LSMW - Upgrade Technical 4.7 to ECC 6.0
Hi All,
I am studying / researching ways to optimize the migration process of master data in the case of scenario of SAP version.
Anybody have any experience to share about the use of a scenario of LSMW upgrade of version? Or, hints to optimize the scenario.
Thanks
Regard
Rafael Aires
There is no impact, the projects can still be used if you don't migrate to Unicode at the same time.
Markus
Similar Messages
-
Issues during technical upgrade from 4.6c to ecc 6.0
Hi
We are doing a technical upgrade from 4.6C to ECC 6.0. Some transactions in QM module when tested in ECC 6.0 test client give a abap termination message (or dump) and certain transactions like qs42,46, qa18, qs34 etc do not get executed (error = no entry foound for......) and similarly in PP-PI module transactions like C203 have similar problems, even though master data does exist. What should I look for? Can somebody pl. give details on configuration checks and the OSS notes from a functional point of view for a technical upgrade?
For certain transactions I get the error message - "Central system of distribution SM-P06CLNT430_TRUSTED is unreachable RFC destination SM_P06CLNT430_Trusted does not exist" - what does this mean?
thanks
BEHi,
1. Have you done successfull installation from 4.6C to ECC 6.0 at the time of PrePare ans SAPUP?
2. Check SP' for QM and PP-PI modules from http://service.sap.com/sp-stacks.
3. Configure RFC connections correctly, SM_<SID>CLNT<No>_Trusted automatically created, not manually.
http://service.sap.com/notes --> search for RFC trusted connections for Ecc 6.0
http://service.sap.com/upgrade.
Regards,
Srini Nookala -
Upgradation from 4.6C to ECC 6.0
Dear All,
I have worked on a upgrade project from 4.6C to ECC 6.0.
I am in the process of maintaining documents for the project. I am just planning to maintain a repository for all the relevant documents.
I feel that it will act as a useful document for all the consultants involved in upgradation.
Right now I am engaged in documenting the issues involved with upgradation- Technical and Functional.
I will collate all the docs and send a copy to all the major contributors. Your contribution is solicited
Regards,
RakeshDear Rakesh,
Hi, I am Albert from Philippines, and is involved in the 4.6C to ECC6 upgrade as of this writing.
I am new to SAP--my first two posts here might sound silly to most SAP gurus
I would appreciate if you could send your documents on the upgrade. Those will really help me.
Thank you very much in advance.
Regards,
Albert
Edited by: Albert Joseph Canceran on Feb 8, 2008 12:24 PM
Edited by: Albert Joseph Canceran on Feb 8, 2008 12:25 PM
Pls email them to me at [email protected] -
Upgrade from 4.6c to ecc 6.0
Hi,
We are doing a technical upgrade from 4.6c to ecc 6.0 without activating New GL. As a functional consultant, what should i look for? I know that we need to test the business processes and check Z programs but anything specific, plzz let me know.
What changes should be made in Asset Accounting?
Regards
SatyaThanks for the reply.
What are the changes made in Asset accounting after upgrading?
I heard of RBE tool...how is it used for FI?? (u check for the mostly used transactions or what??)
Anyone, plzz answer..waiting for ur replies
Regards
Satya -
Requirements for upgradation from 4.7 to ECC 6.0
Hi Guru's,
Can anybody explain what are the steps required for upgradation from 4.7 to ECC 6.0, technically and functionally. If any body have documents regarding the same, please share.Full marks will be awarded.thanx in advance....Hi
You have to aware of all related program like BDC's , Screens related errors and all dictionary related problems.
Some function modules may become obsolete, and some screens will change
abnd some new fields will be added in the new versions etc.
Also take care of SPAU and SPDD tcodes.
You should be able to know about Unicode concept in sap.
chk this
http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
also chk these 2 notes in service.sap.com
Technical Upgrade is only a version upgrade without any functionality changes.
The objects that are needed to be upgraded are:
Includes
Function Groups / Function Modules
Programs / Reports
OSS Notes
SAP Repository Objects
SAP Data Dictionary Objects
Domains, Data Elements
Tables, Structures and Views
Module Pools, Sub Routine pools
BDC Programs
Print Programs
SAP Scripts, Screens
User Exits
You can refer to the below links for more information on technical upgrade:
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
Reward points if useful
Regards
Anji -
SAP Upgradation from 4.5B to ECC 6.0
Hi all,
We need to upgrade from 4.5B to ECC 6.0. Gathered all the information abt. the 4.5 B system...Its on AIX using ORACLE.
I want to know few more info. with your help. i have access to the system through GUI, but didnt have OS level access..
1.) How to know whether the system is CLUSTER configured, any transaction?
2.) I didnt find any Upgradation Guide particular to AIX, can u pls. guide me the path for that in SMP?
3.) How to check whether its using any third party tools(Like Fire Fighter...etc) and any usage types configured(Like PI, BI...)
please guide me in knowing the above through GUI?
Thanks,
SubbuHi,
Roadmap is the recomended way to manage the Upgrade project, but this will not make anything automatic. If you don´t have the knowledge and time to configure the project in Solman then just follow the Upgrade Guide. In this Roadmap is included Technical and Funtional processes and it is an excellent starting point for the project but as already said, if don´t have the knowledge or any other person from the team either, then don´t worry much about it althoug it is imperative that a good Project is designed before starting the process either using MS Project or any other software, after the first tests you will have to adjust times for next upgrades.
Buy the way in the upgrade guide there are some sections specially dedicated to AIX but most parts of the process are the same for any OS/DB combo. Basically check prerequisites, do prepare, fix what ever is necesary and then run upgrade process.
Read the Upgrade Guide 2 or 3 times to get a clear Idea on what should be done before, during and after the upgrade process, read all related notes and have them printed in case of any problem.
AND you should have access to OS level, if you don´t then when doing Prepare or Upgrade then you won´t be able to look at the logs and that is Vital during the process. Also need to have access to SAP directories to check and change files like copying upgrade DVD's, upgrading R3trans, TP, etc so explain that to them or make one of them to be next to you.
Good Luck -
Re : Roles of Functional Consultant in upgradation from 4.6b to ECC 6.0
Hi
I need the Roles of Functional Consultant and Technical Consultant in upgradation from 4.6b to ECC 6.0.
Thanks
AntoDear Anto,
In Technical SAP,Upgrade from 4.6 to 6.0- the role of any fucntional consultant would involved integrated with the technical Consultant.
The phase starts with the technical Patches apply to the latest stack level which will done by the BASIS Consultants.
Once the System preparation is happened, the next phase is with SPDD phase, Thru this transaction the dictionary Objects-Database elements, database tables and structures of teh latest system can be
compared with the old system.
This results in the version modification results between the old and New versions. During this phase the involvement of the Functional Consultant needed for the tech guy, to identify the functional chnages between the two version (Old and New). Which helps for him either to Reset to Original(ie., adopting the new one) or Adopt Modification in previous system(ie., adopting to older functionality)
Once this is done, the System Upgradation will be done by the BASI, the system will be replaced with new system. At teh end of this phase SPAU phase starts, which inturn reults with version difference in the field namely, Programs, Reports, Screens, Messages, Notes an Function Modules. Here too the involvement of functional consultant neede to determine either reset to original or to go with Adopt modification from the older design, as explained earlier.
At teh end of the, moreover the functional consultant role involved in testing the Entire processes and transactoin in the system for system dump and bugs, in necessity to correct teh same and results with nil errors in production client.
Also the Zprograms invloved in the older versions, needs to be examined for the actual need, and to be justified with adoption in the newer version or by adopting to the updated functionality in the newer version.
Hope this may give better clarity in the involvement of the Functional Consultant in the Updgrade project.
Njoy SAP
Regards,
-Saravanaganesh -
Roles of Functional Consultant in upgradation from 4.6b to ECC 6.0.
Hi
I need the Roles of Functional Consultant and Technical Consultant in upgradation from 4.6b to ECC 6.0.
Thanks
AntoIn Technical SAP,Upgrade from 4.6 to 6.0- the role of any fucntional consultant would involved integrated with the technical Consultant.
The phase starts with the technical Patches apply to the latest stack level which will done by the BASIS Consultants.
Once the System preparation is happened, the next phase is with SPDD phase, Thru this transaction the dictionary Objects-Database elements, database tables and structures of teh latest system can be
compared with the old system.
This results in the version modification results between the old and New versions. During this phase the involvement of the Functional Consultant needed for the tech guy, to identify the functional chnages between the two version (Old and New). Which helps for him either to Reset to Original(ie., adopting the new one) or Adopt Modification in previous system(ie., adopting to older functionality)
Once this is done, the System Upgradation will be done by the BASI, the system will be replaced with new system. At teh end of this phase SPAU phase starts, which inturn reults with version difference in the field namely, Programs, Reports, Screens, Messages, Notes an Function Modules. Here too the involvement of functional consultant neede to determine either reset to original or to go with Adopt modification from the older design, as explained earlier.
At teh end of the, moreover the functional consultant role involved in testing the Entire processes and transactoin in the system for system dump and bugs, in necessity to correct teh same and results with nil errors in production client.
Also the Zprograms invloved in the older versions, needs to be examined for the actual need, and to be justified with adoption in the newer version or by adopting to the updated functionality in the newer version.
Hope this may give better clarity in the involvement of the Functional Consultant in the Updgrade project. -
Documents related to upgrade from 4.6C TO ECC 6.0
Hi all,
can anyone send some documents related to upgrade from 4.6C TO ECC 6.0
my emil id is
[email protected]
THANKS
VENKIHi Venki,
Please check for the following links for the information on Upgradation from 4.6C to ECC6.0
Upgrade Procedure/Support Packages:
http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
SAP Upgrade guide:
http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
Upgrade information centre:
Upgrade Information Center [original link is broken]
For Functionality Differences pls refer to the below site - http://solutionbrowser.erp.sap.fmpmedia.com/
From ABAP's perspective, the link below helps you:
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
For technical upgrade inputs, check:
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
I am sending you a mail too.Please check it.
Reward if found useful.
Regards
Sayee -
Upgrade from 4.0b to ecc 5.0
Hi all,
My company is upgrading from 4.0b to ECC 5.0. So, can anyone let me know what problems we would be encountering and what is the best method to resolve such problems.
I would like to know how both versions are mainly different ?
My company mainly works on SD, MM and FI, so is there anything is specific that I have to keep in mind while the upgradation?
Thanks,
Praveen.check...
http://sap.ittoolbox.com/groups/technical-functional/sap-basis/about-upgrade-of-sap-40b-1384660 -
Interview questions on upgrades from 4.7 to ECC
Hi,
Can any one please post some potential areas/questions that will be asked for upgrade projects from 4.7 to ECC6.0
Points will be awarded.
ThanksHi Frank,
this is good question, why because sap upgrades from 4.6b to ecc 6.0 is very risky.
take one example , in 4.5b , me21n application having 620 screen where as in ecc 6.0 having 9000 screen . that time we will take care of it.
check the obsolete function modules , 4.5b , having ws_upload, ws_download.... use cl_gui_frontend_services , under these having differnt type of methods.
once you change the code in ecc , go to tranx : SLIN check the error where it is exact. -
Error during Upgrade from 4.6c to ECC 6.0
Hi All,
We are facing an error when upgrading from 4.6c to ECC 6.0. We are facing this error on the table COEP - runtime object inconsistancy. What we found is there is ERP upgrade has created new extra fields in the table. In log file the error is specified as : Duplicate Field name, But we not able to find the duplicate field name in the table. Please kindly help as early as possible. The upgrade process is stuck.
Regards
Anil Kumar KHi Anil,
Is this issue fixed? Can i know how you fixed it?
replied to your message Re: How to adopt the index changes during upgrade.
Thanks,
Somar -
Unicode error while upgrading from 4.6 to ECC 6.0
Dear All,
I am getting unicode errror while upgrading from 4.6 to ECC 6.0, when iam trying to open downloaded file in excel.
In debugging, error occurs while executing statment "CALL METHOD OF obj_ex_sheet " in the code given below:
FORM open_downloaded_file_in_excel *
FORM open_downloaded_file_in_excel.
DATA:
lv_ole_books TYPE ole2_object,
lv_ole_sheets TYPE ole2_object,
lv_subrc LIKE sy-subrc,
lv_title(70) TYPE c,
lv_text1(70) TYPE c,
lv_text2(70) TYPE c.
start excel
CREATE OBJECT obj_ex_sheet 'EXCEL.SHEET'.
IF sy-subrc NE 0.
lv_subrc = sy-subrc.
FREE OBJECT obj_ex_sheet.
PERFORM error_handling_ms_excel USING lv_subrc.
ENDIF.
CALL METHOD OF obj_ex_sheet 'Application' = obj_ex_app.
IF sy-subrc NE 0.
lv_subrc = sy-subrc.
FREE OBJECT obj_ex_app.
FREE OBJECT obj_ex_sheet.
PERFORM error_handling_ms_excel USING lv_subrc.
ENDIF.
SET PROPERTY OF obj_ex_app 'Visible' = 1.
open data file: main file
CALL METHOD OF obj_ex_app 'Workbooks' = lv_ole_books.
CALL METHOD OF lv_ole_books 'Open' = obj_ex_wbook
EXPORTING #1 = gv_filename
#2 = 2
#3 = 0
#4 = 1
#5 = 0
#6 = 0
#7 = 1.
IF sy-subrc NE 0.
lv_subrc = sy-subrc.
FREE OBJECT obj_ex_wbook.
FREE OBJECT obj_ex_app.
FREE OBJECT obj_ex_sheet.
PERFORM error_handling_ms_excel USING lv_subrc.
ENDIF.
FREE OBJECT lv_ole_books.
CALL METHOD OF obj_ex_wbook 'Worksheets' = lv_ole_sheets.
CALL METHOD OF lv_ole_sheets 'Item' = obj_ex_wsheet
EXPORTING #1 = 1.
FREE OBJECT lv_ole_sheets.
GET PROPERTY OF obj_ex_wsheet 'UsedRange' = obj_ex_usedrange.
CALL METHOD OF obj_ex_usedrange 'AutoFormat'
EXPORTING #1 = 18.
SET PROPERTY OF obj_ex_wsheet 'Name' = sy-tcode.
FREE OBJECT obj_ex_usedrange.
PERFORM free_ole_objects.
CALL FUNCTION 'FLUSH'
EXCEPTIONS
OTHERS = 0.
ENDFORM.
regards,
Divyahi,
In the OPEN DATASET STATEMENT ADD THE ENCODING ADDITION IN TEXT MODE.
Regards,
Balakumar.G
Reward Points if helpful. -
Top-Down Distribution - tcode KE28 (release upgrade from 4.6 to ECC 6.0)
All,
we are performing a release upgrade from 4.6 to ECC 6.0 and we have a problem with the tcode KE28.
The variant already set up in the system don't match with the selection fields present in the screen, and the following message is shown:
Message no. KG346
The variant does not adhere to the current Customizing setup
We have saved the variant again, and no problem are present, but the error message refers also to Customizing setup.
Is there a section in the Customizing where it is possible set up the field to show in the initial screen or the new fields (All Valuation Views, Legal Valuation View and Profit Center Valuation View) are due to the release upgrade?
If yes, do you know the transaction/path?
Thanks in advance for your collaboration.
Regards,
Jody Mancini.Hi Satish,
Now i am sending some URL for Functional upgrade
May be those are all useful toyou
https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/transactionsChangedinECC6.0
http://solutionbrowser.erp.sap.fmpmedia.com/Default.aspx
https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/
Regards
Surya -
Performance issue after Upgrade from 4.7 to ECC 6.0 with a select query
Hi All,
There is a Performance issue after Upgrade from 4.7 to ECC 6.0 with a select query in a report painter.
This query is working fine when executed in 4.7 system where as it is running for more time in ECC6.0.
Select query is on the table COSP.
SELECT (FIELD_LIST)
INTO CORRESPONDING FIELDS OF TABLE I_COSP PACKAGE SIZE 1000
FROM COSP CLIENT SPECIFIED
WHERE GJAHR IN SELR_GJAHR
AND KSTAR IN SELR_KSTAR
AND LEDNR EQ '00'
AND OBJNR IN SELR_OBJNR
AND PERBL IN SELR_PERBL
AND VERSN IN SELR_VERSN
AND WRTTP IN SELR_WRTTP
AND MANDT IN MANDTTAB
GROUP BY (GROUP_LIST).
LOOP AT I_COSP .
COSP = I_COSP .
PERFORM PCOSP USING I_COSP-_COUNTER.
CLEAR: $RWTAB, COSP .
CLEAR CCR1S .
ENDLOOP.
ENDSELECT.
I have checked with the table indexes, they were same as in 4.7 system.
What can be the reson for the difference in execution time. How can this be reduced without adjusting the select query.
Thanks in advance for the responses.
Regards,
Dedeepya.Hi,
ohhhhh....... lots of problems in select query......this is not the way you should write it.
Some generic comments:
1. never use SELECT
endselect.
SELECT
into table
for all entries in table
where.
use perform statment after this selection.
2. Do not use into corresponding fields. use exact structure type.
3. use proper sequence of fields in the where condition so that it helps table go according to indexes.
e.g in your case
sequence should be
LEDNR
OBJNR
GJAHR
WRTTP
VERSN
KSTAR
HRKFT
VRGNG
VBUND
PARGB
BEKNZ
TWAER
PERBL
sequence should be same as defined in table.
Always keep select query as simple as possible and perform all other calculations etc. afterwords.
I hope it helps.
Regards,
Pranaya
Maybe you are looking for
-
Hi, I'm having problems with a event handler that I'm trying to create. I currently have 2 event handlers, one of which needs to only happen when Shift + a key is pressed. I currently have: function keypressedHandler(event:KeyboardEvent):void {
-
Does anybody know why Illustrator will open Solidworks DWG files saved in R2007-2009 version but not version R2010?
-
Created mailbox for new user in Exchange 2010, user not visible in AD.
Hi everyone! This morning I created a mailbox for a new user on my Exchange 2010 box. Everything works fantastically but I am unable to view the new user in AD except by searching. If I run a search the results say the user exists in my Users contai
-
How to apply image or footage to shape?
How do I apply an image or footage to a shape layer. Also, is possible to apply a different image to the front and back of the shape? I am using AE CS4.
-
To trigger ADOBE form from Custom Infotype
hello, I hae create d ADOBE form and want to trigger it on "Save" record from Custom Infotype.... I need this form to be displied as User my do some changes and save it again... I have used following code to trigger this from module pool... Data : lv