MAIL FLOW AND ROUTING GROUPS

Hi Folks
I have two Exchange(2003 and 2010) Servers in co-existence, I am able to send and receive on Exc2003, on Exc2010 I am only receiving I am not able to send.mails but cannot receive on the Exchange 2010. See error below when sending from Exc2010 server.
Thank you in advance
Delivery has failed to these recipients or groups:
[email protected]
Your message wasn't delivered due to a permission or security issue. It may have been rejected by a moderator, the address may only accept e-mail from certain senders, or another restriction may be preventing delivery.

Hi
Did you create a routing group connector for Exchange 2003-2010?
Have you got some anti-spam filtering enabled on exchange at all?
Do you have MX records for the new server?
Lastly, any SPF records?

Similar Messages

  • Routes and route groups expanded

    Is there any way to force the routes and route groups to show un-expanded when I click on the Routes/Groups tab in switch executive? I have many and it is difficult to navigate when they are all expanded.
    kph

    Hi kphite,
    At this time, there is no method to force the collapse of the routes and route groups.  However, thank you for this product suggestion.  Just so you know, we have previously considered the implementation of such a feature and agree that this functionality would be beneficial.  We do have it in our plans for future revisions of NI Switch Executive. 
    Thanks again!
    Chad Erickson
    Switch Product Support Engineer
    NI - USA

  • Exchange 2013 upgrade from 2010 and no mail flow and cannot move mailboxes

    I am in the process of moving to Ex 2013 from 2010. I have installed Ex 2013 SP1 on a new server 2012 R2. All of my Ex 2010 servers are SP3 RU 5. Ex 2013 is running and I can connect through the EAC and see all other Exchange servers and connectors that
    were already in existence. Several puzzling things are happening now that the servers are in coexistence:
    1) As soon as Ex 2013 was installed on the network, many Outlook users are continuously being prompted to enter their domain credentials.  They can cancel the prompt and Outlook still sends/receives email.  No user mailboxes are on Ex 2013 yet. 
    Why is this happening?
    2) I am following the Ex 2013 Deployment Assistant and I get to the step to move the Ex 2010 Arbitration mailbox to Ex 2013 and the move does not happen--it just says "syncing" and never completes.  I tried moving a test mailbox from Ex 2010
    to the 2013 database and I get the same result.  I created the move request on the Ex2013 server and I see it as queued on the Ex2010 server, so I know they are "talking" to each other.  However, when reviewing the status of the move I
    see "MapiExceptionNoAccess: Unable to open message store".
    3) There seems to be no mail flow on the same Ex2013 server or between the Ex 2010 and 2013 servers.  I created two new test user mailboxes in Ex 2013.  The Ex2013 mailboxes cannot send/receive to each other or to Ex 2010 users.  This
    seems strange, unless I am completely missing something in the Ex 2013 install?
    I know this is a lot in one post, but following the Deployment assistant, I was hoping this would be something that others have faced.  Thanks for any input here.

    Does the below points already fit for you.
    Exchange 2013 Supported with the following minimum versions of Exchange:
    1) Exchange*** 2010 SP3 on all Exchange 2010 servers in the organization, including Edge Transport servers.
    2) Exchange 2013 CU2 or later on all Exchange 2013 servers in the organization.
    *** If you want to create an EdgeSync Subscription between an Exchange 2010 Hub Transport server and an Exchange 2013 SP1 Edge Transport
    server, you need to install Exchange 2010 SP3 Update Rollup 5 or later on the Exchange 2010 Hub Transport server.
    Thanks Prem P Rana MCSA Messaging 2003 MCSE 2003 Server MCTS MCITP Exchange 2007, 2010 Gurgaon, India http://blogs.msexchange-experts.com

  • Will MX record work for the incoming mail flow and external mail flow.

    Hello All,
        I have created 2 machines with windows 2008 R2 workgroup and  installed Forefront TMG 2010 
        I am using the VIP for the external adapter for the NLB and going to connect it through the MX record will it work for the incoming mail flow to the Exchange 2010 and external mail flow.
        Is that right what i am doing please suggest. Thanks in Advance!
    Sidharth Guntoji,Messaging Consultant, ITBigBang (P) Ltd Www.ITBigBang.Com | Hire Us for Messaging Consulting

    Hi,
    Based on my experience, the MX record contains the fully qualified domain name of the messaging server that’s responsible for accepting messages for the domain.
    Do you want to configure the TMG server as a secure SMTP relay server? Did you mean that the external DNS server point to TMG’s external IP for the MX rcord and the internal Exchange server is using TMG’s internal IP address as the default gateway? Did you
    install any exchange role on the TMG server?
    I am sorry to say that I am not quite sure of your deployment, I would appreciate it if you can share your network topology and configuration.
    Best regards,
    Susie

  • Decommissioning old Win2k3 DC impact on Exchange Server mail flow and client Outlook connection ?

    People,
    I'm going to decommission one of the three AD Domain Controllers / Global Catalog during the business hours that is used by the Exchange Server 2010 SP3 due to it is still running Win2k3 (Exchange Management Console > Server Configuration >
    Client Access | System Settings tab, I can see the three DC/GC as follows DC01-VM, DC02-VM, DC03-VM).
    So if one of the DC above in the tab is decommissioned during the business hours, is there any impact or steps that I need to take to avoid any email outage or problem ?
    Let me know what is the correct steps if possible.
    Thanks,
    /* Server Support Specialist */

    You may wish to remove the DC that is going to be decommissioned from the GCs available for use by Exchange.
    In any event that that is the GC that is being used by Exchange during the course of decommission, you will encounter issues.
    Blog: http://theinfraguys.com
    Follow me at Facebook
    The Infra Guys Facebook Page
    Please remember to click Mark as Answer on the answer if it helps you in anyway
    Hi Vincez,
    How do I do that on Exchange Server 2010 SP3 ?
    My understanding is that the DC/GC is detected and used by Exchange when it is on the same AD Site.
    /* Server Support Specialist */

  • Matching Route Patterns with standard Local Route group and Specific Route Group

    Hi
    I have a customer with CUCM 8.6 with few branches
    couple of branches in UK and few in Europe and middle east.
    I configured route patterns with Standard local route group, but using their own Voice gateway, everything was working fine until adding the recent branch with matching pattern 
    UK has a mobile pattern with 9.07XXXXXXXXX (11 digits)
    One Branch has a mobile with 9.07XXXXXXXX (10 digits)
    When branch call 907X..(10digit) number there was a delay and I ticked the Urgent priority to process it quicker, but later realized the UK branch cannot dial 907x.. (11Digit) mobile.
    I created Route List for branch and added the 10 digit pattern to that but still the UK cannot call 11 digit. so i believe when you call out it will check the pattern first and the Route-List and Route-Group and gateway play a part.
    Is there a way to get 07 -10digit call out quickly also allowing the 07 -11digit pattern as well ( without changing the T302 timer)
    Really appreciate your support
    thanks
    shameer

    Yes, they key to managing overlapping centralized dial plans is to be really good with patterns, partitions, and CSSs. You can have 3 different 9.0[2-9]XX-[2-9]XX-XXXX patterns and assign them a different partition, and then assign that to the branch CSS. This will only work if each Branch has a different CSS.
    For example:
    9.0[2-9]XX-[2-9]XX-XXXX @ Egypt-PT ->Routes to Local route group of Egypt.
    9.0[2-9]XX-[2-9]XX-XXX @ UK-PT -> Routes to Local route group of UK
    9.0[2-9]XX-[2-9]XX-XXX @ Germany-PT -> Routes to Local Route group of Germany.
    //PT = partition//
    Then have Egypt-CSS that contains 9.0[2-9]XX-[2-9]XX-XXXX @ Egypt-PT. 
    UK-CSS contains 9.0[2-9]XX-[2-9]XX-XXX @ UK-PT
    Germany- CSS contains 9.0[2-9]XX-[2-9]XX-XXX @ UK-PT
    The other patterns will be invisible to your sites because they are in a different partition that is not in their CSS. 2 overlapping patterns in the same PT will cause you to wait for the inter-digit timeout unless you press #.
    Thanks,
    Frank

  • Migrate Exchange 2010 to 2013 External Mail Flow

    Dear All,
    I am in the middle of Exchange Server 2010 to 2013 Migration. The scenario is I have single Exchange 2010 server with HUB/CAS/Mailbox and installed new Exchange 2013 with single CAS and single Mailbox server. The internal email flow between Exchange
    2010 to 2013 and 2013 to 2010 is working. Having some issues and need assistance to resolve at earliest.
    The issue with the external mail flow and I want to Exchange 2010 should be configured to send external email while migrating users to Exchange 2013. Once migrate all users to Exchange 2013 then will configure Exchange 2013 send connector.
    How can I configure single name space of web URL for OWA both on Exchange 2010 to Exchange 2013, if user mailbox is in Exchange 2010 can access same OWA URL as user migrate to Exchange 2013.
    How to configure SSL certificate, I have single URL certificate this would be enough for OWA, ActiveSync and Anywhere.
    Is that possible if directly move the Exchange 2010 database to Exchange 2013 database, this will move all users mailboxes in one go or do I need to migrate users mailbox individual or in bulk.
    Kindly guide if any thing missing that need to address during start the migration activity.
    Thanks in Advance

    Hi ,
    Sorry for delay.
    Question : Thanks for your valuable response. On
    point no.2, I want to use same external URL for Exchange 2010 and Exchange 2013, is this possible if user is on exchange 2010 server or migrated on Exchange 2013 can use same external single name space URL to access OWA ?
    Yes you can have the same External URL for the exchange 2010 owa and exchange 2013 owa.So users from exchange
    2010 and exchange 2013 can access owa on the same URL from external world.For exchange 2010 users owa connections will be proxied from exchange 2013 to exchange 2010.
    For mailbox connectivity issue in exchange 2013 :
    1.From internal outlook clients ,Please check the internal outlook anywhere name is resolved to exchange
    2013 server and also make sure the authentication set on the outlook anywhere is set to NTLM. Same time we need to have the internal outlook anywhere name on the SAN certificate.
    2.Make sure the names used exchange on 2013 URL'S is available on the SAN certificate and also the certificate
    needs to installed on the exchange server and that certificate has to be enabled for the required services like iis,pop.imap,smtp.
    3.Make sure the outlook client request coming for internal outlook anywhere name and also to autodiscover
    service is not reaching the proxy server if you have on your network.
    In case if you have proxy server in your environment for internet access ,So for that we need to add the internal outlook anywhere name and autodiscover name
    on the internet explorer proxy exceptions for all the internal outlook clients.We can globally achieve it through group policy.
    4.please share me the output for the below mentioned command.
    get-ClientAccessServer -Identity “server name”  | fl AutodiscoverServiceInternalURI 
    5.If you are having outlook 2007 then make sure it fully patched with latest sp and updates.
    6.On which operating system version those outlook 2007 clients are installed?
    Please reply me if anything is unclear.
    Thanks & Regards S.Nithyanandham

  • Mail flow configuration.

    Scenario:
    Company abc.com mail server is hosted by a 3rd party hosting company. (mail.abc.com)
    I deployed an exchange 2013 server in the company abc.com.
    Created users similar to the users in the 3rd party host.
    When i sent mail from my exchange server: [email protected] to the internet: it works
    When i sent mail from the internet to [email protected] I recieve mail on my 3rd party host mail domain only.
    I made mx records on the 3rd party mail host and A records pointing to my exchange server.But I am not able to recieve the emails inside exchange .( Made through admin panel web interface)
    Is there a way to set in such a way that i recieved the mail on both the servers.??

    Hi,
    According to your description, the 3rd party hosting company doesn’t have an Exchange server. If I misunderstand your meaning, please feel free to let me know.
    If yes, as far as I know, we can try the following workaround: make inbound mail flow to Exchange 2013 server well and create a transport rule to forward the emails.
    Firstly, let’s try to resolve the mail flow issue inside Exchange server.
    And I’d like to recommend the following troubleshooting:
    1. Use the telnet to test the mail flow and confirm the error code.
    http://technet.microsoft.com/en-us/library/bb123686(v=exchg.150).aspx
    2. Check the configuration in the following article:
    http://msexchangeguru.com/2013/07/29/troubleshooting-mail-flow-issues/
    Note: Microsoft is providing this information as a convenience to you. The sites are not controlled by Microsoft. Microsoft cannot make any representations regarding the quality, safety, or suitability of any software or information found there. Please make
    sure that you completely understand the risk before retrieving any suggestions from the above link.
    For transport rule , you can refer to the following article:
    http://technet.microsoft.com/en-us/library/dd351127(v=exchg.150).aspx
    If you have any question, please feel free to let me know.
    Best regards,
    Angela Shi
    TechNet Community Support

  • Specify Open Relay in Route Group

    Is there a way to specify opening a relay connection in MAX?
    I want to create a route group that opens some relay connections and closes others without having to issue individual connect and disconnect commands in TestStand for each relay.

    Hi Jason,
    You could use the Switch Soft Front Panel (right-click on the switch module in MAX and select Test Panels...), but since you've already configured a route group (and thus I assume you're using NI Switch Executive), you can use the NI Switch Executive Test Panel! 
    In MAX, select the NI Switch Executive Virtual Device of interest (i.e. SwitchConfiguration1).  In the menu above the NI Switch Executive user interface, click "Test Panel..."  The test panel allows you to connect/disconnect the routes and route groups in the Virtual Device.  You can even launch the Switch Soft Front Panel!
    Let me know if you have further questions.  Best regards!
    Chad Erickson
    Switch Product Support Engineer
    NI - USA

  • Utilizing the Standard Local Route Group with CER

    Hello,
    I'm running UCM 7.1(2) and recently a contractor we brought in to install our CER 7.0(1) created a very signicicant amount of Calling Search Spaces, Route Patterns, Partitions, Route Lists and Route Groups in an effort to route calls from our 6 sites (we are centrilized with one Publisher and 6 suscribers) out the correct gateway towards the correct PSAP.
    I took the contractor's word that we needed to make such drastic additions and now I belive I made the wrong choice. We already have a Route List (PSTN_RL) that includes:
    1)Standard Local Route Group
    2) XX_RG (the backup RG)
    3) XX_RG (another backup RG)
    Most of my Directory Numbers (DN) and the Primary CER Route Point belong to one Partition (PhoneLines_PT) and I would like all the calls from the Directory Numbers associated with the PhoneLines_PT to be routed via the Route List that utilizes the Standard Local Route Group (PSTN_RL) and maintain that CER is able to "see" 911 calls.
    Can anyone tell me if I I change the PSTN_RL (Standard Local RG) associated Route Pattern Partitions to the PhoneLines_PT, will all Directory Numbers associated with the PhoneLines_PT route calls over the PSTN_RL?
    I guess I am trying to wrap a sort of reverse implementation "around my head."
    Thanks in advance for you time.

    Partition and Calling Search Space (CSS) are closely related but always confused.
    Good examples are:
    Line A and Line B in the same partition doesn't necessarily mean Line A can call Line B.
    Phone A and Phone B have the same CSS doesn't necessarily mean Phone A can call Phone B.
    Now back to the topic of LRG (Local Route Group).  A good use case would be 911 calls.  We always want 911 calls to be routed through local gateway so it can reach local PSAP.  Without LRG, you'll have to configure multiple 911 patterns (in different partitions) so you can assoicate them with different gateways.  With LRG, you just need one 911 route pattern.  Of couse that route pattern should be accessible by everyone.  To make it simple, you may put it in null partition.
    Michael
    http://htluo.blogspot.com

  • TS3276 I sent out a mass mailing to my various groups and the Yahoo accounts have been getting bombarded with the same message every 2 minutes and I don't know haow to stop the hemmoraging. Non of my other contacts had this problem. Please help!

    I sent out a mass mailing to my various groups and the Yahoo accounts have been getting bombarded with the same message every 2 minutes and I don't know haow to stop the hemmoraging. Non of my other contacts had this problem, just Yahoo. Can someone help me get out of this nightmare?

    I sent out a mass mailing to my various groups and the Yahoo accounts have been getting bombarded with the same message every 2 minutes and I don't know haow to stop the hemmoraging. Non of my other contacts had this problem, just Yahoo. Can someone help me get out of this nightmare?

  • Lead Time - Customizatiou0131n steps: Shipping point, route, and loading group

    It says about delivery scheduling that "The lead time considers the shipping point, route, and loading group". Can anybody explain me briefly the customization menu steps about this sentence?
    Thanks in advance.

    Please go through this document it will help you
    1) Maintain transportation planning point through Menu as follows:
    IMG Maintain Logistic Execution  Definition Enterprise Structure  transportation planning point.
    Create your own like BP01 enter the general data¡¯s required
    2) Defining modes of transport:
    IMG RoutesBasic Transportation Functions  Transportation Logistic Execution Define modes of transportDefine routes
    Use the standard like:
    Shipping type: 01
    Description: Road
    3) Define shipping types :
    Basic Transportation Transportation Logistic ExecutionIMG Define shipping types Route Functions
    Or through T-code: SM30
    PT: 01
    Description: Truck
    Mdtr: 01
    STPG: 0001
    4) Define transportation connecting point :
    LogisticIMG DefineRoutes  Basic Transportation Functions  Transportation Execution Define transportation connection pointsroutes
    Copy the std point and make it FB01 as departure zone and FB02 as destination zone
    5) Define routes and stages.
     Logistic Execution IMG Define Define routes Routes  Basic Transportation Functions Transportation routes and stages
    Use the standard route and copy it as FB0001 and enter the departure zone and destination as what we created.
    6) Defining Transportation Zone:
    Basic Transportation Logistic Execution IMG Define transportation Router determination  Route Transportation Functions zones
    Use the standard transportation zone depending on the route so as for the example use 0000000003 - Southern Region
    7) Maintain country or transportation zone for shipping points
     Logistic Execution IMG  Route determination  Route  Basic Transportation Functions Transportation Maintain country and transportation zone for shipping point
    Shipping point be ASH1 and route as 0000000003 which is assigned to country India
    8) Maintain route determination:
    Logistic ExecutionIMG Route determination Route  Basic Transportation Functions  Transportation  Maintain route determination
    Country of departure: India
    Departure Zone: 0000000003
    Country of destination: India
    Destination Zone: 0000000003
    And enter the data’s needed like shipping condition 01, etc.
    Maintain Transportation relevance for shipping point, sales document type and delivery types.
    9) Now create shipping types
    IMG Define shipment Shipments  Transportation Logistic Execution types
    Copy the standard 0001 and make it to AFIL
    10) Define and assign traffic zones through T-Code: T_76 (or) thru menu as follows
    IMG Define Basic functions  Shipments cost  Transportation Logistic Execution and assign tariff zones
    Copy the standard and make it to FABTARIFF and assign our transportation planning point as ATP1, ATP2 assign tariff zone to every particular transportation planning point
    11) Define and assign pricing procedures
    Shipments Transportation  Logistic Execution IMG define and assign pricing Price control  Pricing cost procedures
    Copy the standard shipping cost pricing procedure SDFC00 to FBSC01
    12) Assign purchasing data:
     Logistic Execution IMG Assign purchasing data Settlement  Shipments cost Transportation
    13) Assign transportation planning point to shipping condition, purchase organization, purchasing group and to plants.
    14) Define Automatic G/L account determination:
     Transportation  Logistics Execution IMG Automatic G/L Account Determination Settlement Shipment Costs
    Or through T-code: OMWB
    Use G/L account 614000 as used in standard
    15) Automatic determination of CO assignments:
    IMG Automatic Settlement  Shipment Costs  Transportation Logistics Execution Determination of CO Assignments
    Or T-code: OKB9
    16) Maintain shipping point address.
     Logistics Execution  Definition Enterprise Structure Define, copy, delete, check shipping point
    17) Creating G/L account centrally.
    Financial AccountingAccounting  Master Records  General Ledger 
    Individual Processing Centrally
    Or through T-Code: FS00
    18) Enter the G/L account 614000 to the company code AFIL
    19) Create transportation condition records:
     Shipment cost  Transportation  Master data Logistic Execution createPrices
    Or thru T-code: TK11
    Enter condition type FB00 that is freight condition type, which is used as standard in the shipping cost pricing procedure.
    Enter the price and save it
    Process:
    1. The system determines the pricing procedure for the shipment cost item-using transportation planning point, service agent and shipment cost item category
    2. Calculation Basis
    3. Condition Record
    4. Access sequence.
    For the sales order, create a delivery using VL01N and pick the goods. Now create a shipment using VT01N and assign the delivery to the shipment document. Make sure to enter the carrier and other details before performing the transportation planning and execution. Save the shipment document and PGI for the delivery would be done automatically.
    A shipment represents a physical goods movement between two or more locations.
    For the system to create a shipment, shipping-relevant deliveries must exist.
    You use Transportation Planning to group pending deliveries into shipments and then to perform the shipments.
    The outbound delivery documents contain routes that the system calculates in route determination, and a transportation planning date for the delivery.
    Dynamic transportation planning is responsible for grouping together outbound deliveries into shipments that have at least the same route, visit plan type and the same transportation planning date.
    The following restrictions can be taken into account for a shipment in Dynamic Transportation Planning:
    • Weight
    • Volume
    • Variable capacity
    • Number of stops
    • Maximum duration
    • Loading units
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Transportation Create Single document Logistics Logistic Execution  TransportationPlanning
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Create Delivery:
    T.code: Vl01n
    Create TO:
    T.code: LT03
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
     Transportation Planning  Create Single document Logistics Logistic Execution Transportation
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Generally process is-
    1) VL01N
    2) VT01
    3) VL02N - PGI
    4) VI01
    5) ML81N – Service Entry Sheet
    6) MIRO – Invoice Verification
    Shipping docs (VT01) are created before PGI...
    You cannot carry out transportation planning or creation of shipment after the goods issue has been executed. Once goods issue is done it means that the material has left your premises so there is no need for a transportation planning after it.
    In case you need carry out the shipment documents at the end of the day you could just create the delivery documents during the day and at end of the day create the shipment documents and the goods issue
    This link is also usseful:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LETRA/SDTRA.pdf
    Hope this helps you.
    Regards
    nitin

  • Failure writing file and Failure sending mail: The user or group name is not recognized.Mail will not be resent.

    Dear All,
    I am using MSSQL SSRS 2008. 
    All the reports run properly when viewed via a web browser. However for subscription, I am having a strange
    experience. 
    The subscription having intermitten failure. I need to execute multiple times to get it work. 
    Following is the exception I am getting:-
    Failure sending mail: The user or group name 'xxxxx' is not recognized.Mail will not be resent.
    Failure writing file DailyPolicyExportCDN_ST@timestamp : The user or group name 'xxxxx' is not recognized.
    Following is the exception I retrieve from log files. 
    webserver!ReportServer_0-2!1b0c!07/31/2014-05:25:09:: e ERROR: Reporting Services error Microsoft.ReportingServices.Diagnostics.Utilities.ReportServerHttpRuntimeClientDisconnectionException: A client has disconnected from the Report Server Web service application
    domain ReportServer_MSSQLSERVER_0-2-130512716074991980. No corrective action is required. An error code has been submitted to ASP.NET to release the connection. The error code is 800708CA. ---> System.Runtime.InteropServices.COMException: This network connection
    does not exist. (Exception from HRESULT: 0x800708CA)
    Any idea what went wrong?
    Thanks in advance

    Hi NeoCK,
    According to your description, you can access your report successfully, but it fail to send e-mail subscription. Right?
    In this scenario, since you can access the report successfully, so this user has permission on report server. Please go to E-mail setting in your Reporting Services Configuration Manager, check if the current user has permission on that SMTP server.
    If this is still not working, please recreate the subscription and try again.
    Reference:
    SUBSCRIPTION
    ERRORs : Failure sending mail: The user or group name 'CB_OFFICE\XXXX' is not recognized.
    The user or group name 'MYDOMAIN\myuser'
    is not recognized
    SSRS
    2008: Failure writing file ... The user or group name 'domain\user' is not recognized
    If you have any question, please feel free to ask.
    Best Regards,
    Simon Hou

  • UCCX Redirect Step and Local Route Groups

    Hello,
    CUCM 9.1.2
    UCCX 9.0
    I have come across a situation in one of our UCCX scripts with the call redirect step where it is forwarded to a local cell phone for after hours calls. The number in the Call Redirect step is 9, followed by the 10-digit number of the cell.
    While the call does redirect successfully from the UCCX script, the call always uses the local route group of the original calling party's device. So, if the call from an IP Phone to the cell is going out the gateway where the cell number is a local call, the 9 followed by the 10 digit number works fine.
    If it's a site across the WAN, the call redirect to the cell fails because it's using LRG of the calling party's phone and thus it needs to be a long distance call.
    I kind of thought the Service Parameter Local route group for redirected calls being set to "Local route group of last redirecting party" might have addressed this, like it did for call forward all situations, but it does not seem to be the case.
    Would the recommendation be to use Call Consult Transfer instead of the Call Redirect step? This seems to work, but was wondering if there were other ways to approach it.
    Thanks for your help,
    Frank

    Hi Anthony,
    Thanks for the reply. The Call Consult Transfer step did resolve my issue, so now the call is always coming from the local site and using the LRG of the DP of the CTI ports. I previously had it set up using the Call Redirect step in the script with 9 followed by the 10-digit number, and thus it was kind of not working when calling over the WAN from remote sites.
    I should have mentioned that we recently did an CUCM / CCX upgrade. In CUCM, all call restrictions were previously done at the device level, nothing on the line. Now we have the line doing the call restrictions. So the Call Redirect step worked fine in the old environment with the 10-digit number, not so much in the new.
    But I like your suggestion about +E164 even better, since we rolled that into the upgrade as well. I tried putting the full +E164 number in the script using the Call Redirect step. Works perfectly from all sites.
    Thanks for your help.
    Frank

  • Adding ICT trunk and SIP trunk into Route group

    Hi ,
    We need to map ICT and SIP trunk into the same route group  ,but the problem here is already same ICT is mapped to another route pattern.
    If i try to create new ICT with same remote IP ,it's throwing Add failed because the remote IP is already defined.
    Is there anyway we can add ICT with same remote IP and map the ICT and SIP trunk ? or Is there anyway that we can add exisitng ICT into route pattern.
    Route pattern is used for this route group is different.CUCM version - 7.X.Please advice.
    Regards,
    Ramanathan

    Thanks Suresh ...
    In that case ,I can assign the route group(ICT ,SIP - Top Down)  to two different Route pattern.
    Both patterns will hit ICT first ,Please correct me if I am wrong.
    Ram

Maybe you are looking for

  • Apple TV 1st gen not seen in itunes

    Apple TV would not show in Itunes. I found that the Apple TV tab was completely missing from Itunes preferences. I Googled and found likely due to itunes 10 update. Uninstalled itunes 10 and re-installed itunes 9. Apple TV tab back but still will not

  • COBL-PRCTR in transaction VL01N

    Hi Friends, In Vl01N transaction (delivery note creation) we want to make the screen field COBL-PRCTR as input field in an editable mode. Currently this field and all the other filed of COBL are in display mode. Business needs this because of the bel

  • Backup Fails with Invalid RECID Error

    Hi All, Please help me to understand Caution -section below text is from [http://download.oracle.com/docs/cd/B10501_01/server.920/a96566/rcmtroub.htm#447765] Backup Fails with Invalid RECID Error: Solution 2 This solution is more difficult than solut

  • Packaging a captive runtime bundle for desktop computers

    This question was posted in response to the following article: http://help.adobe.com/en_US/air/build/WSfffb011ac560372f709e16db131e43659b9-8000.html

  • I can't open iphoto v9.3.2

    I can't open iphoto v9.3.2 It says your photo library is either in use by another application or has become unreadable. I have an iMac 21.5-inch Mid 2011, OS X 10.8. This is a new brand iMac that I purchased from BestBuy a month ago. I have tried pre