Hi all,
I want to migrate open production orders from legacy system to the other SAP system. Please let me know how should I do it?
I tried using the idoc method with  Message type LOIPRO and the Basic Type LOIPRO01 but the it gives a error that No process code for message type LOIPRO. I guess this is a Outbound Idoc.
Next I tried searching for a BAPI for prodcution orders. I found the BAPI,   BAPI_PRODORD_CREATE. But it does not contain all the fields I need. Also this BAPI cannot be used in LSMW as it ALE message type does not exist for it.
So please let me know how can I use the idoc method to create the production order as I have all the fields required in the idoc basic type. Also please share if any other method is there to upload the data.
Regards,
Mozila

We had to use BAPIs to upload the production orders.
It was not possible with LSMW.

Similar Messages

  • BAPI for Open production orders

    Hi All,
    Any BAPI for open production orders?.... Using BAPI i want to upload open production orders informatiomations.... Please help
    Thanks & Regards
    Santhosh

    Hi,
       Please check the following BAPI,
    Goto BAPI tcode, select hierarchical tab
      Production orders,ProductionOrder ,ProdOrdConfirmation , RCVPRORDCF and check the BAPIs

  • API for open purchase order creation

    Hi,
    Is thier any API for creation of open purchase order?
    Thanks
    triveni

    see if this helps
    Re: APIs in PO
    Mahendra

  • Open Production Order with Mark for deletion

    Hi
    Friends again stuck in open production order
    i want to calculate  production order quantity for open production order,
    only those production order which dont have mark for deletion.
    I find a field in afpo XLOEK ..but it wont get reflects when done changes in CO02
    Then i used the table JEST and i want to delete those aufnr which has deletion flag i wrote the folowing code pls do correct me where iam wrong .
    IN this code  deletes aufnr which are marked as deletion  ?
    SELECT afko~aufnr
           afko~gamng
           afko~plnbez
           afpo~dwerk
           afpo~psmng
           afpo~matnr
           INTO CORRESPONDING FIELDS OF TABLE i_afko
           FROM afko INNER JOIN
           afpo ON afpoaufnr = afkoaufnr
           WHERE afpo~dwerk = s_werks
          AND   afpo~matnr IN s_matnr
          AND afpo~elikz = space.
    LOOP AT i_afko.
      CONCATENATE 'OR' i_afko-aufnr INTO i_afko-aufnr.
      MODIFY i_afko.
    ENDLOOP.
    IF NOT  i_afko[] IS  INITIAL.
      SELECT jest~objnr
             jest~stat
             jest~inact
              INTO CORRESPONDING FIELDS OF TABLE i_jest
              FROM jest
             FOR ALL ENTRIES IN i_afko
             WHERE objnr = i_afko-aufnr.
    ENDIF.
    LOOP AT i_jest INTO wa_ijest.
      IF wa_ijest-stat = 'I0076' and ( wa_ijest-inact = SPACE  ).
        DELETE i_afko WHERE aufnr = wa_ijest-objnr.
      ENDIF.
    ENDLOOP.
    i_afko1[]  =  i_afko[].
    SORT i_afko BY matnr dwerk.
    DELETE ADJACENT DUPLICATES FROM i_afko COMPARING matnr dwerk.
    loop ....
    calculate :quantity
    endloop.
    Regards and answers will be rewarded points

    thnks
    solved the problem
    regards

  • FM for creation of production order creation

    Hi All,
    Can anyone tell me the BAPI for the production order creation.
    BAPI for creation of production order through CO01 transaction code.
    Thanks in advance
    Ramesh.

    Hi,
    Please check this FM CO_ZF_PRODUCTIONORDER_CREATE.
    Regards,
    Ferry Lianto

  • Open Production Order

    Hi have to create a report that has open sales order , open po , open pur req , open planned order and open Production order.
    I need the logic for OPEN PRODUCTION ORDERS.
    The status of the production orders are maintained in JEST Table .
      I need logic to elimate the completed production orders during my selcet . Since JEST Table has multiple entries and for some orders that are released the 'DELV'  status wil not be maintained at all at that time.
    I wil really appreciate your help , if you can tell me how to emliminate the completed production orders during my select query to get the open prod orders.
    Is there any fun moduel or bapi that wil give the Open prod orders ?? or any std report that gives open PO??
    Thanks

    for this you can use the Function STATUS_TEXT_EDIT , for this pass Objnr (get the objnr from AUFK table using the production order) it will give you the status in the LINE exporting parameters.
    Import parameters               Value
    CLIENT                          100
    FLG_USER_STAT
    OBJNR                           QM000200000010
    ONLY_ACTIVE                     X
    SPRAS                           EN
    BYPASS_BUFFER
    Export parameters               Value
    ANW_STAT_EXISTING
    E_STSMA
    LINE                            OSNO NOTE   "this is the status text
    USER_LINE
    STONR                           00
    if line CS 'DELV'
    "ignore the Order
    endif.

  • Open the reservation for the Production order

    Hi,
    I have post the GI for Production order MB1A with movement type 261 from 100 peaces components. I would like to cancel a partial quantity of components from this posting (about 30 peaces). After cancel it the reservation for the production order has to be open for 30 peaces of components.
    I've canceled it through MB1A and mtype 262 but the reservations weren't open and in the PO (component overview there is always the sign"the Final Issue for This Reservation").
    Which T.code and mtype could I use.
    Thanks
    Dede

    Hi,
    Have you cancelled the movement (of 30 pieces) by selecting the "with reference" option from the menu?
    If not, then reverse the current cancellation document. Then again cancel the 261 movemtn by selecting the with refernce button from the menu. It will sove the problem.
    Check & revert.
    Regards,
    Rohit.

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • IDoc Configuration for Production Order Creation and Change

    Hi All,
    Please Help me out for IDoc Configuration for Production Order Creation and Change
    I have found the IDoc for Production Order
    Messgae Type : LOIPRO and IDoc type : LOIPRO01
    Actually my requirment is to send the (LOIPRO01 )IDoc from SAP R/3 to XI system ,when ever the Production Order Created and Changed,
    I have done following Configurations:
    1. RFC Destination created for XI system
    2. PORT was created for XI
    3. Partner profile created WE20 and LOIPRO01 IDoc is added in OutBound Perameter.
    I need to know how to do the followning.
    1. How do i configure the outbound Production order idocs when Production Order is created or changed.
    2. in NACE (Output control) which is the Application for Production Order.
    3. How can I set IDoc as output Type for Production Order Creation.
    Thanks in advance
    Dhanabal T

    Hi Michal,
    I know that it is the old thread but still want to get clarified from you out of curiosity.
    Unlike other IDOC, i actiavated change pointers for LOIPRO
    1.message and idoc type is linked
    2.function module , message type , idoc type is linked
    function module used is CLOI_MASTERIDOC_CREATE_LOIPRO
    3.BD64, distribution model is created and distributed
    4. port and partner profile is in place.
    5. IDOC is not getting generated after creating the process order.
    do we need to activate the change documents for the message type in BD52,
    if yes can you please provide the object types for the same.
    or i am missing something else. please guide me in this regards.
    Thanks in advance for your time.
    S.Janagar

  • Block Production Order Creation for Particular Order Type

    Hi Experts,
    I want to disable the production order creation for a particular order type XX01 however there are some existing orders for this order type which should be processed further.
    In other words my objective is to -
    1. Block new Production order XX01 creation -
    2. Processing of order type XX01 should be possible.
    Is there standard setting available to achieve this or user exist is the only option..
    Regards,

    Hi
    You can use the user exit PPCO0006 and its function mdoule EXIT_SAPLCOZF_003 to archive that. That function module is called when the user click enter after inputting the material/plant/order type in CO01 then you just need to check the imported value CAUFVD_IMP-AUART which contains the inputted order type then rasise an error message to tell user that the order type cannot be used due to certain reason. The source code need to be written there is very simple.
    Regards.
    Leon.

  • BAPI for Production order creation against wbs element

    dear all,
    I am using BAPI (BAPI_PRODORD_CREATE) for Production order creation against wbs element.I am putting following input paramters in this
    material no,
    order type
    plant
    qty
    basic start dt & end dt
    wbs
    But during GRN it is not taking the account assignment as project stock i.e. its picking movement type 101 but it should be 101Q.
    For this what changes are required.
    regards
    ravi arora

    Hi,
    2 options i can think of:
    1. Create a BDC program by recording co10
    2. Create a planned order with order type PR using BAPI_PLANNEDORDER_CREATE, specify the WBS element & other details. Now use BAPI_PRODORD_CREATE_FROM_PLORD to create a production order with reference to the planned order created earlier.
    I believe option 2 should meet your need. Check & revert.
    Regards,
    Vivek

  • Exit for production order creation that update BOM explosion date

    Hi Guros
    does any one know a user exit for production order creation that update BOM explosion date = AUFLD.
    or a UE that run before the BOM explosion.
    thanks.

    Dear,
    I dont think user exist will work for you,
    You need to find BAdi for it, cl_exithandler=>get_class_name_by_interface .
    Or try with SE84,
    Enter the package name and check the " Enhancements"
    Regards,
    R.Brahmankar

  • BAPI for Production Order creation ?

    Hi Experts,
    I am new to PP module and as per my requirement I have to:
    1. Create Production order in ECC 6.0
        After searching BAPI explorer, SDN and other sites I could see that there is no BAPI for Create Production order.
        In one of the link I could find FM CLOI_CHANGES_UPL_31 used to create Production order in SAP.
    Is there any BAPI to create ??
    Can anyone let mw know right FM or BAPI to create Production order with an example.
    2. And I have to:
    Delete Production order
    which BAPI is used for deletion of Prd Ord
    BAPI_PRODORD_SET_DEL_INDICATOR or BAPI_PRODORD_SET_DELETION_FLAG
    For Confirm Production order - in ECC 6.0 Let mw know the BAPI for this ..
    Really helpful if you answer my queries...
    Thanks
    Uday

    Hi udaya,
    use the BAPI 'BAPI_PRODORD_CREATE'
    The following BAPIs are available confirmation of production orders:
        Entry
            Time ticket
            ProdOrdConfirmation.CreateTimeTicketMultiple
            BAPI_PRODORDCONF_CREATE_TT
            Time event
            ProdOrdConfirmation.CreateAtHeaderLevelMultiple
            BAPI_PRODORDCONF_CREATE_HDR
            Order confirmation
            ProdOrdConfirmation.CreateAtHeaderLevelMultiple
            BAPI_PRODORDCONF_CREATE_HDR
            Activity confirmation
            ProdOrdConfirmation.CreateActConfMultiple
            BAPI_PRODORDCONF_CREATE_ACT
        Defaults
            Time ticket
            ProdOrdConfirmation.GetTimeTicketProposal
            BAPI_PRODORDCONF_GET_TT_PROP
            Time event
            ProdOrdConfirmation.GetTimeEventProposal
            BAPI_PRODORDCONF_GET_TE_PROP
            Order confirmation
            ProdOrdConfirmation.GetAtHeaderLevelProposal
            BAPI_PRODORDCONF_GET_HDR_PROP
        Cancelling confirmations
        ProdOrdConfirmation.Cancel
        BAPI_PRODORDCONF_CANCEL
        List of confirmations
        ProdOrdConfirmation.GetList
        BAPI_PRODORDCONF_GETLIST
        Detail data for confirmations
        ProdOrdConfirmation.GetDetail
        BAPI_PRODORDCONF_GETDETAIL
        Existence check
        ProdOrdConfirmation.ExistenceCheck
        BAPI_PRODORDCONF_EXIST_CHK
    Regards,
    Ravi

  • Data Migration for Open Purchase Order

    Hi, All,
    Is there anyone know how to Count the volume for Open Purchase Order. What's the normal strategy for the Data Migration and Cut-over stage?
    My client want to know how many Open Purchase Order in the legacy system and then determine manual or automatic data migration. If manual, how to do? If automatic, how to do? Because all materials and vendors, plants are different number. How to track? How to find out to match between new and old?
    Thank you very much

    JC,
    Sounds a bit early to be making decisions about the realization phase.  It doesn't sound like you have finished the Blueprinting phase yet, much less the testing phase.
    Anyhow, in my experience I typically use LSMW (Legacy system migration workbench) to load MM master data (material masters), Inventory (WIP, RM, FG, etc) Purchasing Master data (Vendors, Purchase Info Records, Source Lists, Quota Arrangements), and Purchasing transactional documents (POs, PurReqs, Scheduling Agreements, etc).  Depending on the complexity and volume of data, it  may be necessary to write custom programs to load the data.  You will find this out during your requirements gathering.
    It is uncommon but possible to load all of these data manually.  I have never run across a client that wants to pay a consultant's hourly rate to sit at a terminal to peck away loading master data, so if the client intends to have his own users enter the data manually, the project manager should make provision that there will be qualified TRAINED client employees available for this data entry.  I did help with a portion of a conversion once manually; of Sales Credits, but there were only about 30 SD docs to load.   I did this the evening before go-live day, while I was waiting for some of my LSMW projects to complete in the background.
    A good opportunity to 'practice' your data loads is right after you have completed your development and customization, and you have gotten the approval from the client to proceed from the pilot build to the full test environment.  Once you have moved your workbench and customization into the client's test environment, but before integration testing, you can mass load all, or a substantial portion of your conversion data into the qual system.  You can treat it like a dry run for go-live, and fine tune your processes, as well as your LSMW projects.
    Yes, it is good practice to generate comparisons between legacy and SAP even if the client doesn't ask for it. For Purchase orders on the SAP side, you could use any of the standard SAP Purchasing reports, such as ME2W, ME2M, ME2C, ME2L, ME2N.  If these reports do not meet the requirements of the client, you could write a query to display the loaded data, or have an ABAPer write a custom report.
    You didn't ask, but you should also do comparisons of ALL loaded data - including master data.
    It sounds like you are implying that the client wants YOU to extract the legacy data.  For an SAP consultant, this is not very realistic (unless the legacy system is another SAP system).  Most of us do not understand the workings of the myriad legacy systems.  The client is usually expected to produce one or more legacy system technical experts for you to liase with.  You normally negotiate with the technical expert about every facet of of the data migration.  In addition, you will liase with business users, who will help you and the implementation team to logically validate that the final solution (turnkey SAP production system, fully loaded with data) will meet the client's business needs.
    Finally, you mentioned how do you track the mapping of master data between legacy and SAP.  There are many ways to do this.  I normally try to get the legacy person do the conversion on his end, eg, when he gives you the load file, you would like to have already translated the master data and inserted the SAP relevant values into the file.  If this is not possible, I usually use MS Access databases to maintain a master map, and I perform the mapping on a PC.  If your data package is small, you can probably get by using MS Excel or similar.
    Good Luck,
    DB49

  • Open production order issue in recording

    Hi,
    I am doing an LSMW recording of the transaction CO02 for the release of open production orders.If i try to release an order which has a missing part list a pop up appears which has the following three options
    1. Release order
    2.Mising part list
    3.Cancel.
    I need my LSMW to handle the release of production orders even when there is a missing part and hence i need to record the pop up screen.
    Can anyone let me know how it can be done ??
    Regards
    M

    Hi,
    Check whether yours lot size in routing is greater then 1.
    If yes then make it zero then i think it should work.
    Regards,
    Vishal

Maybe you are looking for

  • Purchase order (STO) schedule line change through BAPI_PO CHANGE

    Hi Gurus, we have requirement in user exit of MIGO ; to change the purchase order(STO) Scheduline change through BAPI_PO_Change. Current process. STO -> outbound delivery through VL10B -> PGI -> MIGO to the receipt It is working fine MIGO if we give

  • Cannot delete unwanted layer. Unwanted layer previews even though it's off...

    My question relates to InDesign 5.0.3 and Acrobat Pro 9.0.0 When Exporting a PDF I am selecting Export Layers and choosing "Visible and Printable Layers" to export. I'm not using distiller as I want to keep some layers intact so I can make one layer

  • How can i fix this in PSD CS3 flash Web Gallery

    hi. i have a gallery on my website made in psd cs3 and if you look at the page ( http://signsofkauai.com/WEBSITE/PictureGallery/gallery.html ) you will see the .sfw or the image centering the whole page vertically. therefore creating a large space be

  • Duplicate file name suddenly appearing in audio stems

    I have a FCP project that I've been working in that includes sequences with Dialogue, SFX and Music audio stems cut in (as .wav files). The Dialogue stem is mono and is not affected by this issue. The SFX and Music stems were imported as SFX L, SFX R

  • Can not receive mail from outside domains

    We are setting up our OCS 10g mail server, and are having trouble setting up our policies. -unsure how to allow mail to come in from outside domains -are able to send mail to outside domains if that one is set. is there a way to allow to send to any