Maintenance Order creation control

Is there a way to control that a Maintenance Order could be created only if the notification is already put in progress? Not if the notification is on status u201COutstanding notificationu201D.
Iu2019ve tried to do it by security access but didnu2019t get the way to do it either, I need to know if itu2019s possible by customization.
Thanks.

Dear all,
You can do this by using User Status attached to Order.  Create User Staus , with Object Type ticking Maintenance Order & Maint Notification you get all buisness transcition , in that select " PUT NOTIFICATION IN PROCESS AGAIN " and  select "SET" Radio button ,
So whenever you create the Order from Notification , Even if notification is in "CRTE" Status , Notifcation gets released while saving Order.
This is similar to ur Requirement ,
Check for Other Notification Parameter also.
Regards,

Similar Messages

  • Can User Exit works for Settlement Rule in Maintenance Order creation?

    Dear Experts,
    I have this situation where I tried to create an Internal Maintenance Order via IW31 for multiple equipments from different functional location (different cost centers) using the Object List.  However, the settlement rule has a problem to pull out as there's no Equipment in the reference object. That's the reason, I'm looking at the User Exit which I understand the IWO10027, can do the work.  Since I'm new to User Exit, can I enhance the settlement rule by the following condition.
    The costs spent on each equipment will be used as a basis of calculating the weightage (via equivalence no) for the settlement rule.
    Can it be done that way?
    regards,
    Abraham

    Sanjay,
    This data can be checked in the following user-exits:
    COZF0001: Change purchase req. for externally processed operation
    COZF0002: Change purchase req. for externally procured component
    PeteA

  • Maintenance order cost control through Permit

    Hi
      I want to know whether  Maintenance order release approval on the basis of planned cost can be done on the basis of issuing Permits. May I please be guided with the process for this?
    Thanks

    Hi,
       This topic has been discussed many times in this FORUM , u can search up
    check this link http://www.sap-img.com/plant/complete-help-to-implement-maintenance-cost-approval.htm
    Link 2 :- http://www.sapfans.com/forums/viewtopic.php?f=7&t=132912
    Link 3 :- http://aq33.com/quality-management/Articles-000534.html
    If u want to have more level of permits based on planned costs then u you need to create Charac in CT04 , assign that in class
    This class you need to give in IPMD while creating permits -under classification -> Here u need to mention the characteristic , In the characteristic - u need to mention the range , if u mention range as 0- 2500

  • SAP PM: Maintenance Order Creation

    Dear Sir,
    We have a scenarios, Example A department is having 30 Activites to be performed during maintenance in diffrent cyle.
            JAN         1     2     3    4    5 .........................
    Act1   -  1M     E1   E2
    Act2   -  1M     E1   E2
    ACT3  -  3M            E2
    ACT4  -  3M     E1  
    ACT5  -  6M     E1
    ACT6  -  6M
    ACT7  -  9M           
    ACT8   - 9M     E1
    ACT9  -  9M             E2
    ACT10 - 9M     E1    E2
            FEB         1     2     3    4    5 .........................
    Act1   -  1M     E1   E2
    Act2   -  1M     E1   E2
    ACT3  -  3M          
    ACT4  -  3M            E2
    ACT5  -  6M    
    ACT6  -  6M
    ACT7  -  9M     E1      
    ACT8   - 9M             E2
    ACT9  -  9M     E1   
    ACT10 - 9M             E2
    Like this planning performed activiy wise. Based on this I am creating Plan. On a perticular day I am getting 13-20 Maintenance orders generated by the system. It looks very Cumbersome.
    Please guide to make it single order for one equipment.
    Regards,
    Mohan

    Dear Sunil,
    Thanks for information.
    If I have not created Maintenance plan according to Activities ie Dates requirement, then How can I generate schdule for each equipment wise
    Please guide me how I have to create?
    Regards,
    Mohan

  • Restrict the Preventive Maintenance Order creation through IW31 for few users.

    Dear Guru's,
    Good Day.
    My client requirement is he wants to restrict the Preventive Maintenance Orders through Transaction IW31 for few users. Is it possible through authorization? Please do the needful.
    Regards,
    Bhanu.

    possible for order type.
    create a role with all order types (optional) including Prev. Maint Order type, obviously having T.code IW31. and create another similar role excluding Prev. Maint Order type.
    Assign earlier role to few users (want to give the permission of IW31 Prev.) and later role to all remaining users.
    Auth. Object: I_AUART, first test in sandbox or testing client.

  • Production order creation control in the case of jumping quty in routing

    Hi,
      i have a routing in which first operation i make one quantity . in the second operation it becomes 12 quantity.and third operation also it becomes 12 quantity.
    for
    operation  1      quantity 1
    operation 2        quantity 12
    operation 3       quantity 12
    it means in operation 2 the quantity 1 is made in to 12 pieces.
    so my final material is 12 quantity.
    in this situation i want the production order to be created for this material in the multiples of 12 only.because system is not restriction the creation of production order for 1 quantity in this case. but it only stops during confirmation of first operation.
    pls sugest any where i can control the creation of production order which is not meeting the multiples of that operation quantity.
    rgs
    madan

    Hi Madan,
    I am not sure about direct control for your requirement, so try below work around solution.
    System should only allow to create prod order if the order qty is in multiple (12,24,48 ...), other wise it should not allow .
    I hope u have defined bom as (12  Nos/pcs header material = 1 Nos/pcs raw material )
    For multiple order qty, the components requirement qty should not be in decimal, it should in integer.  If u create the order with qty not multiples (say 13 ,14..) , the component requirement qty comes in decimal.
    I am not sure, Find the user exit and set Error message (with Abap`rs), once components requirement qty comes in decimal.  I have never tried this, I just give my idea.
    Regards
    Pradeep

  • Order creation control if components stock not available

    I am creating a production order manually through CO01 for a material which is having components. But some components are not having sufficient  stock as per required for the above production order qty.Now system should not allow me to create the order. What settings I need to do in the system.

    Dear ,
    You can apply user exit : PPCO0001 Application development: PP orders   or Screen Variant SMOD .
    Refer useful theards of list of user exit : UserExit / CO01/ urgent
    or You can also stop realseing in Standrad settings even the order is created  in OPJK-Order type and Availability Check key -02-Keep Relase Material -3 ( No realse if missing parts )  , Mark Status Check , Check material availablity while Saving of order .
    Regards
    JH

  • Using Manufacturer Part numbers (HERS) in Maintenance orders (IW32)

    We want to be able to allow our maintenance engineers to select the MPN's they want (material type HERS) from the maintenance order creation screen (Iw31/IW32) but we get the message CO010 Material nnnnnnnn not found in plant xxxx. Of course the HERS will not be created in MARC, however the end user should be able to select the HERS and generate a reservation for the "Firms own inventory managed material" (the ERSA).
    Any suggestions?

    We have the same problem; so far we think we have to create a custom search help and append the MAT1.
    I spent a long time searching for OSS notes but could not find any ...

  • User exit for maintenance order Quantity check

    Hi All,
    I have one requirment in PM maintenance Order creation IW31.
    If Quantity is not entered in maintenance Order creation, system should through message.
    I have tried the following Enhancements
    IWO10002
    IWO10009
    Please help me in this regards.
    Deekshitha.

    Hi
    Please try from the list of available EXITS triggered in the case of IW31 transaction.
    EXIT_SAPMIWO0_003
    EXIT_SAPLIWO1_001
    EXIT_SAPLCOIH_003
    EXIT_SAPLCOIH_005
    EXIT_SAPLCOIH_007
    EXIT_SAPLCOIH_008
    EXIT_SAPLCOIH_009
    EXIT_SAPLCOMK_003
    EXIT_SAPLCOIH_012
    EXIT_SAPLIQS0_001
    EXIT_SAPLCOIH_014
    EXIT_SAPLCOIH_015
    EXIT_SAPLCOIH_016
    EXIT_SAPLCOIH_017
    EXIT_SAPLCOIH_018
    EXIT_SAPLCOIH_019
    EXIT_SAPLIWO1_004
    EXIT_SAPLIWO1_005
    EXIT_SAPLISM6_001
    EXIT_SAPLISM6_002
    EXIT_SAPLIQS0_017
    EXIT_SAPLCOIH_025
    EXIT_SAPLCOIH_026
    EXIT_SAPLCOI1_027
    EXIT_SAPLCOMK_029
    EXIT_SAPLCOI1_030
    exit_saplcoih_030
    exit_saplcoih_031
    exit_saplcoih_032
    <b>Reward points</b>
    Regards

  • Authorization control of PR creation from maintenance order

    Hi,
    I want to control creation of PR through maintenance order (Service as well as material PR) for only some users with the use of authorization object control.PR should not be created for this users.
    Can anyone suggest me which authorization object I have to control to acheive the expected result.
    Regards,
    Yogesh

    Thanks Yawar,
    Your solution is perfectly works for me. Earlier solutions are also useful the things is you have to first activate the authorization object through SE24,that means change the Check indicator from N (Not checked ) to C (Check )or CN(Check & maintain)
    Regards,
    Yogesh

  • Automatic Creation of Settlement Rule for Maintenance Order

    Hi,
    While doing TECO for Maintenance Order, its asking for Settlement Rule. IF I click settlement rule, message is coming as Maintain Settlement Profile with options like With Default, Without Default & Cancel.
    I have maintained the Cost center in Equipment Master. Also I maintained Cost Center as Default Settlement receiver.
    Also I have gone through setting in Automatic Creation of Settlement Rule under Controlling Category.
    But I couldnt understand that. Can you please tell what are the steps to be done?
    Regards,
    Maheswaran.

    Hi,
    Please check the indicatorsin Actual cost/cost sales  and Valid recevivers in settlement profile.
    If for cost center : 1 settlement optional is maintained in valid recevivers and also for order
    and in actual cost/ cost sales: indicator to be settled in full is selected.
    Also check Allocation structure too if you have assigned the valid allocation structure.
    **check if you have assigned the valid settlement profile to order types.
    *****Most important after doing all these settings you need to create new order. for same order you will not get the automatic settlement rule
    Hope this helps.
    Regards,
    PMAddi

  • Sales order creation with bapi in webdynpro using table control

    When i use table control to update the line items only first row is getting updated in the sale order creation and the loop is not updating the other row to header only the first row is getting saved, for the same set of data sale order is getting created in va01 for multiple line items. Pls give me some idea to resolve this issue, here is the code i am using for creating sale order using bapi 'BAPI_SALESORDER_CREATEFROMDAT2' method CREATE_SALES_ORDER .
    Declaration for Order Header Node DATA: node_order_header TYPE REF TO if_wd_context_node, elem_order_header TYPE REF TO if_wd_context_element, stru_order_header TYPE if_componentcontroller=>element_order_header . * Declaration for Order Items Node DATA: node_order_items TYPE REF TO if_wd_context_node, elem_order_items TYPE REF TO if_wd_context_element, stru_order_items TYPE if_componentcontroller=>element_order_items . * Declaration for Order Partners Node DATA: node_order_partners TYPE REF TO if_wd_context_node, elem_order_partners TYPE REF TO if_wd_context_element, stru_order_partners TYPE if_componentcontroller=>element_order_partners . node_order_header = wd_context->get_child_node( name = if_componentcontroller=>wdctx_order_header ). elem_order_header = node_order_header->get_element( ). elem_order_header->get_static_attributes( IMPORTING static_attributes = stru_order_header ). * via lead selection node_order_items = wd_context->get_child_node( name = if_componentcontroller=>wdctx_order_items ). elem_order_items = node_order_items->get_element( ). elem_order_items->get_static_attributes( IMPORTING static_attributes = stru_order_items ). * via lead selection node_order_partners = wd_context->get_child_node( name = if_componentcontroller=>wdctx_order_partners ). elem_order_partners = node_order_partners->get_element( ). elem_order_partners->get_static_attributes( IMPORTING static_attributes = stru_order_partners ). DATA: v_sales_doc TYPE bapivbeln-vbeln. DATA: w_order_header_in TYPE bapisdhd1, i_order_header_in TYPE table of bapisdhd1," i_order_partners TYPE TABLE OF bapiparnr, w_order_partners TYPE bapiparnr, i_return TYPE TABLE OF bapiret2, w_return TYPE bapiret2, i_order_items_in TYPE TABLE OF bapisditm, w_order_items_in TYPE bapisditm, i_order_conditions_in TYPE TABLE OF bapicond, w_order_conditions_in TYPE bapicond, w_order_SCHDL type BAPISCHDL, i_order_SCHDL type table of BAPISCHDL. * Order Header Details CLEAR: w_order_header_in, i_order_partners, i_return, i_order_items_in, i_order_conditions_in, w_order_SCHDL, i_order_SCHDL. refresh : i_order_partners, i_return, i_order_items_in, i_order_conditions_in, i_order_SCHDL. w_order_header_in-doc_type = stru_order_header-doc_type. w_order_header_in-sales_org = stru_order_header-sales_org. w_order_header_in-distr_chan = stru_order_header-distr_chan. w_order_header_in-division = stru_order_header-division. w_order_header_in-req_date_h = stru_order_header-req_date_h. w_order_header_in-sales_dist = stru_order_header-sales_dist. w_order_header_in-purch_no_c = stru_order_header-purch_no_c. * Order Item Details CLEAR: i_order_items_in,w_order_items_in. * w_order_items_in-itm_num = stru_order_items-itm_num. w_order_items_in-ITM_NUMBER = stru_order_items-ITM_NUMBER. w_order_items_in-material = stru_order_items-material. w_order_items_in-target_qty = stru_order_items-target_qty."'5'. w_order_items_in-target_qu = stru_order_items-target_qu."'5'. w_order_items_in-plant = stru_order_items-plant. w_order_items_in-target_val = stru_order_items-target_val. w_order_items_in-currency = stru_order_items-currency. CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT' EXPORTING input = w_order_items_in-material IMPORTING output = w_order_items_in-material. APPEND w_order_items_in TO i_order_items_in. * Order Partner Details CLEAR: i_order_partners,w_order_partners. w_order_partners-partn_role = stru_order_partners-partn_role. w_order_partners-partn_numb = stru_order_partners-partn_numb. CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT' EXPORTING input = w_order_partners-partn_numb IMPORTING output = w_order_partners-partn_numb. APPEND w_order_partners TO i_order_partners. * Order Condition Details w_order_SCHDL-ITM_NUMBER = stru_order_items-itm_number." '000010'. w_order_SCHDL-req_qty = stru_order_items-target_qty." '5'. APPEND w_order_SCHDL to i_order_SCHDL. * Create Sales Order BAPI Call *loop at i_order_header_in into w_order_header_in. CALL FUNCTION 'BAPI_SALESORDER_CREATEFROMDAT2' EXPORTING order_header_in = w_order_header_in IMPORTING salesdocument = v_sales_doc TABLES return = i_return order_items_in = i_order_items_in order_partners = i_order_partners order_schedules_in = i_order_SCHDL order_conditions_in = i_order_conditions_in. * Get message manager DATA: l_current_controller TYPE REF TO if_wd_controller, l_message_manager TYPE REF TO if_wd_message_manager. l_current_controller ?= wd_this->wd_get_api( ). CALL METHOD l_current_controller->get_message_manager RECEIVING message_manager = l_message_manager. DATA: v_message_text TYPE string. * When Sales Order is created commit the data IF NOT v_sales_doc IS INITIAL. CALL FUNCTION 'BAPI_TRANSACTION_COMMIT' EXPORTING wait = 'X'. CONCATENATE 'Sales Document' v_sales_doc 'has been created.' INTO v_message_text SEPARATED BY space. * Report Success message CALL METHOD l_message_manager->report_success EXPORTING message_text = v_message_text. ELSE. v_message_text = 'Error Creating Sales Order'. * Report Error message CALL METHOD l_message_manager->report_error_message EXPORTING message_text = v_message_text. ENDIF. *endloop. endmethod. and code for table control i am using is method WDDOINIT . Types : Begin of item_tab, itm_number type bapisditm-itm_number, material type bapisditm-material, plant type bapisditm-plant , target_qty type bapisditm-target_qty, target_qu type bapisditm-target_qu, target_val type bapisditm-target_val, currency type bapisditm-currency, end of item_tab. *Creating internal table and Work Area of the same structure *as that of the Node created. Data : it_item type standard table of item_tab, wa_item type item_tab. *Appending Blank Work Area to Internal table. ***********************************************888 *LOOP AT it_item INTO wa_item. **wa_item-itm_number to bapisditm-itm_number. **wa_item-material to bapisditm-material. **wa_item-plant to bapisditm-plant. **wa_item-target_qty to bapisditm-target_qty. **wa_item-target_qu to bapisditm-target_qu. **wa_item-target_val to bapisditm-target_val. **wa_item-currency to bapisditm-currency. ** * APPEND wa_item TO it_item. *ENDLOOP. **********************************************88 ******** Do 10 times. Append wa_item to it_item. enddo. ********* "Binding the table DATA lo_nd_order_items TYPE REF TO if_wd_context_node. * DATA lt_material TYPE wd_this->Elements_material. * navigate from to via lead selection lo_nd_order_items = wd_context->get_child_node( name = wd_this->wdctx_order_items ). * @TODO handle non existant child * IF lo_nd_material IS INITIAL. * ENDIF. ** @TODO compute values ** e.g. call a model function * lo_nd_order_items->bind_table( new_items = it_item set_initial_elements = abap_true ). endmethod.

    DATA: node_order_header TYPE REF TO if_wd_context_node, elem_order_header TYPE REF TO if_wd_context_element, stru_order_header TYPE if_componentcontroller=>element_order_header . * Declaration for Order Items Node DATA: node_order_items TYPE REF TO if_wd_context_node, elem_order_items TYPE REF TO if_wd_context_element, stru_order_items TYPE if_componentcontroller=>element_order_items . * Declaration for Order Partners Node DATA: node_order_partners TYPE REF TO if_wd_context_node, elem_order_partners TYPE REF TO if_wd_context_element, stru_order_partners TYPE if_componentcontroller=>element_order_partners . node_order_header = wd_context->get_child_node( name = if_componentcontroller=>wdctx_order_header ). elem_order_header = node_order_header->get_element( ). elem_order_header->get_static_attributes( IMPORTING static_attributes = stru_order_header ). * via lead selection node_order_items = wd_context->get_child_node( name = if_componentcontroller=>wdctx_order_items ). elem_order_items = node_order_items->get_element( ). elem_order_items->get_static_attributes( IMPORTING static_attributes = stru_order_items ). * via lead selection node_order_partners = wd_context->get_child_node( name = if_componentcontroller=>wdctx_order_partners ). elem_order_partners = node_order_partners->get_element( ). elem_order_partners->get_static_attributes( IMPORTING static_attributes = stru_order_partners ). DATA: v_sales_doc TYPE bapivbeln-vbeln. DATA: w_order_header_in TYPE bapisdhd1, i_order_header_in TYPE table of bapisdhd1," i_order_partners TYPE TABLE OF bapiparnr, w_order_partners TYPE bapiparnr, i_return TYPE TABLE OF bapiret2, w_return TYPE bapiret2, i_order_items_in TYPE TABLE OF bapisditm, w_order_items_in TYPE bapisditm, i_order_conditions_in TYPE TABLE OF bapicond, w_order_conditions_in TYPE bapicond, w_order_SCHDL type BAPISCHDL, i_order_SCHDL type table of BAPISCHDL. * Order Header Details CLEAR: w_order_header_in, i_order_partners, i_return, i_order_items_in, i_order_conditions_in, w_order_SCHDL, i_order_SCHDL. refresh : i_order_partners, i_return, i_order_items_in, i_order_conditions_in, i_order_SCHDL. w_order_header_in-doc_type = stru_order_header-doc_type. w_order_header_in-sales_org = stru_order_header-sales_org. w_order_header_in-distr_chan = stru_order_header-distr_chan. w_order_header_in-division = stru_order_header-division. w_order_header_in-req_date_h = stru_order_header-req_date_h. w_order_header_in-sales_dist = stru_order_header-sales_dist. w_order_header_in-purch_no_c = stru_order_header-purch_no_c. * Order Item Details CLEAR: i_order_items_in,w_order_items_in. * w_order_items_in-itm_num = stru_order_items-itm_num. w_order_items_in-ITM_NUMBER = stru_order_items-ITM_NUMBER. w_order_items_in-material = stru_order_items-material. w_order_items_in-target_qty = stru_order_items-target_qty."'5'. w_order_items_in-target_qu = stru_order_items-target_qu."'5'. w_order_items_in-plant = stru_order_items-plant. w_order_items_in-target_val = stru_order_items-target_val. w_order_items_in-currency = stru_order_items-currency. CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT' EXPORTING input = w_order_items_in-material IMPORTING output = w_order_items_in-material. APPEND w_order_items_in TO i_order_items_in. * Order Partner Details CLEAR: i_order_partners,w_order_partners. w_order_partners-partn_role = stru_order_partners-partn_role. w_order_partners-partn_numb = stru_order_partners-partn_numb. CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT' EXPORTING input = w_order_partners-partn_numb IMPORTING output = w_order_partners-partn_numb. APPEND w_order_partners TO i_order_partners. * Order Condition Details w_order_SCHDL-ITM_NUMBER = stru_order_items-itm_number." '000010'. w_order_SCHDL-req_qty = stru_order_items-target_qty." '5'. APPEND w_order_SCHDL to i_order_SCHDL. * Create Sales Order BAPI Call *loop at i_order_header_in into w_order_header_in. CALL FUNCTION 'BAPI_SALESORDER_CREATEFROMDAT2' EXPORTING order_header_in = w_order_header_in IMPORTING salesdocument = v_sales_doc TABLES return = i_return order_items_in = i_order_items_in order_partners = i_order_partners order_schedules_in = i_order_SCHDL order_conditions_in = i_order_conditions_in. * Get message manager DATA: l_current_controller TYPE REF TO if_wd_controller, l_message_manager TYPE REF TO if_wd_message_manager. l_current_controller ?= wd_this->wd_get_api( ). CALL METHOD l_current_controller->get_message_manager RECEIVING message_manager = l_message_manager. DATA: v_message_text TYPE string. * When Sales Order is created commit the data IF NOT v_sales_doc IS INITIAL. CALL FUNCTION 'BAPI_TRANSACTION_COMMIT' EXPORTING wait = 'X'. CONCATENATE 'Sales Document' v_sales_doc 'has been created.' INTO v_message_text SEPARATED BY space. * Report Success message CALL METHOD l_message_manager->report_success EXPORTING message_text = v_message_text. ELSE. v_message_text = 'Error Creating Sales Order'. * Report Error message CALL METHOD l_message_manager->report_error_message EXPORTING message_text = v_message_text. ENDIF. *endloop. endmethod. and code for table control i am using is method WDDOINIT . Types : Begin of item_tab, itm_number type bapisditm-itm_number, material type bapisditm-material, plant type bapisditm-plant , target_qty type bapisditm-target_qty, target_qu type bapisditm-target_qu, target_val type bapisditm-target_val, currency type bapisditm-currency, end of item_tab. *Creating internal table and Work Area of the same structure *as that of the Node created. Data : it_item type standard table of item_tab, wa_item type item_tab. *Appending Blank Work Area to Internal table. ***********************************************888 *LOOP AT it_item INTO wa_item. **wa_item-itm_number to bapisditm-itm_number. **wa_item-material to bapisditm-material. **wa_item-plant to bapisditm-plant. **wa_item-target_qty to bapisditm-target_qty. **wa_item-target_qu to bapisditm-target_qu. **wa_item-target_val to bapisditm-target_val. **wa_item-currency to bapisditm-currency. ** * APPEND wa_item TO it_item. *ENDLOOP. **********************************************88 ******** Do 10 times. Append wa_item to it_item. enddo. ********* "Binding the table DATA lo_nd_order_items TYPE REF TO if_wd_context_node. * DATA lt_material TYPE wd_this->Elements_material. * navigate from to via lead selection lo_nd_order_items = wd_context->get_child_node( name = wd_this->wdctx_order_items ). * @TODO handle non existant child * IF lo_nd_material IS INITIAL. * ENDIF. ** @TODO compute values ** e.g. call a model function * lo_nd_order_items->bind_table( new_items = it_item set_initial_elements = abap_true ). endmethod.

  • Table control View in Maintenance order Services tab

    Hi Experts,
    I am trying to change the table control fields of the services tab of the maintenance order , when we use PM03 control key to generate services PR.
    I try to remove some check box which are earlier defined as invisible to make it visible. However after saving the system variant system doesnt take the changes. It is coming back to the original .
    Here are couple of fields I would like to change the setting. As of now I am trying to change the below mentioned field to visible . Presently it is in invisible mode.
    Fields
    Formula::ESLL-FORMELNR,
    Form values: ESLL-FRMVAL1 to ESLL-FRMVAL5 and
    User field3:  ESLL-USERF1_TXT
    program name SAPLMLSP
    Control TC_VIEW
    I am following the below. Kindly let me know whether I am following the right step.
    1) Click on tbale setting
    2) CLick on administrator
    3) Select the field and do the necessary change to make visible or invisible.
    4)Activate
    5)Close
    6) save.
    RG
    Vinod
    Edited by: vnodpm on Feb 6, 2012 7:07 PM

    Hi,
    The IMG customizing will have greater priority than the screen table controls (also specific program logic can supersede the table controls). Check the customizing for service screen at following path:
    SPRO - Materials Management - External Services Management - Define Screen Layout
    -Paul

  • Creation of maintenance order from notification

    Hi experts,
    Is there any standard settings available by which I can block to create maintenance order from a notification until & unless it's system status is "NOPR"?i.e when the system status of notification is OSNO ,system should not allow to create maintenance order.
    Also in notification front page under TAB 10\TAB01(Notification1), I want to populate activites under screen area 015(item+cause) like object part,damage, cause code as my users do not want to enter the activities under tab 10\Tab12(Activities) due to the complexity it containes.
    Would appreaciate of any suggestion pl
    rgds
    rajib

    Hi Rajib,
    First one:
    Create a user status profile for the notification . In the initial status make it forbidden for the create of order. So as soon as you create the notification system will set to the initial status and will make it forbidden to create order at OSNO.
    You have to assign this status profile to the notification type you want to do. Further you can make status profile in auhtorization control also.
    refer the config path: Maintenance and Service Processing ->>Notification Processing>>User Status for Notifications>>Define Status Profile.
    Second one:
    In the config path
    Maintenance and Service Processing>>Maintenance and Service Notifications>>Overview of Notification Type
    select the notification type you want to include the activity code in the header data. click on Screen Structure for Extended View >> selec the 10\TAB01 add the 045 in the screen area , most possible it will be at 10\TAB01
    Hope this will meet your requirement.
    DP

  • Purchase requisition with Item Category – L creation via Maintenance orders (Plant Maintenance)

    Hi Guru’s,
    I have a scenario where purchase requisition with Item Category – L (subcontract External) for Repair items (Storeroom Process) need to get generated with Item category-L.This requirement is to MAP in my system.
    I am aware that purchase requisition can be created with reference to maintenance orders.
    Can anybody through some light on the integration between PM and MM.
    If creation of purchase requisition is possible via maintenance orders then please explain me with detailed steps both configurations and master data so that I can able to replicate the same as per business requirement.
    I look forward to the expert’s response.
    Regards,
    Kumar

    Hi Kumar.S
    You have to installed DIMP 6.0, and activated the business function Refurbishment and Subcontracting (LOG_EAM_ROTSUB) and Serial Numbers in Purchasing (LOG_MM_SERNO) .
    Please check the below link:
    http://scn.sap.com/thread/1956895
    Hope it will help you to resolve your issue.
    Regards,
    Ritesh

Maybe you are looking for

  • Using Windows without OSX

    Hi, Is it possible to remove OSX Mavericks and keep Windows 8? I barely used OSX Mavericks when I got Windows 8. Do I have to use a program like Minitool Partition Wizard or do I have to do it myself? Thanks!

  • I need a replacement HD audio driver other than the IDT/Beats hunka junk.

    Anyone out there know if its alright to install a HD audio driver (brandwise) other than the one that came pre loaded on my HP Dv6 A8 windows7 x64? Hp apparently has IDT by the short hairs, not letting anything get out without being overprocessed, co

  • IPad2 Passcode help

    I have never set up a passcode to unlock my iPad. Suddenly it is asking for a passcode to unlock the screen. I used it before bed and no one has had access to it since then. Now it asks for a code that I don't have. How can I fix this problem?

  • PDF creation causes rich black colors to shift

    I'm designing a book cover. There are three main areas: front, back and spine. Each area has specified the default "black" color in the swatches panel. This color uses 100% K in the CMYK color space. In the preferences panel, under "appearance of bla

  • I get error itms-4096 wheni try to delivery my epub on itunes store

    i write from ITALY I prepared a text with pages'09 and format it all the styles it needs to work. I tried it on book proofer and it works. When i go to itunes producer and when i try to delivery the epub the program shows me the following message:: E