LZM Scheduling agreement: delivered lines still generate requirement in MRP

Hi all,
The problem I have is simple:
- schedule agreement for finished goods of type LZM
- the forecast lines are not updated daily and sometimes we can still have forecast lines for which deliveries were already performed
Those lines are still present in MD04 - how can we get rid of those past requirements that are already 'satisfied'?
If any other details are needed, please let me know.
Thank you,
H.

Hi Shiva,
and thank you for your prompt answer.
I do not suspect that there is some error and running the correction program will solve it but this is the normal behaviour of the system given its actual configuration. Something has to be changed in the configuration of the system or some basic data are not properly maintained...
Regards,
Horatiu
P.S. I made a run of SDRQCR21, no change.

Similar Messages

  • No Scheduling line is generated when RUN MRP

    Hi Gurus,
    My SA type is 'LP', source list is marked with 2 'relevant to scheduling line'.
    then i RUN MRP with parameters 33132, but no scheduling line is generated, could you help me find the reason , thank you!
    BR,
    Dragsky

    Dear Dragsky,
    You need to create scheduling agreement in ME31L
    Also check this link
    [Schedule Lines not getting created in MRP;
    Regards
    Madhu

  • MRP To Generate SCHEDULE LINES for Scheduling Agreement

    Hi
    I have followed the below steps but still the Schedule lines is not generated for scheduling agreement.
    1Maintain MRP views 1,2,3,4 for the material in material mste.(MM01)
    2. Maintain Purchase Info Record for the vendor plant & material combination.(ME11)
    3. Create Scheduling agreement using ME31L
    4. Maintain source list for the material & the scheduling agreement # and Line item set the MRP relevant indicator 2 (Necessary ?) ME01
    During Run MRP for the material.the below details entered///
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Schedule lines 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 1 Determination of Basic Dates for Planned
    Run MDBT or MD02 but still doesn't create the schedule lines......Anything else missing.
    MRP1:
    MRP Procedure: PD
    MRP Group: 0000 (External Procurement only)
    Lot Size: EX (Lot For Lot)
    MRP2:
    Procurement Type: F
    Sched Margin Key: 000
    MRP3:
    Avilablity chec: 02 (Individual requirement)
    MRP: 4
    Nil

    Raj,
    Source List a Mandatory for Scheduling Agreement, if you want to create automatic Scheduling line.
    Plz use (2) in MRP RELEVENT tab in ME01 (Source List).
    rest of the thing is ok, make sure a material master(MRP 2 VIEW) in that view you have to give a planed delivery days. it is must.
    HOPE IT WILL WORK
    Regards:
    Poision

  • Fully Close Off Under Delivered Schedule Agreement Line Items

    Hi There,
    I am supporting a customer who is having an issue with line items on a scheduled agreement, which she has closed off, appearing in MIGO.
    Example: I have a scheduled line item of 100 EA.  I GR 90 EA but I am happy with this so I want to close off the line.
    I go into ME38, select the line item, click the delivery schedule icon, set the scheduled quantity to 90 and click the fixed check flag. I refresh the Schedule Agreement and re-release it.
    However when I go into MIGO and do a Goods Receipt for my scheduled agreement, MIGO is still proposing the 10 EA to me.
    I have two questions
    1) Are the steps I am doing the correct way to close off an under-delivered scheduled line item
    2) If 1 is correct, how come the 10 EA is still being proposed and how do I stop this happening?
    Many Thanks for any help provided,
    Colm

    No Answer

  • Scheduling agreement, unnecessary delivery schedule lines

    Hello
    We use Scheduling agreements for purchasing spare parts. The MRP run checks the warehouse requirements and creates delivery schedule line to scheduling agreement.
    Now the MRP run creates unnecessary delivery schedule lines to scheduling agreement if the earlier created delivery schedule line's delivery date has been changed manually.
    For example,
    Today the MRP run finds requirement for one article  and creates the delivery schedule line, where delivery date is 2.9.2008 (determined from articles basic data).
    The Vendor confirms the delivery date as 3.10.2008 and the purchaser changes manually  (transaction ME38) the delivery date to delivery schedule line accordingly and prints the created message.
    The next MRP run creates new delivery schedule line, where delivery date is again 2.9.2008.
    now there are two open delivery schedule lines for this article with delivery dates 3.10.2008 and 2.9.2008.
    Why the MRP run does not notice the existing delivery schedule line with the new delivery date 3.10.2008?
    we have changed delivery dates manually several years and this has never happened before.
    could you please help me to resolve this.
    Thanks in advance,
    Srikanth

    In addition to the above post,
    as you changed the date manually from 2nd to 3rd....
    so there are was no report for 2nd generated ulitmately...and if generated it was changed...right...
    so when you again run the mrp...the system will generate one more pr for the same article....
    this ultimately happens because of the set del dates in the MMR as i told above..
    Hope it helps..
    Regards
    Priyanka.P

  • Change Schedule line in Scheduling agreement by function.

    I want to know that is enalbe to change schedule line in Scheduling agreement by function( 'BAPI' or Standard function).
    I known that is possible by BDC.
    But I have to change many records. So I want to know faster method.
    Please let me know what function enbale that.
    Thank you for your interest.

    Hi..
    The Scheduling agreement is one which is created runing MRP not VA31.
    I know that is two transaction data in SAP.
    One is Sales Data other one is Purchasing Data.
    This is second one.
    Thank you your response.

  • Scheduling agreement & Lines

    Dear all,
    I am not getting the Excise duties & taxes in Scheduling agreement and Lines, as like PO, If anyone knows please send the solution.

    Hi,
    Actually in Print Preview I am not getting the tax and excise duties, I have selected the tax codes. If I go MIGO I can see the excise duties but not in Print Preveiw as like Purchase order.
    regards,
    MD

  • How are deliveries automatically created from scheduling agreement?

    How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
    Thanks in advance.

    hi
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Document Types
    To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
    The R/3 System contains the following document types for component suppliers:
    LZ - Scheduling agreement with delivery schedules (no external agents)
    LZM - Scheduling agreement with delivery orders
    LK - Scheduling agreement with delivery schedules (external agents)
    ED - Delivery by external agent (consignment issue)
    EDKO - External agent correction
    RZ - Scheduling agreement returns (no external agents)
    KAZU - Consignment pick-up for external agents
    KRZU - Consignment returns for external agents
    Item Categories
    To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
    The system determines the following item categories for the related document types in
    documents containing materials with item category group NORM:
    Item category LZN for scheduling agreement type LZ
    Item category LZMA for scheduling agreement type LZM
    Item category LKN for scheduling agreement type LK
    Item category KEN for document type ED
    Item category EDK for positive corrections (or the manual alternative EDK1 for
    negative corrections) for document type EDKO
    Item category REN for document type RZ
    Item category KAN for document type KAZU
    Item category KRN for document type KRZU
    Schedule Line Categories
    To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
    The R/3 System contains the following schedule line categories for component suppliers:
    L1, BN, L2, and CN for item category LZN
    E4, E0, E5, and BN for item category LKN
    L2 for item category LZMA (standard for delivery order processing)
    Schedule Line Types
    To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
    Creating Scheduling Agreements
    To create a scheduling agreement with delivery schedules:
    1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
    2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
    relevantorganizational data.
    3. Choose ENTER.
    4. Enter the following data:
    Sold-to or ship-to party number
    Purchase order or closing number
    Material or customer material number
    You can use the Description field to identify the scheduling agreement. For
    example,
    you could enter the model year for a particular production series.
    The system allows up to 35 digits for a customer material number.
    Rounding quantity
    Usage
    Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
    Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
    Planning indicator
    Choose Goto -> Header ->Sales.
    Target quantity
    Mark an item and choose Goto -> Item -> Sales A
    Partners
    For scheduling agreements with external agents , choose Goto -> Header
    ->Partners to enter the external agent as forwarding agent and special stock partner
    on the partner function screen.
    5. Create a delivery schedule
    Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
    schedule>. Enter:
    A delivery schedule number and date
    The cumulative quantity received by the customer
    The last delivery confirmed by the customer
    A schedule line with date, time, and quantity
    To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
    configuration:
    img->SD->Sales->sales document->scheduling agreements with delivery schedules->
    step1: define schedule line types
    schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
    stds are 1. fixed date 2. backlog 3. immediate requirement
    4. estimate
    step2: maintain planning delivery sched. instruct/splitting rules
    The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
    2.1 delivery schedule splitting rules
    2.2 dly schedule instrusctions
    2.3 assign dly schedule splitting rules
    step3: define sales documents type
    step4 : define item categories
    step5: define schedule line categories
    step6: maintain copy control
    PROCESS
    step1:  create scheduling agreement
    VA31
    enter SP,SH valid from, valid to,
    goto ITEM OVERVIEW tab
    enter material, rouding qty
    select ITEM  click on FORECAST DLSCH
    enter different dly dates and qties
    save it.
    step2: create sales order with reference to above
    step3: create delivery
    step4: create billing
    regards
    krishna

  • MRP Reschedules PO ahead of Scheduling Agreement

    Hi,
    We have a situation where one company code (Company A) buys product from a second (Company B) via an inter-company Scheduling Agreement. The schedule lines are generated automatically from MRP.
    Company A now has a need to purchase a one-off quantity of the same product from an external company and so have subsequently raised a Purchase Order with delivery dates in the future (after the next requirement from company B is due).
    The result of the MRP run has been to prompt rescheduling of the Purchase Order in to meet immediate requirements and only generate schedule lines from Company B after the full Purchase Order quantity has been used. This is not as required, as the dates on the PO are those that are achievable by the external supplier.
    I can't find any settings that relate to a prioritising of MRP elements which would imply that a PO has precedence over a Schedule Line, and I would rather not fix the schedule lines of the Scheduling Agreement.
    Has anyone seen this before, or knows what I'm missing.
    Thanks

    Hi suresh
    The requirement goes this way.the sales person creates a scheduling agreement instead of a sale order.The next process is running MRP for the scheduling agreement .
    Just he wants to know through a report what are the sceduling agreements peding for MRP run.
    Shankar

  • Scheduling Agreement with Delivery Orders

    Hi,
    When i create (LZM)scheduling agreement(Qty 10) with Delivery orders, when i create deklivery schedule
    ie
    Date                Qty
    25.10.2008      1
    26.10.2008      1
    27.10.2008      1
    in MD04 for that particular material i can see only requirement for cumulative Qty i.e. 3, &  PP guy is not able to create planned order for those dates unless i create delivery Order(TAM) for the same
    whats the solution for this?
    Regards,
    Amol.

    Hi Suresh
    The *** issued qty gets updated when the PGI for the delivery happens. There is a field called *** received by customer and it gets updated when customer sends the *** back in the 830 or 862 as the case may be.
    The difference between the *** issued and the *** recieved is always shown in transit.
    If you do not want the schedule line to be opened up, then in *** recd change it to the *** issued or ideal option is populate the last delivery PGI'd on the delivery number field next to *** recd field. Hope this helps and let me know if you need any more informataion
    Regards

  • Craete Sales Order with reference to Schedule Agreement

    Dear All,
    I want to create a sales order with reference to a schedule agreement.
    Purpose:
    In case of quantity shortages in delivery of the schedule agreement  line item (Doc type - ZDS), customer want to send a replacement for the balance.
    This replacement is send using a new sales order (Doc type - ZREP). So the requirement is to refer the schedule agreement to keep the link between initial schedule agreement & the replacement order.
    I have maintain the relevant copy controls as well. (ZDS to ZREP)
    I have 2 type of item categories used in the schedule agreement (ZDS).
    LPN - this is for the normal delivery, billing. (Billing relevance - A in the Item category)
    ZPN - this is just to do the manufacturing. No delivery billing is done using this type. (Have Billing Relevance -BLANK)
    So when I try to create a Sales order w.r.t. Schedule agreement, only lines with ZPN shows me in the copying dialog.
    But I want to copy lines with LPN, not lines with ZPN.
    Any idea how to solve this?
    Thanks a lot !

    Thanks you very much for all replies !!!
    Dear Raj/Ankur,
    This replacement is due to quality issue in the initial sent material.
    So I'm sending the same material I sent earlier from the schedule agreement LI. Only difference is to capture the replacement, I use sales order type ZREP (VA01) other than schedule agreement.
    To give you more info on this,
    They use Item category ZPN to produce semi-finished goods & keep it ready for that customer. Once customer asked it with specific color, they do color it & deliver & bill. To do delivery & billing they use Item category LPN.
    Therefore each Scheduel agreement, they have one line with ZPN - only to production.
    one or more LI's with LPN - to do subsequent delivery & billing for that customer.
    So replacement should be created with reference to the LI with LPN. Because my initial delivery happened from that LI.
    Everything is in place as you have mentioned.
    I have maintained copy controls from ZDS to ZREP
    I have copy controls from Item Category LPN to my normal order Item category.
    I have schedule line copy control as well.
    Am I missing anything??
    And there is no issue with my Item category group & material master Item category group as well.

  • How ro delete/cancel procurement Scheduling Agreement Release in APO system

    Hi,
    Can you please tell me the ways to delete procurement schedule agreement release in APO system.
    I have gone through the thread "How to delete the old schedule line release? and found two transactions but it seems both the transactions like /sapapo/cmds_del  & sappao/cmds_sc02 are used for sales scheduling agreement release deletion.
    The system is not allowing me to delete the same in APO system as these are APO scheduling agreements.
    Please help me on the same.Thanks in advance.Revert back if any further clarification is required.
    regards,
    kaushik

    Hi,
    Thanks for your reply again.
    The /SAPAPO/DELETE_PP_ORDER program does not select the release schedule lines though it selects the Scheduling Agreement Schedule Line (Not released) for deletion.
    The transaction /SAPAPO/PWBSRC2 for Deleting External Procurement Relationship but as long as the released schedule line exists , it is not possible to delete the scheduling agreements.
    I have gone through the help.sap.com site and I was not able to found anything about deletion or cancel/closing of Scheduling Agreement Release.
    Still waiting for the solution.
    regards,
    kaushik

  • Schedule Agreements with JIT/FRC

    We are using schedule agreements with JIT and FRC.  When MRP runs it generates the delivery schedule lines with the delivery dates which appear on the JIT/FRC schedule.  However, when MRP pulls in the date and suggests a new (earlier date) in MD04 under rescheduling date, the date on the delivery schedule and the JIT schedule do not reflect this rescheduled date.  Is there a setting or some configuration I have missed.  I need to have the delivery schedule and JIT schedule reflect the rescheduled MRP dates.

    Thank you Ramakrishna,
    I tried entering the data as you specified (below), but it still did not bring the rescheduled dates into the delivery schedule.  I tried increasing the days and %, still no change.   My rescheduled dates go back to March 07, but the delivery date still says 8/07. 
    A few questions:
    In the Tol. profile under Legnth in workdays, what does this mean if I enter 10.  Does it only check the previous 10 days?  and what does each period do?  Do I need to specify days and %'s in each period?
    <b>Tolerance Profile</b>
    You specify 10 days as the checking period for JIT schedules, since this corresponds to the release horizon. You enter 5% as upper and lower tolerance limits and choose Overall check.
    Regards,
    Elizabeth

  • Stock transport scheduling agreement SD Delivery

    Dear Experts.
    I am using stock transport scheduling agreement in order to show requirements from one plant to another plant belonging to the same company code.
    Delivery to the Stock Sched Agreem will be managed  thru the SD delivery processes.
    I use VL10I in order to create a delivery linked to the Sch Agrm, nevertheless the business processes requires that sometimes the delivery created is modified adding new materials.
    Need.
    I have not found any option on the VL02N which would allow add a new material linking it to a specific sched agreement ---(this same option exists for the case that a new material is delivered and has to be added and linked to an existing customer order)
    Does anybody know how can I do this from the delivery - VL02N??? I would prefer to avoid using VL10I again - which is actually the way I am getting this solved.
    Any help would be appreciated.
    Regards vpa
    Valentí

    Have you configured required settings for Stock transport scheduling agreement in SPRO (STO Settings)
    If yes check in SA r u getting shipping tab or not.
    Give some more details about your process .

  • Tiered Costing in Scheduling Agreement

    Hi all,
    I'm working with scheduling agreements and we have a requirement to have have the price picked up by tiers and I know that this will be accomplished by SCALES, However when I'm trying to configure the scale types I'm facing some difficulties.
    Here's the exmple how we would like the pricing to work for different tiers,
    Pricing Condition PB00 will be created with the following SCALES
    To  Quantity 1      HR - 10$
         Quantity 500   HR - 9$
         Quantity 1000 HR - 8$
    If the delivery schedule line is created for 1100 Hours then the price calculation should be : 500 x10$ + 500 x 9$+ 100 x 8$ = 10300$
    Please correct me if I'm wrong but I think we can accomplish this by "Graduated To" scales. I've tried changing the standard condition type PB00 with the scale type D, but the problem is whenever I create a scheduling agreement it's getting created with condition type PB00 with scale type "A" ( From scale)
    If I delete this condition and create a new one I get SCALE D.
    I was hoping if any one of you could give any heads up on this or suggest something that could help me in accomplishing the task cited above.
    Appreciate your help in advance,
    Cheers,
    Dhaval

    Hi Ramesh,
    Thanks for the heads up. I looked at the config for the schema dtermination and I see that the pricing procedure RM0002 has not been assinged to any vendor POrg schema in this configuration.
    I then looked at the config for the condition type PB00 --> pricing procedure RM0002 has been assigned to the condition type PB00 and since we don't have any entries maintained for RM0002 in the schema determination config I was just wondering if this is what is influencing the automatic proposal of the condition type PB00 in my scheduling agreement.
    Also can you please tell me what is a difference between a Purchasing Document (BIG) and Purchasing Document (Small) in the schema determination config.
    All I wanted to accomlish here is my teired pricing to work when I assign scales on the condition type in the scheduling agreement ( not in the PIR)
    What currently happening in my case is ....
    Example: Scale From 1 pc - 100.00 USD
    from 50 pc - 90.00 USD
    from 100 pc - 80.00 USD
    Target quant. 100 pc
    schedule lines 30 pc
    20 pc
    The problem is  that the goods receipt of 30 pc is valuated at the price 80.00 USD It always takes a lowest price on the scale.
    I've tried looking for OSS notes and also looked enough on the forums but I could not get any resolution to this question.
    I would appreciate if I could get any heads up from your side.
    Cheers,
    Dhaval

Maybe you are looking for

  • HT1414 How do I find out a forgotten passcode?

    I have followed the directions about using I-Tunes and everything appeared to be working until I got the message that nothing would happen until I put the Passcode in. 

  • How do I bring up color gradually on a slide?

    I am new to Keynote and to making presentations. I have just about zero familiarity with Keynote tricks of the trade or lingo, so please keep that in mind if you answer my question. I recently got as an e-mail attachment a PowerPoint presentation tha

  • Downloaded Mavericks but no "install" appeared...

    Trying to install Mavericks on my late 2008 model MacBook Pro 15" ... I downloaded the Mavericks app from the app store, It says "downloaded", but the computer is not prompting me to "install"... is there a way to find the file and force install it??

  • Placing answers in prescribed order

    Hi I am using Captivate 2, does anyone know how I could create an activity where the students have several items and they have to place them in order eg alpha, numerical etc.? Example: Arrange the following in file number order: 750923 785423 665239

  • How to set content type while sending an email?

    Hello, I want to set content type text/html while send an email using org.apache.commons.httpclient api. I am using MultipartPostMethod method. and i am set using object of multipartpostmethod like post. and post.setRequestHeader("Content-Type","text