Maintenance Work Center : Capacity Planning CM01

Hello Gurus,
We are using T-code CM01 to determine the Requirements / RemAvailCap of the Maintenance Work Orders in a given Maintenance Work Center.
After executing CM01, the detail capacity list contains Not Scheduled orders( CRTD )and  capacity of these not Released orders also taking into consider.
How to restrict CM01 Order selection based on the work order System status or User status ?
I found below discussions on SCN but couldn't get precise answere.
Plant Maintenance: Capacity planning CM01/ CM07
Configuring profiles in CAPACITY PLANNING (CM07)
Please help.
Thanks in Advance
Ashok M

There are a few ways:
Create a new status profile via BS42 and assign the REL status only (see image 1). Then in the CM01 display screen, use menu path: Planning->Selection->Order and enter the status profile created above (see image 2)
Create a new selection combination via OAP0. In the CM01 display screen, use menu path: Planning->Selection->Combination and enter the selection combination created above (see image 3)
The above settings can then be defaulted via the various capacity planning profiles.

Similar Messages

  • Varying Maintenance Work Center Capacity by Days of the Week

    I had submiited a question a month or so ago about varying the capacity of a maintenance work center depending on the day of the week.  I got an answer and it worked.
    We've set up another work center (in staging) for the same scenario (the work center is half staffed on Fridays).  Monday through Thursday the capacity is 36 hours, Friday the capacity is 18 hours, the validity from date is 04/05/2010.  When we use CM34 to do some scheduling though, the capacity shown is 40 hours a day, Monday through Friday which is what the capacity was set up for prior to the validity from date.  It's also the same capacity as shown in the 'Standard Available Capacity' section.
    I looked back at the work center I had modified previously and it's showing the same thing.  It's like it's ignoring the validity dates.
    Any ideas?
    David Macindoe

    David,
      I know for sure that this is reflected in the standard profile for Capacity Availability check as part of release of the order (SAPSFCG013). The Availability for the week does show the capacity for the interval dates of the week and not the standard available capacity.
      I haven't checked this on CM24 and if the standard profiles don't reflect the change then the profile probably needs to be changed.I need to look into it to make sure. In the meantime if you aren't able to resolve the same, i would suggest to raise a note and see where that leads you.
    Regards
    Narasimhan

  • Shift definitions for work center capacity planning

    Is there a way to create a 9-80 work schedule over a 2 week period.  Client doesn't want to maintain date every two weeks.

    Hi Dean,
    Could you please eloborate your requirement?
    Regards,
    Prasobh

  • Capacity Planer Group --- Maintenance work center

    Hi,
    I have a query
    1. like do we have to create capacity planner groups same as the planner groups in equipment master data....Do they have any link??
    2. What would be the start time and end time in maintenance work center, for 24 hrs open manufacturing industry with 3 shifts???
    thanks
    DM

    Hello Deepak,
    There is no relation between capacity planner grp & Maintenance planner group...These are 2 different things..
    Now the work centers can be defined for the technicians if  HR module is not implemented...
    To perform the capacity planning for the technicians, there daily working hrs must be maintained in the system..Though the maintenance is working for 24 hrs,Single technician cannot work for entire 24 hrs..
    Hope this will help..
    Thanks

  • Blocking of work center capacity for capacity planning

    How can i block a work center capacity for capacity planning during Machine breakdown( via a Preventive maintenance order)?
    i believe it will reduce machine capacity, yet how can i view this, against the previous capacity? is there a possible report or can it be shown through a transaction?

    Hi,
    In capacity header details screen not exactly as "can be used for capacity evaluation " but
    "relevent to finite sceduling"
    "can be used for several operations"
    "long term planning"
    these all indicators you can deflag this and check the results ,it may helpful to you.

  • Block PP Work Center capacity  when breakdown maintenance order create on that work center

    Hi All,
    My Client want to Block PP Work Center  capacity when breakdown maintenance order create on that work center, how can i do it ..
    Please help me.
    Payal

    Dear Sir,
    I have Done Every think but still Production Order is create.
    CM50
    OIOI
    CO02
    Payal

  • Work center-CApacity-Work force planning

    Dear Expert !
    Please tell me all necessary steps to configure Work center , Capacity and workforce planning .........please provide me all the information of business scenerio where I can use this at user level....with screen shot.
    Thanks in Advance
    ROBERT SMITH "HP"

    Check out below links....
    http://help.sap.com/bp_bblibrary/600/Documentation/Q60_BB_ConfigGuide_EN_US.doc
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPCRPPS/PPCRP_PS.pdf
    Venkat

  • Plant Maintenance: Capacity planning CM01/ CM07

    Hi
    In capacity planning CM01, the standard sap shows all the maintenance orders which have system status created. But we would like to look at onlly the released pm order in the standard overview list and detailed capacity list. Please let me know if there is way we can configure it.
    Thanks

    Hi Nayan202,
    You could configure desired "selection set" T.code "CSM1" and then assign this to appropriate "Selection Profile" under initial set.
    Hope this helps.
    Shahnawaz

  • Long-term planning: planning details of work center capacity

    Hi,
    we need to know what is the effect on planned production orders (generated by MPS, transaction MD40) of the flag <b>&#8220;long-term planning&#8221;</b> in planning details of work center capacity (table name: RC68K; field name: KAPLPL). We made a test  analyzing planned orders scheduling details in <i>Stock requirements list</i> (MD04) and in the <i>Planning table</i> (CM21) in both cases: with "long-term planning" flag set and without this flag for the same work center.
    The schedule of planned production order on that work center is the same in the two instance.
    Could you suggest us something?
    Thank you.

    Hi Rudy,
    Purpose for carrying out Long Term Planning to simulate impact of Future Demand Program on
    u2022 Material Requirements
    u2022 Capacity Requirements
    u2022 Material Cost budgeting (activity by Accounts dept.)
    T.Codes used -
    u2022 Demand      MD61, MD62, MD63
    u2022 Scenario Creation     MS31, MS32, MS33
    u2022 LTP Variant  Creation & Execution     MSBT, SM37
    u2022 LTP statistics Evaluation     SM37, MS04
    u2022 Data Set Up     MS70, MSB&
    u2022 Evaluation based on Set up data     MCB), MCEA, MCEB, MCEC
    u2022 Capacity Evaluation     CM38
    To Summarize -
    u2022 In long-term planning, production plans for future demand programs are simulated using MRP runs with reference to the planning scenarios.
    u2022 The parameters for the simulation in the simulation planning area are defined in the scenario.
    u2022 The Evaluation of LTP Statistics enables identification of Material for which LTP processing was terminated.
    u2022 The Data set for purchasing & Inventory Control enables reports for demand analysis
    u2022 LTP run with setting for u201CLead time scheduling and capacity planningu201D enables simulation of capacity situation/overload on work centers.
    Hope it is helpful to you.
    Srini

  • Capacity planning CM01 not displaying PM Order capacity

    Hi experts,
    I have created one order with the work center and defined operations...... but i am not able to see the CAPACITY REQUIREMENTS in the capacity planning (CM01)............
    Please suggest me what should  i do for this.............

    Hi Maheswaran,
    Thanks for the information , in configuration "Capacity Requirement Planning" have been maintained and now i am getting the CAPACITY REQUIREMENTS and CAP. LOAD also .........................but there is one problem i.e. when i am seeing the capacity planning (CM01) , IT IS NOT SHOWING THE VALUES ON THE DAY WHICH IS WORKING actually according to factory calendar FRIDAY and SATURDAY are holiday, but it is showing the value on SATURDAY and not showing the value on THURSDAY that is today........Please see the screen shot also......
    what should i do.......

  • Work Center Capacity Shift Interval

    Hello,
    I'm looking for a function or Tables from which I can get Work Center Capacity Shift & Interval data, Transaction CRC3.
    Any help in this regard will be highly appreciated.
    Regards,
    Hashir Ahmed.

    hi,
    check these tables.
    AFIH     Transparent table     Maintenance order header     Application table (master and transaction data)
    AFKO     Transparent table     Order header data PP orders     Application table (master and transaction data)
    AFRU     Transparent table     Order Confirmations     Application table (master and transaction data)
    AFVC     Transparent table     Operation within an order     Application table (master and transaction data)
    CABN     Transparent table     Characteristic     Application table (master and transaction data)
    CBPR     Transparent table     CO-ABC: Activity Master Table     Application table (master and transaction data)
    COEP     Transparent table     CO Object: Line Items (by Period)     Application table (master and transaction data)
    CRCA     Transparent table     Work Center Capacity Allocation     Application table (master and transaction data)
    CRHD     Transparent table     Work Center Header     Application table (master and transaction data)
    CSKS     Transparent table     Cost Center Master Data     Application table (master and transaction data)
    CSSL     Transparent table     Cost Center / Activity Type     Application table (master and transaction data)

  • Work center capacity header freezed

    Dear Gurus,
    we're  not able to edit the work center capacity header. not able to edit the start and finish times.
    it is happening only for one work center. in other work centers same capacity category is editable.
    Please help us in resolving this.
    Regards,
    Gowri

    Hi,
    Check your work center categeroy definition for which edit is not possible.
    The work center category determines which data can be maintained in a work center.
    Each work center category is assigned to the applications (for example, production, plant maintenance or quality management) whose menus allow you to maintain work centers with this category.
    Each work center category has a number of screens assigned to it which the system displays when work centers of this category are displayed. The screens contain groups of fields (for example, scheduling data). Depending on the work center category, you can make field selections on these screens (for example, defining required entry fields).
    Thanks,
    nandha

  • Work Center Capacity Intervals

    HI,
    Where can I get the work center capacity interval dates i.e. valid from, valid to and corresponding week days that are being populated in the table control when you follow the following path in transaction IR03->Enter Work Center and Plant-> Press Enter->Go to Capacity Tab-> Press Capacity Button on the lower left hand corner->Press Intervals and shifts
    My requirement is to calculate the weekly capacity of a work center. I have to find the valid interval for current date then find the number of working days in this interval so that I can use it in calculating the weekly capacity.
    Regards,
    Bharat.

    I de-bugged the main program behind IR03 and found out that the Valid-from-date is being calculated during runtime for all the records from table KAPA for given work center KAPID.
    Anyway thank you all who cared to check the thread.
    Regards,
    Bharat.

  • Work center capacity

    Hello experts
    I am truing to compare between actual Work center capacity (I am using data source 2LIS_04_P_ARBPL).
    And standard work center capacity (transaction cro3 in the R3)
    I canu2019t find an info cube or data source that will help we extract the standard capacity.
    Thanks.
    Tal shalom

    Hello,
    You can use [0PP_C13 InfoCube (Capacity Load Utilization)|http://help.sap.com/bp_biv170/BBLibrary/documentation/B58_BB_ConfigGuide_EN_DE.doc]
    Thanks
    Chandran

  • To find 'Maintenance Work Center' for Equipment (without Production order)

    Hi,
    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client -->  It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

Maybe you are looking for

  • HTTP error 403 to Integration engine

    Hello, Problem a) While posing data from eSourcing to PI box by HTTP , we are getting HTTPerror 403. The error message states: ID: E-Sourcing was unable to publish PROP-00090--2010 to ERP. class java.io.IOException Server returned HTTP response code:

  • PT Spy in 6.5

    PT Spy is broken on a newly built 6.5 vmware image. We're still in our 6.1 to 6.5 upgrade and I've finally hit the wall to where I need pt spy to work to continue making progress w/ the upgrade. I've browsed a bit through localhost:12345 (alui config

  • AVCHD-Lite no sound

    Hello, I have a problem with the file type  AVCHD-Lite. When I open a file in photoshop elements 11, I can watch the video but there is no sound. I have already installed the latest version of quicktime, but this didn't help. Thank you for your help

  • Call transaction mb51 : performance issue

    Hi, I have written one report where I am calling Tcode mb51 and getting the records from it and displaying those in my report. Is there any way to have better performance in my report. Since its taking too much time if I select all materials for spec

  • Going Crazy trying to DB other than my Local DB in OEM

    I have a local 10g database and I have installed EM. The tool works fine for that database, but I was not able to connect to another 9i database instance sitting on the Unix Server. Can anyone tell me how I make EM see the remote Database instance an