Maintenance reservation of material

Hi
Reservation of a material is created by IW31,but when posting the material document with reference to the above reservation the system is not allowing to post the document
Regards
Gopal

Hi,
I think you refer a PM order based reservation.
Check the order status, I thing the Order status should be released and it should not be TECO .
If im worng, pls check with PM consultant.
Harish

Similar Messages

  • Maintenance Order - disallowing deleting reservation after material issue

    Dear ALL,
    How to resrict deletion of reservation in maintenance order after material issue done partially / completely.
    Currently system is allowing to delete the reservation in maintenance order.
    Please guide.
    Regards,
    Prashant Salvi

    Hi,
          In Tcode O04C for Version 00000000 , Application Area CN , Msg No : 750 , mention as Error message ..
    If the above does not work then use user exit CNEX0039 : Check Whether Component can be Deleted
    regrds
    pushpa

  • Bloqueio de reservas de materiais de contas razão especificas na transação IW32

    Gostaria de saber se é possível realizar o bloqueio de materiais de uma especifica conta razão, em reservas em ordens de serviço pela transação IW32.
    Estou com problemas no controle de custo de materiais que são utilizados pelo setor de produção, e estão na conta razão da manutenção. Para isso eu gostaria de bloquear somente as reservas de materiais da conta razão da manutenção.
    É possivel?

    Olá Rafael,
    Qual o centro de custo alocado ao material/equipamento?
    Na imagem está destacado o campo "componente"
    Os materiais nele inseridos serão reservados de acordo com o depósito configurado. Não seria melhor apontar um outro depósito?

  • Tcode-mb24 - Reservations by Material

    1) In standard transaction "mb24 - Reservations by Material" .
    2) on selection of all the options in the scope of list- open reservations, cancellable reservations, goods mvnt not possible, issues and receipts.
    In this report, even if the reservation does not have material it picks the material description from previous line.
    Example
    Reservation- 907741
    item- 1 to 13
    it is observed that items numbered 7,8 and 9 have no material, but the description is same as item 6.
    I have debugged and found that the problem maybe caused because of the absence of a clear statement in standard program .
    Please confirm.
    your time and answers will be rewarded with points.

    Hi
    You are absolutely correct.  You do clear the work area or particular field. It will solve your problem.
    Regards
    Raghav

  • How to reserve the material ( Make to Stock) for selective customers?

    Dear Friends,
    I want to reserve the material which is a Make to Stock for selective customers i.e if the customer base is 100 I want to reserve the certain quantity for 3 customers.
    It is a Make to Stock.
    Thanks in advance.
    Regards,
    Shrikant

    Dear Friend
    First you have to create sales orders for these three customers
    There are three ways of doing this
    1. T code MB1B use movement type 412 E and input your sales order no
    Stocks will be reserved for this order
    Your item category should be marked E in special stock indicator
    This is the perfect way of doiung it
    Suppose if the order gets cancelled stocks can be moved back to unrestricted using  T code MB1B use movement type 411 E
    2.Create sales order and then delivery and save dont do picking and PGI
    Stocks will be reserved for this delivery
    3.In t code OVZ9 if you have ticked include sales requirements then for whatever sales orders created stocks will be reserved for them
    But this is soft way of handling as thro backorder processing the stocks can be allocated to other orders
    Regards
    Raja

  • Reservation in Material Document

    Hi all,
    I am facing with and issue related to Reservation.
    Problem Defination.
    In the Material document List for a particualar MAterial i am able to see the Reservation no.
    i.e a material has been issued against a reservation so material document is created and in mateiral document in reservation tab i am able to see the reservation no also.But when i am double clicking on that reservation ,it is taking me to display reservation where  i am getting message
    =================================================
    Reservation 0000022986 does not exist
    Message no. M7520
    Diagnosis
    The reservation you entered does not exist in the data base.
    Procedure
    Make sure your entries are correct.
    Choose the input help in the "Reservation" field to search for a reservation for a material or an account assignment.
    ============================
    It has to be noted that in the reservation tab in the material document .
    The requirement quantiy is " 0 "
    Withdrawal Quantity is " 0"
    Whereas the Material document which has been posted against the reservation is for 10 quantity.
    the requirement quantiy should have been 10 and withdrawal quantity should have been 10 because the reservation i have made is of 10 quantity.
    I have checked the reservation list ,the reservation is not there too.
    Please help me on this issue
    Thanks and Regards
    Shailesh

    Hi
    Can you provide me the information ,i.e how to restrict the user from deleting the reservation at Document level,
    Though i want to give him authorization of MB22 but i want to restrict him from deleting the reservation at document level.
    Is there any user exit
    regds
    shailesh

  • Funds reservation with material reservation

    Hello all,
    The matter I need help with is funds reservation with material reservation, as the title says.
    I have done some research about this and although [this thread|Material Reservation; and [this note|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=91036] say it is not possible, [this SAP Library page|http://help.sap.com/saphelp_erp60_sp/helpdata/en/17/aea93769928b7fe10000009b38f8cf/content.htm] and [this enhancement package overview|http://www.id.uzh.ch/dl/sw/sap/upgrade/EHP3_Overview.pdf] (p. 194) state explicitly that it is possible. I am going to be optimistic and assume the latter are valid, what still lacks however is information about where this configuration is to be made and how.
    How can I enable the creation of commitments upon material reservation?
    Any help will be appreciated.
    Thanks in advance.

    Hi,
    There is no automatic linkage/iteractions between the two, at least not up to release 6.02 (for more recent packages I'm not sure).
    Regards,
    Eli

  • Reservation Of material against a particular job

    Hi ,
          I have a scenarion at my clients place. Here I procure material for different jobs againsat stock. When the material is received it should be reserved for specific job, but the material goes to unrestricted stock & anyone is able to issue this stock for other jobs.
    Without using any special stock( like project stock or sale order stock) how can I reserve this material for that material for that job.
    Regards
    Jimmy

    Hi,
    For that u have to create the production order , carryon availability check, When all components are available then save the order,Then u can found that components required for that order are get reserved.So that other cannot be used.
    In scope of check set x for reserved material so that reserved material will not be considered during another production order availability check.
    If any querry ask.
    Regards,
    Suhas

  • Reservation of material for customer

    Hey guys,
    We have requirement to reserve stock against perticular customer which no other customer can access. How can i do in SAP ?
    Regards
    Rajesh

    Hi,
    Just create a delivery against the sales order of this customer, ultimately this stock will be reserved for this customer until u do PGI for the same order.
    besides refer this link
    Re: Reservation of material for some customer
    Reg
    JJ

  • Reservation of material for some customer

    Hi,
    I want to know how to reserve the material for a customer , like i have one material code : A and i want to reserve this material for one customer for which i will do billing after 10 days and this material should not be sale to any other customer or issue to any departmetn how to do this.
    regards,
    zafar

    Hi
    Check the following links:
    [Material reservation]
    [Reserve stock against a sales order.]
    Hope this will resolve your issue.
    Regards
    Amitesh Anand
    Edited by: AA on Oct 31, 2009 4:07 PM

  • PM - Equipment BOM VS Maintenance Bills of Material

    Hi,
    In Materials planning,  Using maintenance bills of material have  advantage , know that there's Equipment BOMs
    & Functional location BOMs.
    When & How to use the Functional Location BOM ?
    When & How to use Equipment BO?
    Can we use normal production BOM (CS01) replace all this equipment BOM / FL BOM?
    TQ.

    Hi,
    Production BOM will have the Materials in Header as well as in Item level. Even BOM usage will be defined as Production.
    In Equipment / FL BOM, BOM will be created against the Technical Objects. These BOMs will be used in Maintenance Orders. In these BOMs, components of the Equipments (For example, equipment will be motor. Components may be capacitor, rotor, casing, etc.,) will be mentioned with the qty.
    Based on the type of motor, components can be different type. So BOMs will be maintained by the MDM people. Maintenance Planner will create the Maintenance Order & BOM will enable him to select the right component (There may be different type of rotors in Material Master, but based on Motor type, rotor should be selected in Maintenance Order).
    As Maintenance Planner will not aware of the type of component, BOM will help him to select the right component.
    Regards,
    Maheswaran.

  • Definition of reservation for material

    Dear All,
    can ne one provide me the definition of reservation for material .
    regards
    sap11

    Hi,
    A reservation is created for stock material if it is available.
    For more check the Links:
    http://www.sapbrainsonline.com/PROJECTS/FUNCTIONAL/create%20a%20reservation%20using%20transaction%20MB21.html
    http://www.scribd.com/doc/2229266/MM2007Reservation-Goods-Issue
    Regards,
    Biju K

  • Inventory maintenance for Configurable Material and their Variants.

    Hi Gurus,
    Can anybody help me as how to handle the following issues?
    1. inventory maintenance for configurable material
    2. variants stock position maintenance (should it be maintained seperately from configurable material?)
    3. what about single values and multiple values components stock position?
    Regards,
    Sada

    Hi,
    Thanks for your reply.
    my query is say for example there is a material called XXX.
    for this material the stock position is now 1000 units in warehouse. that is ok
    if the above "XXX" is a configurable material, it might be having chars (say as additional components upto 10, which may be required by customers some times and no some times).  If we maintain stock position for material XXX then what about components.  because it is not always fixed and asked by the customers.  customer may ask all components or some components. 
    Ex:  Car is material.
           A/C, Luggage carrier on the top, tool kit these are characteristcs.
    I hope you understand me.
    Regards,
    Aanand

  • What are the views/fields that we can't change by Mass maintenance of MMR(material master record)?

    Hello friends,
              I would like to know the fields/views that we can not change by using mass maintenance of MMR if there are open PO for that particular material in concern. Likewise there was a question in SAP certification exam having options: "base unit of measure", "material type" and so on....

    in general you can change any field that can be changed in MM02. if the field is grayed then you cannot. e.g. if you make use a MRP profile. and in this profile the maintenance of those fields is disabled then you cannot do it MM17 either.

  • How to use Reserve the material in r/3 from CRM

    Hi,
    The client is using a customized process (i.e work flow ) to reserve material in r/3 from crm service order.
    Now they want to use standard reservation process of r/3 to reserve the stocks of the crm service order.
    The client is using the crm 4.0 and r/3 4.7 .
    I have checked the crm logistics integration process but it could not suit the requirements
    regards
    Edited by: Kamineni Sharma on Mar 31, 2008 8:35 AM

    hi Sharma
    check this may solve ur problem
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/4b/8bc43ace7a3b46e10000000a114084/frameset.htm
    Reward points if helpful
    cheers
    ranga

Maybe you are looking for

  • Are libraries with the same name a problem?

    In previous versions of FCPX, having the same event on two drives was a real problem.  I had backup drives that mirrored my media drive, and if I started FCPX before closing the backup drives, FCPX would warn me about the same event being present on

  • How to add a dynamic parameter with VB 6?

    I'm building a simply application that will open crystal 11 reports and add a single parameter. I've been able to get this working however I don't know how to set the parameter as dynamic and add to the list of values?

  • Enterprise manager not installed.

    Hello everybody I have installed the SOA 11.1.1.2 suite as per the documentation. But when i am starting teh weblogic server,during startup it throws error regarding enterprise manager. stacktrace is like this <Jan 8, 2010 12:00:40 AM GMT+05:30> <War

  • How i can start session to synchronize my ipod touch 5g in Itunes?

    I can't synchronize my ipod touch 5g because when it start synchronizing Itunes tell me that I have to start session of synchronization.

  • Object oriented design problem concerning abstract classes and interfaces

    I have an abstract class (class A) that takes care of database connections. It cannot be made into an interface as other classes extend it and all these other classes require the functionality in the methods it has (i.e. I cannot make all the methods