LSMW for Production Version

Good day gurus,
Can someone tell me whether Production Versions should be done in LSMW through Batch Recording or Direct Input method? Please help
Thanks in advance

Production Versions can be done in lsmw both by batch recording as well as Direct Methood after having exported from QA client.One thing one needs tyo ensure that in Direct Methood the data needs to be converted in phases that is in intervals not all records at a time.It doesnot matter whether it is functional or technical rather technical pepole are more active in running them.
                  SHDB is for recording so in LSMW any way you create  recording but need not in production versions as you need to export it from QA client.
Regards
Somnath

Similar Messages

  • BAPI or FM or Standard BDC program for Production version creation (C223)

    Hi All,
    Is there BAPI or FM or Standard BDC program for Production version creation?  Please help me.
    Thanks & Regards
    Santhosh

    Hi,
    Try this FM "CO_OCM_CREATE_PROD_VERSION"
    Regards,
    Smart

  • Windows 2003 Server Service Pack 2 for product version 4.0.1.0.03

    Hi Experts,
    A customer wants to know if there Are any known issues with applying Windows 2003 Server Service Pack 2 for product version 4.0.1.0.03 .
    i gave him the answer that SP2 is not tested for that version hence it is not supprted. So he now asks me if Windows 2003 Server Service Pack 1 is supported for 4.0.1.0.03 , Any input would be of great help.

    Hi,
    Be careful when you say SP2 is not supported.
    Hyperion s policy in terms of third party products was the following (I would imagine this should remain the same with Oracle, however you may want to check with your local support team):
    Hyperion products are tested against the versions specified in the product matrices. They do not actively look for issues in maintenance releases or service pack upgrades from 3rd party vendors for obvious reasons (there would be far too many). They will investigate any maintenance release or service pack upgrades as long as the vendor confirms backward compatibility.
    Therefore SP2 would be supported with 4.0.1 and Hyperion/Oracle should investigate any issues you may encounter.
    However keep in mind that if a specific issue you have encountered in 4.0.1 is caused by SP2 but fixed in a later version then Oracle's recommendation will be to upgrade.
    So its a catch 22 situation really.
    Personally I would take this opportunity to recommend an upgrade to 9.3.1 ;-)
    Hope this helps.
    Seb

  • BAPI/Function module for production version tab data of  MRP4 view(MM01).

    Hi,
    I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    Thanks.
    Edited by: sanu debu on May 6, 2009 3:24 PM

    >
    sanu debu wrote:
    > Hi,
    > I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    >
    > Thanks.
    >
    > Edited by: sanu debu on May 6, 2009 3:24 PM
    BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA

  • MRP for production version.

    Hello all.
    Is it possible what MRP does the selection of the production version for the semi-finishings depending on the version of production of the finished product?
    <b>Example</b>:
    If I plan the <b>Finished Product 1</b> in the <b>version of production "0001",</b> does the mrp create the order drifted for the <b>Semi-finishing 1</b> in the version <b>of production "0001"</b>
    however if I plan the <b>Finished Product 1</b> in the <b>version of production "0002"</b>, does the mrp create the order drifted for the <b>Semi-finishing 1</b> in the <b>version of production "0002"</b>
    That is possible?
    Regards
    Santos

    Hi,
    You can select the production manually when you are creating a production order.
    You can maintain this setting in the order type dependent parameters (OPL8).
    If you want the selection to be automatic, if both the prod versions are of different lot-sizez (no-overlapping) then this can be done.
    If you want to select 0001 for both finished & semi-finished, In the production version if the lot-size for prod version 0001 is 1 to 100 & if the order quantity is 50 then 0001 prod version will be selected.
    For 0002 if the lot-size is different 101 to 200 then for order qty of 150 prod version 0002 is selected.
    Regards,
    Senthilkumar

  • MFPR - Processing Inspection Lots for Production versions issue

    Hello,
    User are not able to seeing line item to create inspection lot for a specific part number.
    I checked inspection set up in  material master, rate routing, and compared with similar part numbers.It all looks good to me.
    Any help would be greatly appreciated!!
    Regards,
    Owais

    In REM Inspection lot for Inprocess is generated for header material for which you actually define "production version".
    Line items can not be seen in MFPR.

  • TABLE FOR PRODUCTION VERSION DETAILS

    Dear All,
    pls. let me know the table from which I can get the details of Production Version
    With Regards
    Aniruddha

    Hi,
    Table name:<b>MKAL</b>
    Field names:
    VERID  Production version
    ADATU Date from which the production version is valid
    BDATU  Date to which the production version is valid
    BSTMA Upper limit of the lot size range
    BSTMI Lower limit of the lot size range
    STLAL Bill of material alternative
    PLNTY Key distinguishing task lists by their functionality (for example, routing, reference operation set, rate routing, standard network, rough-cut planning profile, etc.)
    Hope this helps, pl. reward & close the thread if you have got the appropriate solution.
    Regards,
    Senthilkumar

  • Not valid Explosion Date for Production Version

    Hi Experts,
    I am creating a production order for a new item and I am getting the following error.
    version: xx
    is not valid on explosion date
    no other versions are available
    should the document link be transfered anyway?
    What is the right approach to correct this?
    if I choose yes, the production order does great created,
    but is it going to be a valid order?
    let me know
    Cheers
    JD Loera

    Hi,
    I believe it should be a warning message, else system would not allow you to proceed, so do a re-check on that.
    Coming to resolving the issue, this would occur when the valid-from date of the production version is later than the date on which bom & routing is exploded in the order. So before proceeding to make any changes, analyze the valid from dates of the BOM & Routing, now create the production version valid from that date.
    This would at the very minimum ensure that the production version will be valid. If you still get a warning message, it implies that validty dates of the BOM & Routing needs a re-visit as well.
    So go to MM02, MRP-4 / work scheduling view & modify the valid from dates of the production version. Once the same is done create a new order & system should read the production version.
    Regards,
    Vivek

  • BAPI for production version

    Hi,
    I want BAPI or FM to upload data related to production version for MRP4 view.

    Hi Abhi,
    check this FM..
    BAPI_MATERIAL_SAVEDATA
    Regards,
    Prabhudas

  • Transfer of Production Version

    Hi Gurus,
    i am trying to transfer the Production Versions of a Material to an other System via IDoc. I am using BD10 for transfering.. The relevant Segment E1MKALM in MATMAS05 is filled with all data from the source. But in the Target Systen tge Production Version is not added (Material exists already in Target system, only addition is needed).
    what am i am doing wrong? The Segment E1MKALM is directly for Production Version, but why this is not used in the target system? There are no errors in BD87 when i process the IDoc.
    any Ideas?
    Best Regards
    Udo

    no answered but i dont want this question to hang in ....

  • Variance due to Two Production Versions

    Dear Experts,
    I am working for a cement Industry. We are having one FG Material. The material can be produced from two sources (Kinl1 & Kiln2).
    Every month we produce the material from both the sources. 2 production orders will be created every month one for Kiln1 & another for Kiln2.
    Standard cost estimate has been run for production version 1 (ie. Kiln1).
    When activites are booked in production order 2 (i.e Kiln2) a huge variance is comming after settlement. Reason is
    at the time of booking the activites its taking the activity price of Kiln1 and at the time of settlement its settling against kiln2 activity price due to which a huge variance is happening.
    Kindly guide on how to resolve the situation since creating differenet material for kiln1&kiln2 is not feasible.
    Thanks

    Hi,
    I think there is no problem in system behaviour. If you have two alternative production methods for a single product and one is cheaper than the other, you will eventually have to deal with and explain the variance. If some of the time you produce with high activity prices, I suppose you have your own justifications regarding this choice such as capacity constraints and delivery schedules. Suppose if you run cost calculation with a third production version (maybe with a third dummy source) which is in the middle of the two versions form cost perspective, you may lower the variance of second alternative with respect to standart cost, however difference of the actual costs of the two alternatives will not change. To summarize, if your data is correct (activity prices etc.) either try to produce with the cheaper version or document your justifications well.
    Regards.

  • MRP Run with production version.

    Hi Experts;
    I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
    But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
    Is it possible to cover safety stock with alternative BOM.
    Please help..
    Thanks,
    Malka

    Hello Malka,
    For your issue,,
    As per other expert suggested you can block the first production version but if in future you want use first production then,,
    In these case you maintain production version in many way
    Ex.
    1.  Lot size .(if production version using for specific lot)
        Maintain the Lot for both production version, so Production version 1 lot completed system take       second production version.
    2. Production version validity date (If production version using for specific period )
        In this case after completion of 1. Production version period system take second one
    3. Manually selection of production version (If multiple production version and all have same condition)
        Whenever you convert the planned order to production order, one pop up come and ask for                manually selection for Production version, for this you go to OPL8 and select the Manually                production version
    I hope this information cover your all requirement, No need to go with quota arrangement
    Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
    Regards
    Umesh Mali

  • Production version issue.

    Dear Guru's,
         I have created two version in material master.
    also I have changed in "opl8"{ production version = Manual selection of production version}
    but still system is not asking me for production version at the time of creation of production order.
    system is asking me routing only
    now I am selecting version from function>read master data ( production version).
    please sugest me wat i have to do for pop up of production version at the time of production order creation
    and also system is not giving me any request no. at the time of save the changes in IMG.what will be issue
    Nilesh

    Dear,
    please see that PV is applicable in terms of lot size, dates and status
    if both
    PV are valid wityh respect to the above then only upi will get the pop up for PV selection.
    MRP4 setting is alosm required.

  • Production version problem

    Hi friends
                        when i have created production version for one material i got the error. pleas efind the error below.
    inconsistencies for production version.
    when i checked the production version for that material systm shows the green light for bom and red light for routing. but system shows bom exists and task list exists. onle problem is inconsistencies for production version.
    please help me any missing from my side
    Thanks
    venkat

    Hi
    1. Check the valid from date for Routing and the Valid from date that you entered in the production version  ( MM02/ MRP4 VIEW ) is same
    The vaild  from date should be same for Routing and the PV valid from date (Mentioned in PV BASIC DATA)
    Suppose the valid start date of the Routing is later than tha Date that you given in the production version basic date, then the inconsistence error will come . it give the red light to Routing
    ie.
    Routing valid from date : 06..06.2009
    PV vaild from date        : 01.06.2009
    So for the date 01.06.2009 - 05.06.2009 , ysytem say that no Routing exist.inconsistence in pv.

  • About Tables of production versions

    Hi
    My planner needs to list all the materials which have a certain production,so,I need to know if there are any tables can have that connection.
    Or could anyone tell me the table lists of production version related?
    Thanks a lot!

    Dear Leo,
    Check with
    MKAL     Production Versions of Material
    to view the list of Production versions the T code is C223  &
    C252 - Print List for Production version with consistency
    Check.
    Regards
    Mangal

Maybe you are looking for

  • Media Start and End times have changed.

    Hello, I have an old project from which I off-lined all footage to save disk space. I only saved the Project files. Now when I open the project to do some changes I naturally have to recapture the original footage. The problem is that some clips have

  • Applet function call from javascript

    Hi, I'm haveing a problem with accesing applet's functions from Javascript in Mozilla. IE works fine but in Mozilla I get the following error: Error: document.applets[0] has no properties The code used is: document.applets[0].test(); The applet has t

  • Photoshop Elements 4 - Mac versus Windows versions

    I downloaded a trial of PE4 onto my Windows machine at work and found it really impressive - great interface, easy to navigate and some great features. On the back of this I bought the Mac version by download, but have found that it is different in s

  • IPhoto crash when creating photobook

    I am trying to create a Book through iPhoto.  iPhoto is consistently shutting down when I try to purchase the book.  The error message states a crash in Thread 40.  I have not yet attempted to re-install iPhoto.  Any ideas or help would be appreciate

  • Suspend Data is exceeding limit in LMS

    Hello, I created a project in Captivate 6 and uploaded to our company's LMS.  I am using SCORM 1.2 as our LMS does not successfully accept SCORM 2004 3rd version.  The lengh of the suspend data used by my project is 5029 characters and the limit of S