"Make-to-Order Production with Variant Configuration (147)" doesn't work ..

Hi, I'm trying to run through this scenario ) on the Cloud Showroom and clearly the document I have (147_BPP_EN_UK.doc dated Oct 2008) is out of date or at least out of sync with the system as configured u2018in the cloudu2019 u2026.. the necessary roles specified in the document are not available in the cloud and some of the transactions are not there, e.g. VL10I.
But more infuriating is that the process just does seem to work, for instance from page 13 u2026.
Item  7 ...
"If a material variant can be determined on the Display Material Variant screen, select the configurable line item and choose Enter. In this case the previous configurable material number will be replaced by the new configurable variant that was created. For example, F1000-M1 will replace F1000 if Type of Material Material Metal and Type of Packaging Normal is selected."
In my case Iu2019m not clear what the u201CDisplay Material Variant screenu201D is u2013 the previous instruction (Item 6) from the document says u201CWhen all of the configurable choices have been selected, choose   Back.u201C which takes you back to the document overview. Highlighting the line and pressing enter doesnu2019t do anything and there is no option to select the configurable line item that I can find so the expected material substitution doesnu2019t happenu2026.
I've got a couple of screen scrapes that show the approriate variant material being specified and found (Characteristic Value Assignment) but there doesn't seem to be any way to attach to the forum. I have tried to double click the variant material on the Characteristic Value Assignment screen and also tried clicking clicking once and then 'entering' but neither method resulted in the necessary substitution (i.e. the overview screen still shows F1000 and not the variant material F1000-P1 that has been specified?
Also the schedule line was confirmed as deliverable u2018todayu2019 even through there is not stock u2026 all very puzzling u2013 any help much appreciated.
Regards.

I found the answer to this myself - I was looking at out of date best practice documents on our server, the latest bast practive documents are written for EHP4 and therefore should work on the 'cloud'.

Similar Messages

  • Configure-to-Order (CTO) Production with Variant Configuration and Assembly

    We are trying to create a Configure-to-Order (CTO) Production with Variant Configuration and Assembly Processing.
    I have set up the required master data for variant configuration which is working fine in a sales order. I have used startegy group 82 in the MRP view of the material master for Finished goods/header material. A production order with BOM explosion is getting generated automatically during the creation of the sales order.I have stock of components available. Uploaded using 561 movement type (unrestricted stock).The requirement class that is being determined is 201.
    ISSUE:
    Availability check of the components in the production order that is getting automatically generated during sales order creation is failing. The components are not getting confirmed inspite of initialising the stock of the components in the plant we are using.
    I am looking for pointers on the important settings related to the availability check in Configure to Order scenario that have to checked to resolve this issue.
    TIA

    Hi,
    Availability check controls for Production order will be done in OPJK for plant , order type combination. Based on the settings either for creation or release system will carry Availability check of components. you can set the controls such that release can be possible even if parts are missing.
    If you have settings to restrict the release if components are missing and there is stock in unrestricted, then you need to transfer the stock to the sales order using MB1B and 413 movement type so that system can recognize the availability and allow the release of order.
    Based on your requiremnts you can map the settings in OPJK
    Hope this will help
    Regards,
    Brahmaji D

  • Production Order BOM with Variant Configurable Material

    Hi,
    I have a requirement to process the document items in the Production Order BOM for a variant configurable martial. I am not sure which Function Module will do this purpose. I checked the FM: CS_BOM_EXPL_MAT_V2 and does not seem to be working.
    Can you please help me with a suitable Function Module or program that will process the Production Order BOM? Appreciate Your Help.
    Thanks,
    Kanan
    Edited by: Kannan SA on Jul 6, 2011 8:59 PM

    What are you doing with the characteristics right now ?
    If you want operations selected based on characteristic values, you need to have dependencies written just like you do (or in your case, will do) in your BOM components.
    I understand the business-push to not do things 100% at the start and just "oh we'll add that part later" but I would really push back to get that part included initially.

  • Make-to-order production with configuration( str type 25)

    Hi,
    WE are using above planning strategy. When we try to convert the planned order, we are getting following message
    "You cannot make an assignment to make-to-order"
    We have checked sap notes also.
    Pl let us know what are the setting required in settlement profile.
    Regards
    Vineet

    Hi Vineet,
    This Strategy is for Variant configuration that is it is for congfigurable material for this you need to maintain in Sales view 2 Item category should be 0002 and the classification view you should have class as 200 or 300.
    The get planned order you need to create the saleorder after that you need to run the MRP then you need to convert the planned order to Production order since this is make to order scenario you cant manually create the planned order and convert for that.
    Regards,
    Satish

  • Creation of sales order with Variant configuration info

    Hi friends,
       I am creating sales order along with Variant configuration data. We have 3 level BOM structure.
    I am using BAPI_SALESORDER_CREATEFROMDAT2 and filling in ORDER_CFGS_REF, ORDER_CFGS_INST, ORDER_CFGS_PART_OF ORDER_CFGS_VALUE, ORDER_CFGS_REFINST
    tables exactly the same way BAPISDORDER_GETDETAILEDLIST FM returns.
    Sales order is being created with no variant configuration information.(Not in the header level atleast)
      Can any one help me on this.
    Thanks
    Seshagiri

    Updating Variant Configuration data for SO item became little tricky for us in an ongoing implementation. After spending some hours investigating the correct combination of data to pass, we were able to post the document correctly. As no detailed documentation is available online for this scenario, I hope this post will help community for similar requirements. J
    For updating Variant configuration (VC) data for Sales order item, we need to populate below tables of standard FM or BAPI (e.g. SD_SALESDOCUMENT_CREATE).
    Normally the standard FM or BAPI does not return any error messages in case configuration data is not updated successfully.
    ·         SALES_SCHEDULES_IN: The required date field should be populated with appropriate value (REQ_DATE).
    ·         SALES_ITEMS_IN: Field PO_ITM_NO should be populated with appropriate value.
    ·         SALES_CFGS_REF Table:
    1.       This table should have 1 record per item.
    2.       Combination of CONFIG_ID and ROOT_ID should be unique across line items.
    POSEX
    000010
    CONFIG_ID
    000001
    ROOT_ID
    00000001
    SCE
    1
    COMPLETE
    T
    CONSISTENT
    T
    CBASE_ID_TYPE
    G
    ·         SALES_CFGS_INST:
    1.       This table should have 1 record per item.
    2.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    CONFIG_ID
    000001
    INST_ID
    00000001
    OBJ_TYPE
    MARA
    CLASS_TYPE
    300
    OBJ_KEY
    MATNR value
    QUANTITY
    Quantity value
    QUANTITY_UNIT
    Quantity Unit
    COMPLETE
    T
    CONSISTENT
    T
    OBJECT_GUID
    MATNR value
    PERSIST_ID_TYPE
    G
    ·         SALES_CFGS_VALUE:
    1.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    2.       We can have multiple characteristics for a material. In that case appropriate records should be inserted in this table. Note that CONFIG_ID and INST_ID should be same for all the rows you insert in this table for multiple characteristics for a material.
    3.       The characteristic value should be in SAP internal format.
    CONFIG_ID
    000001
    INST_ID
    00000001
    CHARC
    Material characteristics
    VALUE
    Material characteristics value
    ·         SALES_CFGS_VK:
    1.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    2.       We can have multiple characteristics for a material. In that case appropriate records should be inserted in this table. Note that CONFIG_ID and INST_ID should be same for all the rows you insert in this table for multiple characteristics for a material.
    CONFIG_ID
    000001
    INST_ID
    00000001
    VKEY
    Material characteristics

  • Create a production order with variant configurator data

    Hello,
    Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
    Is there several steps ?
    I have to create an interface which creates automatically PP orders. The data input is a file.
    Thanks for your help

    Hi,
    There are fews BAPI's available for creation of Production Order. They are:
    BAPI_PRODORD_CREATE
    This bapi will suit to your requirement, as input will be provided from file.
    Others are
    BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
    BAPI_PRODORD_CREATE_FROM_REF      " this creats production order considering other production order as reference.
    Hope your query is answered.
    Regards,
    Brajvir

  • Sales order with ref to make to order and with ref to make to production...

    My requirement is as follows:
    Material code : Plant specific and MRP activated
    In one sales organization  the sales order should be created without limitation and with make to order type with ref to above material
    Another sales organization the sale order should be created if stocks are available and with ref to make to production with above material.
    The availability check rule  as no check for first scenario and  Individual requirement for second scenario.
    can it possible ...........

    Hi,
       functionality of availabity check is it checks the material as per order if it is avialable then it confirms quantity & if not then u have to procure or manufacture.
      Mts scenario works for sales from stock while mto to generate requirement via purchase requisition ir plan order.
      however you can configure availabity check for both the scenario by selecting suitable checking group, requirement class, requirement type & schedule lines.
    Reward if it helps u
    Regards
    Dev kumar

  • BAPI/FM in ECC to create a sales order with variant configurable material

    Hi all,
    I need to create a function module that creates a sales order in ECC with a variant configurable material.
    can some one tell me if there is a in built function module or BAPI that i can make use of to create a sales order with variant configurable material in ECC.
    Regards,
    Jessica Sam

    Thanks MxG,
    I dont know how to use this BAPI. .Can you suggest me a sample code.
    My reqmnt is, i have
    Sold to party, ship to party, bill to party , VC config material and all char values that should be populated while creating a sales order.
    please help me with what values should i populate in i/p paramters and and how to use this BAPI with some sample code if posible.
    Regards,
    Jessica.

  • Sales Order with Variant Configuration

    I´m trying to create a Sales Order with Variant Configuration.
    First, I tried to create the order with the BAPI SD_SALESDOCUMENT_CREATE but It would not let me update characteristics.
    Then I separated into two BAPI's:
    SD_SALESDOCUMENT_CREATE to create Sales Order and  BAPI_SALESORDER_CHANGE to modify the characteristics.
    I run the two SAP BAPI's from SAP and create the Sales Order and make the characteristics correctly, but when I try to invoke from The Middleware the message  V1 555 The sales document is not yeat complete  is displayed and does not update the characteristics.
    Both functions are such as Remote-enabled Module.
    The remote user profile is SAP ALL
    Reviewing where the message is used, I see that the message is in the include MV45AF0B_BELEG_BEARBEITEN_ENDE
    IF DA_LINES> 0 AND
    SY-NE SPACE AND BINPT
    CTU_AMODUS BI_INFO-NA 'A' AND
    CATTAKTIV IS INITIAL.
    MESSAGE I555.
    ENDIF.
    Do you have any idea why since Middleware is not working?.
    Best Regards.
    Blanca Segovia.

    Hi Diwakar
    I changed the creation of Sales Order using only SD_SALESDOCUMENT_CREATE and using Commit Work and it is the same, running the function from se37 create the Sales Order and make the characteristics correctly, but when I try to invoke from The Middleware the message V1 555 The sales document is not yeat complete is displayed and does not update the characteristics.
    I Open that Sales order in VA02 and check 'Incompletion Log'  the screen show 1 Configuration, I Open the tab of the characteristics without changing the characteristics and only save, then the status changes to Complete document.
    You give me another idea that could be happening?
    Thank you very much.
    Blanca Segovia.

  • Process order with variant configuration material

    Hi,
    I create a process order for a material XX.
    This material has a BOM with a material that has variant configuration "class type 300" for price configuration.
    When I save the process order I get a message saying "There are still characteristics for components to evaluate". I dont want to evaluate this material in my process order.
    What can I do to not have this message?
    Regards.

    Hi all,
    Yes, I work with variant configuration. But sales orders are not involved.
    What I do is:
    1) I create a purchase order for material X (this material belongs to a BOM), this material has variant configuration. I give a value to the characteristics in the PO.
    2) I create a process for a material XXX that has a BOM (material X is in the BOM and cannot be removed).
    3) When I save the process order the system asks me to evaluate again the characteristics. This is what I dont want it to do.
    Any ideas?
    Regards.
    Eduardo

  • Overdelivery shipping for make-to-order production

    Hello,
    I have the following business scenario example:
    We have a make-to-order production of carton boxes.
    A customer places an order for 1000 UN.
    Production is always planned with an overdelivery tolerance so the actual produced quantity for that particular order is 1050 UN.
    The customer allows an overdelivery of 10% so it should be fine to ship the 1050 UN.
    When I create the outbound delivery, the system creates it for the exact sales order amount: 1000 UN, even though there are 1050 UN produced for that order and item. So right now, the user has to manually modify the delivery quantity to match the actual stock.
    Is there a standard way of configuring the system so that in the delivery creation the system selects the entire produced quantity (respecting the overdelivery tolerance)??
    Do I need a user exit for this? In that case, which one should I use and what would be the logic for it?
    Thanks for your help!

    Hi,
    Unfortunately there is no easy way to influence delivery quantity in delivery processing by user exit or customer function.
    At creation of an delivery FORM USEREXIT_BATCH_DETERMINATION in include MV50AFZZ would be the best option to influence the delivery quantity. Despite the name of this user exit it could be used for changing normal items as well and the main advantage of this user exit is that the ATP check is done afterwards.
    If you change the delivery quantity please be aware that you have to ensure the consistency of all delivery quantity fields at item level (LIPS-LFIMG, LIPS-LGMNG, LIPS-LFIMG_FLO, LIPS-LGMNG_FLO). You could use FORM LIPS_QUAN_SET (Include FV50XFLP_LIPS_QUAN_SET) to synchronize all the quantity fields.
    Regards,
    Harry

  • Configuration management (LO-CM) used with Variant configuration (LO-VC)

    Hi
    I am new to SAP, working with Variant configuration (LO-VC).
    I wish to enforce configuration management during development of a new Variant configurator.
    Would Configuration management (LO-CM) work together with Variant configuration (LO-VC)?
    My expectation is that SAP Configuration management (LO-CM) will work similar to solutions like e.g. MsVisualSourceSafe, SubVersion, CVS, IBM/Rational ClearCase etc. in the software development domain.
    best regards Henrik

    Hi Amber
    Thanks a lot for answer, and please apologize my late response.
    I am not confused by the term 'configuration', being used in two different meanings.
    (1) Variant configuration (VC) is the dicipline of creating product variants by making a set of choises from the characteristics describing the product. A complete and consistent set of choises is a 'configuration'.
    (2) Configuration Management in the 'traditional' software development meaning: Software Configuration Management (SCM). E.g. Microsoft VisualSourceSafe, IMB/Rational ClearCase, Subversion etc. are examples of tools used for the kind of SCM I wish to apply to VC models.
    My confusion is whether the SAP CM that I can read about in the SAP online help, is similar to traditional SCM, and whether it can be applied to VC models.
    I wish to apply SCM to a VC model. All the objects that together make up the VC model may then each exist in various versions (version control). A complete set of the objects (in a given version) make up a configuration of the VC model.
    What is achieved is : you can control the development of VC model in just the same way that all serious software is under the control of SCM. This will allow an evolution of the VC model, like e.g. version 1.0 is released in January, then version 1.1 is released in June. A major upgrade of the model may become version 2.0 in December etc. The 'source code' (the objects) of each of the versions can be retrieved at any time from the SCM system. Also with SCM several developers may work on the same VC model at the same time, and merge their individual work into the same model.
    This is very different from todays VC model development. In todays VC model development, only one version exists, that is 'todays version'. Any change to the model is released immediately, and you can undo model changes only if you remember what it was like a little while ago.
    We do develop and test VC models in one SAP system, and then move them to the production system. This is however still very far from the benefits of SCM.
    best regards
    Henrik Saugbjerg

  • Details about Master production Scheduling & Variant configuration

    1)  What are the steps for Master Production Scheduling (MPS)?
    2) What are the steps for Variant Configuration?

    Hi,
    MPS:
    With in your planning time fence (maintained in mat master ) , you will get firmed planned orders because your MRP Type P1 - P4 has firming type.
    And the firmed planned orders will not change after next MRP run.
    You have to set MRP Type p1 - p4. acc to firming type. in ur mat master.
    Then run MPS .It is generally for important products and it is run single level.Because it will not change your procurement proposals as it has firming type.So you get effective planning for your imp products.
    Variant configuration:
    Go to mm01 create a material and in bd2 view mark the check box material is configurable and then save the material and go to ct04 create chara.
    Go to cl01 and create class with class type 300 and assign the charac. to it
    Go to tcode cu41 create the profile using material code and assign the class to it
    then got tcode mm02 and assign the profile there
    Variant configuration material type is KMAT (SAP std), u can use this material type alternately u can mark the indicator in basic data 2 view ->client specific configuration->Material is configurable tick.
    For further reference, check the link below
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf

  • Sales order does not allow make-to-order production

    Dear Friends,
    I am trying to do do planned order for sales order in MD50 it was showing the error message as
    "Sales order does not allow make-to-order production"
    Can any one solve this
    Shakthi

    Hi Shakthi,
    It is also possible to set the priority for Requirement Type determination like
    0 Material master strategy, then item category and MRP type
    1 Item Category and MRP Type
    2 as 1, with check for allowed requirement type.
    The transaction for this is same as "Requirement Type Determination :
    Sales and Distribution --> Basic Functions --> Availability Check and Transfer of Requirements --> Transfer of Requirements --> Determination Of Requirement Types Using Transaction
    Look for "Source".
    In this transaction, Please, check "Requirements".
    Please, make sure of the following 2 things :
    1. If you do not set an indicator for maintaining the requirements class: Transfer of requirements is not carried out, irrespective of the specification you make at schedule line level for the transaction.
    So it is necessary to mantain the setting first at the Requirements Class. As mentioned in my earlier posts, the requirement class for the material can be found out from Planning Strategy / MRP3 view --> Main strategy (defined in the strategy group) --> Requirement Class for Customer Requirements.
    The IMG path for "Define Strategy" is Production --> Production Planning --> Demand Management --> Planned Independent Requirements --> Planning Strategy --> Define Strategy.
    2. Once the "Requirements" indicator is set in Requirement Class, the requirements indicator at the Schedule Line decides whether or not you require transfer of requirments for the relevant transaction.
    I hope this should solve your problem.
    Regards,
    Sandeep

  • Forecast Consumption in SNP for Make-to-Order products

    We are working on using APO-SNP for Make-to-order products (PlngStrategyGroup = "81" in R/3). We want to achieve normal forecast consumptino on FinishedGoodLevel and generate PlndOrders which shall derive component demand for purchasing (such PlndOrers wont be released to production - they should only function as demand driven on component level)
    What we have done so far: Forecast in APO-DP on Finished good level exists and has been released to SNP. The product gets "ciffed" from R/3 into APO material master with planning strategy group "20" (which is basically "make-to-stock") --> we were hoping this would allow us to use "normal" forecast consumption but nothing happens (FCST is not being consumpted by open Sales orders). Within the product view of such products APO is still "realizing" that this is a make-to-order product.
    Any other ideas / thoughts what could be done to achieve "normal" forecast consumption on FGI level for make-to-order products in APO-SNP ?
    Tks !

    I checked in /n/SAPAPO/RRP3 (Product View), unfortunately only FC exists there
    Seems that the open Sales Orders from R/3 are being created within another segment (the "element" Tab of RRP3 shows 2 segments:
    1) "Make-to-stock" (which contains the FC)
    2) "Make-to-order" (which contains the Sales Orders)
    That might explain the issue I see (FC and SOs are in different planning segment --> no consumption). Reading about planning segments in the help sounds like I need to find a way to bring Sales Orders for Make-to-Order products into the Make-to-stock segment  ... jus a thought .. any idea how to do this ? Does that mean I need to modify the CIF for Sales Order transfer for Make-to-order products ?
    Tks
    Thomas

Maybe you are looking for

  • What questions do I need to ask the IT department?

    My employer recently set up wireless access for our whole campus, and I'd like to be able to connect to it with my MacBook. This isn't a hack job - I'm fully authorized to access the network. My problem is just that when I called the Help Desk to ask

  • Premiere Pro CC speedchange when rendering effects

    Why does Premiere Pro CC keep changing the speed of my clips when I render them? But only those have effects on them like Auto-Color etc. The 720p 120fps footage comes from a GoPro Hero 3 Black Edition. If I add an effect to a clip, when renderering

  • Deficit of PU IR Quantity 12960.000 EA

    Hi SAP Gurus, While the user tried to cancel the material doc, the system threw the following error message. Please help me with this. How to carrout this . This is actually for the movement type 102 - GR for PO reversal error: deficit of PU IR Quant

  • Can't login after time machine restore

    Had a new drive fitted today on my 27inch iMac. Got it home and restored all my data from my time machine backup. Now I am trying to log in and my password does not work. Any ideas anyone. Using MountainLion Best regards Phil

  • MP620 unsupported by Leopard?

    I have the MP620 canon. I used it fine with Tiger. Now that I upgraded to Leopard it says its unsupported. Is there a way around it? The printer is connected to a PC I never had problems printing wirelessly from my macbook. Need to print asap