Make-to-Order with Different Plant

Hi Experts,
I'd like to know how to implement business scenario of make-to-order but delivering plant (in Sales Order) is different with manufacturing plant (in Process Order). My client has material locking problem (huge batch records) so that my client wants to create new plant for delivering plant in order to minimize material locking problem. Is this scenario possible?
I have set parameter 'Share Lock' but it does not work to solve material locking problem. Batch level is set in material level.
Hope anyone can give me tricks or experience.
Best regards,
Heydarul Humam

Hi,
     In OID2 -> In Application area O , For same order type assign different shop papers ..,
     After doing config in OID2 , In Application area O , these shop papers wil be be avaialble for assigning to planning plant, planner group in OID3 .. , here assign each of these shop papers to different planning plant ..,
Now in IW32 system checks combination of order type to planning plant and defaults shop papers while printing ..
Note :-  Here , If a particular shop paper is not assigned to an order type in OID2 , then u cannot default in printing via IW32 .for that order type and any planning plant ..
check it up
regrds
pushpa

Similar Messages

  • Can we give 2 materials existing with different plants in 1 Sales order

    can we give 2 materials with different plants in 1 Sales order

    Hi dear,
    In that Case : u can create a single delivery...... AS the ccriteria for delivery split as per standard are
    1. ship-to-party
    2. shpping point
    3. route
    4. incoterms
    5. transportation zone
    Thanks,
    Raja

  • Sales order with different Distribution channels

    Hi experts,
    how can i create a sales order with different distribution channels.
    I mean item level 10 = one distribution channel.
    Item level 20 = another distribution channel.
    also in Item level 30 also.... is it posible .?? how can i create ??
    because we have the material in different distribution channel in differen plant with different price ..
    Thanksin Advance,
    Anthyodaya.

    Hi Anthyodaya,
    As already answered by others, the distribution channel is only on header level(VBAK), so it is not possble to have different distribution channels in one sales order.
    Could you please consider using different division?
    Item division could be different than header.
    Go->item->Sales B->Division
    Hope it helps.
    Best regards,
    Smile

  • Single invoice for multiple orders with different divisions

    Dear All,
    while I am trying to do single invoice for muliple orders with different divisons invoice is gettting splitted..In copy control vbrk routine I  tried with 003 and 007 etc..but result is same..what configuration need to be done for getting the single invoice
    Thanks In advance
    Regards
    CNRNAIR

    Hello
    single invoice for multiple orders with "different divisions" invoice is getting split
    FYI - Different Division means different Sales Area.
    So, sales doc (whether sales order, Delivery & Billing) is applicable to EXACTLY one sales area.
    Thus, combining docs with different sales area is practically impossible.
    Provided, you are using common division.
    Hope this assist you,
    Thanks & REgards
    JP

  • Multiple Orders with Different reasons on a Single day

    Hi,
    I am recently learning Device Management of IS-U Electricity. Now I have a problem with meter reading orders generated at the time of periodic meter reading with reason 01 and different system generated orders with reasons like 22, 21 , 16 and 11 which are the orders get created internally based on device replacement and modification.
    If the scheduled meter reading date lies on the day or the day before of device replacement or modification, the meter reading for the periodic order is getting prorated based on the meter reading entered at the time of replacement or modification. This is what I dont want.
    Is it possible to have multiple orders with different reasons on the same date? Any configuration changes are welcome.
    - Arghya

    Hi,
    You can acheive this using following config changes.
    SAP Utilities --> Device Managment -->Meter Reading --> Meter Reading Order -->Order Creation --> Define Automatic Interpolation for Meter Reading Reason.
    Uncheck  the 'Auto Interpolation' flag for Meter Reading reason 01.
    This will not use the Replacement or Modifiaction read.
    Let me know if anything more is reuiqred.
    Thanks and Regards,
    Ranjit Thakur.

  • Is it possible to make an order with danish keyboard and documentation

    Hallo
    I need a computer with danish keyboard so my question is
    Is it possible to make an order with danish keyboard and documentation
    Jesper Nielsen

    You can give each track its own artwork. iTunes will normally display the artwork of track 1 in album listings. The individual track art will show in the small window at the top of the screen when playing, or the artwork panel of the mini player, or the now playing window on a device. Try it and see.
    tt2

  • Standard Rush Order with multiple plants

    Hello gurus,
    We just upgraded to 6.0 from 31I and when creating a
    rush order with multiple plants the first item's delivery
    does not contain a ship-to party were the second item's
    delivery does.  Table VBPA does not have a record for the
    first delivery but the second delivery is there. This did not happen in 31I.
    Please advice.
    Best Regards.

    hello, Ruben.
    hhmmm.  your table XVBPA looks like a created table that is not SAP standard.  i am not an ABAP person so i could not pretend to give you good advice, but i (my speculation only) suspect that there was a user exit or an ABAP program that made the system do the postings to this table instead of the standard VBPA.
    i further speculate that during the upgrades, some of the enhancements may have been lost or diverted.  (to prevent this, you usually use the 'Z' naming convention, which is to have this letter as the start of any name for an enhancement or definition outside of SAP standard)
    your best bet is to try getting an ABAP consultant (or are you one already?) to help you look at this.
    regards!

  • Sales Order with different sold to party & ship to party

    Hi experts,
    We have one sold to party customer code DE0009 .  There is no other ship to party code assigned with this customer in the masters. but still user can make Sales order with Sold to party DE0009 & another ship to  party code ( DN0020 ) which is not assigned.
    Ideally , system should restrict it .
    Please guide us how to control.
    Regards,
    ( Rajneesh Gulati )

    Hello Rajneesh Gulati,
    Ship-to party doesn't have to be assigned to the sold-to party in the master data.
    You can kindly refer to Note 380507 which can provides you with more info.
    Best regards,
    Miri Shimony
    Solution Management
    Globalization Services

  • Make To Order With Credit Check.......

    Dear Expert,
    Could i know about Automatic Credit Check-Static and Make to Order with Credit Check...
    Thanking you,

    hi
    in simple credit check it considers only the current sales order with the value assigned to the customer
    but in automatic credit check we have two types
    1. Static: it compares the value assigned to the customer with the value of open sales orders + value of open delivery documents + value of open billing documents + value of billing doc's posted into accounting but for which we have not recieved the payment..
    2. Dynamic : the way of calculation is the same as static but the difference is we have horizon in dynamic credit check
    Example:  in static all the open doc's will be considered for credit check
    but in dynamic if i give the horizon as 2 months
    sales orders for which the delivery date falls after two months will not be considered
    similarly delivery doc's whose billing date is after 2 months will not be considered..
    etc
    even though its a make to order it will be processed using doc type OR
    you assing the credit group to the sales doc
    that is suffecient
    hope this helps
    regards
    ravi

  • Does Premeire Elements 11 make a slideshow with different background themes?

    Does Premeire Elements 11 make a slideshow with different background themes?

    Em Smither
    Do you actually have Premiere Elements 11 Windows at this time? And, have you used any prior version of the program? I ask so that I van gauge how deeply to go into different aspects of the program. So, please excuse if I generalize now on matters that you already are aware of.
    Premiere Elements is a video editor that will support the use of your own stills and video and music on its Timeline tracks to export to file or
    burn to disc.
    The Instant Movie can be broken apart once created. And,that Instant Movie feature is editable, leaving components that you want, adding others, and removing others, and you can include your own music in it.
    But if you prefer to start from the beginning you can import your photos and music and then add your own assets to the tracks..title templates, backgrounds, etc probably along the line of what one of those Instant Movies would be aimed at. But, I do not see a choice for selecting a particular theme for the slideshow other than that. However, there is an opportunity to select a theme for the disc menus if the export is a burn to disc or part of the webDVD feature.
    Did you have in mind, something like placing a theme based background on Video 1 and then on upper tracks directly above scaling your photos so that the background can be seen around them?
    Please let me know if I am still not targeting your question.
    Thanks.
    ATR

  • How to generate SNP planned order with different category

    Our SNP system receives Forecast and Salse Order from DP system.
    and we'd like to generate SNP planned order with different category..for example, 'AI' for Forecast Demand and 'AL' for Sales Order..
    currently, If we run CTM, system generate SNP planned order with the
    same category 'AI'..
    another system(APS) in Our company receives planned order from SNP
    and they want to receive planned order for forecast and planned order for sales order seperately..

    It is not directly achievable however can be done through BADIs and two CTM profile. I am assuming that sales orders are planned ahead of Forecast demands. So have two CTM profiles - one for Sales Orders (regenerative mode) and the other for Forecast Demands (net change mode). You may have to invoke two BADIs in the first run for Sales Orders - one that changes master data by putting a temperory Forecast Horizon in SNP2 tab (BADI /sapapo/ctm_matloc). The other BADI (BADI /sapapo/ctm_orders) changes the ATP category just before saving. in the second run though you just need to run the latter BADI by saving it in the ATP category required. BADIs can be invoked based on CTM profiles used.

  • Make-to order with production in alternative plant

    Hi,
    We are thinking about implementing a scenario with Make-to Order production for our products, but with production in alternative plant (special procurement type 80).
    For example, sales orders will be directed to plant A, but production should take place in plant B - and using a make-to order strategy (in our case planning strategy 50 - planning without final assembly).
    Is there any problems with our approach, making it not feasible to implement? Is it even possible in SAP to combine MTO with special procurement key 80 (production in alternative plant)?
    Is there any other issues that can be foreseen with using this type of production strategy?
    Thanks in advance,
    Lars

    Hi,
    The production strategy which you are going to use is very fine.
    As per me there is one concern. Example you have created a sales order in Plnat A, in plant A that FG is handling through Special procurement 80, then in the MRP run system will be creating a planned order in Plant B without running MRP in plant B. In MD04 screen you can see planning plant as Plant A. In plant B, u r converting this planned order in to Production order and executing the production. While doing the GR against the production order, the goods receipt will happen directly in Plant A.
    This is the one problem (Accountability)  you can face.
    Regards,
    V. Suresh

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • Service order operations with different plants

    Hi,
    We would like to use different plants in our operations for service. This works fine but at certain operations we have set components (with backflush). While processing the service order these components receive the service order planning plant where it should be the plant mentioned in the operation.
    The reason why we would like to use different plants is because the material that has to be repaired will pass through those different plants. (or should we just create multiple service orders ?)
    Example :
    Task list created in plant 001 :
    Operation A plant 001 with component Y
    Operation B plant 002 with component Z
    The service order is created in planning plant 001 and when you go to the component tab, the plants of component y and z are set to plant 001 where it should be component Y --> plant 001 and component Z --> plant 002.
    Is setting the plant for components equal to the planning plant, standard behaviour ? (can't find anything to change this)
    Do i have to achieve this with a user exit ?
    with regards

    Hi dear,
    In that Case : u can create a single delivery...... AS the ccriteria for delivery split as per standard are
    1. ship-to-party
    2. shpping point
    3. route
    4. incoterms
    5. transportation zone
    Thanks,
    Raja

  • BOM line item with different plant than header item.

    Hi friends,
    Can we have different plants for BOM child items?
    For example,BOM is created for plant 1000 with 5 sub items. when sales order is created BOM expodes with 5 sub items with plant 1000 because BOM is maintained for plant 1000.
    do we make any settings that line item should pick other than plant 1000?
    Please let me know is it possible in standard SAP? if not, how can we acheive it?
    Thanks in advance for your solution.
    Regards,
    Ravinder

    Ravinder Reddy ,
    Scenario 1:
    I have tried this scenario, I am having one header material (plant 1000). I have created one sub material 1100001 of plant (1000) and another material 340771 (Plant 2000) and i have assigned Item Category = N then i entered qty for ist item =1
    it is throwing an error. "Material 340771 not maintained in plant 2000." at sub item level
    Scenario 2:
    In another scenario, if  I am having one header material (plant 2000). I have created one sub material 1100001 of plant (1000) and another material 340771 (Plant 2000) and i have assigned Item Category = N then i entered qty for ist item =1
    It is throwing an error "Material 1100001 not maintained in plant 2000."  at hedaer level
    Scenario 3: I have extended the materials for both the plants
    Here i am entering the material header material 12345 (plant 2000). I have created one sub material 1100001 of plant (1000) and another material 340771 (Plant 2000) and i have assigned Item Category = N then i entered qty for ist item =1
    It is picking up...
    Material has to be extended to the plants that you are using let it be at sub item level or header level. Material has to be extended.
    Regards
    Sathya

Maybe you are looking for

  • How to - correct episode order within the Remote App

    Recently I found that when i was using the Remote App to control my iTunes Library, all my TV Show episodes where in alphabetical order instead of episode number order. after searching on how to solve this and speaking with Apple Support (who couldn'

  • What's the best practices for mirroring a (symetric) vector design?

    ok, say I'm making a detailed user icon (persons head and shoulders) for some icons, etc that need to scale from icons to general graphics for web and print. I can create the silhouette easily by tracing around my pencil sketch or making it up on the

  • Using attributes from another entry type

    Hey experts, use case: there are multiple departments within the company. Each department has it's own folder in Active Directory where users are stored for that department. When a new user is created in IdM and send to AD he should be created in the

  • Help using /AFS/BAPI_PO_CREATE with multiple schedule lines

    I'm using /AFS/BAPI_PO_CREATE to create POs and everything works fine until I pass an item with multiple schedule lines.  When you pass multiple schedules it is giving each of the schedule lines under an item the same grid value!  So if I want to ord

  • Automating meta data changes

    Hi. This is my first time trying to automate something like this, so any help is greatly appreciated. I have about 1000 jpeg files and a text file that lists each file name followed by a title, date, etc... I am looking for a way to automatically wri