while using transaction CM22, the planning board takes very long time or some times time out. I think that it checks even the planned orders during run. We need to use only production orders. Is this issue relates to sort key? If yes, How can I modify the settings?

Hi,
In customization for capacity levelling you must create a new selection profile where you can axclude planned orders by unchecking planned orders indicator. Then you must assign this selection profile to the overall profile called by transaction CM22. You can learn which profile is used behind which transaction from the SAP help link below.
[http://help.sap.com/saphelp_erp60_sp/helpdata/en/1a/f2f33419ec8d44e10000009b38f844/frameset.htm]
It would be wise not to make changes on a standart profile and transaction. You can copy the overall profile and create a Z profile with your selection profile as well. This time you can select this Z profile when running transaction CM25. This transaction is designed for working with the overall profile of your choice.
Regards.

Similar Messages

  • Consider preventive maintenance schedule into PP order capacity planning

    Hi PP experts,
    My client's requirement is that when a preventive maintenance order is created in PM module for a particular work center (used in production) on a given date, NO production order (which is processed on that work center) should get released or confirmed. In other words, the capacity should be blocked at all for the subject work center.
    Could you please guide how to make this effective?
    We are using discrete manufacturing with capacity planning. At the time of PP order release, system shows capacity situation so as to decide whether go-ahead even with overloaded capacity.
    Regards,
    HKV...

    First, you should assign the PP work center in the location tab of the PM equipment which refers this workcenter.
    Secondly you should enter the sytem condition in the task list of the equipment.
    During preventive schedule  the work center  will be reserved by PM orders for maintenance and this can be seen from capacity planning from PP side.
    regards

  • Setting needed for Capacity Planning.

    Hi PP Gurus,
    I want to know what setting we have to do for capacity planning.
    what I know is:
    1. W/C should be set for finite scheduling.
    2. In scheduling parameters for process order tick "Generate capacity Requirement".
    This both setting are made in my scenario, but it is'nt loading the work center fot that week.
    Any other setting nedded?
    Thanks, in advance.

    Dear ,
    You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
    1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
    2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
    1.Automatic Scheduling check box should be marked
    2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
    3.Scedulinga and Generate Capcity should be ticked .
    3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
    4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
    6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
    6.Period Profile : SAP___P001 -Weekly period
    7.List Profile : SAPSFCI001-Production Planing
    Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
    Refere the below theread for farther reference :
    Capacity problem in production order
    capacity planning
    Hope this will be useful .
    Regards
    JH

  • Capacity planning is not possible for this info structure

    Hi Gurus,
    When I create Rough cut planning profile, I am getting error message ""Capacity planning is not possible for this info structure""
    I am using info structure S994 copied copied from standard info structure.
    Please suggest to oversome this error.
    thanks  and regards
    Murugesan

    Hi,
    Make sure the capacity planning relevant field is maintained for the Infostructure config setttings in MC7F.
    regards
    Ratan
    Edited by: Ratan on Aug 10, 2009 7:49 PM

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Planning of Dependent Requirements for BOM Components in Make to Order scen

    Hi Friends - I want to execute a full cycle Make to Stock Scenario with Materials planning using MRP.
    The scenario will include BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    To execute this I have done the following
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - NORM, and General Item Category group as NORM
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6. Now created a standard sales order for the product.
    7. Executed the MD50 for the Sales Order Item.
    Now where do I find the BOM components for this material in the Sales Order?
    After executing the planning Run MD50 I am only getting the requirements for Product only. I can't see any dependent requirements for the BOM components.
    How do I make sure that the BOM components are also planned while the product is planned?
    I have checked the component Stock Requirement List - there are no requirements generated from the Sales Order Product BOM.
    Pls help me on this. How to do this so that the raw material components are also planned?
    Thanks
    Purnendu

    Hi Dhaval, Sandeep, Ashok - Thanks a lot for your replies.
    I have checked the Planned Order Created through Planning Run.
    If I click on the Components Tab I am getting following message
    No material components were determined
    Message no. 61027
    Diagnosis
    Until now, no BOM explosion has been carried out or no BOM has been created for this material yet.
    Procedure
    Either explode the bill of material for this material, or
    create the components manually by processing the planned order in change mode.
    If I try to explode the BOM through Header Menu - Edit> Explode BOM
    I am getting the same message.
    If I click on the Bill of Material Tab - I am getting the same above messge.
    Ashok - I have tried both the Selection Method -
    Nil - Selection by Order Quant.
    1 - Selection by Explosion Date
    But with no effect.
    Waiting for your advice.
    Thanks and warm regards
    Purnendu

  • Capacity planning and schedulng production order based on availabe capacity

    Hi Gurus,
    I am trying to use capacity planning, when the production order is created it takes the order start date as the requirement date. Then when i do he capaity check it says capaity not available. After finite scheduling again it proposes to shift operations by certain days.
    I need the capity to be check in MRP and the palled orders to have start dates based on aviable capity, currenty all the palled orders are starting on the requirement date irresptive of avaiabe capaity. I tried using finite scheduling option in MD02 still it does not take in to account exsting production orders for giving dates of the planned orders.
    Regards
    Abhi

    Dear Abhishek,
    1) This is Std SAP of MRP, only material Av check will be carried out in MRP & create procurement
    Proposals
    2) Capacities will not Checked  ( consider ) in MRP in Std R/3
    3) Your Need can be only met through APO
    Regards
    Madhu

  • Planned order splitting during capacity planning

    Hello,
    anybody plese help me during the capacity planning in T.code.CM31 i want to split a planned order and want to assign alternative sequence. how can i do this and the capacity should be reschedule automatically to my requirement date. i am using backward scheduling.
    plese suggest immediately
    Thanks and reagards
    Bhakta

    Dear Bhakta
    MRP does not perfom any Capacity Requirement Planning .While  you are executing MRP with Lead Time Scheduling , MRP proposes Planned Order Dates based on the Routing Operation Timing not based on the Work Centre available Capacity because in SAP Std R/3 we did not have scope to check the finite scheduling and capacity requirement chek .MRP assume that Work Centre has infinite available capacity .
    In MRP run , it will give you Detail scheduling of the Operation in Planned Order -Detail Scheduling tab  and copied the routing , BOM as master data .When you convert that Planned order to Production order , it will copy the Routing details based on the Order Type denpendt Parameters -OPL8-Routing -Alternative sequnce  and Automatic selection -3 option
    Thats why we have Capacity Requirement Planning  for Detail Capcity check and production order scheduling  .
    Note : Earlier to my first  reply , please note that you have option in CM21  enter sequence number  at order level which may applicable to you .CM21-Work Centre -exectute -Select the Order from order pool -Goto Order -Sequence number maintainence
    This number( sequence number operation /order )  that can be assigned to production orders or planned orders at the level of the task list header and is therefore valid for all the operations in an order.
    Hope this is clear .Revert if you nees farther help
    Regards
    JH
    Edited by: Jiaul Haque on Jul 5, 2010 3:32 PM
    Edited by: Jiaul Haque on Jul 5, 2010 4:01 PM

  • Any std report in Capacity Planning showing only dispatched orders/opns ?

    Hi CRP gurus:
    Does SAP has any standard report/transaction in Capacity Planning that shows (or has a selection for showing) only "dispatched" orders/opns ?
    - Chetan

    Chetan,
    Use transaction COOIS. In this choose Operations, System status as DSPT at operation level, enter plant and execute. You will get only orders and the operations which are dispatched in this plant.
    You can navigate to the capacity planning table from the selected records through order change.
    Hope this is ok with you,...reward points..and close.
    Regards
    Ram

  • Planning strategy for Both scenario of Make to order and make to stock

    Hi
    My client having Both scenario of Make to order and make to stock ,so please explain me step by step which Planning strategy is use for following situation
    1.Forecast the production quantities for the variants and create the PIRs
    2.sales order is created for variants
    3.Planned independent requirements should consumed by incoming sales orders
    Note:If it is MTO scenario i need sales order reference number in production order
    With regards
    Laxmipathi

    Hi,
    You can Define Strategy Group under SPRO>Production>Prod.Planning>PIR>Planning strategy-->define st.Group.
    In this step, you group strategies together into a strategy group. You can determine a main strategy as well as up to seven alternative strategies.
    The main strategy is proposed in demand management or in sales order management and can be overwritten by another planning strategy defined in the strategy group.
    You can allocate the strategy groups to the materials directly in the material master record, or you can allocate the strategy groups to an MRP group and then in a second step allocate the MRP group to the material in the material master record.
    Hope it will help you.
    Regards,
    Mukesh

  • Capacity Plan for Partially Confirmed Order

    Hi Guys
    Can any one please guide me on Capacity Planning (CM29) how to:
    1. Plan to plan a partial order. Or in other terms: how to plan a part order in wk1 and rest in wk2
    2. If the process order is partially confirmed, then how should supervisor re-schedule it again for later date!
    3. Ideally what should be followed:
      a. Schedule the Planned Order on CM29 and then Convert them to Process Order , OR
      b. Convert the Planned Order and then Schedule the Process Order on the CM29 screen
    Thanks in advance
    -Rahul

    Hi Mehdi,
    Once order status is PCNF you cannot create lot with inspection type as 03. You need to reverse all the confirmations/Goods issue and activate 03 inspection type in material master, maintain MIC related data in routing and do Read Master data. Then system will create inspection lot.
    For 03 inspection type manually inspection lot cannot be created. Once order is released inspection lot will be automatically created by system.
    Thanks & Regards,
    Ramagiri

  • Capacity planning at Planned order level

    Dear All,
                      In my current scenario i'm able to see load of process orders against the workcenter in CM01. My requirement is to do capacity levelling at the planned order level.
             I have created Production version also & attached to the planned order. Still in CM01  no load or planned order is shown on workcenter.
    when i convert it into process order then it shows load / process order.
    pl.let me know how i can do the capacity planning at planned order level.
    Thanx & regards,
    dev

    Hi,
                       In MD12 when click on Go to > Capacity Levelling >
    Error Message : No work centers with capacity requirements were found
    I have given formula : SAP006 in capacity & Relevant to finite schedulling indicator is also active.
    what may be the cause ?
    thanx & regards,
    dev

  • Service Order in Capacity Planning

    Experts,
    how can I include Service Orders, generated by IW31 to the Capacity Planning.
    Thanks in advance
    -Jörg

    Dear,
    Please refer this useful help link,
    http://help.sap.com/saphelp_47x200/helpdata/en/10/d06396f62711d1951c00a0c93033d8/frameset.htm
    Regards,
    R.Brahmankar

  • Make to order planning in APO

    Hi guys,
    Can we do the make to order planning in APO ?
    Thanks in advance
    S.Murali

    Hello,
    You can carry out MTO planning in APO.
    But normally we do not recommend since you may not be able to utilize advantages offered by APO.
    With Regards
    Mangesh A. Kulkarni

  • Where do I find planned order capacity

    We need to incorporated planned orders into our capacity.  I found the extractor for production orders but planned is not contained in it.  I found the table to get planned orders but thee is no capacity in the PLAF table.  any ideas where this information resides?

    Hi,
    Have you got this,
    We are also stuck at the same point
    Would appreciate your inputs
    Regards
    Lalan

Maybe you are looking for

  • Supported platforms in FIM 2010 R2 Sp1

    I have FIM 2010 R2 Syncronization Server running on Windows 2008R2 OS. The available Galsync connectors that we have are Exchange 2003, 2007 and 2010. The FIM sync server runs on Exchange 2010 environment but in order to fulfill the requirements of e

  • Compatibility of adobe forms

    I am a newbie to Adobe forms. We have a requirement in which we need to create forms and ask our customers to fill those forms. Most of the form elements would be long text fields for essay type questions , or simple text fields for (name, title, dat

  • Marker Import Weirdness iMovie to DVDSP

    Hi, For Some Strange Reason, when I drag an imported video asset created with iMovie 3.0.3 that contains markers into a blank chapter index menu in DVDSP 3, the first scene always gets named "Start". I did not name this first marker "Start" in iMovie

  • GR Posting failure

    Dear all, I got a problem with GR. The scenario is procurement from PR, then created PO reference to PR, then do GR with PO, but posting is failure. The error message : <inadmissible movement type - acceptance at vendor set for PO item--Message No. M