Make to order with Prod version with object depedency

I m using 2 production version. In both case BOM & Routing having object dependency. Its make to order scenario. How can I select prod version in costing as well in configuration in sales order. Because by default its taking first version for both configuration & costing.How??
And if I select second version in sales order, in prod order it should automatically take second version. How??
Thanks
varun

Hello Varun,
If you have two valid production versions for a part then by default system take the first available production version. You have give some selection criteria through quota arrangement.
In ck11n you have the option for selecting the vesion in the quantity structure tab so i think there will be no problem for costing.
For selection of production version in the production order you have work with planning strategy 82. Or incase of MTO (strategy 20) run MRP from MD50...your assigned production version in sales order will be planned.
If helpful rewards your points
Regards
TAJUDDIN

Similar Messages

  • Make to order availability check scenario with production order

    We have a make-to order scenario where we build custom products for our customers.
    In SAP, we specify a strategy group so a production order is automatically generated when an sales order item is entered. However, we sometimes create a small amount of stock, in anticipation of an order. I would like the system to first check available stock in the system, beofre proposing a production order.
    Is something like thi spossible thru configuration of the strategy group, or perhaps another method?
    Regards
    Ken

    Hi,
    In SPRO->Sales and Distribution->Basic Functions->Availability Check and Transfer of Requirements->Availability Check->Availability Check with ATP Logic or Against Planning->Carry Out Control For Availability Check
    Select the Availability check and the Checking rule  combination of intrest and if you select the details,here you define that stocks that are to be considered during availability check.

  • Make-To-Order MRP for components with unstricted-use stock

    Dear Experts,
    There is a finished goods of material with standard planning strategy group "20" in the material master.
    There is a component e.g. material A, under the BOM of the FG material.
    There is already enough unrestricted stock for material A which has no special stock indicator assigned.
    After creating the sales order,  I use MD50 to run the make-to-order MRP, but the result shows that there a purchase requisition has been generated for the material A with the sales order assigned and specail stock indicator = "E".
    Is there any solution so that there will be no PR generated for mat A as there is enough unrestricted-use stock.
    And in the production order of the FG, can the component only requires the unstricted-use stock instead of the "E" stock?
    (It is ok for the FG goods receipt as "E" stock.)
    Thanks a lot.

    Hi Ram,
    Thanks for your information. 
    I set the indi/coll = 2 and null for the strategy for the component material A
    Just want to know, which strategy should I use for the finished goods?  And any other setting for the finished goods and the component?
    And which transaction MD02 or MD50 for the planning run for the finished goods?
    In such setting, after the planning run , PR will be generated for the net external procurement?
    Actaully my situation is that I just keep own stock for components, I want MRP to consider the own stock instead of sales order stock before generating PR.
    Thanks for your help again.
    Claude

  • HT1414 ipod cannot be updated with new version with error message says ipod software could not be contacted

    Cannot transfer book purchased from itunes store to ipod
    Tried to update ipod sowtware but fails with error message cannot contect to ipod server

    Update Server
    Try:
    - Powering off and then back on your router.
    - iTunes for Windows: iTunes cannot contact the iPhone, iPad, or iPod software update server
    - Change the DNS to either Google's or Open DNS servers
    Public DNS — Google Developers
    OpenDNS IP Addresses
    - Try on another computer/network
    - Wait if it is an Apple problem

  • Want to create Document new version with BAPI_DOCUMENT_create2

    Hi,
    I want to create a document with new version with the help of existing document in DMS. In my development of module pool
    i can add new file and also i can create new version of existing document. all this i can do from my Z-development.
    When on initial time when there is no dicument exist BAPI creating new document correctly with attached files. also i am able to create a new version of that document if i am excuting applicatin from my PC. if this appication run from another system to generate new version BAPI is giving me Error.
    i am passing below data in DOCUMENTFILES(table parameter of BAPI) for existing File which is available already in older version.
    DOC_HEADER-DOCUMENTTYPE = 'ABC'
    DOC_HEADER-DOCUMENTNUMBER = '456'
    DOC_HEADER-DOCUMENTVERSION = '00'
    DOC_HEADER-DOCUMENTPART = '000'
    FWA_DOCFILE-STORAGECATEGORY = 'ZDMS'.
    FWA_DOCFILE-WSAPPLICATION = PFX_EXT.
    FWA_DOCFILE-DOCPATH = F_FILEPATH.
    FWA_DOCFILE-CHECKEDIN = ''.
    FWA_DOCFILE-ACTIVE_VERSION = 'X'.
    FWA_DOCFILE-DOCUMENTTYPE = WA_COMDOC-DOKAR.
    FWA_DOCFILE-DOCUMENTNUMBER = WA_COMDOC-DOCNR.
    FWA_DOCFILE-DOCUMENTPART = WA_COMDOC-DOKTL.
    FWA_DOCFILE-DOCUMENTVERSION = WA_COMDOC-DOKVR.
    FWA_DOCFILE-APPLICATION_ID = WA_DOCFILE-APPLICATION_ID.
    FWA_DOCFILE-FILE_ID = WA_DOCFILE-FILE_ID .
    FWA_DOCFILE-DOCFILE = F_FILENAME.
    APPEND FWA_DOCFILE TO FIT_DOCFILE.
    I am passing all those data which i am getting from BAPI_DOCUMENT_GETDETAIL2 for existing attached file. Need help.

    use BAPI_DOCUMENT_CREATENEWVRS2 ..

  • MTO Sales order is NOT a COST OBJECT

    Hi All,
    I'm working on MTO process and i have some question.i would like to clarify MTO process.
    If we are using Valuated MTO process and Sales order is NOT a COST OBJECT
    1.Are we going to run material cost estimate for MTO materials?
    2.How can i configure or make Sales order is NOT a Cost Object?
    3.If Saleso order is not a cost object,how production order process will work from controlling point of you?are we going calculate WIP on production order and WIP is settled to sales order or FI/PCA?
    4.Once production order is complete,Goods Receipt will post to Inventory or Sales order stock?
    5.Once production order is complete,we are going to calculate variance on production orders?
    Any help is appreciated...
    Thanks,
    Anusha

    Hi,
    When the MTO is created from sales end it will create the Planned order then it will convert to Production or Process order.
    Once the production do GR or confirm Produced QTY the stock will go to Sales stock not to inventory stock.From there the sales can do PGI to customer.once PGI has done the account entry for the customer account will take place automatically.
    Once the production completed the Production order need to calculate for the variance & the Settlement need to be done for the production order against the Material which you produced & sale to customer.The difference & variane amount will post to Price difference & moved to Product cost of the material automatically & COPA entry will be done automatically.
    The MTO Material need to run for the Cost estimate also.
    The WIP can be calculated & difference can be posted against the production order & the material which you produce.
    The Process is same as the Make TO Stock scenario.Only the difference is the Production will get generate automatically when the MTO order get created & the stock will post to sales stock automatically.Rest the CO part is same as MTS scenario.
    Regards,
    Raj

  • Planned Order, with first Prod Version.

    Dear All,
    I am Trying to use Production version for diffrent style of Production Req for same product.
    When i Gave PV in MD61, for diff days, diff PVs,
    Is is not reflecting in PLanned ORders.
    Planned Order have only one PV. for all RIRs.
    Kindly let me know the,
    Where cud i miss .
    In MRP 4 Selection is 3,
    Ind/Coll : 1
    Stratgy :40
    Regards
    Raghu

    Raghu,
    1)check material master selection/explosion  of BOM is always by by production.
    2) lots size should not have oevrlapping.
    3) and you cant create PIR in same period with differnt versions.
    4)You might want to check whether the In-house Prod Time in Material Master has been maintained. I would think that this is the cause of the inconsistencies.
    By right, if you run MRP by lead time scheduling, you don't need to enter the In-house Prod Time in MRP 2 view, because MRP will calculate the prod time by using your routing data.
    5)Message no. MD425 ,
    Please check the routing for all level in CA02 and do the consistance check through CA02ExtraConsistance check.
    6)The error is talking about the Scheduling Master data.
    What was the scheduling type selected during the MRP run
    Basci scheduling: make sure the In house production data in material master is maintained.
    Lead time scheduling: make sure the Scheduling data in routing is maintained properly.
    7)Check the setting of *OPU5 *check the selection ID and also check setting in OPJH. And also check routing selction id COR4 . Also check the status usage and validity date of routings
    another thing is , please describe what exact results you are expecting.
    Regards
    Ritesh

  • Problem with prod. ver. explosion to production order

    Hi
    I have problem with production versions. I have FERT with 3 production versions. Additionaly we have Z-program (on Z-table) which control parameter sold to party (from sale order) with production version. So after MRP I see in planned order right production version for example 3 - field PLAF-VERID; in master data in planned order I see right alternative BOM and routing; but when I make a conversion to production order I see that system always explode 1st version; additionaly in planned order in components (button)  I see 1st pr.ver (1st alternative BOM) and in Bill of Material (it seems like to manually expolding BOM) I see right version??? But it couldn't be like this that to have right data I need to go to transaction MD12, explode BOM manully, save and after that make a prod. ord.
    I would like to system explode BOM according to production version (field VERID) already in planned order; so after that it should be that when I will converted it to production order I should have right BOM and right routing from production version signed in planned order.
    I know it sounds complicated Add. in configuration all parameters are set right to explode BOM etc. etc. system version: 4.7
    Thanks and regards. Joanna
    Additional info: I cancel this question cause problem is in Z-program; becuase when according to Z-table system change input in field VERID for system it is only "digital" not parameter for which system should explode right BOM; sorry for disturbing, we need to change Z-programm; I do not know how but maybe any function module can help - we will think. Regards
    Edited by: Kostkaj on Aug 17, 2010 10:25 AM

    HI
    Check this link and find valuable suggestion by Mr Mangalraj regarding selection of PVs
    Produciton version selection in MRP
    Regards
    Anupam Sharma

  • Make to order and stock both in one material with consignment

    Hi Seniors
    FERT Material = XYZ which is being used for Make to Order and Make to stock both.
    In case of make to stock  scenario from GR u2013 101 and PGI made @ std price. At the time of Consignment 631 mvt. No accounting document is generated. As per my knowledge its fine. No issue.
    In case of Make to order scenario for above material.
    Q.1   At the time of goods receipt (101 Mvt) from production order,  accounting document is generated at the rate of Per unit target cost of production order and no variance shown on production order. Why not accounting document is created at Std price of Material?
    Q.2 At the the time of consignment an accounting document generated with following entry.
        Finished Goods Inventory      Dr
        Price difference                   Dr             
                        Finish Goods Inventory Cr
    Why accounting document is generated at the time of consignment in case of make to order scenario?  Pls confirm is this a sap standard behavour or anything wrong with me. As I told earlier that in case of make to stock when we make 631 mvt there is no accounting document generated.
    Note: My standard price is on the base of mix costing using two production versions.  Every time we create production order in each version.
    Regards
    Imdad

    Hi Imdad
    Q1: Why not accounting document is created at Std price of Material?
    Check your req class... There is a Field called "Valuation"... your valuation depends on whether you select M or A there... You can decide to valuate based on CK11N std cost estimate or based on Sales order cost estimate / Prod order cost estimate
    So, in a nut shell, you can configure the system to generate acc doc at CK11N Std cost also
    Q2. Why accounting document is generated at the time of consignment in case of make to order scenario?
    In my opinion, your MTO stock is maintained in Table EBEW.. Pls check that... WHen you do GR from Prod order, it resides in EBEW table..
    However, when you send it as a cons stock, the link to sales order is lost and your stock is no longer a MTO stock.. Hence, it is valuated at CK11N Std Cost.... If there is a diff between CK11N cost and GR Price, then PRD is generated... Thats why you are seeing PRD in your case
    BR, Ajay M

  • I used migration to send photos form my Mac Book to my I Mac now i get an error message "iPhoto can not be opened because of a problem"  Check with the developer to make sure iPhoto works with this version of Max OSX.  You may need to install any availabl

    I used migration to send photos form my Mac Book to my I Mac now i get an error message "iPhoto can not be opened because of a problem"  Check with the developer to make sure iPhoto works with this version of Max OSX.  You may need to install any available updates or reinstall IPhoto.
    I tried installing Iphoto it said it was downloaded successfully. I still get the error messafe, and can not open any photos of program,  any suggestions?

    What version of iPhoto do you have on the Macbook and on the iMac? What systems are you running on the Macbook and on the iMac?
    Does the message only refer to "a problem" or does it specify what it is?
    Happy Holidays

  • They sent me a serial number for a windows version of PS Elements when I ordered a mac version.  The serial number doesn't work, not surprisingly, but they don' t seem to care.  I have tried the chat line and have waited for almost a day with no response.

    They sent me a serial number for a windows version of PS Elements when I ordered a mac version.  The serial number doesn't work, not surprisingly, but they don' t seem to care.  I have tried the chat line and have waited for almost a day with no response.  What should I do?

    Look here
    Order product | Platform, language swap

  • Sales order with ref to make to order and with ref to make to production...

    My requirement is as follows:
    Material code : Plant specific and MRP activated
    In one sales organization  the sales order should be created without limitation and with make to order type with ref to above material
    Another sales organization the sale order should be created if stocks are available and with ref to make to production with above material.
    The availability check rule  as no check for first scenario and  Individual requirement for second scenario.
    can it possible ...........

    Hi,
       functionality of availabity check is it checks the material as per order if it is avialable then it confirms quantity & if not then u have to procure or manufacture.
      Mts scenario works for sales from stock while mto to generate requirement via purchase requisition ir plan order.
      however you can configure availabity check for both the scenario by selecting suitable checking group, requirement class, requirement type & schedule lines.
    Reward if it helps u
    Regards
    Dev kumar

  • Make-to order with production in alternative plant

    Hi,
    We are thinking about implementing a scenario with Make-to Order production for our products, but with production in alternative plant (special procurement type 80).
    For example, sales orders will be directed to plant A, but production should take place in plant B - and using a make-to order strategy (in our case planning strategy 50 - planning without final assembly).
    Is there any problems with our approach, making it not feasible to implement? Is it even possible in SAP to combine MTO with special procurement key 80 (production in alternative plant)?
    Is there any other issues that can be foreseen with using this type of production strategy?
    Thanks in advance,
    Lars

    Hi,
    The production strategy which you are going to use is very fine.
    As per me there is one concern. Example you have created a sales order in Plnat A, in plant A that FG is handling through Special procurement 80, then in the MRP run system will be creating a planned order in Plant B without running MRP in plant B. In MD04 screen you can see planning plant as Plant A. In plant B, u r converting this planned order in to Production order and executing the production. While doing the GR against the production order, the goods receipt will happen directly in Plant A.
    This is the one problem (Accountability)  you can face.
    Regards,
    V. Suresh

  • When trying to open Pages 4.0.1 I get a message stating "Pages cannot be opened because of a problem, check with the developer to make sure Pages works with this version of Mac OS X. You may need to reinstall the application." Using OS X 10.6.8

    When trying to open Pages 4.0.1 I get a message stating "Pages cannot be opened because of a problem, check with the developer to make sure Pages works with this version of Mac OS X. You may need to reinstall the application. Be sure to install any available updates for the application and Mac OS X."
    I've run the software update several times. Pages is located in my iWork '09 folder in Applications. Using OS X 10.6.8

    Delete and reinstall it.
    (104030)

  • Is it possible to make an order with danish keyboard and documentation

    Hallo
    I need a computer with danish keyboard so my question is
    Is it possible to make an order with danish keyboard and documentation
    Jesper Nielsen

    You can give each track its own artwork. iTunes will normally display the artwork of track 1 in album listings. The individual track art will show in the small window at the top of the screen when playing, or the artwork panel of the mini player, or the now playing window on a device. Try it and see.
    tt2

Maybe you are looking for

  • StreamCorruptedException : invalid Type Code AC .. In case of a network app

    Hi I am developing a peer-peer application here. What i have is a client and a server on each user, both running parallell. User A sends an object to User B through an ObjectOutputStream through the main thread. User B reads it using an ObjectInputSt

  • How to close AP invoice with zero balance

    Customer created payment on account before creating the AP invoice. Then they created the AP invoice and applied the partial payment on account to the invoice, leaving an open balance. They created an AP credit memo for the balance. They did a BP rec

  • MOV-Files: Syncing out of Apetture - No Syncing with Connection Kit - Yes

    Hi, I have a Lumix LX3 and videos taking by the cam won't sync to the ipad via itunes/aperture. When I import the video files with the Camera Connection kit everything works fine. So there is no different in the format of the video. Why doesn't it wo

  • How to use customized exception

    Hi all, I have a problem using struts-action-mappings. I have a method for update in my app module, and i'm using that method with data action. In that method, I have to throw my customized exception to user if there is error. I just don't know how t

  • Give me a hand please!!

    I have applet running in my webpage, and I'd like to keep track of how often it downloads by client user and how long s/he runs it. it is possible for applet to write in a file at the server and how. how can implement this function?