Make multiple clips from one music track

How do I trim my music track so that I can edit out parts in the middle--not just the ends?

do the following:
1. create the two different instrument tracks, let's say instr1 and instr2
2. got to the environment window and search these two tracks and drag them a bit aside
3. choose New/Transformer
4. drag the Transformer object in the neighberhood of the two instrument tracks
5. cable the output of instr1 to the input of the transformer object
6. cable the output of the transformer object to the input of the instr2 track
7. go back to the arrange window
8. select instr1 and enjoy!

Similar Messages

  • How do you select/move multiple clips from one timeline to another?

    Has to do with combining multiple edls from Avid - required due to an issue with duplicate reel names in the original Arri footage. I can move them one at a time, but it is very tedious. Is there a way to select multiple clips and move them together?

    Actually discovered the magic of the shift key.
    IRCP Beauty doesn't recognize multiple timelines in a session, so first you have to at least get the footage on multiple tracks in the same timeline. Shift + drag on the track will allow you to move it to another timeline. Also Shift + drag on the center of the first clip in a sequence will slide the entire sequence down - which is how timelines end up getthing offset all the time. Also, if there are multiple tracks in a timeline and some are locked and some aren't, Shift + drag on a clip will slide ALL UNLOCKED tracks in the timeline.
    Finally, Shift + click on either in or out marker moves both points up or down the timeline.

  • Export multiple clips from one timeline

    Hi,
    Is there a way to export multiple clips into separate files from the timeline. So, basically i have a time line with many clips which i need to export to individual files, not one long video. In FCP 7 I would drag all these clips into a new folder and then batch export. But in FCPX?
    Thanks!

    Of course i's  not "half baked". Just because it lacks a feature that you want doesn't make it so.
    There isn't  as NLE out there that doesn't attract  complaints from some users about its functionality in some area or other.
    Fortunately, the fully functional  trial version gives us a good chance to find out first-hand whether the design meets our requirements.
    Russ

  • Batch export of multiple clips from one video in Premiere CS4

    Hello,
    I'm really in a bind and hope you guys can help me out. I have about 30 hours of video in about 30 mpg files..1 hour in each video. I need to splice out small clips from each video..anywhere from 10 to 20 clips in each and send them to Media Encoder to store as video files I can then re-use. In CS3 I can do this manually one clip at a time ..set In point, Out point and then export. This however takes a very very long time....set the ins/outs, then export, then wait, then repeat..very tedious
    In CS4 can i set multiple ins/outs for the entire video and then have premiere go to work and do a batch export? Or is there another way of doing this? I have about a week left to get this done and at a total of about 450 clips to export each 2-5 mins for encoding this will take forever...plase help!
    Stan

    It wont do exazctly what you want but.... But the batch encoding should save you some time since you can continue to work while it encodes/exports.
    Do you need to make more than one output type? Like DV, WMV, FLV... for each one? If so, I suggest this workflow:
    1. Open source file 1 in Source monitor set in and out, ctrl drag subclip to a folder in the project panel.
    2. Repeat step 1 for any other subclips needed from source clip 1
    3. When done with first source clip go into bin where you put your subclips click on them one at a time and do export/media to your lowest compressed need (like DV AVI for example); it will be added to AME queue
    4. Repeat step 3 for all subclips, then click start queue.
    5. While AME is exporting all the subclips for your first source clip, repeat steps 1-3 on source clip 2...
    When you are all done; if you need to make multiple output types for each file; Do (IN AME) File>New>Watch Folder
    Create a Watch folder for each output type you want. Then simply copy all the exported clips you want inot each of these folders and AME will process them all for you in batch.
    It doesnt do exactly what you wished for; but should save you a few buckets of time.
    Curt Wrigley

  • Exporting multiple clips from one sequence as separate files.

    Hello fellow editors!
    I have about 100+ video files that I want to cut into shorter clips, edit a bit and then export in a Final Cut friendly format (currently they are AVCHD mts files) to send it to my friend, who is putting the whole movie together.
    I dont want to use Final Cut for this ( I cannot, I have a windows machine) and I was hoping to work with premier CC and media encoder CC.
    There is a way of putting all clips in one sequence and then nesting each one, then you can send them to Encoder CC and it will render them as separate files - thats is just not very productive, nesting clips one by one and it takes forever for Encoder to import sequences.         
    I was wondering if there is a better workflow? I heard that Final Cut has shortcuts to do this very easily, you just click on all those clips in sequence and "batch export" them, which puts them in some place as separate, already cut files.?
    Anything? I love premier, let my feelings be justified!)

    Kevin Monahan ...
    Lucid George is right ... select one trimmed clip, File->Export->Media, you can choose whether in-out or entire clip.
    Select MORE than one clip, you get a completely different export box ...
    These two selections were "exported" from that bin created by dragging the trimmed clips from the timeline to a new bin ... I don't know what else one is supposed to do. You can't even select multiples clips and batch sub-clipping, which would at least cut the steps down.
    Neil

  • Capturing multiple clips from one mini dv tape

    i have been having trouble using the 'capture project' option. i can capture individual clips, but would like to set them all before hand and have the computer go through and capture them all at once. this seems to be possible, but when i click 'capture project' it either only captures the first clip or reads 'error'. any suggestions?

    Hi(Bonjour)!
    You cannot capture project with this method in FCE, it's not suported.
    See page 179 and 181 of user's manual.
    You can capture now all your tape (or portion with the esc key), and recapture a project (from a previously captured but now erased media). See page 189.
    Each clip that is logged in capture window is captured right after you set the in and out points. One clip at a time.
    Final Cut Pro can meets your needs.
    If your problem is to recapture a project, it seems that there is a time code break on your DV tape, thus the error.
    Note that HDV cannot be recaptured.
    Michel Boissonneault

  • How do you consolidate audio files in Premiere? (Make multiple audio files on a track one file)

    How do you consolidate audio files in Premiere? (Make multiple audio files on a track one file). Also, my client is having a hard time making an omf that Pro Tools can read. The files can not be found by Pro Tools. How do you make an omf that Pro Tools can read?

    Multichannel export;
    http://strypesinpost.com/2012/11/exporting-multichannel-quicktimes-in-premiere-pro/
    When you export the OMF, select Encapulate Files in the Settings window

  • Change duration of multiple clips "as one" overall clip?

    Here's my situation:
    I have a song at 127 BPM. I have a music video (muted sound) at 125 BPM.
    I've spent a long time slicing up clips from the video into different channels and muliple clips to form one timeline (but with many clips and channels lined up).
    I now want to change the overall duration of the video clip to match the BPM of the song (which I should have done in the first place), but the video is, as previously stated, sliced up in mulitple clips in multiple channels. How can I change the duration of all clips at one time, where the end and start of the clips still line up to eachother?
    This would've been incredibly easy if there were a un-nesting feature. Where I can nest multiple clips, change the duration, and un-nest the clips to slices clips with a changed overall duration. (Which is not possible. Yes, I can drag the clips out of the nested clip, but the clips will still have the original duration).
    TL;DR: How can I change duration of multiple clips "as one" overall clip?

    Never mind. I've found a alternate solution. I used a time stretch calculator at http://mp3.deepsound.net/eng/samples_calculs.php and time stretched all the clips to match the BPM of the song. Now I only need to snap all the clips, which can be done one by one, but I found this trick to snap all the clips at once: http://vimeo.com/27428526.
    I'll just let this thread stay open so other with the same problem can find this

  • Moving a Clip From One Project to Another

    How do you move a clip from one project to another keeping the sound clip and title that was used on that clip?

    As far as I can tell, you can COPY all, or some, of the video clips (and stills) with transitions and FX and PASTE into a different Project. But you can't copy titles or audio tracks.
    However, you can make a QT movie of the segment you want and import it. If it's short use 8-biy uncompressed or ProRes 422.
    Or you can DUPLICATE what you need, and and new clips to the duplicate.

  • Make sub clip from a sequence?

    I am a recent convert from FCP and am used to placing multiple clips on a sequence and making sub clips from the sequence.  I shoot a lot of 20 -30 minute interviews and this sub clipping from the time line in FCP was my workflow to select the best sound bites.
    What am I missing?
    It appears you can only make sub clips from the source window?
    Help
    Thank you

    Thank you, that is so easy - now that you showed me.
    Yes as I have several clips from each segment of interviews (especially if they take breaks, or I to need shut off the camera) then I scurb through them all, by subject, which may cross over multiple clips to make sub clips and rate them based on a star system to do final assembly in a new sequence.  If do this in the source monitor I would have to load dozens and dozens of clips, one at a time to preview.
    Can you suggest a better workflow?
    Maybe with Prelude?  I have not even opened this app yet

  • Transfering clips from one 'project library' project to another

    When I copy and paste clips from one 'project library' project to another 'project library' project it somehow brings along all the deleted material that was taken out of the finished product. Can't even figure out how this is happening... I'm trying to make different versions of a music video with most of the same clips and transitions. (imovie '09)

    Thank you soooooo much! I don't know if this is possible, but I wanted to add beat markers to the music first before I added the clips from the other project. When I duplicate the project,it also brought along the music. I know you have to add beat markers to the music before you add clips. So is there anyway to lay the music down first then add the duplicated project (minus it's original music).
    THANKS for your time!

  • How can I move clips from one library to another? Clips are still in original drive and not in new drive.

    I am using iMovie 10.0.7 on a 1-week old iMac 27" running Yosemite 10.10.2. I migrated from iMovie 9 on a 2008 iMac running Snow Leopard and updated the libraries and events, etc.
    I have two external drives connected via USB. I want to move / consolidate the library and clips from one of the external drives to the new iMac's 3TB fusion drive. This is to make room on the external drive to run Time Machine backups.
    Apple's instructions on managing libraries and moving/copying clips/events tell me to drag to move between libraries and to Option-drag to copy. However, simply dragging only copies. I find that if I Command-drag the events/clips, I can "move" them. But when I look outside iMovie in the Mac OS X Finder, the event folders and clip files themselves are still sitting in the original drive.
    I'm very perplexed as to how to really move the clips and event structure. Should I manually copy the clips and event folder structure outside of iMovie? I worry I will mess up iMovie's internal record keeping and folder structure information.
    Thanks in advance.

    Ahh, Ok. I actually had to go to Lynda.com to watch a training video of this highly bassackwards maneuver, but now I have it. In other words, while the intuitive thing is to make a new event to hold the clip you want and then open the old event and drag the clip into it's new event, the only way to accomplish this maneuver is to NOT create a new event, but rather, go to the clip AFTER the one you want to move, select it and then Right-Click on it and select SPLIT EVENT BEFORE SELECTED CLIP (or go to FILE>SPLIT EVENT BEFORE SELECTED CLIP). Then you wait a few seconds while the program thinks a bit (no feedback it is doing this - just a pause) and then it automatically creates a new event with the clip you wanted. Now just double-click the new event and name it something meaningful.
    Thanks for your help!

  • How do I move clips from one Event to another?

    How do I move clips from one Event to another?
    As soon as I got the new iMovie, I started importing clips and making video's. Unfortunately, I hadn't fully understood the Events feature, so all of my clips are in a single "New Event" Event. I have now created several other Events and named them properly and would like to sort all of my clips into their proper "Event" folders. How do you do that?

    Ahh, Ok. I actually had to go to Lynda.com to watch a training video of this highly bassackwards maneuver, but now I have it. In other words, while the intuitive thing is to make a new event to hold the clip you want and then open the old event and drag the clip into it's new event, the only way to accomplish this maneuver is to NOT create a new event, but rather, go to the clip AFTER the one you want to move, select it and then Right-Click on it and select SPLIT EVENT BEFORE SELECTED CLIP (or go to FILE>SPLIT EVENT BEFORE SELECTED CLIP). Then you wait a few seconds while the program thinks a bit (no feedback it is doing this - just a pause) and then it automatically creates a new event with the clip you wanted. Now just double-click the new event and name it something meaningful.
    Thanks for your help!

  • Moving multiple queries from one category to another in QM

    Hi All,
    Is there is any way of moving multiple queries from one category to another in the query manager?
    Or is the only way of doing it by saving each one individually into a different category.
    Any ideas ?
    Regards,
    Rakesh N

    Hi Rakesh,
    The query manager has limited function compare with normal file management applications. Under current design, you have to do this one by one. You just need to make sure move the smaller amount of queries to large category. Category name can be changed easily.
    Thanks,
    Gordon

  • One script to make multiple cells call one function or vice versa

    Please help.
    I need one script to make multiple cells reference one function or one cell reference multiple functions.
    Goal: On the enter event of cell c1, I want to make cells (this, Header.c1, Example.c1, rLabel) highlighted, and this would be for every other cell that is entered into, their corresponding column header and row header will be highlighted.
    I've tried combining cells: eg
    colourControls.hdfieldLoseFocus(this, HeaderRow.c1, Example.c1, rLabel);
    and I've also tried combining some scripts in the function:
    fieldObj.ui.oneOfChild.border.fill.color.value = "255,255,200";
      HeaderRow.fieldObj.ui.oneOfChild.border.fill.color.value = "255,255,200";
      ExampleRow.fieldObj.ui.oneOfChild.border.fill.color.value = "255,255,200";
    But they dont work. See the link to my form.
    http://www.winstonanddavid.com/example.com
    I tried testing the function with the cell 'c1' but it doesnt work.
    Also, I want to get rid of the multiple lines of script in every other cell.
    How can I do this?

    I played around with the ExtendScript Toolkit and cutted and pasted the previous script from here until I managed to get a script that actually works like I was thinking. I then added a code from the CS4 Reference Manual to move Layer1 to the top (just to see if it worked).
    I have no idea yet if the the code includes something that does not belong, but at least I get no errors. The current code is like this now:
    //Apply to myDoc the active document
    var layerName = LayerOrderType;
    var myDoc = app.activeDocument;
    //define first character and how many layers do you need
    var layerName
    var numberOfLayers=0;
    //Create the layers
    for(var i=0; i<=numberOfLayers; i++)
    { var layerName = "Background";  var myLayer = myDoc.layers.add(); myLayer.name = layerName;  }
    { var layerName = "Picture";  var myLayer = myDoc.layers.add(); myLayer.name = layerName;  }
    { var layerName = "Text";  var myLayer = myDoc.layers.add(); myLayer.name = layerName;  }
    { var layerName = "Guides";  var myLayer = myDoc.layers.add(); myLayer.name = layerName;  }
    // Moves the bottom layer to become the topmost layer
    if (documents.length > 0) {
    countOfLayers = activeDocument.layers.length;
    if (countOfLayers > 1) {
    bottomLayer = activeDocument.layers[countOfLayers-1];
    bottomLayer.zOrder(ZOrderMethod.BRINGTOFRONT);
    else {
    alert("The active document only has only 1 layer")

Maybe you are looking for

  • Best practises for Hub and spoke Metro Etherent network

    Hi there, It is my first MAN deployment. I will use the 6513 as the core switch and the 3550 as the edge switches to the customer. The customer has 9 locations. The customer asked for interconnection between the 9 locations and his Data center in his

  • Problem in Creating Billing Document

    Dear all, I'm doing practice according to course SCM600 - Processes in Sales and Distribution. I tied to create a billing document for a delivery. But in t-code VF01, the processing status of the delivery is "Incorrect". When I tried to save that doc

  • Itunes Multi-Pass

    Hi, i am not getting too much info on this New Multi-pass option now i was looking at The Daily show and i see that option if i pay 9.99, does that i mean i will NEVER have to pay for downloading episodes again or its only for the next 15? 30?

  • Bug when using IBOT

    Hi all, has anyone had this kind of error? I am using IBOT, and I set Schedule_ to Start Date=21/09/2009, Time of Day=08:00, Set Time Zone=GMT+01:01, and Recurrence_ to Every 1 week(s) on  MON. When I look overview of this IBOT, everything is fine, b

  • Query regarding transport of customizing data to another client

    I have some queries related to transport of workbench and Customizing data to another client. As I am new to SDN forum, I am not sure if this is the right forum to post my query. Kindly let me know.