Maintaining Unit of Measure (not alternative)
Dear colleagues,
I need to maintain a unit of measure (1 BOT is equal to 45 DEG) where we are going to use it for Z programsu2019 calculations, not in standard functions. But I don't want to maintain this ratio under additional data units of measure because if I maintain then there is possibility of being use this new measure in sales ordersu2019 etc. Is there any other field where I can maintain this ratio without infecting standard calculations?
Regards
I would suggest you need to put logic in Zprogram.When ever program finds this UOM it will automatically converts and will update in sheet.
Maintain UOM convertion in a Z table.This will help if you want to add some more UOM it is use ful to you.While running in Z report it will fetch the convertion from table .
Similar Messages
-
Error while creating PO -- Unit of measure not defined for lanuage ZH
Hi all,
i have created the PR with EA as UOM. Then while creating PO, i am getting error like
' Unit of measure not defined for lanuage ZH' .
Then I execute CUNI
Then menu is GOTO > Translation > units of measure
enter source language and target language . After this i am getting the below message
---> Language not available on server
Please suggest what i should do. Thanks.
Thanks
pabiHI Pabi,
Go to material master for material in purchase requisition, the Go to Additional data and maintained language as ZH in material master data.
Also the other possibility, that if in your case purchase requisition are converted to purchase orders through background jobs,
then check the background job execution in SM37 whether that background job has been triggered twice parellely in the background, which could have resulted in locking of same purchase requisition at same time and hence your are getting the Error.
Br,
Tushar -
Unit of measure not defined for language ZH
Hi,
We were creating a PO when we encountered the error which states "Unit of measure not defined for language ZH".
We executed CUNI to translate the units of measurement to our target language. System prompted "This object was segmented. Only new lines evaluated." What does this mean?
We tried creating the PO again, however we encountered the same error that the unit of measure was not defined for the language.
Please recommend action/s that we should take. Thank you.Take a look at the below threads. Your problem has the solution.
Re: Unit of measure XX not defined for language DE
Re: Unit of Measure Error in Purchase order -
Numerator in Unit of Measure not big enough
Hi,
The numerator, field UMREZ, of the unit of measure has a maximun lenght of 5 digits ( maximum of 99999 ). But for certain conversion I need (in MM02-> aditional data->tab units of measure):
120000 EA = 1 ROL
How can I do this without entering something bigger than 99999?
I have thought in three alternatives:
1.- Modification of that data domain, so that it can be stored up to 999999.
2.- Use decimals in the denominator , so that I have something like 12000 EA = 0,1 ROL.
3.- With an auxiliar unit of measure EA2 ( created via CUNI, linked to EA): 10 EA2 = 1 EA :::::and then::::: 120000 EA2 = 1 ROL.
I havent been able to complete the 2nd and the 3rd. ANd I want to avoid the first...
Do you know if something like this can be done? if so, how????
I have found post UOM conversion not big enough but I could not find any usefull answer in there ...
Many thanks in advance.
AaronHi,
Yes, I had already read this note, thanks for the info anyways.
They describe exactly my case:
Example 3: Too large numerators and denominators
When 120000 CM3 = 0,2 tons (TO), you can no longer save numerator and denominator of conversion ratio 600000 CM3 = 1 TO as numerator and denominator may have maximally five digits.
Here, you must either select a larger volume unit or a smaller unit of weight: With DM3 the conversion ratio would be 600 DM3 = 1 TO, with KG the conversion ratio would be 600 CM3 = 1 KG.
Generally, the alternative units of measure and the base unit of measure should result in quantities that are in the same dimension since the conversion factors may not be larger than 99999/1 and not smaller than 1/99999.
But I can not change the Basic Unit of Measure, because the Material has already movements, and I dont know how to create another unit of measure (let say EA2) linked to EA with a the value 1 EA2 = 10 EA. In this case I could use EA2 in the material with the conversion 12000 EA2 = 1 ROLL.
Is this possible? How can I create this unit? in CUNI I can create a new UOM but I dont see how to link it with an existing one ( create a conversion between them ) .
Thanks!! -
Is it possible to manage 3 units of measure (not just 2) using IS CWM
Our customer requirement is to handle the stock in 3 different units of measure.
We have read that with the EHP7 CWM (Catch Weight Management) this is possible but we are not sure if it's possible with 3 units of measure.
If not any other alternative?
Many Thanks
You can contact me at: [email protected]CWM supports only one parallel unit of measurement as the valuation unit of measure. It however allows adding several unit of measure as in standard ERP system.
Hope this helps.
Baseer -
Unit of measure not craeted in EN
There is an item in matl master (R/3)with micro liter as unit of measure . The same product has been checked in COMMPR01 in EBP , where in microlitr is extracted from back end . I checked the language and it is in English.
Also I checked for unit of maesure both in T006A in R/3 and EBP with english as language .We r using SRM 5.5 with ECC 6.0.
But while selecting that material for creating shopping cart it is giving error as
'unit ML is not created in English language'.
The ISO code for micro liter is 4G.
Please help me ..
Thanks in advance
SK...
-
QM_Change of base unit of measure not possible
Dear QM Experts,
Scenario is,
1. Material master created with QM view activation.
2. The Base Unit of Measure kept as EA
3. Inspection plan prepared for material with usage 5 and status 4.
4. Material has not undergone any purchase order / production order / routing or any other transactions except inspection plan.
5. No movements have done and the stock is zero
6. The requirement is to change Base Unit of Measure from EA to KG
When tried through MM02 system throws an error message as The base unit of measure cannot be changed; choose "Display errors" Message no. M3189
When viewed through log another information gets displayed as Routings already exist that are assigned to the material. Task list type Q.
I tried through trial and error method. First material assignment was deleted from task list, problem did not resolve. Thereafter deletion flag put to task list. No impact. At last entire task list deleted. Still system does not allow changing unit.
Has anybody faced the same problem ever? Whether deletion of task list (By T-Code QSR6) from data base will server the purpose? What are the obligations that one must follow while execution QSR6?
Or if there is any other solution to this requirement?
Thanks in advance
Best Regards,
Anand RaoHi
*What are the obligations that one must follow while execution QSR6?*
By this T code Deletion is very much possible provided that
If there are no stocks of the material in the current period and in the previous period
If there are stocks in the previous period, you can clear them as follows:
a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
If no purchase requisitions, purchase orders, or scheduling agreements exist for the material
Material Is used in any task list/Rauting.
Now as per your schenario I hope you have checked Inspection lot & PR,PO.
Error showing Q type of task list.
Go to PLKO & MAPL table for this material & group & Gr counter check the entry.
Check deletion Indicator in both the tables. If it has status "X" then this task list is very much possible to delete through QSR6.
I hope this will add some value to your Execuation.
Regards
Sujit -
BOXI 3.0 Units of Measure not coming over to universe based on Infoset
We are noticing that the Unit of Measure for Infoset based query objects are not coming over with the base install of the SAP integration Kit. However, it does seem to work after fixpack 2. Can anyone confirm this?
Hi Mark,
we had a separate thread on this already - or ?
for Universes on top of Web Intelligence it has been identified as an issue.
For Universes on top of InfoCubes it works fine.
Ingo -
Converting Unit of Measure (not quantity)
Hello All,
I have an interesting issue that I am not sure how to address. I have done some searching online and through the forums on how to convert unit of measure. Nearly all of the returned entries pertained to converting FT to LB, and scenarios like that.
My issue deals with the data in the EORD table. I created a custom program to create/update numerous source lists using a BDC for transaction ME01. This way the user can enter numerous materials and plants into one program one time, rather than create each source list individually. One such source list has a value in field MEINS as GAL (Gallon). However this is the converted value, this can be viewed in SE16n. If I use SE16, or debug the program, I can see the value in MEINS as GLL. This is the unconverted value. Thus when I create the source list I get an error.
I was wondering if there was a function module I could use to convert the UoM. I know I could create logic to check the value of UoM and if it is incorrect to change it using a custom FM or even in the logic of the enhancement itself. But this could change over time, meaning more units could be added requiring more logic changes. If there was a standard FM I could use, I could implement it once and be done with it.
So does anyone have any advice or know of an FM I could use? I will continue to search for an answer and if I find one I will post. If my question is confusing please let me know and I will clear up anything I can.
Thanks for your help in advance.
Regards,
C.There is a conversion exit on unit of measure, "CUNIT" (via table T006A) use
CONVERSION_EXIT_CUNIT_INPUT Conversion exit for commercial (3-char) measurement unit INPUT
CONVERSION_EXIT_CUNIT_OUTPUT Conversion exit for commercial (3-char) measurement unit OUTPUT
Regards -
Material condition unit of measure not allowed
Hello Friends,
I am facing error of material XXXX condition ZPPL unit of measure SFT not allowed while creating the opportunity in CRM
Kindly note that I have defined a new UoM in ERP and for this new UoM the sales created perfectly in ERP, i have checked the netweaver settings for ISO codes and UoMs in CRM and they are fine...
Please help me with thisDid you ever find the solution for this? I am getting the same warning message and have no idea why it is defaulting 'ST'.
-
Why will my units of measure not change
I have an old ai file created in CS5 and am opening in CS6 is comes in with cm even though I have changed the units of measure with the file open and also with no files open. Yet every time I open the file it is still in cm. Any ideas?
Hi Jacob,
Tried that already no go. Have tried changing with no documents open, with documents open saved as CS6. All my other files seem fine but this one will not update.
Thanks
Emma
On 2014-07-10, at 11:02 AM, Jacob Bugge <[email protected]<mailto:[email protected]>> -
Requirement in alternative unit of measure
Hi,
A material is maintained with EA as Base unit of measure and alternative unit of measure is maintained as 100m=1 EA. when MRP is run, the requirement appears in EA and not meteres. The issuing UOM is maintained as M in plant/storage view. Is there a way to have the uom for the requirement in the reservation to be in Meteres.
thanksDear
Please check in BOM, routing according to the same UOM.
And in Stock reqyuirement list MDO4 click on the Settings there u ll find the general settings under that tab u find the UOM
basuunit of measure and alternate unit of measre in that u ll find the list
With regards
Pushpalas -
QAC1 in alternative unit of measure
Hey All
I need to know how can I make the quantity correction of actual quantity of inspection lot based on the alternative unit of measure not the base unit of measure?
I have inspection lot (04) where it's actual quantity is in base unit of measure M2 but I need to make the correction in CAR which is the alternative UOM.
As i know there is a SAP not that allows the posting at UD to be done in alternative unit of measure so I am asking if there is any similar solution for QAC1?
I need that urgently and Thanks in advanceAs i know there is a SAP not that allows the posting at UD to be done in alternative unit of measure so I am asking if there is any similar solution for QAC1?
No its not possible !!
check Note 605861 - Provision of a BAdI for input help for quantities in UD -
WM MF60 different unit of measure
Hi all.
I am trying to move material from raw material warehouse (managed in WM) into production warehouse (not managed in WM). In production warehouse production order exists for manufacturing.
For transferring components between both warehouses I am using MF60 trasaction.
There are some materials that are consumed in one unit of measure (ST) but transferred in another one (CRT). Although the requirement is to transfer 1 unit for one production order, one box (containing 60 units) will transferred and this will cover the production of the next 60 production orders.
For this purpose I maintain WM unit of measure including CRT and as base unit of measure ST but the 311 movement is made based on ST unit of measure and so the TR and TO.
Did I miss any customizing? Should I use the issue unit of measure, not enough with WM unit of measure?
Many thanks in advance and best regards.Note 880211 - Alternative Unit is ignored while transferring PDS
-
Unit of measure with language Key
Hello Guruz,
WHile creationd of purchase order, there is a check kept which compares the vendor communication language which gets updated in the Po header - Communucation tab with Db table T006A which holds the Unit of measurements with Language Key and pops up an error message.
It cheks the order unit in the PO, and the T006A whether the unit is maintained in the Language key as in the PO header - Communiction tab.
But while creating a unit of measurement in CUNI, we dont have the option to maintain the language key for the UOM.
In CUNI, it defaults the language key as EN in table T006A.
I need a prompt support from you guys on this issue. Please suggest how to go about with this?
Best Regards
Greg.Hello,
When i am trying to go for the language key in CUNI, it says that the said language is 'not available in server'. I guess it is checking whether the language patch is updated in the server.
But it doesn't sound logical to maintain all the unit of measurements in all the vendor languages. Suppose if we are having vendors with 75 communication languages and we are having 50 units os measurements, so does that mean that we have to maintain units of measurements 75 X 50 times ?
Kindly provide your inputs on the issue. We are facing lots of issues with this control kept in PO header checking for the T006A with the vendor communication language.
Regards
Greg
Maybe you are looking for
-
How do I get my media replaced if it fails to play?
I purcahse a movie through iTunes and it worked fine for a few months. Now when I hit play it acts like it is going to play (the screen comes up like it did) but it will not play. The file is right where it should be, the hard drive works fine (all
-
how do i get full songs to download and play on my windows pc?
-
Connected Servers Not Showing Up in Sidebar
When I connect to a server it used to show up in the sidebar of a Finder Window under Shared (I think) or perhaps Places. It no longer does despite the fact that I have Connected Servers checked under the Sidebar tab of Finder Preferences. How did I
-
Just applied for the QS (for the 21.5% back on Uber, since I spend 1k/month on Uber Approved for 30k @ 12.9% APR (0% until March 2016). Thought about the Venture two-fer since I could probably get 50k based on other QS+V approvals, but decided my AA
-
How to create Printer Device in SPAD
Hi All, can any one please tell me step-by-step process to create new printer device and configure it in ECC5.0 If you need any more info plz let me know That would be a great help Regards, Faisal