M7126 Manual reservation for order category 30 is not
Dear Experts,
Our's is extended classic scenario. Here I am trying to create a cart for stock material and in const assignment I am assigning order as maintenance order number.
After cart is approval it is showing the status as Error in process, no reservation is created.
When I searched for the root cause for the error in BBP_PD, there I am getting the message "M7126 Manual reservation is for order category 30 is not"
Can any one please help me on it.
Thanks & Regards
Krish.
Hi Krish,
In SPRO > IMG > Cross Application Basic Settings > Define Objects in Backend System.
Check for the settings mentioned over there. For reservation to be created under Internla Procurement column instead of " Always External Procurement" the entry should be " Reservation generated if stock available or external procurement".
Run the cycle again after modifying this setting.But mainly the above setting is used in case of Classic Scenario.
If your intention is create a SC for stock material which should be stored then "Order as Direct material" button needs to be clicked, which will check for the stock and in case stock is available then will create a requisition otherwise will create a P.O.
Anyways check and revert for further help.
Award points for helpful answers.
Rgds,
Teja
Similar Messages
-
Manual reservation for order category 20 not allowed
Hi,
We are getting the error message "Manual reservation for order category 20 not allowed" when trying to manually create a Reservation Order charged to a network through transaction code MB21.
Anyone knows how to solve this?
Will appreciate feedback. Thanks!Hi,
You would need to add this component in your WBS element & then the MRP run will generate a reservation for this. You cannot create a manual reservation using 281 mvt in MB21.
Refer sap note 43924, read the paragrah under 'cause and prerequisites' means that according to SAP's standard design, reservation for Network is supposed to be automatic, not manual. However, if manual reservation is really needed, do apply the solution provided.
Hope the above clarifies.
Regards,
Vivek -
Manual reservation for order category 30 not allowed
Gurus,
I want to do manual reservation for order category.In MB21 when i try to do the reservation the system in giving the error message
Manual reservation for order category 30 not allowed
What should be done to overcome this.
In the order one component is given,i want to issue additional component,this is where i am encountering the problem.The Standard System would not allow you to create a reservation manually against a Maintenance Order Whether you change the Res / P Req Indicator to Never. Still the System would generate the Reservation for the Stock Materials. Purchase Requisition could be created manually against the Order but reservation is not. The Movement types used for reservations are 261/262. Kindly elaborate on the requirement, may be a work around is there.
If you want to skip the goods movement against reservation step, you should enable the back flushing indicator against the stock material in the General Data View so when you would be entering Confirmation against the order, the goods movement would be automatically posted against the reservation created automatically from the Order without you having to bother about the reservation.
Edited by: Usman Kahoot on May 31, 2010 1:50 PM -
Manual reservation for order category 10 not allowed
why cant i make any manual reservations for a production order? is this possible or i can i configure the system to allow this?
>
R Brahmankar wrote:
> Dear,
>
> It is not possible.
>
> You entered an order whose category only permits automatic reservations. The following order categories do not allow manual reservations:
>
> 10 PP production order
> 20 network
> 30 maintenance order
> 40 batch order (process manufacturing)
> 50 inspection lot
>
> When convert the planned order into production order, reservation will take place.
> This planned order is created by mrp run.
> Without running mrp, you are creating production order manually.So not possible to reserve.
>
> Order reservation will be created in issuing plant for components if u create production order manually.
>
> Plese check the "Plant"assigned in for the 2component in the "Component Overview" of the Prodution order.if it is 0002, order reservation will be created in at 0002 .
>
> Regards,
> R.Brahmankar
can this order category be configured? -
Manual reservation for order category 30 is not allowed
Hi,
I have created a shopping cart with maintenance order as account assignment category.
SC is showing the status of Error in process. When I checked the process erro cause in function module there I am getting the message " Manual reservation for order category 30 is not allowed "
Can any one tell me how to move forward.
Thanks & Regards,
Govardhan,V.Hi Govardhan,
If you are working in ECS, the Shopping cart will not create any follow on document in backend R/3.
I think your Product category is 30, thats why the error says Manual reservation for order category 30 is not allowed.
Where did you get the maintenance order? Generally maintenance order is created in the backend R/3 (Plant Maintenance) and a P.R will get generated against that order.
Using PDP (Plan driven procurement) you can transfer that P.R to SRM and can carry out sourcing and can complete the procurement cycle.
Can you please tell me what is your exact business requirement?
Hope this will make you more clear.
Clarifications are welcome.
Award points for helpful answers.
Rgds,
Teja -
Manual reservation for Order Category 30
Dear All
I want to know whether is there any customisation setting to allow Manual reservation for Maintenance Order Category 30 using MB21 .
What is Restricting to do manual reservation is it GL Account or some setting in MM reservation.
Regards,
SrinivasHi
You entered an order whose category only permits automatic reservations. The following order categories do not allow manual reservations:
10 PP production order
20 network
30 maintenance order
40 batch order (process manufacturing)
50 inspection lot
Enter a different account assignment like reservation against cost center ok
jitender -
Maintain settlement rules for order category 30(Maintenance order).
Hi Gurus,
Can we maintain two settlement rules for an order without distribution rule?
Eample:- In an order there are three different costs i.e. material cost,external labour cost and internal labour cost.We want to settle the material cost and external labour cost to Profitability segment and the internal cost to a particular GL account directly.
Note: No distribution rule is required,because all the cost should settle directly to correspoanding heads i.e. PSG or GL.We don't want to assign the GL# again and again for different orders in the corresponding order's settlement rule.
Require your valuable inputs to proceed.
Best Regards,
RamakantaHi Govardhan,
If you are working in ECS, the Shopping cart will not create any follow on document in backend R/3.
I think your Product category is 30, thats why the error says Manual reservation for order category 30 is not allowed.
Where did you get the maintenance order? Generally maintenance order is created in the backend R/3 (Plant Maintenance) and a P.R will get generated against that order.
Using PDP (Plan driven procurement) you can transfer that P.R to SRM and can carry out sourcing and can complete the procurement cycle.
Can you please tell me what is your exact business requirement?
Hope this will make you more clear.
Clarifications are welcome.
Award points for helpful answers.
Rgds,
Teja -
Manual Reservation for Maintenance Order (Category 30)
Hi,
Can anyone suggest some procedure so that I can stop automatic reservation creation from Maintenance Order (type PM01, Category 30) and create manual reservation for the same.
Presently Manual reservation is not allowed for Maintenance Order.
Thanks
SatadalHello Satadal
nobody's answered you because it's not possible to create a manual reserve for logistic orders as Network/PP orders or PM orders.
If you want inhibit the automatic reserve creation :
- customizing (transaction OIOE) : set "Never" in field "Reservation Relevance/Generation of Purchase Requisition". The reserves will be created but they will be not relevant for MRP.
- Hide the field AUDISP "Reservation Relevance/Generation of Purchase Requisition" at component level (OICMPD) and operation level (OIOPD)
Good luck
silvia -
Manual Reservation for Maintenance Order
Hi,
Can anyone suggest some procedure so that I can stop automatic reservation creation from Maintenance Order (Transaction:IW31, type PM01, Category 30) and create manual reservation for the same.
Presently Manual reservation is not allowed for Maintenance Order.
Thanks
SatadalTo the best of my knowledge this is possible. To the best of my knowledge G/L account determination for every material happens after a series of checks are done internally by SAP. By checks I mean the sequence of steps as customized by the consultant in the configuration. Now at the end of the sequence if SAP has not succeeded in identifying a G/L account it will open up a tab in which u can manually enter the G/L account. For non-stock item you can anyway enter it.
I would suggest that you post this query in the MM forum also.
thanks
Bala -
Manual Reservation for Movement type 261
Dear Friends,
I want to create a manual reservation (MB21) for production order i.e. movement type 261. But system is not allowing and giving error message order category 10 (prodn order) not allowed for manual reservation.
Can some one help to know how the setting which allows manual reservation for MVt type 261
Thx
RishiHi,
After my long analyzation, I came know that, this is SAP standard setting.We cann't make any changes in order category 10. As per SAP standard procedure , the below order categories do not allow manual reservation.
10 PP production order
20 network
30 maintenance order
40 batch order (process manufacturing)
50 inspection lot
So please make goods issue through MB1A , if you want tracking this issue seperatly please put your production order number in text filed.
I hope the above information is useful for you.
Please reward points if my information useful.
Best Regards,
Nagapandian. -
Manual reservation for Project Stock / wbs element
Dear Gueus,
In Project base Industry,
For Production order confirmation I want to transfer Project stock of raw Materials from Main Storage stock to Production WIP stock, from this WIP Stock, I will consume raw mtl at the time of Order confirmation.
Now at the time of Manual Reservation in MB21 system is not allowing 311 Q Mvt type for Project stock reservation.
Is there any other procedure / t- code to reserve project stock.
Pl guide me for the same.
Thanks
UmeshHi,
A word of caution, before processing any mass transactions such as COHV etc, its always better to double check the data. Reason is because the program performs mass update & any reversal would be a time consuming process.
Now for mass confirmations of orders via COHV
1. Execute COHV, in the first screen, select Order Headers, specify the order numbers in the field. If you have saved the list as a text file, then click on multiple selection & click the green icon at the bottom right corner, specify the file & the orders will be read.
2. In the tab - Mass Processing, select confirmation for the field Function & if you want to execute immediately, then select the same in execute function. Depending on your rqmt, you can have the log & also output the logs.
3. Click execute or F8, then select all the orders & then click on the mass processing drop down icon & click execute. The processing begins in foreground. Once the processing is done, system puts out a log showing the once which were confirmed & the once which were not able to be processed & the reason for the same. (For background processing, select the same in mass processing tab in the selection screen).
Please note, for order confirmation to take place the status has to be REL, also if any user status is active, check if the same allows confirmation.
I would strongly suggest, first try in your sandbox server & once you're familiar with its processing, then proceed to use in production system.
Hope the above helps.
Regards,
Vivek -
Message no. RU 195:Automatic goods receipt for order 619271463 is not possi
dear expert:
when i confirm the production order via co15 ,sytstm prompt :
Automatic goods receipt for order 619271463 is not possible
Message no. RU 195
Diagnosis
Order 619271463 contains several operations, which have a control key which indicates "automatic goods receipt".
However, an automatic goods receipt is only allowed once per order for the following reason:
If the automatic goods receipt is posted more than once, this would lead to incorrect stock quantities.
Procedure
Check the control keys of the operations in order 619271463. Change the control keys in such a way, that an automatic goods receipt occurs for one operation only.
production order is confirmed but it cann't be delivered automatically.
help me analyse it .
best reagards.Hi,
In normal scenario in a production order each routing operation will consist a control key with settings for automatic goods reciept.
So in a production order you can use only one control key with automatyic goods recipt. This will be the last operation of the order. From message mentioned by you it is showing as may u have mentioned auto goods reciept for more than one operation.
PP01 is normal confirmation control key & PP99 is for milestone with auto goods reciept. PP95 - w/o milestone with auto GR.
Please check control key & correct it.
Hope this will help you.
Regards,
Ashish -
Container for alert category could not be loaded
Hi All,
I am having very strange issue with container(Variables).
I defined Alert category, created container elements and I was using them in long and short text. They were working fine, but now if I open Alert category and click on container tab, its says: Container for alert category could not be loaded and I dont see container elements that I created before. Same thing happened before and I re-created those container variables. But now I have many Alert categories. Is this an existing issue? or does any body having similar situaltion? Can anybody please provide information on this.
Thank you,
IndrasenaHi Moorthy,
Thanks for your quick reply . We are on WAS 6.40,SP16, but SAP note 656488 is released on 01.09.2003 for 620, it should have been implemented alreay. Do you think we still need to implement that???
Thank you,
Indrasena -
Query about Manual Reservation for Maintenance Order Category 30
Hi,
I have a problem. Generally from Maintenance Order type PM01 under Order Category 30, when we give some materials requirement, SAP automatically generate reservation for those materials and take the GL as Consumable Item.
But in my case, that GL has to be changed depending on what perpose we are using the material. But Manual reservation is not allowed for the order category 30 and no GL can be changed for automatic reservation.
Can anybody suggest any way-out so that we can give our desired GL No. for the reservation for Maintenance order (say Order type PM01 under category 30 which is SAP internal).
Thanks in advance,
SatadalTo the best of my knowledge this is possible. To the best of my knowledge G/L account determination for every material happens after a series of checks are done internally by SAP. By checks I mean the sequence of steps as customized by the consultant in the configuration. Now at the end of the sequence if SAP has not succeeded in identifying a G/L account it will open up a tab in which u can manually enter the G/L account. For non-stock item you can anyway enter it.
I would suggest that you post this query in the MM forum also.
thanks
Bala -
Manual Reservation for Production orders with automatic reservations
Hello SAP Experts, i have a question regarding Order Reservations, in my company when we create a Production order the reservations for each component are created automatically and assinged to a reservation number, the thing is when i try to create a Reservation through MB21 for the same Production order the system says that" for that type of production order i cant generate manual reservations", can you please guide and tell me if i can change this in the configuration ?? , if you need additional info please tell me , thank you in advance.
Dear German,
Your system working according to std SAP setting, u don't need to change any config setting. Because wehn u release order, it automaticaly genarates reservation for each and evry component of the order.
when u do goods issue to order or to reservation either way it gets issue to the order.
suppose if u need to issue any extra component to the order u can just add in order componet overview before u release the order. so reservation gets genarated for this componets too along with BOM components.
In case afer release, if u need further components go to MB1A give mov type 261 and S.Loc and then click on new item push button, it pop ups one more window give all required parameters and post the goods. These goods issue will also gets updated in the order.
But for the order uc an not manually create the reservations
sree
Maybe you are looking for
-
No "create new review" in Premiere 5.0.3
OK, I have the latest upgrades for all the Adobe programs and Flash too. CS Review works like it is supposed to in Photoshop and Illustrator. The problem is Premiere. I don't get an option to Create New Review in Premiere. All I get using the orange
-
Querying and Assigning Date Value
Hello, this query is not working. I am trying to assign the date value to the from_date variable. set result_list [execsql "select TCM_DATE_BEGIN_REQD into: TO_CHAR(from_date, 'YYYY/MM/DD') from tcm_tau_component where tcm_reference_number = $tau_ref
-
hi all, i downloaded the french hack to allow idvd to see my dl burner and can now access dl under the project info. unfortunately, my project is weighing in at 11.7 gig. in toast, if the image is to large, it compresses the image just before the bur
-
WHICH basic type for doing inbound PO closing (to tick delv complete ind)?
Dear SAP Gurus, The IDoc should tick the delivery complete indicator of a PO, that's it. I think this should be very simple but I already tried using basic type PORDCH02 but not yet successful. Need your advise:whether i used the correct basic type?
-
Help with XMLSEQUENCE and repeating elements
I need help with the following XML extraction (note this is on Oracle9i). I have the following XML structure. There are multiple <Reading> elements <MeterReadings> <MeterReading> <Meter> <id>0004128190</id> <idType>METER_X_UNIVERSAL_ID</idType> </Met