Maintenance Cycle Text from IP03

HI,
   How to get the Cycle, Unit and Maintenance cycle text  under the tab Maintenance Plan Cycle from the Transaction IP03.??
Regards
Anji

hi,
use these tables.
MMPT
MMPX
T351X.

Similar Messages

  • IW21 Retrieving the maintenance cycle text while creation of work order

    Hi Experts,
    My requirement is to display the maintenance cycle text on the print preview while creating a work order via transaction IW21.
    Since the print preview is clicked before saving the work order, the data from the work order has not been updated in the database tables (AFVC, PLWP).
    Hence, the maintenance cycle text will have to be accessed through a runtime structure.
    The text has to be fetched in a subroutine program which is called from the SAPscript.
    I tried accessing the global data while debugging. However, the maintenance cycle text does not seem to be present.
    Please help.
    Regards,
    Anusha

    It is inappropriate to produce a SAPScript prior to save, IMHO.  What prevents the user from changing something after the print preview was done in this case?
    At any rate, you'll find that some data values, like document numbers, etc., are not set until the user has saved the document.   The document needs to be saved, and SAPScript generated at the end of that process.

  • Removing a corection from a maintenance cycle

    Good Day;
    I am trying to figure out how to remove a "correction" from a maintenance cycle. There is a transport assigned to the correction.
    We are currently on support stack 17
    Thanks all
    Regards
    Don Newton

    Thanks Sanjai;
    This part works well except that that any transports have remained in the maintenance cycle.
    Not a big problem as I can use SE10 to remove the transport from the maintenance cycle as long as it is in u201Cmodifiableu201D status.
    Thanks again Sanjai
    Regards
    Don Newton

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • To retreive the Maintenance Cycle for a Maintenance Package

    Hi All,
    I am trying to retrieve the 'Maintenance cycle' for a Package in the Maintenace package of the Maintenance strategy.
    I tried table T351P, but except 'Maintenance Cycle' i can see all other fields.
    In IP11 and in IP03 transactions i can see the Maintenace cycle field in the grid where maintenance packages are listed.
    But could not find a way to retrieve the maintenance cycle.
    Appreciate if you guys could help me out in getting the Maintenance Cylce.
    Cheers,
    Jaffer Ali.S

    Hi,
    Check the table MMPX Maintenance cycle short texts .
    Regards,
    Ankur Parab

  • Maintenance Cycle Next Phase

    Hi,
    We are using chaRM 4.0, in tx SCMA,we can not able to move the Phase Transistion from 'Created' to 'Development without Release'. When we click on the next phase it is giving the below error . kindly help us.
    MsgType Message Class        Msg.no. Message text
    E       /TMWFLOW/PHCNTRL          54 Change transaction
                                         is incorrect
    E       /TMWFLOW/PHCNTRL          56 Phase transition
                                         from 'Created' 
                                         to 'Development
                                         without Release' is
                                          not possible
    Rgds,
    Jeni.

    Hello Jenifer,
    The problem usually is due to errors in the CRM transaction that represents the Maintenance Cycle. You can check it by calling transaction CRM_DNO_MONITOR and entering in the transaction type SDMN then process.
    You will get a list of all Maintenance cycles, select the proper one and double click.
    In the CRM Transaction in the upper/right side you should have a red button if you click it you can find out the reason for the error and correct it.
    Then the Phase change can be performed.
    Just a info for you, you can also perform the Phase Change throught the CRM transaction type SDMN, check the actions button and you will find it.
    Regards,
    Andreia

  • Why am I no longer able to copy and paste text from a website?

    I am trying to copy and past text from a website and it will not even let me select it.  I am very familiar with how to do this, and it worked yesterday on the same page in safari.  Please advise if anyone knows how to fix this.
    Thanks,

    Hi, Jrpaige7. 
    Thank you for visiting Apple Support Communities. 
    You can still copy and paste material from various applications in iOS 7.  Here are the steps on how to process these steps. 
    iPhone User Guide
    If you are experiencing issues with this functionality, I would recommend closing multitasking and power cycling the device. 
    iOS: Force an app to close
    http://support.apple.com/kb/ht5137
    Cheers,
    Jason H. 

  • Multiple system maintenance cycles are not shown in pop up for selection

    Hi,
    In change manager, when we create a change document from a change request, we dont get a pop up for selection of maintenance cycles with multiple systems in it.
    The change document is getting created by taking the only available maintenance cycle with only that system.
    Is there any configuration for this?
    Regards,
    Dipti Sawarkar.

    Hi Christian,
    Thanks for your reply.
    I know the pop up will come only when there is more than one maintenance cycles for that production system.
    I have done configuration for Normal correction.( SDMJ) and customized it (ZDMJ).
    When I try to create a CD* from CR* for a particular production system ( CCP) , it just takes up a maintenance cycle for CCP system and doesnt show up any pop for selection of maint cycles whereas I have created 5 maintenance cycles for this system CCP.
    The other 4 maintenance cycles have multiple landscapes (CCP and EAP )in it whereas this one (which gets selected by default) just has CCP landscape in it.
    The strange part is that when I try to create a stand alone CD ( without CR ) , it will give that pop up showing all 5 maint cycles. But this is not happening when I create a CD from a CR.
    I have never done/ seen configuration for the pop up of selecting maint cycles in ChaRM.
    Looking forward to ur help,
    ( *CD - Change Document  and * CR - Change Request)
    Regards,
    Dipti Sawarkar.

  • No maintenance cycle is open for the current system

    Hello!
    I have problems to use CharM functionality due to following error:
    <b>No maintenance cycle is open for the current system</b>
    The error arises when I try to set a urgent correction in status "In Development" I get the following error, menwhile I have an valid maintenance cycle active.
    I use CharM functionality for the solution consisting of an single system with two clients:
    SRM:000 (as DEV-system) (system role: source system)
    SRM:100 (as PRD-system) (system role: target system)
    - No maintenance cycle is open for the current system (meanwhile I have a valid maintenance cycle created and activated).
    Futhermore I get the additional warning:
    IBase component is not a productive system in system lanscape
    Can some help me with this issue?
    Thank you very much!
    regards
    Thom

    Hello Kriti,
    thank you very much for your response.
    Unfortunately I also thought about it.
    Basically my CharM procedure looks as follows.
    I send the message from productive client (I have only one system with client 000 and 100)  to Service Desk in SOLMAN.
    There I can see the IBase of the productive client.
    Then I create a urgent correction by assigning IBase to this IBase of productive client. It is also possible to change the IBase in change mode, so I have tried all the possible values of IBase and get the same error.
    My problem also is that I have multiple values of IBase assigmenets, it means one system has multiple assigments to IBase components.
    I do not know how to delete/cut these settings....
    Thank you for your further help!
    regards
    Thom

  • Need to close maintenance cycles to apply EhP1?

    Hello,
    We are planning to install EhP1 for SolMan, we are currently running SP17.  I've looked through the install guide, but I am still not sure if we need to close all existing Maintenance Cycles and corrections before the upgrade, or if the existing cycles will not be affected.
    Can anyone shed some light on this issue?
    Thanks in advance,
    Michele

    We are using ChaRM in our SolMan production system to manage changes to our other SAP systems, so we have numerous maintenance cycles open and ZDCR corrections being created and worked on.
    When EhP1 for Solman is installed in production, will it mess up any of these maintenance cycles or ZDCR corrections?  Or will these continue to work?  We don't want to stop our support for our other SAP systems for this enhancement pack.
    Thanks,
    Michele
    P.S. - It's really hard to talk about SDCR/ZDCR corrections when their name is banned from the forums.

  • Solution Manager - Import buffer and duplicate imports in maintenance cycle

    Hello,
    I am trying to understand how Normal and Urgent Correction work in a maintenance cycles.
    I am using SOLMAN 4.0  and I would like to know how the import buffers are managed.
    When I have completed a maintenance cycle and all my transport request have been imported in the production system, I want to switch the status of the maintenance cycle back to development in order to complete my previous open normal corrections. I have read in many places that if I act in this way, not only my new corrections but all the old correction will be imported in the quality and production systems because the import buffers do not get empty.
    For example, If I decide to have 10 normal corrections but eventually only 9 corrections are imported in quality and production systems, when I switch back to development and I complete the 10th correction, this correction will be imported together with the other 9 corrections or this will be imported alone since the other nine correction have been imported before?
    How it works?
    I appreciate suggestions.
    Thanks
    Antonello

    Hi Gert-Jan,
    We do the same and we don't face this issue.  There is thus a solution.
    I never had this case, this might be a parameter in your QAS refresh procedure.
    1/ If you empty your production import buffer (meaning you import it all to production) before tacking the production copy you will never have this issue.
    2/ If you have some transportd left in the import buffer of production , you have this issue ? I guess this is our case
    I will try to reformulate the case.
    The refresh of QAS is causing the lost of some customizing that were not yet imported in production but was imported in QAS prior to the refresh of QAS.
    When you reimport the "overwritten" transports in QAS after the refresh, this transport is removed from the QAS import buffer and going too the import buffer of production. 
    A/The same transport is now twice in the import buffer of production ? we don't have this in our landscape (I even think this was not possible)
    B/Or in between this transport has been imported in production and thus you are right it falls in the import buffer of production again with another sequence.
    Thank you to confirm your case A or B ?.

  • Problem with differetn phases for one maintenance cycle

    Dear Solman Gurus.
    It has happened several times, tha while working with maintenance cycle from 2 different places - from activity Maintenance cycle and form Task list, that system shows different phases. For example in task list is phase TEST in activity Maintenance cycle is phase Development wit release. And you are not able to correct it. Or at least we do not know how to do it. So we can only close the whole maitenance and start all over again.
    Please help us how to prevent this situation or how to correct it.
    Regards,
    Petr

    Hi Petr,
    You should have a look to SAP Note 933705 that helps with your problem.
    Best regards,
    Stéphane.

  • Mm2 remove purchase order text from central data M_MATE_MAN

    Hi,
    we restricted the material master data in mm01/mm02 with the authorisation object M_MATE_MAN to activity 03. This setting meets our requirements to 99%!
    We saw in sap note 545380 that the purchase order text is a central text.
    Surprisingly the sales text is created with reference to the sales organization. Is there a similar purchase order text which can be created on the level of the purchase organization and language?
    Or can we use an user exit or something else to allow maintenance and exclude the purchase order text from the M_MATE_MAN authorisation check?
    Thank you in advance for your help!
    Best regards,
    Frank

    Hi,
    have you tried to invalidate item instead of account assignment? You can get a reference to item with method GET_ITEM. I can see only one class which implements interface IF_PURCHASE_ORDER_ACCOUNT_MM. It is CL_PO_ACCOUNTING_HANDLE_MM and this class has no code for this method.
    Cheers

  • Photosmart 8250 constant maintenance cycles while printing & excessive ink usage

    I'm having a problem with my trusty 4-year-old HP Photosmart 8250: Whenever I print a document, whether in color or black ink only mode, it constantly enters maintenance cycles and excessively uses ink.
    Two examples: When I printed a color document (color, HP Bright White Inkjet Paper, 17 pages), the printer behaved erratically, with constant maintenance cycles. It also said I had to change yellow ink, but when I re-turned on the printer to install a fresh yellow ink cartridge (I only use original HP ink), it still showed remaining yellow ink. Then yesterday, when I printed a 32 page graphics document (black ink only, plain paper, normal), the ink meter for black dropped from full to 25% full (I had changed the black cartridge only one week earlier), and the printer went through four maintenance cycles. Neither had happened before in my four years of owning this printer, and the black ink consumption for similar documents in the past was barely a quarter of what it was for this document. 
    Are these issues most likely related to the printhead? I know that the Photosmart 8250, like all printers with HP 02 cartridges, uses a fixed non-replaceable printhead, so does the printhead need cleaning or alignment? Or should I just get a new HP printer, as I have used this printer extremely frequently over the past 4 years?
    Thanks for all your help!

    Hi johnpd,
    There have been some significant upgrades to photo printing and the inks since the MP610 was introduced.  With the MG7120, and the XL ink tanks (which are comparably priced to the standard ink tanks used in the MP610), you should receive similar or greater page yields.  One major reason for this boost is the addition of the gray CLI-251 ink.  When gray appears in your printout, instead of using a mixture of all the other colors, the gray ink is used, reducing your overall ink consumption.
    At the risk of sounding like a typical salesman, "I want to get you in the model that is right for you"!  If you are looking for a photo printer, the MG7120 is one of my top suggestions for a quality Photo All-in-One.  If however, you do not plan to make heavy use of the printer and only occasionally print photos, you might get more value from an Office All-in-One.
    Please feel free to Contact Us if you have any additional questions.
    Did this answer your question? Please click the Accept as Solution button so that others may find the answer as well.

  • Assigment maintenance cycle -- system (IBASE) in CharM

    Hello!
    I have the problem to establish CharM functionality.
    When I try to set a urgent correction in status "In Development" I get the following error:
    No maintenance cycle is open for the current system
    My question are:
    - How do this assignment maintenance cycle <--> system (IBASE) work?
    - Is it perhaps possible to execute this assignment manually?
    - Is there some log files that can be analysed for this problem?
    Thanks & regards
    Thom

    Hi,
    About this issue, there is a detail information about this in blog point 6  u201CChanges in the logical components of a project where Charm is already activatedu201D.
    This is the link:  http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/15116
    So, you have to change the transport route accordingly and then close current maintenance cycle and generate a new one.
    Following is the steps.
    1: please import all the transport requests which were associated in the current maintenance cycle task list by STMS manually import.
    1: change transport route from DEV > PREPROD >PROD to DEV > USER > PROD on the domain controller system.
    2: close current maintenance cycle.
    3: change the system landscape to DEV > USER > PROD in solar_project_admin.
    4: generate a new maintenance cycle.
    Thanks
    Regards,
    Vikram

Maybe you are looking for

  • Different colors for the aggregation in the report

    Hi In my BEx report I require to show the aggregation in different colors. That is suppose my report has 3 characteristics and 2 keyfigures. When the 'Result' appears for characteristic1 it should be shown in blue color(not specific) and when the res

  • SRM-MDM Catalog - XI Scenario

    Hi, I am working on SRM-MDM Catlog 1.0 integration with XI. I have to configure scenarios in XI for: 1) Upload of Supplier catalog via Server File System to SAP MDM catalog. for example in XML Format. 2) Replication of Product and COntract data. We h

  • What does connecting iPad mini to my Mac Mini  through Bluetooth do

    what does connecting iPad mini to my Mac Mini  through Bluetooth do

  • How to change date format in query

    Hi all! there is Date field in query (ref to 0Date) and it is in "01.2010" format. Anybody knows how to switch to "Jan 2010" format?

  • Jdev 11g defect: Error creating partition table diagram

    I'm running Jdev 11.1.1.0.2 on JDK 1.6.0_06 When attempting to drag partitioned table from DB connection onto a DB Diagram I'm getting the following exception. Anybody got similar experience? Also every time I create new diagram or off-line DB JDev s