LTP excludes materials with MRP indicator of storage location

Hi All,
SAP Note 208017 explains the reason for LTP not taking into account the MRP
indicator of a storage location for a material. Has anyone tried a work around for this issue?
<b>We basically are looking for a snapshot of operative MRP a week back from current date</b> and I thought LTP can be used, but it plans at the plant stock level. Since we have service inventory managed at storage location level and its exculded in operative MRP, we cant have consistent results with LTP being used for my purpose.
Any inputs appreciated
Thanks

Hi,
1. I dont think we should use the LTP Forthe purpose of your requriement
2. Since i think you will be runing the MRP at certain frequency say daily,weekly etc
3. LTP is a strong functionality for the forward planning , which means for a medium or long term in the forward direction
4. For the purpose of snap shot we shouldnot use this ...
may be pp gurus in the forum will be giving  us some reply which you are looking for
reg
dskumar

Similar Messages

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • MRP Relevance for Storage Location

    All SAP Gurus,
    In SPRO where we need to maintain MRP Relevance for Storage Location?
    Regards,

    Dear,
    Check transaction OMIR - Storage location - MRP relevance.
    In detail:
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run follow the steps:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards,
    Syed Hussain.
    Edited by: Syed Hussain on Sep 20, 2008 12:51 PM

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

  • How to run MRP on different storage location level ?

    Dear Experts,
    Need your valuable guidance to solve the below requirement form the client-
    1) My client want to enter a "safety stock level" for one spare part/ Material on the basis of individual storage locations.
               For sake of example: in SL01 he wants the safety stock for particular material set to 5
                                  In FS18 he wants the safety stock set to 2
                                  In FS15 he wants the safety stock set to 1
    Kindly tell me whether it is possible? & guide me how to do it.
    2) Also tell me how to run MRP on a storage location level?
               This is because after maintaining different safety stocks for one material in different storage locations,  is it possible to appear each storage location with their differing safety stock levels?
    I checked the MRP type maintained & its-1 (plant) & not as- 2 (storage location).
    Kindly guide me for the above issue
    Thanks in advance for your support.
    Regards,
    Mehul

    Hi Umashanker,
    Thanks for your suggession . Accordingly I have resolved the issue.
    Regards,
    Mehul

  • Change MRP type at storage location level

    Morning,
    i am having trouble with PD and ND reporting. Your you are aware ND should only have balances of 0 and PD should only have balances of >0. When i run a reportto show all PD stock and exclude the positive balances, i am getting MM numbers appearing that are 0 in 1 sLoc but have a positive stock balance in another sLoc. This becomes a problem when i change the PD to ND because it changes at plant level. i only want this to be changed at the sLoc with the 0 stock balance.
    I have tried MM06 to flag the MM for deletion at sLoc level however, when running the report again, the sLoc with 0 stock balance still shows.
    Also, i have about 800+ that need changing so a solution to do this in a batch would also be appreciated.
    Please help.
    Paul

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • MRP to ecxlude storage location stock and read only requirement

    Hi All,
    Below is the requirement for raw material,
    Have two storage locations A and B.
    For storage location A, MRP should exclude stock but has to consider demand's at A (dependent requirements, order reservations) and create MRP elements (purchase requisitions, scheduling agreements etc.).
    SLOC B has to consider as normal for MRP (should read demand and stock as well).
    Please suggest if it is doable, if yes; how to set the storage location A, so that it just read the demands but exclude stock.
    Setting up only "SLOC Indicator" 1 in MRP 4 view is not the option I believe.
    Thank you.

    Can someone please suggest on below requirement,
    How to make the settings at material level so that for a storage location 'A', MRP will just read/consider the demand but exclude the stock.
    Is it feasible?
    Regards,
    Deepak Girme

  • Can PIR created at wbs element and MRP area of storage location level

    Hi,
    I tried to create an planned independent requirement at MRP area and WBS element level, but failed. The MRP area is not plant level, but storage location level.
    *When trying to create account assignment category Q for it, then there is an error message saying:*
    **only stock requirements are allowed when planning at MRP area level.**
    Does it mean it is not possible to create planned independent requirement for this case?
    Thanks!

    Select the "Issue storage location" as '2' here:
    spro -> production -> material requirement planning -> mrp groups -> overall maintenance of mrp groups -> overview -> mrp control parameters at material level -> (field) Issue storage location selection
    & make sure:
    1. In the BOM  issue storage location is blank for the components
    2. For the FG products , in mrp area prod.storage loc is maintained
    3. Components are extended to the mrp area.
    Pl. revert with the results

  • MRP Areas on storage location Basis

    Hi,
    I created some MRP areas for different storage locations, and assigned those MRP Areas to material(MRP 1 View). Every thing looks fine as of now.
    1)Now when I have seen some forums, I seen Convert planning file entries (SE38 program RMDBVM00), I never done conversion of planning files, can any one tell me what is the importance of it? I didn't done conversion of planning files, will that have any impact on MRP Run.
    Thanks
    Aplha

    Alpha,
    Can I convert planning files now, In D,Q and P, will that effect MRP Run?
    As expert Caetano has said repeatedly, of course it will affect the MRP run.
    The whole purpose of having Development, Quality, and Production systems is to ensure that any changes made in software do not disrupt your business.  In any sane environment, you first perform your changes (such as converting your planning file entries) in dev, and perform unit testing.  Once you have convinced yourself that the change is worthy of testing, you then move the changes to Qual, where typically your company performs Integration and User Acceptance testing.  Only after the business community and the IT community have tested and are satisfied with the results, should you then perform the changed process in Production.
    In short, you shouldn't be asking us in SCN when it is OK to perform the activity in the Productive system, you should be following your company's 'change management' processes, which usually involve, at a minimum, asking your company's user community if the change is acceptable to them.
    Best Regards,
    DB49

  • MRP run at storage location

    Dear All
    We have around 10 storage location and out of the 5 storage location i dont want to include in the MRP run.
    What should I do ?  can you please guide me.
    Regards,
    AMOL WAGH

    Dear ,
    In my understanding it's only possible to make stock in transfer,blocked stock and restricted use stock as available/not available
    for planning.So in my understanding it's not possible to exclude a particular storage location's quality stock to be excluded from
    MRP.
    kindly check this thread which gives a clear explanation regarding your requirement.
    Exclude QI stocks from MRP
    Correct me if I'm wrong.
    Regards
    Mangalraj.S

  • MRP for plant/storage location

    Dear all,
    I have a question regarding MRP extension for plants and materials.
    There is one plant (8000). Company has recently got two locations u201Cxu201D and u201Cyu201D in different states. MRP has to be run for u201Dxu201D  for sales orders and PRu2019s generated should be directed to the main plant 8000 which then triggers a TO for u201Cxu201D.
    My question is since u201Cxu201D and u201Cyu201D are not yet maintained in SAP, Please advise whether to maintain them as plants or as storage locations and also the main steps to be followed for this process. Also, Please advise is there any config to be done so that PRu2019s are directed to plant 8000 and automatic TO/STO are triggered to u201Cxu201D
    Suraj

    Hi
    you have to create  both X&Y as plants.
    Then the procedure to be followed in multi plant planning.
    The following link can be followed.
    http://help.sap.com/saphelp_erp60/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    Regards
    YMREDDY

  • Material staging in production with IM and WM storage locations

    Hello,
    I have the following situation at hand in a Client.
    They use Process Orders and want to do material staging of the components.
    The Production Supply área is an IM managed storage location but the storage location of the components is WM managed.
    The staging should take place as pick parts (control cycle) transfering the components from the WM storage location to the IM production Storage location.
    Im not sure we need to use Deliveries instead of Transfer Requirements.
    Is this escenario posible and if so, how to configure it.
    Thanks for any reply.
    Aart

    Aart,
    For Transfer requirement creation for production order components WM staging please follow below steps.
    1.Activate PP interface in Warehouse number control for PP interface in Logistic execution.
    2.You need to assign WM replenishment movement type 319 against the production supply storage type.
    3.In production scheduling profile all necessary WM TR/TO configuration to be done based on your requirement.
    4.Create PSA in PK05.
    5.Create Control cycle in LPK1.
    6.Assign the PSA to production work centers.
    With above settings once production order is released TR gets created which could be converted to TO manually or automatically for further process.
    Br
    KK

  • Goods receipt with mvt 103 and storage location

    Dear All,
    I have a requirement. I create a PO and make the GR with mvt 103. I have to use 103 because no accounting document shall be created at the time of goods receipt. Then i will approve it with mvt 105.
    Now, my client wants to see the storage location info at the time of GR with 103. But i cannot enter storage location if i use 103. Is there another mvt type that i can use storage location but no accounting document created ? I mean i want to enter storage location when i use 103. is it possible or any other mvt  types ?
    Thanks in advance..
    Best regards,

    SAP docu explains:
    To post all items of a purchase order into goods receipt blocked stock, proceed as described in the section Entering a Goods Receipt for a Purchase Order, but use movement type PO to blocked stock ( 103 ) instead of movement type PO to warehouse (101).
    All of the order items are posted into goods receipt blocked stock with movement type 103.
    Since the material is not to be added to the inventory yet, do not enter a storage location.
    Apart from these differences, you can follow the procedure described in the section Enter Goods Receipt for Purchase Order.
    regards,
    Lalita

  • MRP: Consuption per storage location

    Hi MM Experts,
    we want to upload consumption per storage location. Are there any tables where you can find the consumption per storage location?  (in the table mver Consumers are  per plant).
    thanx in advance.
    SDA

    Hi,
    No, there is not any related table which keeps track of consumption per storage location.
    Cheers,
    HT

  • Exclude Materials with only 1 PO count

    Hello experts,
    I have a multiprovider with 5 DSOs corresponding to 5 Logical SOurce systems.
    All DSOs have a similar structure..like .....
    Logical Source System, PO number , PO item, Material, quantity, price..........
    In a query I wish to compare prices of a material for all logical source systems.
    To reduce the number of rows,
    I wish to exclude those materials which have just one PO across all 5 logical source systems.
    Can you tell me how to exclude such rows with just 1 count?
    Regards
    Surekha

    Hi
    PO Number is coming from all logical source systems and available in DSOs of the multiprovider.
    So, you can create one new key figure PO Count and update the value with constant 1 in the update rules. Ensure PO Number is in key field in all of your DSOs. This will enable the DSOs to count 1 for every one occurence of the PO number.
    Then Create a condition in BEx to exclude PO Count =1
    This will avoid all the entries that have a single occurence of any particular PO number
    Regards

Maybe you are looking for

  • Jabber iPad - Voice Mail Pilot Number

    Hi All, We are testing with Jabber ipad & logged in Presence Account.We have logged in the Voice & Video account as well. i couldn't get any number in " Call Voicemail " option. Voicemail configured & profile subscribed for this user in CUCM & CUPS.

  • Can't seem to track my order now?

    (I suppose this is about phones in a way so best I post it here) Anyway, I got a order which is due to get to me tomorrow for a BT6500 (The call blocker phone) order was placed over the phone (added to my bill) I was able to track it but mysteriously

  • Flex Builder 3 Debugger hanging unit tests

    If I try to run my Unit Tests in debug mode from Flex Builder 3, FF and IE just hang until I cancel the debugger.  Is this expected?

  • Notes won't cut off on MIDI

    I recently got a MIDI interphase to hook up to my keyboard and it's doing strange things in garage band. For example, sometimes when I take my hands off the keys, it continues to play the notes. Why is this happening?

  • Relative position of splitter in panelSplitter

    Hi. I wount to set the splitterPosition in panelSplitter to a relative value, e.g. 50%. I see that only an integer value is possible for this attribute. Is it possible to achieve a relative position to the availabe space on the screen? I need it also