LSMW used only for master data upload?
Hi
Can you please let me know if LSMW is used only for master data upload or we can also use it for transaction data ?
Hi Christino.
I have come across a standard SDN thread which deals with the uploading master data, refer it:
[SDN Reference for uploading master data using LSMW|how can we upload master data by using LSMW;
[SDN reference for which uploading is preferred (Master data or Transaction data)|Which one is better for uploading data LSMW or ECATT ?;
Good Luck & Regards.
HARSH
Similar Messages
-
Function module Vs BDC for master data upload
Hi ,
Please advice we should use the following function modules for master data upload or we should go for BDC.
MP_RFC_SINGLE_CREATE
MP_RFC_INACT_CHANGE
MPLAN_CREATE
MPLAN_CHANGE
MPLAN_SET_DELETION_INDICATOR
ASSET_MASTERRECORD_MAINTENANCE
MPLAN_ITEM_CREATE
MPLAN_ITEM_CHANGE
GL_ACCT_MASTER_SAVE
GL_ACCT_MASTER_SAVE
GL_ACCT_MASTER_SAVE
Actually, we have already used these function modules in our upload program, but we are not sure if these function modules will create any data inconsistency.
Please let me know, if we should continue using the FMs, or there is any risk using the FMs and we should replace them by BDC.
Thanks in advance.HI Vikram,
Better to serch for the BAPI for uploading the master data.Becuase we have problems with BDC and FM's.
If you use FM's it does n't contain all the fields which you want.IF you go for BDC this is not maintainable for future releaseas.IF you upgrade then screen may change.
IF don' have any BAPI then better go for BDC.
Thanks -
Where Used List for Master Data Entries
Hi folks,
I am looking for a FM, method, etc. that gives me a list, that shows, where a certain master data entry of an InfoObject is used. The BW system makes this check implicitly, when trying to delete master data, but I couldn't get behind the logic yet.
Anyone here with helpful hints?Hi Durgesh,
Thank you for your answer!
Unfortunately the two mentioned FMs are not helpful for me. I am looking for a where-used-list of master data entries, but not of InfoObjects. For example I am looking in which InfoCubes the measure pieces of InfoObject '0UNIT' is used. -
Tables used in MM Master Data Upload using LSMW or BDC?
Hi,
Can anyone provide me with the following information about uploading MM Master Data using LSMW or BDC :-
1. What and all tables are used for uploading Material Master, Vendor Master, Info Record, Open PO, Open PR, RFQ, Open Contracts/Agreements ?
2. What problems are faced during Data Upload ?
3. What error appears/encouontered during upload ?
4. What is the diffrence b/w LSMW and BDC ? Both can be used for Data upload so, what differences are b/w them ?
5. Any other thing to remember/know during Data Upload ?
Thanks,
LuckyHi Lucky,
Dont get angry by seeing my response.
See each and every question posted by u is available , in this forum,
u need to do just a search on individual post.
see what ever ur posted, u r definetly got the solutions through others,
remember most of these answers are fetching by this threads itself (60-70%)
a few solutions are there that are given by own,
so better to search first, in the forum , if not satisfied with the solutions then .........
Just its an friendly talk
and Reward points for helpful answers
Thanks
Naveen khan -
Maintain number range interval for master data upload for existing employee
Hi Experts,
1)I have the scenario to upload additional data for existing employees in PA. Employees are already existed in SAP HR , But additional Infotypes are required to maintain for those emploees
2) I have the senario where i have to upload master data for new employees.
Pls give the detailed description of how to maintain number range interval i.e. External or Internal for upload in both the above scenario. Do we have to maintain number range manually in master data record & then upload it Through BDC or LSMW?
<< Moderator message - Everyone's problem is important. But the answers in the forum are provided by volunteers. Please do not ask for help quickly. >>
Edited by: Rob Burbank on Jan 12, 2011 3:49 PM>
s c patil wrote:
> 2) For new employees i have to maintain desired ( my or client?) number range in SAP system as External number range & then default that number range in NUMKAR & then maintain those number range in master data record & then get the data template filled by client & then upload the data & after that create new number range which is next to existing External number range as an Internal number range. & then default that Internal number range.
>
> Pls reply ASAP
Yes Mr. Patil...
For existing employees
you need to execute HIRING ACTION Through BDC with External number range. While recording you have to use atleast three infotype i.e. IT0000,IT0001,IT0002. In addition you can upload other infotype through PA30.
For new employees
While configuration you can create another number range as internal for new hiring. and use NUMKR feature as well.
Here I don't understand that why r u looking for upload process for new hiring, if it is not mass hiring. It should be day to day activities which would be done by user through PA40.
Best Regards,
Anand Singh -
.CSV file for Master data upload in GRC PC
Hi all,
We want to upload some Master Data for GRC Process Controls 3.0. Since we do not have access to MDUG tool yet, and we have a demo planned soon, we decided to go with the approach of uploading some data using the program GRPCB_UPLOAD.
So I uploaded a .csv file with the following structure and was able to create master data. But, the object name was not updated.
Structure
Object Type
Object ID
Infotype
Sub-type
Start
End
Object abbreviation
Object Name
Language
In addition, for some objects, we'd like to update the other attributes with data too.
Would anyone have the .csv format for such a detailed upload for Process / Sub process / Control?
Regards,
PrekshaHi all,
First of all, thanks in advance, but I´ve tried to upload a template similar to Preksha´s template but when I uploaded it through GRPCB_UPLOAD program it doesn´t work properly, because when I execute the background process, I´ll check its status and then it is cancelled .
In addition, I follow the recomendations from the pdf called "Process Control Upload Master Data v1" released by RIG in June 2008, but in contrast I can´t upload the structure correctly.
Do you have any idea? Or could you give me an idea which explains how to create a correct template? Do you have any clue of what I would have done wrong?
Thanks a lot.
Regards. -
Xls. sheet for Master data upload
Hi Can any body suggest me or send me the sample, how to maintain xls. sheet Template of particular fields for Infotypes 0,1,2,7,8 etc for the purpose of data upload.
<removed by Moderator>
thanks
S MishraHi Mishra,
You can look into the Standard Business Blueprint Templates - Data Transfer Tool of SAP....and get an idea...
Check this Note 1060029 - SAP Best Practices for HCM US - Variants, Misc, LSMW ...
You will find files for infotypes and you can set up your templates based on these....
Other way is to
Go to SE11 >> Enter the Infotype Number PNNNN (with NNNN being the Infotype)...
It presents you with the structure.......Copy that structure and you can create your excel sheet with that template....
Good Luck !!!!
Kumarpal Jain. -
Steps for Master data upload from ECC6.0 to BI7.0
Hi experts,
I need to load material master and customer master data from ECC6.0 to BI7.0 and i could not see the steps to do so in sdn.
Can anyone please give me the steps from the beging till end usign Business content 0material_attr/text/Hier .
I Will assign deserving points to all the answers.
Thanks in advance.Hi,
Steps:
1. Go to RSA5 in ECC6 to Install Business Content D.S.
2.If you want do any change then Go to RSA6 in ECC6
3. Replicate DS in BW .
4. Create Transformation (to connect DS to MD).
5 Create Info package ( to load from S/S to PSA ).
6. Create DTP ( to load from PSA to MD Objects ).
Please let me know if i am missing any steps.
Ali. -
Is LSMW used mainly for master data transfer? if yes, what can b the reason for this?
About BDC, is it used both for master data, transaction data,right?Hi,
The LSM Workbench is an R/3-based tool that supports You when transferring data from non-SAP
systems ("Legacy Systems") to R/3 once or periodically.
The tool supports conversion of data of the legacy system in a convenient way. The data can then be
imported into the R/3 system via batch input, direct input, BAPIs or IDocs.
Furthermore, the LSM Workbench provides a recording function that allows to generate a "data
migration object" in an entry or change transaction.
In LSMW have source and target field mapping. so that data should not be lost.
Regards,
Boobalan Suburaj -
Why to use chnage pointers for master data idoc why not the change idoc
Hi Gurus,
I have one doubt about Idoc.
When changes to master data has to be sent Change pointers are configured and used. (CDPOS & CDHDR). In case of the transaction data change change idoc is used as is the case with orders (we use ORDCHG for ORDERS message type to send the chnage details to a order which was already sent to other system.
Why we can't use change idoc or message type whatever, instead of Chnage pointers in case of master data or vice versa in case of transaction data.
Your valuable input will be rewarded with suitable points!!
-B S B.Hi,
It was a good question ... SAP seems never designed the change pointer to handle transactional data IDocs. Only for master data IDocs distribution purposes.
It may due to volume data ... the transactional data can change many times within a day compare with master data which hardly change or once a while.
Regards,
Ferry Lianto -
Hi experts,
Please help me to get the sequence for master data upload in sap pm ......Probably yet another Blog/Document for someone to create..
Here's my offerings:
Finance data: chart of accounts, g/l accounts cost centres, profit centres, activity types, etc
Configuration data
Classes/characteristics
Inspection characteristics
Master Warranties/Permits/Partners/Documents
HR masters
Work centres
Materials
Functional locations
Equipment (serial numbers)
Measurement points/documents
BOMs
Task Lists
Maintenance items/plans
Maintenance plan schedule
Historical orders (if required)
Historical notifications (if required)
Historical Measurement documents (if required)
PeteA -
Is LSMW tool only used to update master data??
Hi experts,
Is LSMW tool only used to update master data??i.e for updating material master,customer master etc.,
or it can be used to updated configuration tables also.i.e when we do configuration a CTS is to be created.then how the CTS generation is handled.
Can anyone plesae explain me in detail?
Thanks in advance,
Regards,
N.SreelathaHi
LSMW is used to transfer Legacy data from one system to another system.
Obvioulsy Configuration objects should be transported through CTS only and not with LSMW .
Cheers,
Hakim -
New SAP Tools for faster Master Data Upload?
Hi All!
I am interested in getting some detailed information on different tools that are used for faster master data upload. Please let me know about the tools apart from LSMW, BAPI, eCATT and BDC.
We basically want to know the following things:
1.Which are the tools available for this master data upload?
for eg. SAP MDM, Info Shuttle, other available new age tools etc........
2. Their performance / feature comparions?
Please provide performance / feature comparison for different new age tools in detail.
Thanking you in advance.
Regards,Hi Amar,
regarding SAP MDM you can read advantages and characteristics here: http://www.sap.com/platform/netweaver/components/mdm/index.epx
Hope this help you,
Vito -
Why we are not using "Message Control" for Master data ?
Hi friends,
We are using Message control as output determination for Transactional data, <b>what is the main reason for not using the msg control for Master data.</b>Please explain with details...
I am very thankful to them...
Thanks and Regards.
<i><b>Naveen Kumar. Chamala</b></i>Hi Naveen,
Listing down those I know -
1. Master data is expected to be changed/created less frequestly.
2. Transactional data is expected to be chnaged/created more frequestly.
3. Transactions to create/change/display master data do no have message control integration, since you are not supposed to print/fax/mail master data to your partners.
4. Distribution of master data in generally supposed to happen within Enterprise boundry and typically you will have one central server maintaining master data which will be distributed to multiple downstream operation system (Some thing where MDM fits). So ideally when distributing master data using ALE you will be sending it to multiple systems.
5. Distributing transactional data PO/SO etc is same as sending fax/print which fits with the requirement of message control.
Hope this helps,
Regards,
Sanjeev -
Error in creating RSDS using transfer rules for master data datasources
Hi ,
when i am creating the transfermations(RSDS) using transfer rules for master data datasources while i want to migrate datasource.it is giving the error message saying that INITIAL ERROR OCCURED DURING GENERATION OF THE TRANSFERMATION.AND in the taskbar it is giving the message LOG IS BEING LOADED.
MY QUESTION IS HOW CAN WE SEE THE LOG? AND
PLEASE GIVE ME THE STEPS TO MIGRATE MASTER DATASOURCES.
THANKS IN ADVANCE .Hi Ankit,
Yoy have to load data to the cube.For that you need update rules.
Steps to load data to the cube
1.Replicate the datasource.
2.Assign Infosource
3.Create transfer rules
4.Maintain the update rules to the cube.
5.Right click on the datasource and schedule an infopackage for it.
Execute the Infopackage and pull the data to the cube.
Hope this helps
Regards
Karthik
Maybe you are looking for
-
How to find and install right java for ECC6 intstallation on AIX5.3
Hello I wander how to find and install right java for ECC6 intstallation on AIX5.3. I went thruroughly thru note 723909 and underlying 716927, 1008311 and 1039948 notes but I still do not understand. I guess I should logon to IBM site http://www.ibm.
-
How to put the garageband songs
i have currently some songs with the ending.band all these are songs but i want to put them into the ipad of garageband how do i do that? does it allow me to do that anyway?
-
hello, just installed ios 7 on iphone 4s...keeps freezing restarting...help!
-
Difference between Macros and subroutine
Hi all, What is the difference between the macros subroutine and function module functinalitywise.;
-
What is WiFi networking in location settings of IOS 8?
Can anyone tell me .What is WiFi networking in Security>Location settings>system services > WiFi networking, does for IPHONE