Maintenance plan package change resulting in incorrect call dates
When we change a maintenance package on an existing maintenance plan to a package whose frequency is not an exact multiple of the previous package (for example, changing from a 6M 180-day package to a 1Y 365-day package) and then restart the plan, the call horizon of the plan seems to be ignored and the new call dates are always a day or so before the plan date regardles
Why is the call horizon being ignored in this situation?
Hello
Please check the Option Start in Cycle while scheduling the Plan.
Also refer the below thread too
http://scn.sap.com/thread/1788240
Br
Rakesh
Message was edited by: RAKESH MANE
Similar Messages
-
Search results showing incorrect modified date
Hi All,
I have a one difficulty in search results.
Document showing incorrect modified date in search results. And this happens for one document only.
We have customized the search/results.aspx page, Our document is showing correct modified date in document properties,All Items.aspx like 31/4/2013.
But when i search with document name in search, result showing incorrect modified date like 24/6/2004.
I checked with database in SQL, every thing is fine.
I have updated the Modified date through powershell script for one document and after that this recent modified date is showing in search results.
But after updating the Modified date through powershell, issued document not showing the recent modified date in search results. still showing as 24/6/2004.
I should not do edit property and save, to create new version.
I don't know what is happening in search crawl. All ready full crawl running daily basis.
I want to check whether this issued document is crawling or not. Could anybody help me to get out of this. what is the main cause of this issue.
Thanks & Regards
MD.Liakath aliHi,
I'm seeing the same issue after upgrading the SharePoint 2010 to SharePoint 2013.
When I search any upgraded document in SharePoint 2013, the document's "Last Modified Date" was showing an incorrect value in Search Results page but other metadata of document like "Last Modified User" is showing the correct
value so the problem is not with document crawl, something wrong with Last Modified Date property in Search results.
I have seen below comment as answer but I didn't understand the solution to fix this issue for all upgraded documents.
The most likely cause is that there is metadata on the documents that is set to that date which is overriding the other dates in the search result. SharePoint isn't particulary imaginative so it's got to be finding that date from somewhere.
Do we have any solution for this issue? Is this issue will be addressed in SharePoint 2013 SP1?
Note: No issues with documents, which uploaded after upgrade. -
Work Order - Maintenance Planning plant change
Hi Gurus,
Is there any way to change the maintenance planning plant in a created work order? We are having an issue on work orders and we need to tranfer our open work orders to another plants to solved the issue. Please me let me know if this is possible to do in SAP. And let me know how to do it in SAP.
Thanks in advance,Hi,
The start of the plan is not option as this will surely have an impact. Anyway, work around for this issue was provided and this is OK now. We will continue with the old orders untill such time they will finally be closed. No postings will be created against this old orders and if there's a need to do GR new orders will be created in new plants for the postings.
Thanks for you help, -
IPhoto v6.0.5: Import results in incorrect file date sequence
"Undo" is ghosted after importing a pix file set that is ultimately inserted out of correct date sequence. Keystroke "Control-Z" doesn't work either
dblatch:
Welcome to the Apple Discussions. You can edit the Rolls date in the Info window at the bottom of the Source pane. If the image file dates are wrong you can select them and use the Photos->Batch Change to change the date, adding a selected number of seconds, minutes, etc. between each photo if desired.
Do you Twango?
TIP: For insurance against the iPhoto database corruption that many users have experienced I recommend making a backup copy of the Library6.iPhoto database file and keep it current. If problems crop up where iPhoto suddenly can't see any photos or thinks there are no photos in the library, replacing the working Library6.iPhoto file with the backup will often get the library back. By keeping it current I mean backup after each import and/or any serious editing or work on books, slideshows, calendars, cards, etc. That insures that if a problem pops up and you do need to replace the database file, you'll retain all those efforts. It doesn't take long to make the backup and it's good insurance. -
Counter based maintenance Maintenance plan
Dear all,
I Required help from all of you , I have made one no maintenaance plan with following details :
Annual estimate 120000 Nos
cycle lenth 10000 Nos
schedule the plan 0 Nos and
Plan date call date Next planed counter reading
1 22.2.2011 22.2.2011 New start Hold 10000
2 23.03.2011 23.03.2011 Scheduled Hold 20000
3 22.04.2011 22.04.2011 Scheduled Hold 30000
4 23.05.2011 23.05.2011 Scheduled Hold 40000
5 22.06.2011 22.06.2011 Scheduled Hold 50000
6 22.07.2011 22.07.2011 Scheduled Hold 60000
7 22.08.2011 22.08.2011 Scheduled Hold 70000
8 21.09.2011 21.09.2011 Scheduled Hold 80000
9 22.10.2011 22.10.2011 Scheduled Hold 90000
10 21.11.2011 21.11.2011 Scheduled Hold 100000
11 22.12.2011 22.12.2011 Scheduled Hold 110000
12 21.01.2012 21.01.2012 Scheduled Hold 120000
In this case system check both pland date and next planned counter readind and generate the maintenance order on the call date although next planned counter reading not reach uptpo the planned counter.
But our clint want the maintenance order on next planned counter reading only not on call date please help me the any solution for fullfilling the requirment.
RaghavHi Raghav,
Maintenance order will be generated on counter reading entered in measuring document only.
It is the annual estimate because of which we can see the planned & call dates, which are used for maintenance planning purpose.
Call date and plan dates keep on changing according to measurement documents creation. You create the any measurement document against the same counter which used in plan and see whether dates changes or not.
Dates get changed on counter reading and hence order is generated on counter reading only, not on the dates shown in scheduling as dates are dependent on counter reading.
Sundar -
Maintenance plan number range PROBLEM
Hi ,
How to maintain number range for maintenance plans . Where can i maintain call objects . I had tryed to maintain number range for maintenance plan but when creteing maintenance plan i is showing no number range is found . What's the reason .......\
RBHi
- Go to IP20
- Press F6 (Manitain)
At the bottom you can see the Not assigned element.
Select the element - Press F2 (The color of the element turns blue
Select the group to which you want to assign the element
Press F5
The element is now assigned to the Group
Regards
Jignesh -
Process in restarting a FRP-run: how to prevent incorrect analytics data
Hi,
Today we encountered an issue where stock-data where not transfered to F&R. As a result OrderProposals generated during FRP-run were based on incorrect stock stock-values. As a result also the OrderProposals resulting from the FRP-run were considered incorrect and have been deleted by the business.
After stocks were processed correctly to F&R, a new FRP-run was done for the first 4 sequences in /FRE/FRP_MID_BASIC. (Note that we have these first 4 steps executed in the time critical window, and the Analytics step as a separate job directly afterwards).
Result is ofcourse new, correct, OrderPropsals but also a second run of the Analytics step on the same planning-day. As a result, in table /FRE/ANA_WEEKLY the STOCK_COUNTER is increased 2 times during one planning-day, which will cause incorrect data at the end of the week regarding average weekly-stock level.
It appears, every time the Analytics-step in /FRE/FRP_MID_BASIC is executed on a day, the STOCK_COUNTER field is updated. (this can be reproduced). The result will be incorrect Analytics data if that happens, but on the other hand: not executing the Analytics step a second time during the planning-day will also result in incorrect Analytics data as in that case it would in my situation have contained the stock-data from yesterday(as the initial issue was that current actual stock-data was not sent to F&R)
Is this a bug in F&R, or am I missing something? If there is a guide on what steps to execute under what conditions if FRP-run has to be executed again, or how to correct any (incorrect)Analytics data built up during previous runs?a reply/answer would be appreciated....
-
Maintenance Plan Call Completions Changing
Has anyone noticed in ERP that a maintenance plan call completion date can be changed when the work order for a call is given a new TECO date. I don't remember this happening with 4.6c. When scheduling parameters are set to adjust future calls based on the completion of a previous call, the future calls are moved based on last completion date.
Is there a setting that can be made to fix the completion date for a call as the first TECO or call completion such that it cannot be changed with TECO reversals and new TECO dates?
Thank you,
GeneGene,
I don't think there are any new settings there. The completion dates will be provided for input, on TECO, as long as the MP hasn't generated the next call object. Maybe you could schedule the plan to generate the next call object to be Planned and executed in the future, as soon as the existing call object has been set to TECO?
if not, You could try using the user exit IWO10004 Maintenance order: Customer check for order completion to make sure that the date(NPLDA) isn't changed.
Regards
Narasimhan -
Preventive Maintenance Planning - change call date of future calls
Hello,
we are using time based maintenance plans to schedule our maintenance obligations towards customers. After creating the plan and scheduling (IP10) we get the scheduled calls proposed by the system.
Now we want to use IP10 or IP19 to move those planned call dates that are in the future without releasing the predecssor calls but it gives us an error: "Maintenance plan 16.04.2009: Predecessor to still on hold".
Does anyone know if there is a way around this?
Thanks,
TobiasHi Tobias
As per your query... you cannot move the call dates which are in the future. First you have to skip the cal which are before the future cal date. then only you can do...
- Pithan -
Change/restart start of cycle for strategy maintenance plan MPLA- STADT
Dear experts,
is it possible to change the start of cycle date in strategy maintenance plan (MPLA- STADT).
The start of cycle was entered incorrectly into the strategy maintenance plan (IP42)
Maint. plan was already started
...and called: Service orders are already created
The existing maint. plan should be used with a new cycle start date.
By using u201Crestartu201D in IP10, a new start of cycle date is entered and the orders are called correctly.
But the cycle start date is not updated in the data base: MPLA- STADT
Why?
Regards,
PhilippDear all,
I opened a OSS message. SAP replied that this is not covered by SAP standard. so system works as designed.
SAP:
The described behaviour is the SAP/R3 standard and works as designed.
IP16 only shows this field if it's updated in MPLA-STADT.
The 'Cycle start' resulting of scheduling (IP10) is kept in the table
MHIS (field STADT).
Transaction IP16 takes data from MPLA and does not read the entries
in MHIS. The only value that can therefore be shown as 'cycle start'
is the original value as recorded in MPLA.
Well, this explains why system behaves like it does.
But in my eyes this is not the correct system behavior.
If a maint. plan is restarted, future calls will be calculated based on
the new cycle date - what is ok.
But IP16 indicates the old cycle date!
In my eyes this is not correct because the list will show an incorrect
cycle date.
I was told to take a look at note 11:
Sehr geehrte Kundin, sehr geehrter Kunde,
die von Ihnen benötigte Funktionalität ist leider nicht im SAP-Standardsystem enthalten.
Wenn Sie mit SAP an zukünftiger Produktfunktionalität arbeiten möchten, empfehlen wir Ihnen, dies entweder über die Mitarbeit in einer SAP Anwendergruppe oder über die Mitarbeit in einer der SAP Communities of Innovation zu tun. Eine Liste aller SAP Anwendergruppen finden Sie unter http://www.sapusergroups.org.
Eine Beschreibung der SAP Communities of Innovation können Sie unter http://www.sap.com/ecosystem/communities/index.epx einsehen.
Alternativ können Sie spezielle, von Ihnen gewünschte Funktionalität von SAP Custom Development entwickeln lassen (http://www.sap.com/services/bysubject/customdev).
Weiterführende Informationen finden Sie unter http://service.sap.com/rollin.
Mit freundlichen Grüßen
Ihr SAP Active Global Support
How can I trigger such an improvement?
Regards,
Philipp -
How to look for New start Called call for a Maintenance plan
Hi,
I need to find out all calls for a maintenance plan of scheduling type- 'New Start' and Status- 'Called'. How to find this using tables.
For 'New Start' scheduling type probably table field and value is MHIS-TERMA = 'N'. There are different statuse in this table but I am not able to identify the status 'called'. Also what is the field MHIS-ZAEHL(Maintenance package number) for?
Thanks,
VimalTaken from the standard IP10 program:
* possible status combinations
* TSABR - Scheduling status: planned date called
* TSVBT - Scheduling status: call outstanding
* TSENQ - Scheduling status: call horizon not reached
* TSENM - Scheduling status: stopped manually
* TSTAT - Sceduling status
* TSABR TSVBT TSENQ TSENM TSTAT
* X - - - A called with order
* X - - - - called without order
* - X X - - on hold (TSENQ), due (TSVBT)
* - X X - F on hold, due and fixed
* X - - - X skipped
* - X X X - blocked
* - X X X F blocked
* X - - - - LRMDT <> 0, completed -
Changing a cycle in an active maintenance plan
Hello All,
I received a request from an end user to make a change to an active maintenance plan. The plan has a 3mo cycle. The users would like to first, generate a call for March 2011 and second, to change this to a an annual cycle. I am able to use the 'Restart in Cycle' to generate a call in March, unfortunately, I am not able to figure out how to change the cycle from 3mo to 12mo. Is it possible for to change the plan cycle from 3mo to 12mo once the plan is started? The header section in IP10 is grayed out.
At the moment, it looks as though I need to create a new maintenance plan to accommodate the request.
Thanks in advance.
AnnaMahee,
Appreciate your quick response. This was a strategy plan and I was able to make the changes as you had suggested, through the task list.
Thank you so much for your help!
-Anna
Edited by: Anna Vuong on Feb 24, 2011 10:08 PM -
Change start of cycle date in maintenance plan
Dear Experts,
We would like to change start of cycle date in maintenance plan. Iwe have rescheduled the plan but the start of cycle date remains the same.
could you please confirm, whether it can be changed. The requirement is because of some Mt plan created with future start date in production (Year-2020) and we want to correct the same.
ThanksDon,
To determine the next maintenance call date you need to tell the system when the last maintenance call occured
Example:
You want the next call date on the 1 June based on a six month cycle. Therefore the last maintenance date would have been 1 January (assuming key date scheduling).
In your case you need to RESTART your single-cycle plan on the 1 January and the system then calculates the next maintenance calls.
PeteA -
How to change maintenance Strategy in Maintenance Planning?
Hi Friends
In our maintenance plan, maintenance plan additional data, maintenance strategy is defined as 3M6M. Within this strategy, maintenance cycles are defined. Now we want it to change to the maiintenance strategy, 2M that is bi monthly. How to do it?
Do I need to chage it in the maintenance plan category? I am very new to PM. Pls explain.
Thanks
SangeetaDear,
It is not possible to change the maintenance strategy once assinged to task list,other option just try in the task list select the operation and select the maintenace package ,here delesect all the maintenance package alloted and then try to change it.
First delete all the operations in the task list ,then system wil allow you to change the maintenance strategy.
Best way is to create new maintenace plan with new strategy.
Hope clear to you.
Regards,
R.Brahmankar -
Maintenance Plan: Change Yearly cycle
Hello,
We created maintenance plans for an equipment that has: Weekly, Monthly, Quarterly, and Yearly task.
THe date we initiated this maintenance plan was 6/1/2009. Is there a way to change the Yearly task date to 6/30/2010, but still keep the rest of the cycles the same dates?.
*Note we currently have a s'Schedule date of "0 days"
Thanks.Hi Jay,
I assume that you are using a Time Based Strategy Plan for this. I also assume that you have created Packages of Weekly, Monthly, Quarterly, and Yearly in the Strategy & a Suitable Task list for it.
If you have not done my assumptions, please do them first and then carryout below steps. (Aviod weekly package if you want the date exactly on 06/30/2010, if it is compulsory then you will get approximately yearly package at that time)
After you create a Strategy plan for the Equipment and save.
Set Scheduling Indicator as Time-Key Date. (Possible only with packages in multiplications of Months)
Goto IP10 and Say Start in Cycle & give the Completion date as 6/30/2009 and in the Offset select the package as Yearly.
Now all the dates will adjust based on the requirement.
Regards,
MLN Prasad
Maybe you are looking for
-
Is there an easy way to add a desktop shortcut for all users?
Looking for an easy way to add a shortcut to an app for all users.
-
Safari quit unexpectedly - pls help
Process: Safari [594] Path: /Applications/Safari.app/Contents/MacOS/Safari Identifier: com.apple.Safari Version: 6.0.5 (8536.30.1) Build Info: WebBrowser-7536030001000000~6 Code Type: X86-64 (Native) Parent
-
Hello, i have iphone 4s Outbreak. When I go into iTunes and try to do a backup it gives me an error: this error shows when i tried to backup my iphone and when i tried to restore how can i fix it ? i want to upgrade my ios 6.1.2 to 7
-
Deleted pages move instead of being REmoved
In my current document, I have Preface and Acknowledgements spreads that I'd like to get rid of. I'm using a template from another site that's setup for a specific book size, so since I didn't set up the document myself I'm not really super familiar
-
SOAP Sender Authentication deactivation
Hi All, I have scenerio from SOAP to Proxy. While sending data to PI through URL thrid party wants us to deactivate authentication. We require this only in development enr for testing. Can you please advice how we can do this. Regards, Vikrant