has group counters. some times i should use first BOM and First group counter. Then next Bom and next group counter. But lotsize is same( prodcution version how to assign).
    When creating production order i should select which ever i need.
    Regards,
    S.Suresh.

    >          In my business(Discrete) scenario I have alternate bom and routing has group counters. some times i should use first BOM and First group counter. Then next Bom and next group counter. But lotsize is same( prodcution version how to assign).
    >
    >  When creating production order i should select which ever i need.
    >
    Hi,
    For your requirement you can define your Order Type Dependent parameters OPL8 as:
    Production Version : 1 Manual Selection of production Version.
    In this case every time when you creat your Production order System will ask for the Production version to be selected. You need to select the PV manually then only you can proceed further.
    This setting is applicable only when the Production Order is Created.
    It will not effect the Planned Oredr creation via. MRP Run..
    Hope this helps..
    Regards,
    Siva

  • Looking for a back up drive for photos and videos that works with time machine, prefer wireless. Time capsule has poor reviews and already have BT hub

    Looking for a back up drive for photos and videos that works with time machine, prefer wireless. Time capsule has poor reviews and already have BT hub that serves as a good router. 3gb or 4gb capacity preferred but 2 would suffice.

    Plug a NAS into the BT Hub that does TM. Look at Synology.
    You just use the wireless of the hub.
    But the cheapest solution is still the TC.

  • I am looking for a CRM system that integrates with mail chimp or constant contact, hoot suite and forms stack

    I am looking for a CRM system that integrates with mail chimp or constant contact, hoot suite and forms stack

    Hi,
    I could resolve the issue since there were lot of issues after system copy.
    1. During distribued to Cenrtal system - system copy.
    You need to combine both DB and CI export copies in one folder during which one thing can happen.
    SOURCE.PROPERTIES - this file will be there in DB export JAVA folder and also CI export JAVA folder where
    DB SOURCE.PROPERTIES file doesn't have an entry of "src.ci.host". This will stop the SAPINST with error and after modifying the file "SOURCE.PROPERTIES" Traget System Copy finishes without any issue.
    Then after this stage I encountered an issue with bind hosts entry in config tool which was due to virtual host name usage in my HACMP setup due to whcih JAVA gives a startup problem.
    I eliminated this issue also.
    After JAVA started I faced an issue with XI related navigations.
    ecchangeProfile url still had an entry of Production System. This may be a bug.
    After changing that entry, exchangeProfile was downloaded but it had all the source system host entries which were manually changed.
    Now I can access all the XI related navigations.
    I need to also perfrom SGEN and Profiles import.
    Do I need to change any additional settings after this so that my production and DR can work without any issue?
    Do you have any additional checks which I can perfrom to ensure my DR systems consistency before I start the log shipping from Production?
    Regards,
    Rajkumar

  • Selection of BOM and Routing in Cost estimate

    Hi
    I have an issue with the cost estimate run. We are using CK40n for cost estimate.
    The selection method in MRP 4 is defined as 3 (only by prod version) and the version indicator is maintained in the costing views also.
    When we run the cost estimate the system is chosing a different BOM and routing other than the ones defined in the prod version.
    Following are the details of the prod version defined.
    0010 Prod version
    Lot 0 to 99999
    BOM Alt 1 usage 1
    Routing Grp 1234 counter 1
    0020 Prod version has
    Lot 0 to 99999
    BOM Alt 2 usage 1
    Routing Grp 1234 counter 2
    0030 Prod version has
    Lot 0 to 99999
    BOM Alt 3 usage 1
    Routing Grp 1234 counter 3
    Ideally system should choose the first prod version.(alt 1 and usage 1 and Routing 1234 grp coutner1). This is not happening.
    System for some reason is choosing the BOM with Alt 1 and usage 1 defined in 0010 prod version but the routing from a different prod version 0020 grp 1234 counter 2.
    I have checked with all the relevant settings but i am not able to understand why this is happening.
    This is not the same when i create a prod order. System chooses the first prod version when i create the order.
    I have checked the priorities defined in the customising, and also the details in the costing varaint using CKC1.
    What settings do i need to check to ensure that it works fine? Can you please let me know.

    Vithal,
    While doing the costing run, SAP checks if you have maintained the "Production version to be costed" [MARC-FVIDK] field in Costing View. It will use this Prodn Version for cost estimate.
    If you have not maintained the prodn version field, then it will use the values maintained in the "Quantity structure data" section on costing view. i.e. it will use the BOM alternative..and recipe information from here.
    If you have not maintained above values then system picks up the first BOM alternative (MAST table) and first recipe information (MAPL table) it finds for the material-plant combination.
    Might be this is what is causing the problem for you. Also according to my knowledge SAP cannot decide the Lot Size for Prodn Version while doing the costing run. You need to tell the system what data to be used for costing.
    Try and revert back.
    Swapnil

  • Bom And Routing Import interface errors Help needed

    Hi All,
    I am using bom and Routing Interface to load the Bom and Routing Header.papulating the BOM_INVENTORY_COMPS_INTERFACE,BOM_OP_SEQUENCES_INTERFACE,and BOM_OP_RESOURCES_INTERFACE tables BOM header and Components are created sucessfully but routing is failed with process flag 3.the errorr i am getting is You cannot update or delete operation sequences when there is no routing for the assembly item &ASSEBLY_ITEM_NAME. (ASSEMBLY_ITEM_NAME=TESTITEMBOM) (ORGANIZATION_CODE) and
    This record received an error status since a severe error occurred in the operation sequence 10 while performing user unique index conversions."
    please let me know any api is avilable to load ROUTING Components
    Thanks in advance

    Hi,
    Try following
    step 1. Insert routing header (bom_op_routings_interface) : Run Interface
    step 2. Insert routing lines (bom_op_sequences_interface) with correct reference to routing_sequence_id: Run Interface
    step 3. Insert all resource lines (bom_op_resources_interface) with correct reference to operation_sequence_id, routing_sequence_id , Run Interface.
    Thanks,
    Hrishi

  • CK11N , bom and routing not copied

    Dear all,
    At time of costing run through CK11N , bom and routing not copied I have checked all validity/ status /uses / lot size of bom and routing also . but when i will run costing for next month system has copied bom and routing .
    plz guide me

    Dear Surendra Patil,
    Check the costing variant that you use for executing CK11N, is it PPC1?
    If this is correct means check in T code OKKN and choose PPC1 and check for the quantity structure
    control and check the BOM apllication and the routing selection ID.
    This should match with your BOM that you have created and also the routing that you have created.
    1. Check the BOM status in CS03---> header.
    2.Check the status & usage of routing in CA03,generally it will be
    Usage                1    Production
    Status               4    Released (general)
    3. If you are using Production version check whether have you assigned proper routing group & counter
    and along with the BOM.Also check whether is the production version locked?
    Check & Revert back.
    Regards
    Mangalraj.S

  • To load a object created with 3D Studio Max

    Hello,
    I am a new Java user. I have to realize an interactive presentation in Java of a three-dimensional object created with 3D Studio Max. I would like to know how I can load this object in my java project.
    I should, in fact, allow the customer to modify the color of the object and to rotate it.
    Many thanks
    Massimo

    Well, my first reccomendation is to look into Java 3D. I don't know anything about it myself, but it's the obvious place to look.

Maybe you are looking for

  • Animated .gif files in mail. Problem persists. (PANTHER)

    3-17-07 Happy St. Valentine's Day to all you Irish folks! I'm posting this even though there are threads in the forum that I have used and contributed to in the past on this topic. The problem PERSISTS! The problem/situation is that in mail from fami

  • Access a web service from pl/sql

    I am trying to access a web service from pl/sql. I have downloaded the code from http://www.oracle.com/technology/tech/webservices/htdocs/samples/dbwebservice/DBWebServices_PLSQL.html But when I try to execute the sql, I am getting the following erro

  • ODI 11g Installation Error(JDK).

    Hi I have a problem with installation ODI 11g under Widows 7 (64 bit). I have installed jdk(jdk1.7.0) 32 bit version. When I start setup.exe (run as Administrator), Oracle Universal Installer starts, but needs to specify path to JDK "Preparing to lau

  • Error when determining the PSA name

    I am on BW3.5, trying to load a delta that has been loading for 2+ years with no problems.  The load today is getting the error message:  "RSAODS 132 Error when determining the PSA name" I've looked in OSS Notes and there is nothing with this error m

  • How to download Oracle 10gR2 to win 2008 server R2

    Hi. I'm trying to download Oracle RDBMS 10.2.0.5 for Windows Server 2008 R2. But i don't see it on OTN or edelivery....i can't find any link Have i to request a SR on metalink?