LX26 schedule information

LX26 schedules the bin count based on ABC indicator specified in the material master throughout the year. Is there a standard report which will give out the information of what % of this schedule is complete at any given time of the year based on material?

try transaction LX25

Similar Messages

  • A collections of questions on scheduling information

    Hello, I am doing some research on QoS management, and I need much scheduling information. So I got some questions.
    1 Based on the oracle scheduler, I want to design my own scheduler(non-preempt). That is, once a job is finished, the scheduler need to schedule new jobs based on some job information. So how can i design such a scheduler? I think it should be a job in the database, but it is neither periodic nor event-based.
    2 Each time my scheduler runs, it probably schedule a same job to run. If the former instance of this job has not completed, the new instance will be skipped. How can I disable the former instance and let the new instance run?
    3 I will configure a periodic job which will collect all of the statistic data at the beginning of each period. How can I read the duration time of each job which has been completed? I know I can read the duration time from ALL_SCHEDULER_JOB_RUN_DETAILS,but the accuracy of the duration time in that view is only second. I need better accuracy. Another problem is, if a job has completed several instances in the last period, how can i differentiate them from each other. Because all of the instance number is 1.
    4 And also, I need to know how much CPU time all of the jobs in the last period have consumed. How can I know the cpu time of each instance of each job?(not only the jobs which have completed but also those jobs which are running.) (because I need add them together and write some algorithm to control it not exceed 80% of the period.)
    I am sorry to put so many troublesome questions together. Hope somebody can give me some guidance. Thanks a lot.

    Hi,
    I'll try to answer some of these questions briefly.
    1 Based on the oracle scheduler, I want to design my
    own scheduler(non-preempt). That is, once a job is
    finished, the scheduler need to schedule new jobs
    based on some job information. So how can i design
    such a scheduler? I think it should be a job in the
    database, but it is neither periodic nor
    event-based.The design of a new Scheduler is not something I can really advise on. Perhaps you could have it based on a master process which is a Scheduler job that runs frequently (once every minute or so).
    2 Each time my scheduler runs, it probably schedule a
    same job to run. If the former instance of this job
    has not completed, the new instance will be skipped.
    How can I disable the former instance and let the new
    instance run? The Scheduler does not allow multiple instances of the same job to run. If you want multiple instances of your action to run you need to create a scheduler program and then you can have multiple jobs pointing to that program. Those jobs can happily run in parallel
    3 I will configure a periodic job which will collect
    all of the statistic data at the beginning of each
    period. How can I read the duration time of each job
    which has been completed? I know I can read the
    duration time from ALL_SCHEDULER_JOB_RUN_DETAILS,but
    the accuracy of the duration time in that view is
    only second. I need better accuracy. Another problem
    is, if a job has completed several instances in the
    last period, how can i differentiate them from each
    other. Because all of the instance number is 1.The jobs will have different requested_start_dates . To gain better accuracy you can use log_date-actual_start_date from the ALL_SCHEDULER_JOB_RUN_DETAILS view.
    4 And also, I need to know how much CPU time all of
    the jobs in the last period have consumed. How can I
    know the cpu time of each instance of each job?(not
    only the jobs which have completed but also those
    jobs which are running.) (because I need add them
    together and write some algorithm to control it not
    exceed 80% of the period.)You can do this by querying both ALL_SCHEDULER_JOB_RUN_DETAILS and ALL_SCHEDULER_RUNNING_JOBS .
    Hope this helps,
    Ravi.

  • How can I share my schedule information with my wife on her accounts and devices?

    My wife and I have separate accounts in our MacMini and MacBook.  We each have an iPhone.  She uses GMail.  I use Mac Mail.  How can I share my schedule information with my wife on her accounts and devices?

    It is not advisable to follow the above suggested method. The following will do what you want without complications.
    1. On your Mac, go to http://help.apple.com/icloud/#mm6b1a9479 and follow the instructions to share a calendar privately. If you have more than one calendar you want to share you will have to do each individually. You can choose whether she is able to edit it or whether it should be read-only.
    2. If your wife does not have an iCloud account she will need to obtain one. When you share a calendar and nominate her to access it she will receive and email. All she has to do is to open the email and click 'Join Calendar'. This will add the calendar to her Calendar app on all devices and on icloud.com without affecting any other data. Again, this will have to be done individually if more than one calendar is involved.

  • Querying LOV schedule information

    Is there any way to query the LOV schedule information using the Business Objects Query Builder?  We are able to pull data about Crystal reports and their schedules into a database to do more thorough auditing and we would like to do the same with LOVs.  I know these are treated as reports themselves so I'm wondering how we can get at the backend data of those LOVs that are scheduled.

    I didn't think about the query tool restricting the number of rows returned.  I'm sure that is what is happening with Query Analyzer.
    Executing "select count(*) from jobrun" will give you an accurate count of the number of rows in the table since it only returns one row.
    "Trigger History Retention" does not determine how many days "Job History" will be retained.  Click on the Help Icon (?) for a description of the "Trigger History Retention" setting.
    The Defaults tab has the default value for "Job History Retention".  This determines how long Job Activity is retained.  If this is 30 days, then, if a job has not run in the last 30 days, the job may not have entries in the jobrun table.
    When a job is created, the "Job History Retention" value is used to set the "History Retention" of the job (found on the Job Definition, Options tab).  If you have never changed the value in the Defaults tab, then it is likely all your jobs have this value.  But if the Default value was changed at some point, then the jobs created before the value was changed will have one value, the jobs created after the change will have another value.  To determine the History Retention value for a single job, you can check the Options tab of the Job Definition.  To find out if all your jobs have the same value, you can run this query.
    select distinct jobdtl.jobdtl_retnsn
    from jobdtl
    If your default for "Job History Retention" was never changed, this will return a single value.
    If you know a job that runs infrequently, you can look at the History tab of the job.  I'm not sure what to expect.  If the job only runs quarterly, for example, will there be no history shown if your Job History Retention is set to 30 days?
    It may be possible to determine the last time a job ran by querying the msglog table.  This table can be quite large, so you have to be careful constructing your queries.  The Logging tab of the System Configuration specifies how long these records are retained.
    Tracy

  • The Scheduling information didnt get migrated.

    Hiii
    I have exported work repository for migration from one server to another.
    Everything has been migrated apart from the scheduling information.
    What can be the flaws ?
    Please help.
    Regards
    Manoj.

    I can't say that I've seen this error in past versions or in SP4.  And it doesn't look to be referenced in the errors guide either.  But these are things to consider...
    What datasource is the information space using?  Does it only fail when using one type of database or others as well?
    Is it only your previously created information spaces from patch 12 that fail to schedule? or newly created ones as well?
    Try simplifying the information spaces to only 2 or 3 dimensions and 1 measure.  Can you get to a point where something schedules successfully and build on that?
    Was ther ean error code that was displayed with the message?  Usually it'll show something similar to "PS 30001".  It might make the error easier for you or others to search on.

  • Is there some api to modify the schedule information?

    hi all,
    Is there some GP API to modify the schedule information?
    for example, we just want some users to modify some process's schedule time,not all processes.
    So we must develop some web dynpro application.
    So is there some api to modify GP'S schedule?
    Thank you.
    Best regards,
    delma

    HI all
    I followed this help link:
    http://help.sap.com/saphelp_nwce10/Helpdata/EN/2b/ae193799564c26ab382f2d43ecc1bb/content.htm
    It seems working,except when i use this method:
    GPScheduleFactory.createTimingRecurrentMonthly
    I found it seems make a Recurrent Daily schedule except a recurrent monthly.
    I am confused.
    Can anybody help me?
    Thank you.
    Best Regards,
    delma

  • Scheduling information won't show

    I did a search for a character in the schedule and all the information in the other scenes disappeared.  (Case number 0212026031.)  I chatted with Adobe Support and they sent me to the phone line.  I called the phone number and selected that they call me back in 25 minutes, which they did but it was a robo call and I have now been on hold for an additional 25 minutes and they haven't picked up.  I feel that I am completely getting the run-around and am very disappointed in Adobe Story.  I will probably spend the rest of the day purchasing and learning Movie Magic Scheduling and Budgeting.  Adobe Story is neither reliable in product or support.  Wish you could have been there for me.  I really wanted to make your pipeline work for my film.

    Hi,
    Sorry for the inconvenience. For a faster response, you could always mail us at DL-AdobeStory-support<at>adobe<dot>com
    When you search for a string in schedule, it shows all the scenes containing that string ( and hide the other scenes). When you clear the search, all the scenes are back.
    We also have a request in out backlog around search where the users would like to see all scenes and the expectation is to only highlight the searched string in the view. We will be working on it soon. Is this what you need ?
    Regards,
    Sunny

  • Event Back ground scheduling information

    Hello Guru's
    The start variant in the process chain has after event SAPXXXX. This is a user defined event. The process chain first executes the event and then executes the rest of the steps in the process chain. I would like to know the jobs performed by this event. What are the jobs or programs it is executing in the R/3 side and the BW side. And transaction code where we could see the entire code of the events.
    Urgent need of the information,Ur Help is appreciated.
    Thanks,
    Sri.

    in SM37 , you have a option for based on event to find jobs.. just keep job name * ..at the bottom After ABAP program...you have for event name tooo.. give the event name you are interested in it..and you find out all the jobs that are waiting for this event to trigger.
    you would only get event name in SM64 but not detailed info abt programs or jobs in SM64
    Message was edited by:
            Manga Paidikondala

  • Process scheduling information and changing RR quantam

    hi
    I am abit curious user of linux.
    what scheduling algorithm is used for process synchronization in OEL5.4?
    how to know/examin that?
    if she is using RR (round robin) is it possible to change the quantum slice for that?
    regards

    kido, I think you need to be a little more verbose, because what you say can easily be misunderstood.
    the CFS (completely fair scheduler) is merged into the linux kernel release 2.6.23. the current enterprise linux versions (4 and 5) use kernel version 2.6.9 and 2.6.18.
    this means that the CFS is not used in current enterprise linuxes
    the CFS will probably appear in a future release of enterprise linux if the kernel version chosen is >= 2.6.23 and if the CFS is the default scheduler.

  • Unable to schedule a report to email and print

    I have been working on a task to both print and email a report to recipients whose email addresses are obtained at runtime.  So far I am able to email the report as a PDF attachment, however, I am not able to get the report to print.  I have three thoughts as to why the report is not printing.
    1. The printer is in a subdomain under the domain where InfoView and the Enterprise server reside.
    2. It is not possible to schedule a report for both an SMTP and print destination simultaneously.
    3. The format is causing an issue in printing - the SDK API states "Printer is a report format specific destination and can only be used when the report object is a Crystal Report."
    I have looked at the scheduled report in InfoView and can see that the print settings I am passing are correctly set for the scheduled instance.  Does anyone know if there is a problem with trying to schedule printing and email at the same time, or if the report format must be .rpt?
    Below is my code. Thank you for your time.
    String query = "Select SI_ID, SI_NAME, SI_PROCESSINFO, SI_SCHEDULEINFO, SI_SCHEDULE_STATUS From CI_INFOOBJECTS Where SI_ID=" + reportId;
            IInfoObjects results = null;
            ISchedulingInfo schedulingInfo = null;
            try {       
               results = iStore.query(query);           
            } catch( SDKException sdke ){
               logger.error(sdke);
            if( !results.isEmpty() ){
                // get the actual report object from collection and set scheduling information
                IInfoObject report = (IInfoObject)results.get(0);
                schedulingInfo = report.getSchedulingInfo();
                schedulingInfo.setType(CeScheduleType.ONCE);
                schedulingInfo.setRightNow(true);
                schedulingInfo.setRetriesAllowed(3);           
                try {
                    Set<String> keys = destinations.keySet();
                    Iterator i = keys.iterator();
                    while( i.hasNext() ){
                        String dest = (String) i.next();
                        if(dest.equals(CrystalDestinations.EMAIL)){
                            // get the destination object and set it to SMTP plugin
                            List emailAddress = destinations.get(CrystalDestinations.EMAIL);
                            IDestination destinationObject = schedulingInfo.getDestination();
                            destinationObject.setName("CrystalEnterprise.SMTP");    
                            IDestinationPlugin smtpPlugin = (IDestinationPlugin) iStore.query("SELECT * FROM CI_SYSTEMOBJECTS WHERE SI_PARENTID = 29 AND SI_NAME='CrystalEnterprise.SMTP'").get(0);
                            ISMTPOptions smtpOptions = (ISMTPOptions) smtpPlugin.getScheduleOptions();
                            smtpOptions.setDomainName( emailDomain );
                            smtpOptions.setServerName( smtpHost );
                            smtpOptions.setSMTPUserName( smtpUser );
                            smtpOptions.setSMTPPassword( smtpPass );
                            smtpOptions.setSubject( "Email for report " + report.getTitle() );
                            smtpOptions.setMessage( "This is the message body" );
                            smtpOptions.setSenderAddress( smtpUser + "@cdrh.fda.gov" );
                            smtpOptions.setSMTPAuthenticationType( ISMTPOptions.CeSMTPAuthentication.LOGIN );
                            for(int j = 0; j < emailAddress.size(); j++ ){
                                smtpOptions.getToAddresses().add( emailAddress.get(j) );
                            destinationObject.setFromPlugin( smtpPlugin );                                                                               
    } else if ( dest.equals(CrystalDestinations.PRINT) ){
                            List printers = destinations.get( CrystalDestinations.PRINT );                   
                            IReportPrinterOptions printerOptions = ((IReport)report).getReportPrinterOptions();
                            printerOptions.setCopies(1);
                            printerOptions.setEnabled(false);
                            printerOptions.setPrinterName( (String)printers.get(0) );                   
                            printerOptions.setPageLayout(IReportPrinterOptions.CeReportLayout.USE_SPECIFIED_PRINTER_SETTING);
                    List reportPrompts = ((IReport)report).getReportParameters();
                    for(int j = 0; j < reportPrompts.size(); j++){
                        IReportParameter prompt = (IReportParameter) reportPrompts.get(j);                   
                        if(prompt.getParameterName().equals(mdrParamName)){
                          IReportParameterSingleValue v = prompt.getCurrentValues().addSingleValue();
                          v.setValue(reportParameters.get(mdrParamName));
                        } else if(prompt.getParameterName().equals(addressParamName)){
                            IReportParameterSingleValue v = prompt.getCurrentValues().addSingleValue();
                            v.setValue(reportParameters.get(addressParamName)); 
                    IReportFormatOptions format = ( (IReport) report).getReportFormatOptions();
                    format.setFormat(IReportFormatOptions.CeReportFormat.PDF);
                    iStore.schedule( results );

    Hi Jason,
    Based on your code, I could not tell if you were scheduling a Crystal Report or a WebI document.
    Regardless, what I would suggest is you try scheduling the report/document on InfoView.
    Once you schedule it on InfoView, you can retrieve the instance on Query Builder (or through code) and compare the properties that are being set through InfoView and the one you set through your code.
    This should indicate if you are missing some properies or have set some properties incorrectly.
    Hope this helps.
    Regards,
    Dan

  • How to schedule a job in SAP CPS

    Hi,
    I am new to SAP CPS.
    So please tell how to schedule a job in SAP CPS. And which kind of job cam be schedule means BAP report.
    Thanks
    Anurodh

    Hi,
    In the installation and administration guide you'll probably find some examples.
    The Job Definition you need is SAP_AbapRun to run any ABAP.
    You submit this, specify the parameters as desired, and scheduling information, and that should do the trick.
    That is assuming you have already connected CPS to an SAP system.
    Check the topics in the docs within the product and on SDN on:
    - Connecting to an SAP system
    - Submitting Jobs
    - SAP_AbapRun
    Regards,
    Anton.

  • Is it possible to add new delivery schedule with bapi_change_po?

    Hi all,
    We're able to update PO existing line item and delivery schedule date with BAPI_CHANGE_PO. However we can't find any way to add new delivery date (under delivery schedule tab, in PO) for multiple delivery schedule scenario.
    please advise is it to do so with BAPI_CHANGE_PO or we should try other approach to do it. Thanks.

    Use the BAPI "BAPI_PO_CHANGE".  New delivery schedule information can be filled in the structures POSCHEDULE & POSCHEDULEX.
    poschedule-po_item = <item_number>
    poschedule-sched_line = <new schedule Line>.
    poschedule-delivery_date = <delivery_date>.
    poschedule-quantity = <schedule quantity>.
    append poschedule.
    poschedulex-po_item = <item_number>
    poschedulex-sched_line = <new schedule Line>.
    poschedulex-po_itemx = 'X'.
    poschedulex-sched_linex = 'X'.
    poschedule-delivery_date = 'X'.
    poschedule-quantity = 'X'.
    append poschedulex.
    Regards
    Vinod
    Edited by: Vinod Kumar on Apr 21, 2010 11:35 AM

  • Urgent Help Needed in scheduling reports from BI Publisher

    Hi,
    I have configure the scheduler service on my windows server. Now i am trying to schedule a report from BI pubisher. But it is not working. When i click submit button, It is not doing anything. It seems it adds entry in the job schedule table. Even when i click schedules link, it shows just show progress status on explorer status bar but nothing happens.
    Any help would be on this would be highly appretiated.
    Thanks,
    Prasad

    Have you actually checked the scheduler tab to see what the report did? BI Publisher will not just tell you if a job fails unless you have your email server configured then you tell it to email you if the job fails. Also, be patient because it can take up to 5 or 10 minutes for a report to completely run for a 40000 row dataset. If you check the scheduler tab and the job failed, check your RTF Template. I have discovered through trial and error that BIP is picky about how you do your tags, especially loop tags. These would allow you to view the report online but cause BIP scheduled reports to fail on the report. Other than that, have you installed the scheduler database and tied it in? BIP has its own database schema you have to install somewhere on an database server that it stores scheduling information in.
    I hope this helps.

  • Outlook 2010 : Scheduling Assistant not showing participant's timeline, stuck on updating and won't finish

    Since last week when i tried to schedule a meeting, i am not able to use scheduling assistant to view the participants time. It will just display a gray bar with 'Updating Schedule Information" and it goes on without displaying anything. The
    same goes for my calendar.  I've added few colleagues' calendar and previously i was able to view their time, now it just says 'updating' with the spinning animation.
    I tried to :
    - start outlook in safe mode, not working
    - Create new profile with my account and restart outlook. No luck
    - enable logging on Outlook, but there is not <date>-<time>-fb.log file created when i tried to view a colleagues calendar.
    but,
    - Start OWA and view both calendar and scheduling assistant, works fine!
    - on my colleagues laptop, added my account and it works.
    It seems to me Outlook Calendar is not retrieving the information from exchange server. Sending email and receiving email works as normal and i can see my outlook status is connected to exchange server.
    Any idea how to fix this? Any help is greatly appreciated.

    Hi,
    According to your post, I understand that there is an issue when using Scheduling Assistant in Outlook. I noticed that the issue doesn’t exist in OWA or on your colleagues computer.
    Please change a new computer with your domain account to login to check whether the issue persists. If the issue doesn’t continue in new computer, the issue may be caused by some third-party programs in your original computer. We can disable them and perform
    a clean boot in Windows for the computer to have a try:
    http://support.microsoft.com/kb/929135/en-us
    Thanks,
    Winnie Liang
    TechNet Community Support

  • Document type LPA in schedule agreement

    any one can explain me document type LPA in schedule agreement. I read books as that is document type with release documentation. And what is the diff between LP and LPA?

    Dear,
    Please find below, which I found by search and posted by fellow collegues earlier....
    Default quantity for goods receipt
    In the standard system, the quantity open to date from the last- transmitted SA release is used in the case of scheduling agreements with release documentation (document type LPA). In the case of scheduling agreements without release documentation (document type LP), the open quantity to date is used.
    Document Type of Scheduling Agreement
    As a rule, the APO scheduling agreement in the SAP R/3 system is a scheduling agreement with the document type LP or a scheduling agreement without release documentation.
    If you use scheduling agreements of the document type LPA without confirmation control key then no default quantities can be determined from the release upon goods receipt.
    If you use scheduling agreements of the document type LPA with confirmation control key then the default quantities from the confirmation (shipping notification) are used.
    As a rule, the OLTP scheduling agreement in the SAP R/3 System is a scheduling agreement with the document type LPA.
    A scheduling agreement is a longer trem agreement with a vendor covering the supply of materials subject to predefined conditions.The conditions are valid for a pre defined period and a pre defined total purchase order quantity.
    You can enter the Target value in the header data of the scheduling agreement.You can enter the Target quantity in the item overview for each item
    You can use scheduling agreement with or without release documentation.The advantage of working with scheduliing agreement release documentation is that you always have a record of when you sent which delivery schedule information to your vendor,which you can display at any time.
    Without release documentation(Document type LP)
    The delivery schedule lines have official character-that is to say,they are transmitted to the vendor as they are saved in the system.The system does not document in detail releases aganist the scheduling agreement that have been sent to the vendor.Therefore,in the case of the document type without release documentation,the message control facility should be set up in such a way that a message is immediately sent to vendor if any changes are made to the delivey schedule stored in the system.
    With release documnetation(Document type LPA)
    If you use scheduling agreement with release documentation,the delivery schedule lines are not transmitted directly to the vendor.Intially ,the lines of the delivery schedule stored in the system for an LPA scheduling agreement for an internal information only.A message informing the vendor of your material requirements cannot be transmitted to the vendor until you explicitly create an SA release,that is forecast (FRC) or Just in Time(JIT) delivey schedule.Through this process,you can change the way schedule lines are represented.With release documentation,you can disply the SA releases(delivery schedules) transmitted to a vendor over a certain period of any time.This enables you to trace precisely when you sent which information to vendor.
    Regards,
    Syed Hussain.

Maybe you are looking for

  • HP Officejet 6500 Installing Problems Windows 7

    Hello, When I triy to install the HP Officejet 6500 on my Windows & desktop, I get a error that setting up te printer failed. This happens after I select the printer (wired) en select the printer that is found from the list. After that he try's to in

  • How to terminate the "process" running in weblogic server by servlet

    hi all !! i have executed a external command from servlet but i am not getting the output untill i logoff the weblogic server. now i want to kill the process running in my server by servlet code.how could i do this? here is my code ,it is executing t

  • How do you integrate a column with respect to another column

    I have two columns of data, one is time and the other is velocity. I want to be able to integrate velocity with respect to time, but I can not find a function which will let me do this. Preferably, I'd like to do a cumulative trapezoidal integration,

  • Best external DVD writer for iMac

    What is the Best external DVD writer for iMac

  • Crystal Reports using Visual Studio

    I am becoming more comfortable with working with Crystal Reports using Visual Studio.  I ran into some issues, but I was able to figure them out.  I have ran into one which I am not able to figure out.  I would like for you to ask Business Objects if