Maintenance order header long text copy into PR header text
Dear all,
Can anyone please let me know how I can copy the Maintenance order header long text into the PR header text of service or component PR.
Thanks in advance.
Regards,
Vineet
Edited by: vineet sharma on Oct 19, 2011 1:23 AM
Hi
Please check this link Re: Copy text from PM order to Purchase Requisition
regards
pushpa
Similar Messages
-
PO line item text copied into Line item text on MIRO
i have entered line item text on the PO that i would like to get copied over to the line item of the invoice when created either thru MIRO or MIR7. I have looked and it looks like the copy rule for item text is in TEFP, but i have not got it to work. Am i missing something. Sorry, but i am the FI guy trying to work in the MM side.
Thanks,
SeanMaintain Customer Exits for Invoice Verification
The following SAP enhancements are available for maintaining the customer exits in Invoice Verification:
MM08R001 ERS (conventional Invoice Verification)
MM08R002 Tolerance checks
LMR1M001 Transfer of document header and item data,
account assignment proposal for invoices for blanket
POs
LMR1M002 Account grouping for GR/IR account determination
LMR1M003 Number assignment in Logistics Invoice Verification
LMR1M004 Item text in follow-on documents
LMR1M005 Change criteria for releasing parked documents for
posting
LMR1M006 Change XML data for BAPI call CreateFromData
RMVKON00 Consignment/pipeline settlement
MRMH0001 ERS (Logistics Invoice Verification)
MRMH0002 EDI invoice receipt (Logistics Invoice Verification)
MRMH0003 Revaluation (Logistics Invoice Verification)
MRMN0001 Message output for Invoice Verification -
Freight forwarder (TF) to be copied into delivery header.
Hi Experts,
I have an requirement to copy TF partner function (freight forwarder) from Inter company STPO to the delivery Header.
Vendor xyz selected in the STPO header and while creating delivery, the vendor should copy into delivery header.
I am using all standard document types.
STPO order type = NB
Default order type= DL
Delivery type = NLCC
Delivery item category = NLC
Please advise is there any config setting help me to copy freight forwarder into inter company delivery.
Warm Regards
SriniThanks for your help Karan and Abhishek.
Abhishek..
As per your advise, we did the changes before the user exit FORM USEREXIT_MOVE_FIELD_TO_LIKP and after the exit FORM USEREXIT_DELETE_DOCUMENT now it is working as required to copy Freight Forwarder from STPO header to delivery header automatically.
Thanks for your quick help thru this forum and over phone.
Note : Points rewarded.
Warm Regards
Srini -
The pricing procedure in Sales order is not getting copied into invoice
The pricing procedure in Sales order is not getting copied into invoice.
I have created a document type (pricing procedure),based on the document type ,pricing procedure determination is done.
So while creating sales order the pricing procedure is determined but when invoice is created the pricing doesnt refelect in the invoice.How to over come this problemHi
Please check the in OVKK, weather you have maintained correctly or not.Also check in the Billing document type details what is the Document pricing procedure that has been maintained.
Regards
Srinath -
CS Long Text Copy into Sales Order Long Text
Hello ,
In Depot Repair scenario , I am entering few details in Service Order long text . I want this text to be copied into Sales/Repair Order long text . Do anyone know how to do this.
Regards.Hi,
I am not sure but check in user exit IWO10009 PM Order: Customer Check for 'Save' Event
with FMs READ_TEXT & SAVE_TEXT, WRITE_TEXT ..
or in some sutiable user exit at the time of saving sales order , the above FMs will be helpful for ur case
regards
pushpa -
PR header text copied to PO header text
hi
is there any setting for coping PR header text to PO header text
i checked in define text types & copying rules to PR & PO
am not finding this option
to copy PR header text to PO header text
is it possible in std SAP
nanithis is not possible.
You can convert various different requisitions into one purchase order.
You can create per requisition one PO item.
You can even have one PO item that has a schedule line per PR.
Imagine that each PR has its own header text, from which purchase requisition shall then the the header text be taken?
From all and just adding. Or only from the first PR, or last PR. -
Billing Doc-Header-Texts copy Accounting Doc-Hader Texts?
Dear gurus,
I it possible to copy Billing Doc.-header- Text1 to
Accounting Document>>>>>>"Doc. Header Text" field?Hello,
the SAP note 301077 lists the available userexits in SD/FI interface.
If, for example, you want to fill a BSEG field of customer line, userexit EXIT_SAPLV60B_002 is the good one.
Instead if you want to fill a BSEG field of a G/L line, userexit EXIT_SAPLV60B_004 is the good one.
Best regards,
Ivano. -
Import text values into Attribute ( Edit---- Text)
Dear MDM Gurus,
Kindly let me know how to import Text values into the Text Value of a ttribute.
If we get into Data Manager ---> Taxonomy Mode ---> attribute -
> Text Value -
> right click to get the "Edit Text".
Believe the TEXT can old more info than the TEXT Value itself.
Appreciate any inputs.
Thanks.
Hari
Message was edited by:
Guest 001Guys,
Any inputs appreciated.
Pls treat this as urgent.
Thanks.
Hari -
Sales Header Text copy to Delivery Header Text
Hello,
We want to copy sales order header text to delivery header text.
We already did the configuration VOTXN in DEV client and it is working.
When transported to QA client, we're not able to copy sales order header text to delivery header text. It is still saying Access Sequence missing. Checked the configuration in QA, and the access sequence is there attached to the Text Field.
What else could have been missing?Hello,
Have you created Sales order Header Text by using transaction SO10.
if Yes,then Run the program 'RSTXTRAN' and attach the Text object to your TR.
Then Transport this Text to Quality.
There will be 2 workbench request and 2 Cutomising request.
Please take care of Sequence in order to move it to QAS(As per Condition Technique Determination)
Revert if not resolved.
Regards
Amit -
PR header text copying to PO header text
Hi all,
We have implemented BADi ME_PROCESS_PO_CUST to copy PR header text to PO header. The issue is it is not let us view the PR header text prior to saving the PO.
Also the same BADi is implemented in other instances, and it is allowing us to view the PR header text as soon as PR is copied in PO. Also there is a green tick mark available in Tcode ME21N in this instance, while the same is not available in the instance where we r getting this issue.
Plz helpHi,
Probably this is the issue: (from IMG BadI documentation):
<<<>>>
Standard settings
In the standard system, the Business Add-In is not active.
The BAdI is not filter-dependent.
->>>>>>> The BAdI cannot be used multiple times. <<<<<<<<-
<<<>>>
Have you tried to use BadI: ME_REQ_HEADER_TEXT?
hope it helps.
regards,
wojciech -
Images can no longer be inserted into the header in iWork pages '13?
in iwork '09, it is allowed to insert a image in the header and footer. what happened to the iwork '13?
any ideas?I encountered the same issue as we sometimes use our company logo on all pages in a document. My workaround is to use the 'move objects to master' feature on an image placed in the header area.
Place and select image
Open the 'Arrange' menu
Chosse 'Section Masters'
Select 'Move objects to master'
NB: I use a Danish version and might not translate this correctly. Anyway you can just search for 'Master' in the help menu. -
Text to be copied into the invoice
I have written at the header texts of the delivery (which I have created with VL01N) the "English invoice no" manually. I want this English invoice no to be copied into the header texts of the invoice (which is created with VF01). At each seperate delivery there will be a different invoice number. How can I have the text copied into the header texts of the invoice?
Thanks in advance...Hi,
If we want to copy the delivery text into the invoice then the text must be defined in delivery as well as invoice header or item which ever is required.
Thanks -
Order Header Text not copied to Invoice Header
Hi All friends
I have created text id for copiying sales order header to invoice header in votxn. I assign in text procedure of sales order as well as Invoice text procedure. I create sales order with maintaining text ID But when i created invoice with same sales order text id is not copied. Please suggest me what steps i should take and what Access sequence i must maintain to copy text from Sales order to Invoice.
I have maintained the access sequence and maintain the required text id in access sequence. But system is only access the first text id from order header to Invoice header not other text id which i maintain in order.
Regards
Shambhu
Edited by: SHAMBHU SARKAR on Dec 29, 2008 12:30 PMHi shambu
while doing text determination in one step in i think in text id's in text procedures, maintain as TEXT IS OBLIGATORY AND SHOULD BE DISPLAYED WHILE COPYING.
Text is obligatory and displayed when Transferring - whatever text you have entered in the sales order that will be copied into preceding document say delivery or billing
Regards
Srinath -
Condition type - Freight value is copied into invoice from sales order
Hi All,
I have a Issue while copying freight value to Invoice.
I have created Freight condition type - XYZ where i have maintained "Group condition, Header condition & Item condition" in the definition of the condition type.
I have placed this condition type in Pricing Procedure (Ex: ABCD) and also in Delivery Pricing Procedure (PQRS) - Checked "Manual check box".
When i place this manual condition type in Delivery --> conditions tab(Item level), then it is copying to Invoice. However when I am placing this condition in Sales Order it is not copying into Invoice???
I have maintained copying control between delivery document and Billing document and I have maintained "Price Source" as E - Delivery/Order.
My requirement is when I am maintaining Freight value in delivery, then it has to consider the Delivery Freight..If freight is not maintained in Delivery then it has to copy from Sales Order?? Is it possible ?
Please help me in this regard.
Thanks in Advance.Hi,
Thank you very much for your response.
If i used price source as "D" then other conditions like price & tax are not copied sales order. Freight value is copying from delivery. I want system has to consider the sales order in case of freight value Zero in delivery. -
How to configure Sales order item text copy to Purchase requisition item
Hi,
How to configure sales order item text copy to Purchase requisition text then copy to PO item text.
Regards
JackHi Rajesha,
Thanks for your reply, some of the items in sales order are procured externally by us and our customer maintains text related to price and specification in the item details of the sales order, MRP creates planned order for these materials and these planned orders are always converted in pur requisition, we want that text from the sales order item details should be copied in to the purchase requisitions converted from planned orders.
is there any user exit which can be called at the time of saving a purchase req or user exit for converting planned order in to pur req.?
if there is any such exit available, then I think I can read the pegged requirement of the planned order where sales order item will be found then read the text in the item then copy this text in pur req then save pur req may work.
but this will be a bulky development, please let me know if we can shorten the development.
Thanks again
Anand
Maybe you are looking for
-
iPhone 3G plugged into PC(Windows 7) 'USB is Not Recognized' and unable to restore; stuck on 'Connect to iTunes' I was in the process of putting another firmware for my iPhone(an .ipsw via. itunes) and the house had a power cut. The computer was in t
-
Basic Start and Finish Date coming as default while Order Creation (IW31)
Hi Members, I am in situation where in i am trying to cretae an order from IW31 but after the order creation basic start and basic finish date is being updated as default date which is the current date of creation. I have written my code in Include L
-
"Build and Export Cache" fails to export 100% Previews:
"Build and Export Cache" fails to export 100% Previews: I am moving from Bridge CS5 to CS6 and have a very large number of 100% Previews in my CS5 cache. The idea of regenerating all these 100% Previews in CS6 is NOT amusing. It is amazing that the
-
Can you add several movies that would play in sequence?
Hello I was wondering if you could add 5 DV files that can be played (one after another), with NO chapters? Or do I actually have to first connect all of them together in Final Cut (as ONE larger DV file?) I was looking for a way to avoid that step,
-
Adobe photoshop not responding or wanting to close
i had a lot of pictures in adobe photoshop album 2.0 and it started freezin g up, i had to restart my computer every time i scrolled down to a certain spot.i have deleted all of my pictures,i want to know what happened before i decide to put pictures