LSMW Sales unit ****** 1 is not defined for item 000000 2

Hi, all,
I am trying to create order using LSMW with
Object 0090 Sales documents
Method 0000
Program Name RVINVB10
Program Type D Direct Input
The issue is at the Sales Unit.
I prepared the unit as PC in the folloiwng 3 fields
ZIEME      Target quantity UoM
VRKME      Sales unit
MEINS      Base Unit of Measure
But get the following error, any thoughts?
                               Start of processing
                               V1                   384
Sales unit ****** 1 is not defined for item 000000 2
Data from this document has not been saved ***

Alright Koffer,
I'll give U the place, from where this error can occur, check which is applicable to you:
1) In FV45PF0M_MARM_SELECT, after calling the FM MATERIAL_READ.
2) In Include, FV45PF0V_VBAP-UMVKZ_ERMITTELN, after calling the FM : MATERIAL_UNIT_CONVERSION.
3) In Include FV45PF0V_VBAP-VRKME_PRUEFEN, after material unit conversion.
4) In Incl. FV45PFAP_VBAP_FUELLEN_MAAPV, after call to the FM : F4_ALLOWED_QUANTITY_UNIT.
If U understand German( Ich Keine Deutsch lernen ), U might go to these programs and check the description.
However, all these point to the Sales Unit as U already know.. check all the data related to the Sales Unit and whether this unit is allowed for the material being used.
Rgds,
Raghu.

Similar Messages

  • Error  while creating PO --   Unit of measure not defined for lanuage  ZH

    Hi all,
    i  have created the PR with EA as UOM. Then while creating PO, i am getting error like
    '  Unit of measure not defined for lanuage ZH' .
    Then  I execute CUNI
    Then menu is GOTO > Translation > units of measure
    enter source language and target language . After this i am getting the below message
    --->  Language not available on server
    Please suggest what i should do. Thanks.
    Thanks
    pabi

    HI Pabi,
    Go to material master for material in purchase requisition, the Go to Additional data and maintained language as ZH in material master data.
    Also the other possibility, that if in your case purchase requisition are converted to purchase orders through background jobs,
    then check the background job execution in SM37 whether that background job has been triggered twice parellely in the background, which could have resulted in locking of same purchase requisition at same time and hence your are getting the Error.
    Br,
    Tushar

  • Unit of measure not defined for language ZH

    Hi,
    We were creating a PO when we encountered the error which states "Unit of measure not defined for language ZH".
    We executed CUNI to translate the units of measurement to our target language. System prompted "This object was segmented. Only new lines evaluated." What does this mean?
    We tried creating the PO again, however we encountered the same error that the unit of measure was not defined for the language.
    Please recommend action/s that we should take. Thank you.

    Take a look at the below threads. Your problem has the solution.
    Re: Unit of measure XX not defined for language DE
    Re: Unit of Measure Error in Purchase order

  • Sales document type is not defined for(sales org/division/distribution chan

    Hi Friends,
    I am getting the error that sales document type is not defined for x/y/z(sales organisation/division/distribution channel). while creating sales order.
    Any pointers will be rewarded.
    Regards

    Hi there,
    When you define a sales doc type in VOV8, you also should assign that to the sales area SA (sales org / dist channel / division).
    Only then you will be log a sales order for a sales area.
    Check if you have done it. You will find it in SPRO --> Sales & Distribution --> Sales --> Sales doc header --> Assign sales doc type to SA.
    Regards,
    Sivanand

  • Debliery Units : VENDOR IS NOT DEFINED FOR THIS SYSTEM

    Dear Experts,
    In prespective modeler , tried creating 'DELIVERY UNITS'. However get error message
    "CANNOT CREATE DELIVERY UNIT AS CONTENT VENDOR IS NOT DEFINED FOR THIS SYSTEM" ?
    How can we maintain CONTENT VENDOR ? we are using in-house HANA installation.
    Regards
    Prashant

    Hi Shrikant,
    Please do not reply with your same question in all of the threads which are answered.
    What is the version you are using?
    Where exactly you are unable to see?
    Once you edited the field as mentioned by Jody, it will be in green circle. Also while creating the package, you can see this DU as shown below:
    Regards
    Raj

  • Unit of measure PCS not defined for language FR

    Dear Gurus,
    I try to raise a PO in ME21N, when saving the order, I am being prompted by the system with the following message:
    "Unit of measure PCS not defined for language FR"
    I then went to MM02 to check the material master data "Sales Text" Tab.
    There the only language available is English, so I clicked on the "Language Maintained" Tab and created a new language for French.
    The problem is that when I want to save the changes, the system prompts me with the following message:
    "Blank texts exist in the following languages: French and English, these texts will be deleted"
    Then the Material Master Data closes and no changes have been made.
    Can you please guide me through step by step of what I have to do to be able to populate the field "PCS" for pieces in French so that it is taken into account in the Material Master Data and by extension in a PO.
    Thanks for your help.
    KInd regards
    Chris

    Hi Chris,
    Goto T code CUNI. In the first screen click on GOTO-Translation-dimension.
    Enter EN in Source language and FR in Target.Maintain the entry there.

  • While creating sales order got error version "0" is not defined for company

    Hi,
    i got a error  while creating a sales order(va01) ,i got an error
    saying that "version 0(zero) is not defined for company code
    if there is any solution please provide....
    Thanks&regards
    kishore kumar

    Go to TCODE:OKEQ
    1)select version 0 here and ext select settings for each fiscal year under controlling area settings
    2)give your controlling area XXXX and version 0 then enter
    3)select new entries maintain data for new year 2008.
    Hope this will give u
    Sri

  • Error message :PurchOrder : Unit of measure PC not defined for language ES,

    Hello,
    I am facing a problem with PO replication to R/3 backend.
    POs are not replicated to R/3, POs are in status 'Transfer Failed (E.Sys.)'  .
    When I check with 'RZ20' transaction I got this message :
    PurchOrder : Unit of measure PC not defined for language ES.
    SRM 4.0 Extended classic scenario
    Regards,
    Shaiek

    Hi
    This seems to be a configuration issue,.
    Pls maintain the unit of measure in configuration using transaction CUNI
    Hope this will help.
    Pls reward suitable points.
    Regards
    - Atul

  • Error as unit of measure PC not defined for language RO while creation ofPO

    Hi GUYS,
    When am trying to create a PO in ME21N transaction i got error as below,
    unit of measure PC not defined for language RU
    Message no. 06079
    Table 006A contains no entry for this unit of measure
    Please let me know what action to be taken from my side to over come this issue.
    Note: If i check the related vendor i could able to view that the language maintained as RU.
    Cheers,
    Kumar.S

    Hi Jurgen,
    Thanks for your reply once again.
    As mentioned by you earlier i have tried to login with languae RU in Q system but unfortunately i got an error saying taht language not installed.
    Also we found for Language - EN and UOM - PC has been maintianed in T006A table.But if i check for lanugage - RU and UOM PC combinatoin has not manintaned in T006A table.
    Please let me know how to maintain the values in this table T006A for combination Lang - RU and UOM - PC.
    Please revert back with your soilution.
    Note: I have tried in SM30 but failed due to below error
    The maintenance dialog for T006A is incomplete or not defined
    Cheers,
    Kumar.S

  • Unit of Measure TON not defined for language PT ?

    Hi all,
    I'm new to MM and to SAP in general and I have 2 questions for now :
    1. I have a requisition which is set up using unit of measure TON. When I try to create the PO, an error message pops up saying " Unit of measure TON not defined for language PT ". Do you know what does language PT means and why does this error appears? When I try to convert the TON into TNE, the same message pops up : " Unit of measure TNE not defined for language PT ".
    I also can not convert TON into EA...any ideas why?
    2. How can I see the total value of a PO that has many lines ?
    Thank you very much
    Iuliana

    Hi
    Is this error  "" Unidade de medida *** não definida em idioma PT ""
    appearing only when you select Ton, or any other unit.
    pl. clarify.
    I have seen that you get this message when your loging Login language is Portuguese.
    Any how Configuration of units needs to be checked in
    Spro >General setting > check Units of measurements ,
    ( or pl. use Tcode --  Cuni )
    I also can not convert TON into EA...any ideas why?
    can you give me some more inputs, what erro are u getting ?
    2. you can see the total Po. values in Po header details
    under status tab view.
    if my soln is found usefull
    Pl. award me points
    Thanks
    Prasanna kumar .b.a

  • Unit of measure EA not defined for language PT

    Hello,
    Vendor Communication is maintained in "Portuguese language-PT", while creation of Scheduling agreement system will given the below error, bcz Scheduling agreement will taken the Langause from vendr master
    "Unit of measure EA not defined for language PT"
    Table 006A contains no entry for this unit of measure.
    We have cross checked Material master and maintained the "langauge-PT" in material master additional data.
    Checked  T006A table for "EA" found for language "EN, DE, CN etc. not for "PT"  how to maintain T006A table for Portuguase langauge.
    Regards
    Mahesh Naik

    >
    Mahesh Naik wrote:
    > Hello,
    >
    > Suppose we have changed the source langauge "EN" to Target Langauge"PT" is it change all the Unit from EN to PT. after that how the system will pick english language's
    No, it just gives you all the units maintained in that source language as a proposal to enter the description in target language PT, there will not be any change to the source language EN while maintaining a translation.

  • Sales document item is not defined for this transaction in Pur.Order

    hi,
    At the time of convertion of pr to po one error message received.
    Sales document item 46 000010 is not defined for the transaction
    Message no. V1198
    Diagnosis
    You have tried to carry out a business transaction for this sales and distribution document item which, for this item, is not allowed.
    This may be due to the fact that this item is not part of a make-to-order production with cost management in the sales order.
    Procedure
    Please check your entries.
      this is MAKE TO ORDER SCENARIO  THIS ERROR IS FOR RAW MATERIAL  CONVERTION  AGAINST SALES ORDER.

    Hi,
    Check in material master MRP3 view there is field called strategy group where you have option to define the planning strategy like make to order/make to stock & like.
    Regards
    Ravi Shankar.

  • Err in PO creation-Sales document item is not defined for this transaction

    Dear Consultants the errror  occurs when we process  Individual Purchase Order scenario.
    Err in PO creation-Sales document item is not defined for this transaction  
    Thanks&Regards,
    SanthaRam

    This error because the item category is not determined correctly in the sales order.
    Check the item category in Sales order line item, for Individual Purchase order scenario its TAB.
    If its not TAB, then check the assignement for Item category in VOV4.
    This thread is more of the SD part, so also put it in SD forum for better solutions.
    Regards,
    Sheetal

  • Err in PO creation-Sales document item is not defined for the transaction

    Hi,
    I am getting the following error while creating PO
    "Sales document item 30000183 000100 is not defined for the transaction
    Message no. V1 198
    Diagnosis
    You have tried to carry out a business transaction for this sales and distribution document item which, for this item, is not allowed.
    This may be due to the fact that this item is not part of a make-to-order production with cost management in the sales order."
    I have used an item category which is copy of TAB and the sales order line item is attached to WBS element.
    can any one guide me what needs to be done.
    thanks

    If you want the sales order creation to initiate a PO creation automatically, check if the "Create PO Automatically" button is ticked on for the item category in Transaction flow tab in tcode VOV7
    This will solve your problem, provided your configuration for PO on the MM side is fine.
    Reward if this helps.

  • Ship-to party 10106086 not defined for sales area 6000 40 30 error

    HI gurus,
    We have maintained cross divisions 00, we VR02 have maintanied the combined the divisions and we have maitned the division at MM01, we are getting VP210 error: Ship-to party 10106086 not defined for sales area 6000 40 30.
    please help me in this we are unable to create a order.
    this is urgent.

    Hi,
    The error is Ship-to party 10106086 not defined for sales area 6000 40 30
    Here system is considering distribution chan 40 & division 30 
    Go to VOR1 and maintain like as
    Sales ogz - Distribution channel - Distribution for Condition  - Distribution chn for CUST/MATERIAL
    6000 - 40 - 40 - 00
    Then in VOR2
    Sales ogz - Division - division for Condition  - division for CUST
    6000 - 30 - 30 - 00
    Then also check you have created customer for sales area 6000-00-00
    Check in VOV8 go to details of your sales order type under general control tab Check division should be blank
    OR
    Remove division form material master basic data tab 1
    Kapil

Maybe you are looking for

  • Can I set up a second iTunes library if away from my first?

    I started this post on MacBook Pro, but someone there thought I might get more specific answers here. He said 'yes', I could, by  holding 'alt/option' key while clicking to open iTunes, and selecting 'new library'. But he warned I might lose everythi

  • Why would DownloadHelper suddenly quit working?

    I have been using DownloadHelper for quite some time now. Today I went to use DownloadHelper and nothing came up but a blank screen.

  • DPM on multiple sites with ML6000

    Hi, I must implement a new backup infrastructure. On the central location I will backup the servers with DPM2012 sp1 (Dell PowerEdge R720xd). On a co location I have another Windows 2012 server (PowerEdge R720xd). The central DPM1 server use the serv

  • Problem with a procedure and an  agent

    Hi Guys, I created a local agent and use it to run a procedure that works Ok When I run the procedure using the agent it still working for a long time I tried to stopped but I can not. So I delete them. After that always I run the procedure despite o

  • WRT54G Pushing Through Wrong DNS

    Instead of using my router with my ISP I want my business network to be my ISP and I want a second network to offer internet to wireless users. My current network (old Intel IP address space): IP - 169.254.2.1 Sub - 255.255.255.0 DNS - 169.254.2.214,