Maintenance Order through Measuring Point

Dear all,
I want to know whether it is possible to create the maintenance order on the basis measuring point .
I know how to create the order on the basis of measuring counter.
Is there any procedure to create the maintenance Order through measuring point as done in case of counter?
kindly provide the solution for Creation of Maintenance Order using Measuring Point..

Really very thanks for the solution.
I have one more query, we can create the measuring point using the t.code IK01.As you told we have to create the measuring point with upper and lower range.
Is that we have to create 2 measuring point for upper as well as lower range or in one measuring point it is possible to accumulate both the upper and lower range.
If it is possible to accumulate both the upper and lower range in one measuring point then kindly provide the procedure.
Thanks in advance.

Similar Messages

  • Triggering of Preventive Maintenance based on Measuring Point

    Hi,
    I have set measuring point & defined upper range limit and lower range limit. Now I want to trigger preventive maintenance, based on reading enter against measuring point specifically if measuring point reading is above or below defined upper range limit or lower range limit.
    Letu2019s say example, If 10 and 5 is upper range limit and lower range limit, now in this case creation of notification / main order if user has enter measuring point value more than 10 or less than 5.
    Regards,
    Dipen Shroff

    Hi,
        You can do it via Condition Based Maintenance ..
    IMRC0001- U can use this User exit
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a7/fa4c988f6611d29e8a0000e8323350/frameset.htm
    regards
    pushpa

  • Equipment Efficiency through Measuring Point and Counters

    Hi gurus,
    I am planning to get the efficiency of equipment by using Meauring points and counters.
    Against an Equipment I have created a Measuring point as counter.
    I am capturing Actual output of the machine as mesurment reading.
    In order to set the Target output i dont find a solution.
    I am expecting from all you guys to give me some solution to set the Expected or standard output against an equipment.
    so that i can compare the target vs actual as well as efficiency.

    The purpose of measuring points and counters is to genrate call objects at given overflow reading or points I dont think so that they can help in calculating the effiency in a way that this machine perfomence is let say 80% and other one is 70%.
    However you can maintain it manualy while entering the measuring points in format of % .
    Regards
    Iftikhar

  • Order's measurement points

    Hi Experts,
    I need to read measurement points asssigned to an order( it's functional location).
    We tried RFC MEASUREM_DOCUM_READ_TO_ORDER but it returns measurement documents
    (readings).
    In Our requirenment, the order is newly created and no measurement documents exists.
    we need to give all the measurement points (only) that exists against the order( it's functional location)..
    Could you please help in this.
    Please suggest any table/RFC.
    Rohit

    Hi Rohit,
    The relevant table are:
    IMPTT - for mesuring points
    EQUI - for equipments
    IFLO - for functional location
    Using the Object Number for the Measuring Point Object in table IMPTT, you can link the object to technical objects (object no. from respective tables - EQUI and IFLO).
    I hope it resolves your issue.
    Regards
    Amit

  • Maintenance Order through PS - reg

    Hello,
    Is there any option to raise/create Maintenance Order(PM Order) from Project???
    if there... pls suggest me tht how to create it
    Thanks,
    Prakash.

    Hi,
    You cannot create a PM order from Project. You can link it to Project by entering either WBS or network activity on additional data tab page of PM order.
    Hope this helps.
    Regards

  • Measuring points in maintenance planning

    Hi,
    Can we use measuring point(not a counter) for preventive maintenance planning. for example - i need to perform the operation when a color of oil is changed from yellow to black. is it possible through measuring point?. it is possible means please share that procedures.
    Regards
    sathish

    Hi Satish,
    Yes, it is possible to generate a maintenance notification if the measuring point reading is not as per standards or target value. You require a user exit IMRC0001 to IMRC0005. Also read documentation for these user exits in tcode SMOD.
    Regards,
    Vaibhav Mishra

  • Maintenance order created through notification

    Hi experts,
    I have created one maintenance order through maintenance notification. In the order text description instead of notification text description it is taking long text which I have entered in subject description of notification.
    Is there any settings available for this? what may be the problem?
    Please do the needful.
    Thanks and best regards,
    Praveen

    Hi Praveen,
    Pls try the the following :
    Go to SPRO->Plant Maintenance and customer service->Maintenance and service processing->Maintenance and service orders->Functions and settings for order types->Define Notification- and order Integration. There u'll find a check box Long Text against your order type. If you are getting the notification Long text Description in your order Header, it must be checked.  Uncheck it. Save it.
    Hope this will solve your problem.
    Saurabh.

  • Restrict the Preventive Maintenance Order creation through IW31 for few users.

    Dear Guru's,
    Good Day.
    My client requirement is he wants to restrict the Preventive Maintenance Orders through Transaction IW31 for few users. Is it possible through authorization? Please do the needful.
    Regards,
    Bhanu.

    possible for order type.
    create a role with all order types (optional) including Prev. Maint Order type, obviously having T.code IW31. and create another similar role excluding Prev. Maint Order type.
    Assign earlier role to few users (want to give the permission of IW31 Prev.) and later role to all remaining users.
    Auth. Object: I_AUART, first test in sandbox or testing client.

  • Recording for vehicles in maintenance order

    Hi
    how can i enter  in maintenancne order  counter-reading recording for vehicles like primary counter for miles  using screen O150
    i am getting  License plante  using " Scenario: O150  Field name: LICENSE_NUM though SPRO setting "
    but not able to get the primary counter and its last reading in maint. order
    Thanks
    Ajay khurana

    Dear Ajay
    You requirement is to enter the mesuring counter reading against Vehicle (Fleet object) through maintenance order right??
    You can enter the the measuring counter reading against the vehicle through maintenance order at two points.
    1. At the time of order confirmation using iw41/IW42 transaction.
    2. At the time of TECO using IW32 transaction. When we try to TECO the order the small screen is coming. on this screen measurement document button is there. click on it. Then you will be on enter measurement document screen. Just enter there the counter reading which will get updated against the Vehicle.
    I hope this will satisfy your requirement.
    Regards
    Makarand Gurjar

  • Datatable for upper and lower limit maintained in Measuring Point.

    Hi,
    I am making use of user exit : IMCR0001. User exit generates maintenance order for measuring reading which are beyong the range maintained in measruing point.
    I have create measuring point with characteristics as TEMPERATURE. I have maintained upper limit : 1500 C & lower limit : 1200 C.
    When I check datatable IMPTT and look for upper and lower limit, it is showing me : Upper range :1.7731500000000001E03 Lower range : 1.4731500000000001E03
    Why is that I can not find the actual value as 1500 and 1200 n the datatable?
    In which datatable I can find these values?
    Kindly help.
    Thanks in advance.
    Regards,
    TOM.

    Hi Tom,
                 These are system Generated Values, but they will be concatenated by a few Zeros, but you can always find the exact value,
    I am able to see the Values correctly in my system follower by some 10-12 zero's "E"+ 02 or 03.
    but can check the values
    can cross check the Characteristics for the same measuring point?
    Regards,
    Yawar Khan

  • Measuring Point with  some factor

    Dear Gurus,
    we have scenario in which we have  energy meter each energy meter is created as equipment for entring their daily energy genration in kwh through measuring point
    but we want to multiply  daily reading by some factor like 100, 50 , 40 ,1 etc ,
    i know it can be customized , and also can be used in standard and then factor can be multiply in report only
    but in any way can we achieve it in standard
    Regards
    Armaan

    Hi Armaan,
    Sorry Mate, No std way of achieving this, as per my knowledge. Still you can check with other PM experts.
    Riyaj

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.

  • Measuring Point in Maintenance Plan

    How can I link a measuring point (not a counter) to the Maintenance Plan?
    Currently, I can only link a counter to a Maintenance Plan but not a measuring point.
    The reason why I am asking for this is that I would like to trigger automatic creation of a work order whenever a measurement reading for an equipment goes outside the specified upper and lower limit of a measuring point.  I would like to define a condition in the maintenance plan for this based on the measuring point say for example temperature.
    I believe activating userexit IMRC0001 is just part of the solution.  Is there something else that needs to be done?
    Thanks.
    Giscard

    I have already activated userexit.
    Is it correct that the userexit is triggered upon saving a measurement reading (tcode IK11)?
    Do you have sample code for the userexit so that a Notification or Work Order will automatically be created when the reading entered is outside the upper and lower limit?
    But my questions actually is this - Is possible to link a measurement point (not a counter) to a Maintenance Plan?

  • Measuring points finding by maintenance plant

    Dear Expert,
    Is there any way to find the list of measuring points or documents searching by maintenance plant?
    Thanks & regards,
    TusharA

    Hi Tushar,
    Run the transaction IE07 : Multi-level Equipment List
    Select the dynamic selection displayed at application bar. Select the plant from PM Order node displayed in dynamic list. Copy the same for selction. Enter the plant number in selection screen.
    Also tick mark only 'Measuring Point' from filter screen.
    This way you can get the all mesuring points from selected plant.
    Same way you can get the list of measuring documents by selecting from filter screen.
    Sundar

Maybe you are looking for

  • How do I make a form field validate that it is the sum of two other fields?

    Hi there, I am creating a form, and I would like one of the fields to validate by making sure that this field is the sum of two other fields in the form.  Does anyone have any ideas on how to go about this?  I know I'll need to run a custom validatio

  • AP:  Report or t-code to view blocked invoices by Payment R

    Hello SAP Guru's, Is there a report or other transactions other than MRBR or MR02 to view blocked invoices with an R Payment Block?  I am trying to identify why or what tolerance key the invoice went on hold. I don't want the ability to release the b

  • Flash doesnt work in IE

    i have this flash site iv been working on, and its been fine, and im ready to get paid. (the site looks bad but shes changed it so much she likes it...) but i use a mac so i test everthing in safari, and firefox. but when she looks at it, she uses in

  • My itunes music has gone ='(

    my itunes music has gone! it is still in my documents and stuff but not on my actual itunes =(...it has also erased all my purchased music aswell does anyone know the resolution to this dilemma somebody help me i will die without my ipod music ='(

  • Email header printing on separate page

    Not sure what I did, but now when I print an email, the header (to/From:) prints on the first page and then the main email prints from page 2 on.  I can not see where this can be changed.  They used to print together as they do on my other Macs.  Jus